ROADWORKS SUMMARY
Chapman Square, LONDON, SW19 5QU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chapman Square, SW19 5QU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chapman Square, LONDON, SW19 5QU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chapman Square are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Hartington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Winchester Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Clifden Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Lion Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Copthall Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Staten Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Carrington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Meadlands Drive

London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Amyand Park Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.

Thames Tideway Tunnel logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 2 Jun 2025 at 15:17.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:11.

London Borough Of Wandsworth logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Princes Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Princes Avenue, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Elgar Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Elgar Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 08:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 12 Mar 2025 at 08:01.

LONG TERM
Until
31 Jul 2026
Details
View Map
Share
Follow
Egmont Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Egmont Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:28.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Derby Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Derby Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Douglas Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Douglas Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Broomfield Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Broomfield Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Worthington Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Worthington Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Ditton Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Dec 2025
Details
View Map
Share
Follow
Beaconsfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Kingsdowne Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Hollyfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.

Transport for London (TfL) logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 15:26.

Southern Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Streatham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 09:38.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:02.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:02.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.

Transport for London (TfL) logo
LONG TERM
Until
11 Aug 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 06:00 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Feb 2025 at 12:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 12:28.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out roadworks on Balham Park Road, Balham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:49.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 1 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:53.

Southern Gas Networks logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 11:00 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jan 2025 at 12:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 23 Jun 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 10:53.

Cadent Gas logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are carrying out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works started on 6 January 2025 at 13:51 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 15:25.

Southern Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
St James' Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St James' Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 09:38.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
3 Feb and 18 Jun 2025
Details
View Map
Share
Follow
Imperial Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 22 Jan 2025 at 08:36.

LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 Jan 2025 at 15:52.

LONG TERM
Until
3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are carrying out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works started on 3 February 2025 at 08:00 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 26 Feb 2025 at 10:22.

Thames Water logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Raleigh Gardens

Thames Water are carrying out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 08:00 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Feb 2025 at 09:39.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Salcott Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Winsham Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Jedburgh Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.

Thames Water logo
LONG TERM
Between
3 Mar and 4 Aug 2025
Details
View Map
Share
Mysore Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Mar and 14 Jun 2025
Details
View Map
Share
Follow
Merantun Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Merantun Way, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 13:29.

London Borough Of Lambeth logo
LONG TERM
Between
31 Mar and 28 Jun 2025
Details
View Map
Share
Amesbury Avenue

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 28 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 May 2025 at 08:32.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:29.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:35.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are carrying out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 12:29.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:29.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:12.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:11.

Transport for London (TfL) logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Merantun Way

Transport for London (TfL) are carrying out Highway improvement works on Merantun Way, Colliers Wood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 08:47.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kew Bridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Kew Bridge Road, Brentford.

The works started on 15 April 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:17.

Thames Water logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 10:54.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Feb 2025 at 08:33.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lessingham Avenue

Thames Water are carrying out roadworks on Lessingham Avenue, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:52.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ansell Road

Thames Water are carrying out Utility asset works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:54.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Derinton Road

Thames Water are carrying out roadworks on Derinton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:55.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are carrying out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Lambton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambton Road, Raynes Park.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 08:22.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Lambton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambton Road, Raynes Park.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Jan 2025 at 08:05.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Arterberry Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arterberry Road, Raynes Park.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 07:51.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Arterberry Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Arterberry Road, Raynes Park.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 09:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 10:22.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are carrying out Utility repair and maintenance works on Peterborough Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 10:27 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Kirtling Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 10:05 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 12:38.

Thames Water logo
LONG TERM
Between
30 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Commonside East

Thames Water are proposing to carry out Utility asset works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 07:30.

Thames Water logo
LONG TERM
Between
30 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Raleigh Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:35.

Thames Water logo
LONG TERM
Between
30 Apr and 17 Jun 2025
Details
View Map
Share
Raleigh Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Raleigh Gardens, Surrey, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 17 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:16.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:41.

