ROADWORKS SUMMARY
Southmead Road, LONDON, SW19 6SR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Southmead Road, SW19 6SR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southmead Road, LONDON, SW19 6SR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southmead Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lower Teddington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Amyand Park Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Meadlands Drive

London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
13 Dec 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 08:59.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:24.

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct 2024 and 9 Jan 2026
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 9 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:26.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 5 Aug 2026
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out roadworks on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 5 August 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 18:13.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 06:37.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
31 Mar and 24 Oct 2025
Details
View Map
Share
Eaton Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 6 May 2025 at 10:52.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 12:09.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Kirtling Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:15.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 10:05 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 Aug 2025 at 11:20.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

Cadent Gas logo
LONG TERM
Until
6 Mar 2026
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 14:30.

Cadent Gas logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are carrying out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 10:33 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:20.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:44.

Thames Water logo
LONG TERM
Until
1 Dec 2025
Details
View Map
Share
Follow
Kensington Gore

Thames Water are carrying out Utility repair and maintenance works on Kensington Gore, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 June 2025 at 13:30 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Until
18 Oct 2025
Details
View Map
Share
Follow
Wakehurst Road

Southern Gas Networks are carrying out roadworks on Wakehurst Road, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 13:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 14:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 07:55.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 08:00 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Oct 2025 at 10:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:03.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Sep 2025 at 16:01.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

London Borough Of Wandsworth logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 08:00 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 09:33.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:53.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:54.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Jun 2025 at 12:54.

Cadent Gas logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are carrying out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 March 2025 at 08:27 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 10:30.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are carrying out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:30 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 06:36.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Between
5 Aug 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

LONG TERM
Between
11 Aug 2025 and 17 Jul 2026
Details
View Map
Share
Kingston Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:31.

LONG TERM
Between
11 Aug 2025 and 17 Jul 2026
Details
View Map
Share
Kingston Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:32.

LONG TERM
Between
11 Aug 2025 and 17 Jul 2026
Details
View Map
Share
Cambridge Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 17 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 07:31.

Thames Water logo
LONG TERM
Between
12 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 16:08.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 10:29.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:36.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are carrying out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:43.

London Borough Of Lambeth logo
LONG TERM
Between
1 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 07:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 07:58.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.

London Borough Of Lambeth logo
LONG TERM
Between
2 Sep and 1 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.

BT logo
LONG TERM
Between
3 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Queenstown Road

BT are proposing to carry out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 28 Aug 2025 at 08:07.

BT logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Queenstown Road

BT are carrying out Utility repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 10:04 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2025 at 15:55.

Thames Water logo
LONG TERM
Between
8 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Ambrosden Avenue

Thames Water are proposing to carry out Utility asset works on Ambrosden Avenue, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 08:04.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

National Highways logo
LONG TERM
Between
11 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:16.

National Highways logo
LONG TERM
Until
29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 22:00 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Sep 2025 at 10:01.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:21.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:53.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:22.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Alexandra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexandra Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:55.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Guildford Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 14:59.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Sep 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Cheyne Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Cheyne Hill, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 10:36.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Cheyne Hill

UK Power Networks South Eastern are carrying out Utility asset works on Cheyne Hill, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:58 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:20.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Sep 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Burney Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Burney Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 10:37.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Burney Avenue

UK Power Networks South Eastern are carrying out Utility asset works on Burney Avenue, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:51 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:19.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Sury Basin

UK Power Networks South Eastern are carrying out Utility asset works on Sury Basin, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:45 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:03.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Sep 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Eversley Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Eversley Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
Eversley Road

UK Power Networks South Eastern are carrying out Utility asset works on Eversley Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:55 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:20.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are carrying out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:47 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:07.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Sep 2025 and 12 Feb 2026
Details
View Map
Share
Follow
King Charles Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on King Charles Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Feb 2026
Details
View Map
Share
Follow
King Charles Road

UK Power Networks South Eastern are carrying out Utility asset works on King Charles Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:50 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:19.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Hawkes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 14:42.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:11.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Larkhall Rise

Thames Water are carrying out Utility repair and maintenance works on Larkhall Rise, Clapham Town, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:00 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 08:53.

National Grid Electricity Transmission logo
Finishing
Wednesday
Details
View Map
Share
Follow
Magdalen Road

National Grid Electricity Transmission are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 10:30 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 29 Sep 2025 at 12:23.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Ambrosden Avenue

Thames Water are carrying out Utility asset works on Ambrosden Avenue, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:58.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

London Borough Of Hammersmith & Fulham logo
Finishing
Tuesday
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 08:00 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 Oct 2025 at 14:42.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Follow
Woolneigh Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 09:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
19 Sep and 20 Nov 2025
Details
View Map
Share
Woolneigh Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on Woolneigh Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2025 at 14:58.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 11:27.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:01.

Thames Water logo
LONG TERM
Between
23 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Adderley Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Adderley Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Thames Water logo
Until
19 Oct 2025
Details
View Map
Share
Follow
King's Road

Thames Water are carrying out Utility repair and maintenance works on King's Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:05.

Thames Water logo
Until
19 Oct 2025
Details
View Map
Share
Follow
King's Road

Thames Water are carrying out Utility repair and maintenance works on King's Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:18.

London Borough Of Wandsworth logo
LONG TERM
Between
26 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Burntwood Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Burntwood Lane, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Sep 2025 at 12:24.

London Borough Of Wandsworth logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Burntwood Lane

London Borough Of Wandsworth are carrying out Works for road purposes on Burntwood Lane, Tooting, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 September 2025 at 08:00 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 3 Oct 2025 at 08:16.

Southern Gas Networks logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2025 at 01:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 08:27.