Electricity Network Company logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are carrying out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 16:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 May 2025 at 08:05.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 May 2025 at 16:12.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Apr 2025 at 17:04.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Leythe Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Leythe Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 May 2025 at 13:05.

Southern Gas Networks logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are carrying out Utility repair and maintenance works on The Green, Morden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:30 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 09:54.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Deacon Road

Thames Water are carrying out Utility repair and maintenance works on Deacon Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:12 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 11:00.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 14:41.

Southern Gas Networks logo
LONG TERM
Between
12 May and 29 Jun 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:55.

Southern Gas Networks logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:42.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Abingdon Road

Thames Water are carrying out Utility repair and maintenance works on Abingdon Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:20 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
13 May and 17 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 May 2025 at 14:35.

Southern Gas Networks logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 09:15 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 09:31.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are carrying out roadworks on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:55.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 13 May 2025 at 10:30 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:01.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Malden Road

Thames Water are carrying out Utility repair and maintenance works on Malden Road, Cheam.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 08:40 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:08.

Southern Gas Networks logo
LONG TERM
Between
14 May and 18 Jun 2025
Details
View Map
Share
Follow
Ashbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashbourne Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:56.

Transport for London (TfL) logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:05.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Combermere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Combermere Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:07.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Combermere Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Combermere Road, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:09.

Southern Gas Networks logo
LONG TERM
Between
19 May and 12 Jul 2025
Details
View Map
Share
Follow
South Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Lane, New Malden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 11:10.

Southern Gas Networks logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
South Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on South Lane, New Malden.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
19 May and 12 Jul 2025
Details
View Map
Share
Follow
Lynton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lynton Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
19 May and 12 Jul 2025
Details
View Map
Share
Follow
Lynton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lynton Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 13:33.

Southern Gas Networks logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
Lynton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lynton Road, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 08:33.

Southern Gas Networks logo
LONG TERM
Between
19 May and 12 Jul 2025
Details
View Map
Share
Follow
Cotsford Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cotsford Avenue, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 11:11.

Southern Gas Networks logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
Cotsford Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Cotsford Avenue, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 12 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 08:23.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:18.

Thames Water logo
Between
19 May and 12 Jun 2025
Details
View Map
Share
Follow
Old York Road

Thames Water are proposing to carry out Utility asset works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:59.

Transport for London (TfL) logo
Between
22 May and 10 Jun 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 14:21.

Transport for London (TfL) logo
Between
22 May and 10 Jun 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2025 at 14:26.

UK Power Networks Eastern & London logo
Between
23 May and 17 Jun 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 09:17.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Aberconway Road

Thames Water are proposing to carry out Utility asset works on Aberconway Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 07:35.

Southern Gas Networks logo
LONG TERM
Between
24 May and 1 Aug 2025
Details
View Map
Share
Follow
Dukes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dukes Avenue, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 14:35.

Southern Gas Networks logo
LONG TERM
Until
5 Aug 2025
Details
View Map
Share
Follow
Dukes Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Dukes Avenue, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:15 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 10:12.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Follow
Holdernesse Road

Electricity Network Company are proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Feb 2025 at 10:13.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenburnie Road

Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 31 Jan 2025 at 14:55.

Thames Water logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Burlington Road

Thames Water are carrying out Utility asset works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 12:25 and could run through until 14 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:56.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Rodenhurst Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 14:34.

London Borough Of Wandsworth logo
LONG TERM
Between
26 May and 1 Aug 2025
Details
View Map
Share
Follow
Wye Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Wye Street, Battersea, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 May 2025 at 10:57.

London Borough Of Wandsworth logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Wye Street

London Borough Of Wandsworth are carrying out Section 50 on Wye Street, Battersea, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 May 2025 at 10:57.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 Jan 2025 at 08:36.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 17 Feb 2025 at 09:26.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 May 2025 at 11:41.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 8 May 2025 at 09:22.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Coningham Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Coningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:15.

Southern Gas Networks logo
Until
23 Jun 2025
Details
View Map
Share
Follow
St Alban's Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on St Alban's Grove, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 11:10.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Peterborough Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peterborough Road, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:54.

Finishing
Friday
Details
View Map
Share
Follow
Eden Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 22 May 2025 at 11:22.

Until
10 Jun 2025
Details
View Map
Share
Follow
Eden Street

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 May 2025 at 08:30.

Electricity Network Company logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are carrying out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:30 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 08:54.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Prince Of Wales Drive

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 15:11.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:47.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are carrying out Utility repair and maintenance works on Hogarth Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:30 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:40.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Cadogan Place

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Cadogan Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 19:03 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 15:03.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:06.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:08.

Thames Water logo
LONG TERM
Until
16 Jul 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:12.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sloane Street

Thames Water are carrying out New service connection on Sloane Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:31.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cadogan Place

Thames Water are carrying out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:09.

Thames Water logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Camera Place

Thames Water are carrying out Utility repair and maintenance works on Camera Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:06.

Transport for London (TfL) logo
Between
28 May and 25 Jun 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:31.

Thames Water logo
Between
29 May and 11 Jun 2025
Details
View Map
Share
London Road

Thames Water were proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 12:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Worple Road

Thames Water are carrying out Utility repair and maintenance works on Worple Road, Wimbledon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 13:33 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:41.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bovingdon Road

Thames Water are carrying out Utility repair and maintenance works on Bovingdon Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 06:47 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:05.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are carrying out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 10:50 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:32.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Fulham Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Fulham Road, London.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 18:44.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Point Pleasant

Thames Water are carrying out Utility repair and maintenance works on Point Pleasant, Wandsworth, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 12:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:21.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Burlington Avenue

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Burlington Avenue, Kew.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 14:07 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 10:20.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Burlington Avenue

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Burlington Avenue, Kew.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 14:07 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 12:28.

Southern Gas Networks logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
St Agathas Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Agathas Grove, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 14:22.

Southern Gas Networks logo
Until
27 Jun 2025
Details
View Map
Share
Follow
St Agathas Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on St Agathas Grove, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:45 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:59.

Southern Gas Networks logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:44.

Finishing
Tomorrow
Details
View Map
Share
Follow
Green Lane

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Green Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 29 Jan 2025 at 13:08.

Finishing
Tomorrow
Details
View Map
Share
Green Lane

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway repair and maintenance works on Green Lane, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 May 2025 at 07:32.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway improvement works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 26 Mar 2025 at 03:01.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are carrying out Highway improvement works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 20:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 3 Jun 2025 at 08:41.

Thames Water logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Upper Green West

Thames Water are carrying out Disconnection or alteration of supply on Upper Green West, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:41.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Mitcham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 08:26.

Thames Water logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Camp View

Thames Water are carrying out Utility repair and maintenance works on Camp View, Wimbledon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:39.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 14:57.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 16:23.

LONG TERM
Between
2 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Woodville Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Woodville Road, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 15 May 2025 at 10:08.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Temperley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temperley Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 15:53.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out New service connection on Beaconsfield Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 09:36.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Beaconsfield Road

Thames Water were proposing to carry out New service connection on Beaconsfield Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 10:03.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are carrying out New service connection on Beaconsfield Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 12:27 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:50.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:08.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 13:14.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 10:25.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 08:33.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Palmerston Road

Cadent Gas are carrying out Utility repair and maintenance works on Palmerston Road, East Sheen.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 14:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:32.

Cadent Gas logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Shuttleworth Road

Cadent Gas are carrying out Utility repair and maintenance works on Shuttleworth Road, Battersea, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 14:25 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 13:25.

Thames Water logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:15.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:52.

London Borough Of Hammersmith & Fulham logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Butterwick

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Butterwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 11:36.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:48.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are carrying out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:34.

London Borough Of Ealing logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Queen Annes Gardens

London Borough Of Ealing are carrying out Utility asset works on Queen Annes Gardens, Chiswick.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 16:25 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Jun 2025 at 16:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are proposing to carry out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:38.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are carrying out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:20.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bloemfontein Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bloemfontein Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bloemfontein Avenue

UK Power Networks Eastern & London are carrying out Utility asset works on Bloemfontein Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.