Southern Gas Networks logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2025 at 01:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 08:29.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Burlington Lane

Cadent Gas are carrying out Utility repair and maintenance works on Burlington Lane, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:20.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Lower Richmond Road

Cadent Gas are carrying out roadworks on Lower Richmond Road, Richmond.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 13:55.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Great Chertsey Road

Cadent Gas are carrying out roadworks on Great Chertsey Road, Chiswick, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 22:33 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 12:21.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Battersea Bridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:05.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 29 Sep 2025 at 08:44.

Royal Borough Of Kensington And Chelsea logo
Finishing
Monday
Details
View Map
Share
Sloane Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Sloane Square, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Oct 2025 at 09:27.

LONG TERM
Between
29 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Waters Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Waters Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2025 at 12:15.

LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Waters Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Waters Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 29 Sep 2025 at 08:03.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:10.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Palace Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 26 Sep 2025 at 13:48.

London Borough Of Lambeth logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 14:35.

London Borough Of Lambeth logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Daysbrook Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 26 Sep 2025 at 13:32.

Thames Water logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are proposing to carry out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Until
18 Jan 2026
Details
View Map
Share
Follow
Yelverton Road

Thames Water are carrying out Utility asset works on Yelverton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 11:30 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 11:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Harbut Road

Thames Water were proposing to carry out Utility repair and maintenance works on Harbut Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 10:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mossop Street

Thames Water are carrying out Utility repair and maintenance works on Mossop Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 14:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 12:59.

Electricity Network Company logo
Finishing
Wednesday
Details
View Map
Share
Follow
Oakshaw Road

Electricity Network Company are proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jul 2025 at 08:19.

Electricity Network Company logo
Finishing
Wednesday
Details
View Map
Share
Oakshaw Road

Electricity Network Company were proposing to carry out Utility asset works on Oakshaw Road, Wandsworth, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Sep 2025 at 09:47.

Southern Gas Networks logo
Until
26 Oct 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:46 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:05.

Southern Gas Networks logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:47 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:01.

Southern Gas Networks logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:59.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:15.

Southern Gas Networks logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 10:30 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:29.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Southern Gas Networks logo
Until
27 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 10:30 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2025 at 14:54.

Southern Gas Networks logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2025 at 11:36.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:00 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:27.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:47.

Southern Gas Networks logo
Until
26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:45 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 11:17.

London Borough Of Hammersmith & Fulham logo
Between
30 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Townmead Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Townmead Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Wayside

Cadent Gas are carrying out Utility repair and maintenance works on Wayside, East Sheen.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 19:01 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 10:18.

London Borough Of Hammersmith & Fulham logo
Until
28 Oct 2025
Details
View Map
Share
Follow
Townmead Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Townmead Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 07:30 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 07:39.

Thames Water logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:15 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 08:29.

Thames Water logo
LONG TERM
Until
2 Dec 2025
Details
View Map
Share
Follow
Pont Street

Thames Water are carrying out Utility asset works on Pont Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 08:00 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 08:17.

London Borough Of Hammersmith & Fulham logo
Between
2 and 30 Oct 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

UK Power Networks South Eastern logo
Finishing
Thursday
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.

UK Power Networks South Eastern logo
Finishing
Thursday
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are carrying out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:00 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2025 at 09:40.

Thames Water logo
LONG TERM
Between
2 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Tregarvon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tregarvon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:48.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Battersea Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 13 October 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Jun 2025 at 12:08.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are carrying out Utility repair and maintenance works on Ealing Road, Brentford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 13:56 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 12:44.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
St George's Square

Cadent Gas are carrying out Utility repair and maintenance works on St George's Square, Tachbrook, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 15:00 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 14:03.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Oct and 4 Nov 2025
Details
View Map
Share
Follow
East Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on East Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Gibbon Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Gibbon Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Aug 2025 at 11:26.

Transport for London (TfL) logo
Between
5 and 22 Oct 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2025 at 20:00 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 6 Oct 2025 at 09:38.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Colestown Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:34.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Battersea Park Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 11:39.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 October 2025 at 20:00 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Oct 2025 at 09:43.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:11.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 09:50.

UK Power Networks Eastern & London logo
Until
21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are carrying out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:29 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:30.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2025 at 08:21.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are carrying out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:01.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Bagley's Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bagley's Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 15:35.

UK Power Networks Eastern & London logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Bagley's Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Bagley's Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 13:10.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

London Borough Of Lambeth logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Brockwell Park Gardens

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Brockwell Park Gardens, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 08:10.

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
St Margarets Road

London Borough Of Richmond Upon Thames are carrying out roadworks on St Margarets Road, Twickenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Oct 2025 at 11:46.

Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on King Street, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 9 Sep 2025 at 13:58.

Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on King Street, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Sep 2025 at 13:20.

Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Water Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Water Lane, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 19 Sep 2025 at 11:36.

Thames Water logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Belgrave Place

Thames Water are carrying out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:00.

Thames Water logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 09:00.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Courtfield Gardens

Thames Water are carrying out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 14:58 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 14:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are carrying out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 08:52.

Thames Water logo
Finishing
Friday
Details
View Map
Share
The Pavement

Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 15:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
The Pavement

Thames Water are carrying out Utility repair and maintenance works on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 10:21 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:28.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Howard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Howard Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Howard Road, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2025 at 09:33.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Longstaff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 12:34.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 16 Nov 2025
Details
View Map
Share
Longstaff Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Longstaff Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2025 at 13:44.

Southern Gas Networks logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Merton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Merton Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2025 at 14:26.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Monday
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Jul 2025 at 23:34.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Adelaide Grove

Thames Water are carrying out Utility repair and maintenance works on Adelaide Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:05.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are carrying out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 22 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:43.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Petworth Street

Transport for London (TfL) are carrying out roadworks on Petworth Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:33.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ethelburga Street

Transport for London (TfL) are carrying out Highway improvement works on Ethelburga Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:43.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hyde Lane

Transport for London (TfL) are carrying out Highway improvement works on Hyde Lane, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 21:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 21:38.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pearscroft Road

Cadent Gas are carrying out Utility repair and maintenance works on Pearscroft Road, London.