Thames Water logo
Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 15:37.

National Highways logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

National Highways logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:44.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:32.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Remedial works on Claremont Road, Surbiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 11:13.

Thames Water logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 06:58.

Thames Water logo
Between
4 and 24 Jun 2025
Details
View Map
Share
Follow
Cricket Green

Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 06:57.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Stroud Crescent

BT are proposing to carry out Utility asset works on Stroud Crescent, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Mar 2025 at 15:48.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:41.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 13:30.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 09:55.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:34.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:16.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:14.

London Borough Of Wandsworth logo
Finishing
Saturday
Details
View Map
Share
Follow
Duntshill Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Duntshill Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 08:27.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Jan 2025 at 15:22.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 13:42.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Brixton Station Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Feb 2025 at 13:33.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 09:10.

Southern Gas Networks logo
Between
7 and 10 Jun 2025
Details
View Map
Share
Follow
Replingham Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Replingham Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 11:33.

Southern Gas Networks logo
Between
7 and 10 Jun 2025
Details
View Map
Share
Follow
Replingham Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Replingham Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Apr 2025 at 11:21.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 May 2025 at 16:19.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:45.

UK Power Networks Eastern & London logo
Between
7 and 20 Jun 2025
Details
View Map
Share
Follow
Coningham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.

UK Power Networks Eastern & London logo
Between
7 and 20 Jun 2025
Details
View Map
Share
Follow
Coningham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 15:06.

Transport for London (TfL) logo
Between
8 and 25 Jun 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:09.

Transport for London (TfL) logo
Between
8 and 25 Jun 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:15.

Transport for London (TfL) logo
Between
8 and 25 Jun 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 08:17.

Transport for London (TfL) logo
Between
8 and 25 Jun 2025
Details
View Map
Share
Malden Way Also Known As Kingston By Pass

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way Also Known As Kingston By Pass, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:08.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:20.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 08:28.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Portland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portland Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 09:43.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 23:40.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 13:53.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 07:57.

Thames Water logo
LONG TERM
Between
9 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Derwent Avenue

Thames Water are proposing to carry out Utility asset works on Derwent Avenue, Kingston Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:26.

Thames Water logo
LONG TERM
Between
9 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Kingston Vale

Thames Water are proposing to carry out Utility asset works on Kingston Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:28.

Thames Water logo
LONG TERM
Between
9 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Kingston Vale

Thames Water are proposing to carry out Utility asset works on Kingston Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:55.

Thames Water logo
LONG TERM
Between
9 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Derwent Avenue

Thames Water are proposing to carry out Utility asset works on Derwent Avenue, Kingston Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:57.

London Borough Of Lambeth logo
LONG TERM
Between
9 Jun and 1 Aug 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jun 2025 at 07:50.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Atkins Road

Thames Water were proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:21.

BT logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Putney Heath

BT were proposing to carry out Utility asset works on Putney Heath, Putney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 23 May 2025 at 09:39.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:46.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:49.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:05.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:26.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:48.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 13 Jul 2025
Details
View Map
Share
Nelsons Row

Transport for London (TfL) were proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:42.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 00:00.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:06.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 08:55.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:46.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:11.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Carpenter's Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:45.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:58.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:07.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 09:02.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:45.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:15.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
St Luke's Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:54.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 14:32.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 09:00.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:43.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:12.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Lyric Road

Thames Water are proposing to carry out Remedial works on Lyric Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 15:59.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Hollywood Road

Thames Water were proposing to carry out Utility asset works on Hollywood Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:06.

Thames Water logo
Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 12:41.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:36.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hebron Road

Thames Water are proposing to carry out Utility asset works on Hebron Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hebron Road

Thames Water are proposing to carry out Utility asset works on Hebron Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:25.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility asset works on Iffley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 10:04.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility asset works on Iffley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.

Transport for London (TfL) logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 12:08.