The works started on 8 October 2025 at 22:51 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 13:38.

Thames Water logo
Until
28 Oct 2025
Details
View Map
Share
Follow
Hartismere Road

Thames Water are carrying out Utility repair and maintenance works on Hartismere Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:00 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 11:29.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wimbledon Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wimbledon Park Road, Southfields, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 13:45 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 15:03.

London Borough Of Hammersmith & Fulham logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Campden Hill Road

Thames Water are carrying out Utility repair and maintenance works on Campden Hill Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 08:50 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 14:59.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Devonshire Road

Thames Water are carrying out Utility repair and maintenance works on Devonshire Road, Chiswick, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 09:15 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 13:50.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Plough Road

Thames Water are carrying out Utility repair and maintenance works on Plough Road, Battersea, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 14:02 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:03.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Telford Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Telford Avenue, Streatham Hill West & Thornton, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 09:20 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 10:32.

Transport for London (TfL) logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:54.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:52.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jul 2025 at 12:41.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Cambridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2025 at 17:22.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:16.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:17.

Transport for London (TfL) logo
Until
22 Oct 2025
Details
View Map
Share
Follow
Bridge Lane

Transport for London (TfL) are carrying out Highway improvement works on Bridge Lane, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2025 at 21:00 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 09:58.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:10.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 09:09.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:24.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 12:51.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 08:56.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 11:28.

Thames Water logo
LONG TERM
Between
10 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Bowood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Bowood Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:01.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 29 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 13:26.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 12:29.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 10:45 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 14:29.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:18.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:02.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:15.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 14:15.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:21.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 14:17.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 16:24.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:33.

T-Mobile (UK) logo
Between
11 and 19 Oct 2025
Details
View Map
Share
Battersea Bridge Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 19 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 23 Sep 2025 at 13:16.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Rosenau Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Rosenau Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:34.

Transport for London (TfL) logo
Between
12 and 20 Oct 2025
Details
View Map
Share
Follow
Kersley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kersley Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 08:28.

Transport for London (TfL) logo
Between
12 and 20 Oct 2025
Details
View Map
Share
Follow
Cambridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cambridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 11:31.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Colestown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Colestown Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:37.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Banbury Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Banbury Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 15:33.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 08:27.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway improvement works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 11:23.

City Of Westminster logo
Finishing
Thursday
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Apr 2025 at 07:27.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

London Borough Of Lambeth logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Core Sampling on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 9 Jul 2025 at 15:59.

London Borough Of Lambeth logo
Finishing
Friday
Details
View Map
Share
Follow
Daysbrook Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 3 Oct 2025 at 13:03.

London Borough Of Lambeth logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Emmanuel Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.

Network Rail logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Sep 2025 at 09:30.

Network Rail logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Sep 2025 at 13:55.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:00.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 07:11.

Thames Water logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Abbeville Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 07:17.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Abbeville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 14:27.

London Borough Of Wandsworth logo
Finishing
Thursday
Details
View Map
Share
Howie Street

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 09:43.

London Borough Of Wandsworth logo
Finishing
Thursday
Details
View Map
Share
Elcho Street

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 09:43.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 26 Aug 2025 at 15:32.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 9 Sep 2025 at 11:33.

Lumen Technologies logo
Finishing
Friday
Details
View Map
Share
Follow
Kensington High Street

Lumen Technologies are proposing to carry out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 10 Sep 2025 at 10:53.

Lumen Technologies logo
Finishing
Thursday
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 5 Aug 2025 at 11:29.

Eunetworks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 20 Aug 2025 at 09:44.

Eunetworks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:22.

Eunetworks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Langley Drive

Eunetworks are proposing to carry out roadworks on Langley Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Sep 2025 at 10:44.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:55.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:56.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 14:42.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 13:40.

Transport for London (TfL) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:39.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility asset works on Kings Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jul 2025 at 10:05.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
14 and 20 Oct 2025
Details
View Map
Share
Follow
Woodland Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Woodland Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 8 Oct 2025 at 21:11.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 17:21.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 10:15.

UK Power Networks South Eastern logo
Between
15 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Cowleaze Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Cowleaze Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

UK Power Networks South Eastern logo
Between
15 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Acre Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Acre Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

Thames Water logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 13:41.

Thames Water logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 15:21.

Electricity Network Company logo
Between
15 Oct and 2 Nov 2025
Details
View Map
Share
Garratt Lane

Electricity Network Company were proposing to carry out Utility asset works on Garratt Lane, Tooting, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Oct 2025 at 13:51.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Bressenden Place

Vodafone are proposing to carry out New service connection on Bressenden Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 5 Aug 2025 at 10:42.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Bressenden Place

Vodafone are proposing to carry out New service connection on Bressenden Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Oct 2025 at 18:32.

Transport for London (TfL) logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out roadworks on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 15:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Fentiman Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Fentiman Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:09.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 11:48.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 13:06.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 20 May 2025 at 14:17.

Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Sheen Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Sheen Lane, Mortlake, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 22 May 2025 at 11:53.

London Borough Of Wandsworth logo
LONG TERM
Between
16 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2025 at 14:31.

Transport for London (TfL) logo
Between
16 and 24 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 11:38.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:55.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:19.

City Of Westminster logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:04.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:36.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 16:19.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:28.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 16:20.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.

Transport for London (TfL) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
19 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 26 Jun 2025 at 11:11.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 10 Oct 2025 at 08:10.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 17 Jul 2025 at 07:08.

Cadent Gas logo
Between
20 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Latchmere Lane

Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:07.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Latchmere Lane

Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 14:37.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Latchmere Lane

Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 10:02.

BT logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 10:16.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:25.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Aug 2025 at 14:19.

UK Power Networks Eastern & London logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jul 2025 at 08:26.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
20 Oct and 29 Nov 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 November 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:57.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
20 Oct and 29 Nov 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:50.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:20.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Palace Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 29 Sep 2025 at 09:43.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Daysbrook Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Daysbrook Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 25 Sep 2025 at 16:20.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Gleneldon Road

London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.

London Borough Of Lambeth logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Gleneldon Road

London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.

London Borough Of Lambeth logo
Between
20 and 30 Oct 2025
Details
View Map
Share
Norwood Road

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 Sep 2025 at 12:10.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Bridge Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Bridge Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 Apr 2025 at 16:25.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Bridge Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Bridge Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 30 Apr 2025 at 16:28.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Chapel Side

Thames Water were proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 12:25.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 15:15.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Barkston Gardens

Thames Water are proposing to carry out New service connection on Barkston Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:08.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 13:56.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 11:10.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 09:50.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Cresswell Road

Thames Water are proposing to carry out New service connection on Cresswell Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 16:36.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Cresswell Road

Thames Water are proposing to carry out New service connection on Cresswell Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:28.

London Borough Of Wandsworth logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 9 Oct 2025 at 10:08.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 16 Sep 2025 at 06:20.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 18 Sep 2025 at 08:49.

Between
20 and 30 Oct 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 29 Sep 2025 at 07:21.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 14:10.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 19:09.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:22.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Dukes Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dukes Avenue, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2025 at 10:37.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 16:05.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:19.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2025 at 11:58.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:36.

Transport for London (TfL) logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 17:11.

Transport for London (TfL) logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 13:50.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:10.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 15:50.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 14:58.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2025 at 14:27.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 10:25.

UK Power Networks Eastern & London logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 12:44.

Transport for London (TfL) logo
Between
21 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2025 at 15:28.

Transport for London (TfL) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 17:12.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Spenser Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Spenser Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 15:24.

City Of Westminster logo
Between
22 and 25 Oct 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Sep 2025 at 13:40.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Jun 2025 at 12:10.

City Of Westminster logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jun 2025 at 12:21.

Transport for London (TfL) logo
Between
22 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 16:32.

Transport for London (TfL) logo
Between
22 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2025 at 14:36.

BT logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Maze Road

BT are proposing to carry out Utility asset works on Maze Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Jul 2025 at 16:43.

Thames Water logo
LONG TERM
Between
23 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Place

Thames Water are proposing to carry out Utility asset works on Greencoat Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 06:56.

Thames Water logo
LONG TERM
Between
23 Oct 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Row

Thames Water are proposing to carry out Utility asset works on Greencoat Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 09:09.

Thames Water logo
Between
23 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Utility asset works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:48.

Thames Water logo
Between
23 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Utility asset works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:44.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:18.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:06.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:20.

City Of Westminster logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:05.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:17.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2025 at 09:17.

Network Rail logo
Between
24 and 31 Oct 2025
Details
View Map
Share
Follow
Skerne Road

Network Rail are proposing to carry out Works for Rail Purposes on Skerne Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Aug 2025 at 14:10.

Network Rail logo
Between
24 and 31 Oct 2025
Details
View Map
Share
Follow
Skerne Road

Network Rail are proposing to carry out Works for Rail Purposes on Skerne Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Sep 2025 at 10:32.

Network Rail logo
Between
24 and 31 Oct 2025
Details
View Map
Share
Follow
Down Hall Road

Network Rail are proposing to carry out Works for Rail Purposes on Down Hall Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Aug 2025 at 14:11.

Network Rail logo
Between
24 and 31 Oct 2025
Details
View Map
Share
Follow
Down Hall Road

Network Rail are proposing to carry out Works for Rail Purposes on Down Hall Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Sep 2025 at 10:30.

Thames Water logo
Between
24 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 13:48.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Rosedew Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rosedew Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 12:21.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Rosedew Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Rosedew Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 09:14.

UK Power Networks Eastern & London logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Fulham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulham Palace Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 11:59.

Thames Water logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Long Road

Thames Water are proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:56.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
East Acton Lane

Eunetworks were proposing to carry out Utility asset works on East Acton Lane, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 11:58.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:34.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 4 Sep 2025 at 10:31.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Old Oak Road

Eunetworks are proposing to carry out Utility asset works on Old Oak Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 26 Aug 2025 at 11:07.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:51.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:49.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:01.

Transport for London (TfL) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:16.

Thames Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
Follow
Lillie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 14:37.

Thames Water logo
Between
26 and 29 Oct 2025
Details
View Map
Share
Lillie Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lillie Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 11:34.

Transport for London (TfL) logo
Between
26 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:51.

T-Mobile (UK) logo
Between
26 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Battersea Bridge Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 26 Sep 2025 at 15:34.

T-Mobile (UK) logo
Between
26 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Battersea Bridge Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 1 Oct 2025 at 15:54.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Barrhill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Tierney Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 17 Feb 2026
Details
View Map
Share
Follow
Telford Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:19.

Cadent Gas logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fernhill Gardens

Cadent Gas are proposing to carry out Utility asset works on Fernhill Gardens, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 12:18.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Anselm Road

Cadent Gas are proposing to carry out New service connection on Anselm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:59.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:33.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 00:10.

London Borough Of Hammersmith & Fulham logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
King Street

London Borough Of Hammersmith & Fulham were proposing to carry out Highway repair and maintenance works on King Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 9 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Oct 2025 at 15:53.

London Borough Of Lambeth logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Clarence Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clarence Crescent, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 15:33.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 29 Oct 2024 at 16:15.