Transport for London (TfL) logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:42.

Transport for London (TfL) logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 13:49.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Tremadoc Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:56.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:59.

Its Technology Group logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Lavender Sweep

Its Technology Group were proposing to carry out Utility repair and maintenance works on Lavender Sweep, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 19 May 2025 at 08:48.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 08:22.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:40.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:13.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Woodborough Road

BT are proposing to carry out Utility asset works on Woodborough Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:43.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Woodborough Road

BT are proposing to carry out Utility asset works on Woodborough Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 15:58.

Transport for London (TfL) logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 12:09.

Transport for London (TfL) logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:43.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:31.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 15:25.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:39.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:12.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:28.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 5 Mar 2025 at 21:30.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Osborne Road

London Borough Of Ealing were proposing to carry out Utility asset works on Osborne Road, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 7 Mar 2025 at 09:23.

Transport for London (TfL) logo
Between
11 and 30 Jun 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 14:21.

Transport for London (TfL) logo
Between
11 and 30 Jun 2025
Details
View Map
Share
Follow
Malden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Malden Road, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2025 at 14:30.

Transport for London (TfL) logo
Between
11 and 30 Jun 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2025 at 14:30.

Transport for London (TfL) logo
Between
11 and 30 Jun 2025
Details
View Map
Share
Malden Way Also Known As Kingston By Pass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Malden Way Also Known As Kingston By Pass, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 14:21.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:32.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 10:29.

Thames Water logo
Between
11 and 19 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:07.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:16.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:17.

Transport for London (TfL) logo
Between
12 and 14 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:12.

Transport for London (TfL) logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 12:42.

Southern Gas Networks logo
LONG TERM
Between
13 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Tybenham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tybenham Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:45.

Southern Gas Networks logo
LONG TERM
Between
13 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Kenley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kenley Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:43.

BT logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Graemesdyke Avenue

BT are proposing to carry out Utility asset works on Graemesdyke Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 10:34.

Murphy Gas Networks logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Bollo Lane

Murphy Gas Networks are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 19 Mar 2025 at 15:20.

London Borough Of Ealing logo
Between
13 and 27 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:22.

National Highways logo
Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 13:18.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:40.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Landor Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 09:05.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:59.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:08.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:17.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 12:37.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Circle Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Circle Gardens, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 06:44.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Phipp's Bridge Road

BT are proposing to carry out Utility asset works on Phipp's Bridge Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 May 2025 at 13:57.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:21.

Thames Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Leigham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Leigham Avenue, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 14:44.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:26.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:27.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilford Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 07:56.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Tilford Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:18.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Westmead

BT are proposing to carry out Utility asset works on Westmead, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:47.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Westmead

BT are proposing to carry out Utility asset works on Westmead, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 May 2025 at 12:07.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Westmead

BT are proposing to carry out Utility asset works on Westmead, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 May 2025 at 08:42.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 12:29.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 16:09.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 12:28.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 16:10.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out New service connection on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:53.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Dealtry Road

BT are proposing to carry out Utility asset works on Dealtry Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Mar 2025 at 16:32.

Murphy Power Distribution logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Emden Street

Murphy Power Distribution are proposing to carry out New service connection on Emden Street, London.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Jun 2025 at 14:25.

Murphy Power Distribution logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Imperial Road

Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 May 2025 at 09:54.

Murphy Power Distribution logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Imperial Road

Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 13 May 2025 at 09:13.

Electricity Network Company logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are proposing to carry out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:49.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Averill Street

Thames Water are proposing to carry out New service connection on Averill Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:46.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 15:07.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 09:33.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 08:57.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Caxton Road

Thames Water are proposing to carry out New service connection on Caxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 10:36.

Thames Water logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Pyrmont Road

Thames Water are proposing to carry out New service connection on Pyrmont Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 08:42.

London Borough Of Wandsworth logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Cicada Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Cicada Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Mar 2025 at 15:03.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:43.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Mayflower Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 07:51.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:54.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:42.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:21.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:41.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:43.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:41.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:45.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:30.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:40.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:22.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:40.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:41.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:44.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:39.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 06:44.