London Borough Of Merton logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Cricket Green

London Borough Of Merton are proposing to carry out Highway improvement works on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 07:46.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 16:49.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 14:30.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 15:30.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kenway Road

Thames Water are proposing to carry out Utility asset works on Kenway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 14:32.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Lane

Thames Water are proposing to carry out Utility asset works on Greycoat Lane, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:31.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Lane

Thames Water are proposing to carry out Utility asset works on Greycoat Lane, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:01.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Street

Thames Water are proposing to carry out Utility asset works on Greycoat Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 08:30.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Greycoat Street

Thames Water are proposing to carry out Utility asset works on Greycoat Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 07:19.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Old Brompton Road

Thames Water are proposing to carry out New service connection on Old Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 15:35.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 17:41.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 14:00.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Blenheim Crescent

Thames Water were proposing to carry out Remedial works on Blenheim Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:49.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out Remedial works on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 16:30.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:22.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:49.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:55.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:23.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Vernon Road

Thames Water are proposing to carry out New service connection on Vernon Road, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 15:55.

Thames Water logo
Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 14:39.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Marcilly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 15:31.

Thames Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Marcilly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marcilly Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 14:11.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Churton Street

Thames Water are proposing to carry out Remedial works on Churton Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 13:54.

Virgin Media logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Holly Road

Virgin Media are proposing to carry out Utility asset works on Holly Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Oct 2025 at 09:51.

London Borough Of Wandsworth logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Balham Park Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 31 Jul 2025 at 15:16.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 08:41.

Southern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Haydons Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydons Road, South Wimbledon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2025 at 15:20.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Dukes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dukes Avenue, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:33.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Dukes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dukes Avenue, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Oct 2025 at 12:55.

Southern Gas Networks logo
Between
27 Oct and 23 Nov 2025
Details
View Map
Share
Follow
St Anns Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Anns Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:46.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 11:11.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 10:37.

Transport for London (TfL) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:30.

Transport for London (TfL) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Edgeley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:44.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 13:02.

Transport for London (TfL) logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:45.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Streatham Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
27 Oct 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.

Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Kingston Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 21 May 2025 at 08:44.

Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Kingston Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 21 May 2025 at 12:13.

UK Power Networks South Eastern logo
LONG TERM
Between
28 Oct 2025 and 4 Feb 2026
Details
View Map
Share
Follow
Canbury Park Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Canbury Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 4 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 10:52.

Thames Water logo
LONG TERM
Between
28 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Marjorie Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Marjorie Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:46.

Thames Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:31.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Pimlico Road

Thames Water are proposing to carry out Remedial works on Pimlico Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 08:38.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 13:34.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:01.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Gilstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gilstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:14.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Gilstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gilstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 10:18.

Transport for London (TfL) logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:47.

BT logo
Between
29 Oct and 10 Nov 2025
Details
View Map
Share
Hertford Street

BT were proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Aug 2025 at 12:20.

City Of Westminster logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jul 2025 at 14:12.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Feb 2025 at 10:10.

London Borough Of Hammersmith & Fulham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bolingbroke Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Bolingbroke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 15:47.

Thames Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Wardo Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 08:11.

Thames Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Wardo Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wardo Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:10.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Fentiman Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Fentiman Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:51.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.

Transport for London (TfL) logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.

Between
30 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Birkenhead Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Birkenhead Avenue, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Mar 2025 at 11:51.

Between
30 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Birkenhead Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Birkenhead Avenue, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 1 Apr 2025 at 10:52.

UK Power Networks South Eastern logo
Between
30 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Canbury Park Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Canbury Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:41.

Southern Gas Networks logo
Between
30 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Lower Teddington Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 10:42.

Transport for London (TfL) logo
Between
30 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Dundonald Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Dundonald Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2025 at 10:05.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:21.

City Of Westminster logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Leopold Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Leopold Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 12:14.

London Borough Of Hammersmith & Fulham logo
Between
31 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2025 at 14:33.

Network Rail logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Grove Park Terrace

Network Rail were proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2025 at 10:11.

London Borough Of Wandsworth logo
LONG TERM
Between
31 Oct 2025 and 10 Mar 2026
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 10 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2025 at 07:26.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:56.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 16:21.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 12:55.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 16:21.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.

Transport for London (TfL) logo
Between
1 and 3 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

London Borough Of Lambeth logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Network Rail logo
LONG TERM
Between
2 Nov and 20 Dec 2025
Details
View Map
Share
Follow
Lower Marsh Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lower Marsh Lane, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Network Rail on 19 May 2025 at 10:56.

Network Rail logo
LONG TERM
Between
2 Nov and 20 Dec 2025
Details
View Map
Share
Follow
Chiltern Drive

Network Rail are proposing to carry out Works for Rail Purposes on Chiltern Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 May 2025 at 11:25.

Network Rail logo
LONG TERM
Between
2 Nov and 20 Dec 2025
Details
View Map
Share
Follow
Chiltern Drive

Network Rail are proposing to carry out Works for Rail Purposes on Chiltern Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 20 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 09:47.

Transport for London (TfL) logo
Between
2 and 6 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 14:27.

Cadent Gas logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Albany Park Road

Cadent Gas are proposing to carry out Utility asset works on Albany Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 12:19.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Dover House Road

Cadent Gas are proposing to carry out Utility asset works on Dover House Road, Putney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 12:53.

BT logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Aug 2025 at 15:16.

BT logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 10:03.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

BT are proposing to carry out Utility asset works on Gloucester Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Aug 2025 at 08:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 08:14.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:12.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 3 Mar 2025 at 14:14.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Aug 2025 at 12:04.

London Borough Of Lambeth logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 6 Oct 2025 at 08:48.

London Borough Of Lambeth logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2025 at 14:02.

Network Rail logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Jun 2025 at 09:05.

Network Rail logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2025 at 09:51.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:10.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 16:19.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Earl's Court Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 16:00.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Earl's Court Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 09:37.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Place

Thames Water are proposing to carry out Utility asset works on Greencoat Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 06:11.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Greencoat Row

Thames Water are proposing to carry out Utility asset works on Greencoat Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 06:07.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 11:35.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Holman Road

Thames Water are proposing to carry out Utility asset works on Holman Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:16.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 13:14.

Thames Water logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Albert Road

Thames Water are proposing to carry out New service connection on Albert Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 10:28.

Thames Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Mary Place

Thames Water are proposing to carry out Utility repair and maintenance works on Mary Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 11:33.

London Borough Of Wandsworth logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2025 at 09:07.

London Borough Of Wandsworth logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Garratt Lane

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 30 Sep 2025 at 12:35.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Wilna Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilna Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:27.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Atheldene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:45.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Farlton Road

Southern Gas Networks were proposing to carry out roadworks on Farlton Road, Earlsfield, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:53.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Farlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farlton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:22.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Inman Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Inman Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Blakes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 11:39.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Blakes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 10:29.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Blakes Terrace

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Terrace, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 11:41.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 11:42.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 13 Dec 2025
Details
View Map
Share
Follow
Goat Road To Aspen Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Goat Road To Aspen Gardens, Surrey, Mitcham.

These works are categorised as Major.

The works will start on or after 3 November 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Oct 2025 at 15:09.

UK Power Networks South Eastern logo
Between
4 and 18 Nov 2025
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2025 at 13:40.

UK Power Networks South Eastern logo
Between
4 and 18 Nov 2025
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2025 at 10:16.

Thames Water logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Forthbridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:57.

Cadent Gas logo
LONG TERM
Between
5 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 17:23.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Henry Macaulay Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Henry Macaulay Avenue, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:05.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Sury Basin

UK Power Networks South Eastern are proposing to carry out Utility asset works on Sury Basin, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:03.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Nov 2025 and 21 Mar 2026
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 21 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:24.

City Of Westminster logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:04.

City Of Westminster logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2025 at 14:01.

London Borough Of Hammersmith & Fulham logo
Between
7 and 26 Nov 2025
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wandsworth Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2025 at 09:15.

Thames Water logo
LONG TERM
Between
7 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

UK Power Networks Eastern & London logo
Between
8 and 19 Nov 2025
Details
View Map
Share
Follow
Strutton Ground

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2025 at 15:34.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:54.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:53.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 15:59.

Transport for London (TfL) logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:00.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Glenroy Street

Cadent Gas are proposing to carry out Utility asset works on Glenroy Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nascot Street

Cadent Gas are proposing to carry out Utility asset works on Nascot Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Cadent Gas logo
Between
10 and 16 Nov 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:41.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Aug 2025 at 14:40.

BT logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Aug 2025 at 12:23.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Sloane Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 15:21.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cadogan Place

Thames Water were proposing to carry out New service connection on Cadogan Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 15:22.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 13:53.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 15:31.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.

Virgin Media logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cambridge Gardens

Virgin Media were proposing to carry out Utility repair and maintenance works on Cambridge Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:56.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Dingwall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dingwall Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2025 at 09:21.

Southern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Heybridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heybridge Avenue, Streatham Common & Vale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 15:44.

Southern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Heybridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heybridge Avenue, Streatham Common & Vale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2025 at 10:31.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:13.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:08.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov 2025 and 27 Mar 2026
Details
View Map
Share
Villiers Avenue

UK Power Networks South Eastern were proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 27 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 13:31.

Thames Water logo
Between
11 and 24 Nov 2025
Details
View Map
Share
Casewick Road

Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Ingrave Street

Cadent Gas are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:08.

Cadent Gas logo
LONG TERM
Between
12 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Wye Street

Cadent Gas are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:06.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Turnham Green Terrace

Thames Water are proposing to carry out Utility asset works on Turnham Green Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:45.

Thames Water logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Turnham Green Terrace

Thames Water are proposing to carry out Utility asset works on Turnham Green Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 07:28.

London Borough Of Wandsworth logo
Between
12 and 17 Nov 2025
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2025 at 08:14.

Thames Water logo
LONG TERM
Between
13 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Shelgate Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Shelgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

Thames Water logo
Between
13 and 18 Nov 2025
Details
View Map
Share
Follow
East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove

Thames Water are proposing to carry out Utility asset works on East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 18 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:36.

Thames Water logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Wimbledon Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:18.

Thames Water logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Wimbledon Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wimbledon Hill Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 07:55.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:20.

City Of Westminster logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:07.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 17:32.

Thames Water logo
LONG TERM
Between
14 Nov 2025 and 29 Jan 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 29 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:06.

Transport for London (TfL) logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 13:29.

Transport for London (TfL) logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 15:44.

Transport for London (TfL) logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 13:27.

Transport for London (TfL) logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 15:57.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Robin Hood Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:58.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 10:57.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Follow
Coombe Lane West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:00.

Transport for London (TfL) logo
Between
15 and 17 Nov 2025
Details
View Map
Share
Coombe Lane West

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:17.

Transport for London (TfL) logo
Between
16 and 18 Nov 2025
Details
View Map
Share
Follow
Beverley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beverley Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 10:43.

Cadent Gas logo
Between
17 and 23 Nov 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out New service connection on Lower Sloane Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 14:55.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:10.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:57.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Old Pye Street

Thames Water were proposing to carry out New service connection on Old Pye Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:57.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Old Pye Street

Thames Water are proposing to carry out New service connection on Old Pye Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 16:52.

Thames Water logo
Between
17 and 23 Nov 2025
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 10:03.

Electricity Network Company logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Ealing Road

Electricity Network Company are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 07:17.

Electricity Network Company logo
Between
17 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Ealing Road

Electricity Network Company are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 30 Sep 2025 at 09:51.

Electricity Network Company logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Queensway

Electricity Network Company are proposing to carry out Utility asset works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 08:21.

London Borough Of Wandsworth logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 12:42.

London Borough Of Wandsworth logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Atheldene Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Atheldene Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 10:54.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Eccleston Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Eccleston Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 9 Sep 2025 at 10:33.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Oakshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakshaw Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Waverton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverton Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:34.

Southern Gas Networks logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Tamworth Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 10:10.

Southern Gas Networks logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Bond Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bond Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 15:58.

City Of Westminster logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Oct 2025 at 12:34.