Transport for London (TfL) logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:41.

UK Power Networks Eastern & London logo
Between
20 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:27.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Cambridge Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Mar 2025 at 10:07.

LONG TERM
Between
23 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Clarence Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clarence Street, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Apr 2025 at 13:55.

LONG TERM
Between
23 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Fife Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Fife Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Apr 2025 at 14:13.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cambridge Road

Thames Water are proposing to carry out New service connection on Cambridge Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 11:40.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 08:13.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Tennyson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tennyson Road, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:19.

Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Petersham Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Petersham Road, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Mar 2025 at 12:32.

Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Petersham Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Petersham Road, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Mar 2025 at 12:59.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:28.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2025 at 15:56.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 14:44.

Thames Water logo
Between
23 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Old York Road

Thames Water are proposing to carry out Utility asset works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 15:28.

London Borough Of Wandsworth logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Balmuir Gardens

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Balmuir Gardens, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 09:12.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out New service connection on Worple Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:07.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out New service connection on Worple Road, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:48.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Kentwode Green

Thames Water are proposing to carry out New service connection on Kentwode Green, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 13:43.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Markham Street

Thames Water are proposing to carry out New service connection on Markham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 15:04.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Great Church Lane

Thames Water are proposing to carry out New service connection on Great Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:09.

Thames Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are proposing to carry out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 14:48.

Cadent Gas logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meon Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Meon Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 13:01.

Thames Water logo
Between
24 Jun and 14 Jul 2025
Details
View Map
Share
Bramcote Avenue

Thames Water were proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:33.

Thames Water logo
Between
24 Jun and 14 Jul 2025
Details
View Map
Share
Cricket Green

Thames Water were proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:35.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Tooting High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 09:10.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Brudenell Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:48.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Brudenell Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Beechcroft Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:51.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Beechcroft Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Topsham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:49.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Topsham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Mandrake Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:52.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Mandrake Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Upper Tooting Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Upper Tooting Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 09:11.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Upper Tooting Park

Transport for London (TfL) were proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:55.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:57.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:36.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:36.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:42.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 11:04.

Thames Water logo
Between
25 Jun and 15 Jul 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 22:58.

London Borough Of Wandsworth logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Linstead Way

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Linstead Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2025 at 09:08.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:26.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

Transport for London (TfL) logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:32.

Transport for London (TfL) logo
Between
26 Jun and 15 Jul 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 15 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:09.

Transport for London (TfL) logo
Between
26 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:21.

Transport for London (TfL) logo
Between
26 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 08:20.

London Borough Of Wandsworth logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Linstead Way

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Linstead Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 07:44.

Thames Water logo
Between
27 and 29 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 May 2025 at 11:28.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Ritherdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ritherdon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:26.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Upper Tooting Park

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:34.

Thames Water logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 08:38.

Southern Gas Networks logo
Between
30 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 10:35.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:51.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 10:30.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:13.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 14 May 2025 at 09:27.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 May 2025 at 10:51.

Thames Water logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:49.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 15 Jul 2025
Details
View Map
Share
Ranelagh Drive

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ranelagh Drive, Twickenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 May 2025 at 16:01.

London Borough Of Hammersmith & Fulham logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Dunsany Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Dunsany Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:42.

Transport for London (TfL) logo
Between
1 and 18 Jul 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 14:21.

Transport for London (TfL) logo
Between
1 and 18 Jul 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2025 at 14:31.

Between
1 and 15 Jul 2025
Details
View Map
Share
Follow
Kingston Vale

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Kingston Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Apr 2025 at 10:39.

Scottish Hydro Electric Power Dis logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Haliburton Road

Scottish Hydro Electric Power Dis were proposing to carry out Remedial works on Haliburton Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 3 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Apr 2025 at 16:42.

Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Kingston Hill

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Kingston Hill, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Mar 2025 at 11:56.

Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Kingston Hill

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Kingston Hill, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 2 Apr 2025 at 11:53.

Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Sandy Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Sandy Lane, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 9 May 2025 at 09:08.

Thames Water logo
Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Ingersoll Road

Thames Water are proposing to carry out New service connection on Ingersoll Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 17:04.

Thames Water logo
Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Ingersoll Road

Thames Water are proposing to carry out New service connection on Ingersoll Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out New service connection on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:40.

Thames Water logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Robin Hood Lane

Thames Water are proposing to carry out roadworks on Robin Hood Lane, Kingston Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:48.

Thames Water logo
Between
4 and 10 Jul 2025
Details
View Map
Share
Follow
Cale Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:57.

Thames Water logo
Between
4 and 9 Jul 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Forest Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Side, Worcester Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:36.

UK Power Networks South Eastern logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Lady Booth Road

UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 28 May 2025 at 10:47.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:13.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:03.

Southern Gas Networks logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 16:09.

Thames Water logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Remedial works on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 08:12.

Thames Water logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Remedial works on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 08:14.

London Borough Of Wandsworth logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Mitcham Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 9 May 2025 at 07:52.

UK Power Networks Eastern & London logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 09:35.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

BT logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Princes Way

BT are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 12:46.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

UK Power Networks South Eastern logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Chapel Road

UK Power Networks South Eastern are proposing to carry out New service connection on Chapel Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Apr 2025 at 16:45.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Ailsa Road

Thames Water are proposing to carry out New service connection on Ailsa Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 16:00.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Sherbrooke Road

Virgin Media are proposing to carry out Utility asset works on Sherbrooke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Allestree Road

Virgin Media are proposing to carry out Utility asset works on Allestree Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Thames Water logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Albany Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Albany Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 15:39.

Thames Water logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Albany Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Albany Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:12.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.

Thames Water logo
LONG TERM
Between
7 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 09:52.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Aldensley Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:53.

Thames Water logo
LONG TERM
Between
7 Jul and 23 Oct 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:59.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Brackenbury Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Brackenbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Apr 2025 at 09:47.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Macfarlane Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

BT logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Park Road

BT are proposing to carry out Utility asset works on Park Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Apr 2025 at 16:31.

London Borough Of Merton logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Croydon Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 25 Mar 2025 at 15:04.

London Borough Of Merton logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Croydon Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 28 Mar 2025 at 09:07.

Southern Gas Networks logo
Between
14 Jul and 12 Aug 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 07:28.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:26.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Lower Green West

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Green West, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 08:53.

Southern Gas Networks logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Fieldgate Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldgate Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footpath only.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 09:10.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 10:08.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Thurleigh Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Thurleigh Road, Balham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 09:57.

London Borough Of Lambeth logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 Apr 2025 at 09:28.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:15.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:03.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:23.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Cadogan Place

Thames Water are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:28.

Thames Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Hans Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 May 2025 at 12:33.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

Thames Water logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:02.

Thames Water logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Cricket Green

Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:02.

BT logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Rodway Road

BT are proposing to carry out Utility asset works on Rodway Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2025 at 10:04.

BT logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Rodway Road

BT are proposing to carry out Utility asset works on Rodway Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2025 at 11:01.

Transport for London (TfL) logo
Between
16 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 11:07.

Transport for London (TfL) logo
Between
16 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 08:22.

Transport for London (TfL) logo
Between
16 Jul and 4 Aug 2025
Details
View Map
Share
Malden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Road, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 July 2025 and run through until 4 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:09.

Thames Water logo
Between
16 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Remedial works on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:13.

Thames Water logo
Between
16 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Remedial works on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:14.

Cadent Gas logo
Between
17 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:54.

London Borough Of Ealing logo
Between
17 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 12:51.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
The Manor Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Manor Drive, Worcester Park.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 10:18.

Southern Gas Networks logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 15:21.

LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Burlington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Burlington Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 29 May 2025 at 12:01.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 08:19.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 12:48.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Churchmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:33.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:40.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Stockport Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:29.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:42.