UK Power Networks Eastern & London logo
Between
19 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Peterborough Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jul 2025 at 13:38.

London Borough Of Wandsworth logo
Between
20 and 25 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2025 at 13:53.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 06:52.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Sep 2025 at 09:21.

City Of Westminster logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Sep 2025 at 16:08.

LONG TERM
Between
21 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
King Henrys Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on King Henrys Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2025 at 13:30.

LONG TERM
Between
21 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
King Henrys Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on King Henrys Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Sep 2025 at 10:00.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Shakespeare Road

Network Rail were proposing to carry out Works for Rail Purposes on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2025 at 15:45.

Network Rail logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Half Moon Lane

Network Rail are proposing to carry out Works for Rail Purposes on Half Moon Lane, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Aug 2025 at 09:07.

Cadent Gas logo
Between
24 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Surrey Lane

Cadent Gas are proposing to carry out Utility asset works on Surrey Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 15:00.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Kynance Mews

Thames Water are proposing to carry out Remedial works on Kynance Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 15:15.

Thames Water logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:58.

Virgin Media logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Dukes Lane

Virgin Media are proposing to carry out Utility asset works on Dukes Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2025 at 15:43.

London Borough Of Wandsworth logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 12:02.

Southern Gas Networks logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Peterborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peterborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2025 at 12:11.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:16.

Cadent Gas logo
Between
25 and 30 Nov 2025
Details
View Map
Share
Follow
Aubrey Walk

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 15:22.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
John Islip Street

City Of Westminster were proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Jul 2025 at 11:24.

City Of Westminster logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
John Islip Street

City Of Westminster are proposing to carry out Highway improvement works on John Islip Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:52.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 14:31.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2025 at 07:49.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:12.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 14:12.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:10.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 13:34.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:00.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Kew Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:33.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:03.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Clifford Avenue

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:31.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:02.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Lower Richmond Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:32.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 08:14.

Transport for London (TfL) logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Lower Mortlake Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 17:33.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Jun 2025 at 12:11.

National Highways logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jul 2025 at 17:28.

London Borough Of Wandsworth logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Sep 2025 at 12:00.

Thames Water logo
Between
28 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Aldensley Road

Thames Water are proposing to carry out New service connection on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:19.

Network Rail logo
Between
29 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2025 at 14:24.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Hailsham Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.

London Borough Of Lambeth logo
Between
30 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 05:50.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Utility asset works on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 15:36.

Thames Water logo
Between
30 Nov and 2 Dec 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 15:35.

Cadent Gas logo
LONG TERM
Between
1 Dec 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 12:13.

UK Power Networks Eastern & London logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Old York Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 08:38.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Faygate Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.

London Borough Of Lambeth logo
Between
1 and 18 Dec 2025
Details
View Map
Share
Follow
Palace Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 13:09.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Riverside

Thames Water were proposing to carry out Remedial works on Riverside, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 20:30.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Queensway

Thames Water were proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:53.

Thames Water logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Summerstown

Thames Water are proposing to carry out New service connection on Summerstown, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Aug 2025 at 09:34.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Howie Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 14:38.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Howie Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Howie Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Oct 2025 at 14:48.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Oct 2025 at 14:38.

London Borough Of Wandsworth logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Oct 2025 at 14:48.

Southern Gas Networks logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Commonside East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2025 at 14:25.

Southern Gas Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 14:30.

Southern Gas Networks logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Sep 2025 at 15:16.

Transport for London (TfL) logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:49.

BT logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Follow
Tremadoc Road

BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2025 at 10:11.

BT logo
Between
3 and 5 Dec 2025
Details
View Map
Share
Follow
Tremadoc Road

BT are proposing to carry out Utility asset works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Sep 2025 at 09:18.

Thames Water logo
Between
4 and 9 Dec 2025
Details
View Map
Share
Follow
East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove

Thames Water are proposing to carry out Utility asset works on East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 9 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 14:50.

Thames Water logo
Between
4 and 9 Dec 2025
Details
View Map
Share
Follow
East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove

Thames Water are proposing to carry out Utility asset works on East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 9 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 16:17.

Network Rail logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Burlington Lane

Network Rail are proposing to carry out Works for Rail Purposes on Burlington Lane, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2025 at 12:07.

Network Rail logo
Between
5 and 8 Dec 2025
Details
View Map
Share
Follow
Sutton Court Road

Network Rail are proposing to carry out Works for Rail Purposes on Sutton Court Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2025 at 12:07.

Thames Water logo
LONG TERM
Between
5 Dec 2025 and 9 Apr 2026
Details
View Map
Share
Follow
Kelmscott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kelmscott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:02.

Transport for London (TfL) logo
Between
5 and 9 Dec 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 14:21.

Transport for London (TfL) logo
Between
5 and 9 Dec 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 14:25.

Transport for London (TfL) logo
Between
5 and 9 Dec 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:13.

Transport for London (TfL) logo
Between
5 and 9 Dec 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:30.

Thames Water logo
LONG TERM
Between
8 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Acanthus Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Acanthus Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 16:02.

Thames Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Old Pye Street

Thames Water were proposing to carry out New service connection on Old Pye Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:44.

Thames Water logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Clarence Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Crescent, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 10:22.

BT logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
St Johns Road

BT are proposing to carry out Utility asset works on St Johns Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2025 at 14:01.

Thames Water logo
Between
9 and 12 Dec 2025
Details
View Map
Share
Follow
Albert Road

Thames Water are proposing to carry out New service connection on Albert Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 11:37.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

LONG TERM
Between
10 Dec 2025 and 10 Jan 2026
Details
View Map
Share
Follow
Wimpole Close

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Wimpole Close, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 10 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Sep 2025 at 10:13.

Thames Water logo
Between
15 and 28 Dec 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 28 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:39.

Thames Water logo
Between
15 and 28 Dec 2025
Details
View Map
Share
Follow
Buckingham Gate

Thames Water are proposing to carry out New service connection on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 28 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:39.

Thames Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Falcon Terrace

Thames Water are proposing to carry out Utility asset works on Falcon Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 15:09.

Network Rail logo
LONG TERM
Between
20 Dec 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2025 and could run through until 28 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Sep 2025 at 11:26.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:30.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Mitcham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:42.

Transport for London (TfL) logo
Between
22 and 31 Dec 2025
Details
View Map
Share
Follow
Garratt Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:44.

Network Rail logo
Between
29 and 31 Dec 2025
Details
View Map
Share
Follow
Ferndale Road

Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2025 at 08:37.

Thames Water logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Newton Road

Thames Water were proposing to carry out New service connection on Newton Road, Bayswater, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 2 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 09:16.

Thames Water logo
Between
29 Dec 2025 and 1 Jan 2026
Details
View Map
Share
Malton Road

Thames Water were proposing to carry out New service connection on Malton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 1 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:42.

City Of London Telecomms logo
Between
3 and 20 Jan 2026
Details
View Map
Share
Follow
Belgrave Place

City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2026 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 15 Jul 2025 at 11:19.

City Of London Telecomms logo
Between
3 and 20 Jan 2026
Details
View Map
Share
Belgrave Place

City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2026 and run through until 20 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 3 Oct 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
5 and 17 Jan 2026
Details
View Map
Share
Follow
South Worple Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on South Worple Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 17 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Jan and 5 Feb 2026
Details
View Map
Share
Follow
Sudlow Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudlow Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 5 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2025 at 08:56.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Mar 2025 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Apr 2025 at 11:07.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 15 May 2025 at 17:04.

Thames Water logo
Between
5 and 12 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 14:28.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out New service connection on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2025 at 12:41.

Thames Water logo
Between
5 and 21 Jan 2026
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:07.

Thames Water logo
Between
5 and 11 Jan 2026
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 11 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 08:57.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Grantham Place

Thames Water are proposing to carry out New service connection on Grantham Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 10:21.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:55.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Bellamy Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:23.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Bellamy Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 14:35.

Electricity Network Company logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Mitcham Road

Electricity Network Company are proposing to carry out Utility asset works on Mitcham Road, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 7 Aug 2025 at 08:18.

Lumen Technologies logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Lumen Technologies are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 26 Sep 2025 at 16:00.

Southern Gas Networks logo
Between
5 and 26 Jan 2026
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2025 at 16:11.

Southern Gas Networks logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:14.

Southern Gas Networks logo
Between
5 Jan and 1 Feb 2026
Details
View Map
Share
Follow
Broomhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broomhill Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 14:13.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 31 Mar 2026
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 14:24.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 13:03.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Battersea High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea High Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:19.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
5 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Falcon Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 14:17.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Chiswick High Road

BT are proposing to carry out Utility repair and maintenance works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Sep 2025 at 07:57.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Goldhawk Road

BT were proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2026 and run through until 13 February 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Sep 2025 at 09:30.

BT logo
LONG TERM
Between
6 Jan and 13 Feb 2026
Details
View Map
Share
Follow
Goldhawk Road

BT are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 13 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Sep 2025 at 15:19.

BT logo
Between
6 and 30 Jan 2026
Details
View Map
Share
Follow
Upper Richmond Road West

BT are proposing to carry out Utility repair and maintenance works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Oct 2025 at 14:18.

City Of Westminster logo
Between
6 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Tachbrook Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tachbrook Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 2 February 2026. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:49.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 7 Feb 2026
Details
View Map
Share
Follow
Norwood Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Norwood Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 7 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 22 Sep 2025 at 16:35.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 7 Feb 2026
Details
View Map
Share
Follow
Brockwell Park Gardens

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Brockwell Park Gardens, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 7 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 23 Sep 2025 at 09:40.

Thames Water logo
Between
6 and 9 Jan 2026
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Remedial works on Victoria Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 13:00.


Roadworks Map near to Southmead Road, LONDON, SW19 6SR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 11 Oct 2025 01:46
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southmead Road, LONDON, SW19 6SR (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
COMBEMARTIN ROAD, SOUTHFIELDS 
(0.2 miles)
BT
Utility asset works - Footway - No carriageway incursion
Complete
9 Oct 2025 16:38 - 17:53
0.2
Details
Share
2
Southern Gas Networks logo
EMERGENCY
  
WIMBLEDON PARK ROAD, SOUTHFIELDS 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 8 Oct 2025 13:45
(Scheduled: 8 Oct 2025 - 15 Oct 2025)
0.5
Details
Share
Follow
3
BT logo
GONSTON CLOSE, SOUTHFIELDS 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.5
Details
Share
Follow
4
BT logo
PENNER CLOSE, SOUTHFIELDS 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
Complete
9 Oct 2025 09:00 - 11:05
0.5
Details
Share
5
BT logo
GONSTON CLOSE, SOUTHFIELDS 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 10 Oct 2025 09:15
(Scheduled: 10 Oct 2025 - 14 Oct 2025)
0.5
Details
Share
Follow
6
BT logo
QUEENSMERE ROAD 
(0.6 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 9 Oct 2025 14:00
(Scheduled: 9 Oct 2025 - 13 Oct 2025)
0.6
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
MERTON ROAD, WANDSWORTH 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 6 Oct 2025 - 26 Oct 2025)
0.8
Details
Share
8
Southern Gas Networks logo
MAJOR
  
BUCKHOLD ROAD, WANDSWORTH 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 23 Nov 2025
0.8
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
BUCKHOLD ROAD, WANDSWORTH 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 1 Sep 2025 07:30
(Scheduled: 1 Sep 2025 - 23 Nov 2025)
0.8
Details
Share
Follow
10
BT logo
CHARTFIELD SQUARE, PUTNEY 
(0.8 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data