Southern Gas Networks logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Woodmansterne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:31.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:15.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:10.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Island Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Island Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 16:18.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:14.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 10:03.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:21.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:31.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:33.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:29.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 12 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Mar 2025 at 09:07.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 14:54.

Thames Water logo
Between
21 Jul and 3 Aug 2025
Details
View Map
Share
Dymock Street

Thames Water were proposing to carry out Utility asset works on Dymock Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:48.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Devonshire Road

BT were proposing to carry out Utility asset works on Devonshire Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 13:10.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Temple Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:01.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Temple Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:11.

London Borough Of Ealing logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 15 May 2025 at 08:09.

Thames Water logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Richmond Road

Thames Water are proposing to carry out Remedial works on Richmond Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 14:54.

Thames Water logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Culvert Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Culvert Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:46.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:19.

London Borough Of Merton logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Eveline Road

London Borough Of Merton are proposing to carry out Highway improvement works on Eveline Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 28 Mar 2025 at 09:18.

London Borough Of Merton logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Eveline Road

London Borough Of Merton are proposing to carry out Highway improvement works on Eveline Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Apr 2025 at 13:59.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 14:40.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 15:28.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility asset works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:28.

Thames Water logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility asset works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:33.

Thames Water logo
LONG TERM
Between
23 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:17.

Thames Water logo
LONG TERM
Between
23 Jul and 28 Aug 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:30.

Thames Water logo
Between
23 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Kingston Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Kingston Hill, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 16:04.

Thames Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Atkins Road

Thames Water were proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 12:33.

Cadent Gas logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:35.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:27.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.

Cadent Gas logo
Between
23 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Askew Road

Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:42.

Southern Gas Networks logo
Between
24 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Worcester Park.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:48.

Southern Gas Networks logo
Between
24 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Worcester Park.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 11:08.

Thames Water logo
Between
24 Jul and 13 Aug 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 July 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 12:25.

Thames Water logo
Between
24 Jul and 13 Aug 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 July 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:42.

Thames Water logo
Between
24 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 12:55.

LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Apr 2025 at 13:48.

Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 28 May 2025 at 14:29.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Nov 2024 at 23:17.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Blakes Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 07:13.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Blakes Terrace

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Terrace, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:31.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Blakes Terrace

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Terrace, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Nov 2024 at 23:06.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Blakes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:11.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Blakes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 20:25.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Vectis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vectis Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:57.

Network Rail logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 May 2025 at 13:02.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Sutherland Grove

BT are proposing to carry out Utility asset works on Sutherland Grove, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2025 at 11:24.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Sutherland Grove

BT are proposing to carry out Utility asset works on Sutherland Grove, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Apr 2025 at 09:13.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Park Road

BT are proposing to carry out Utility asset works on Park Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Apr 2025 at 14:38.

Thames Water logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Carrington Road

Thames Water were proposing to carry out Utility asset works on Carrington Road, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 07:51.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Ferndale Road

Thames Water are proposing to carry out New service connection on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:30.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Fishers Lane

Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Fishers Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 09:17.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 16:34.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:38.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:27.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Boscombe Road

Cadent Gas are proposing to carry out Utility asset works on Boscombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Westville Road

Cadent Gas are proposing to carry out Utility asset works on Westville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Findon Road

Cadent Gas are proposing to carry out Utility asset works on Findon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ladbroke Walk

Thames Water are proposing to carry out New service connection on Ladbroke Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 15:27.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ashfield Road

Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:52.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ashfield Road

Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:12.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Apr 2025 at 08:03.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Apr 2025 at 09:18.

London Borough Of Merton logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Merton are proposing to carry out Highway improvement works on Green Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 16 Apr 2025 at 08:53.

Thames Water logo
Between
31 Jul and 13 Aug 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 08:04.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Jun 2025 at 07:49.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Jun 2025 at 07:44.

LONG TERM
Between
31 Jul 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Jun 2025 at 07:36.

Thames Water logo
Between
2 and 6 Aug 2025
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out roadworks on Carlwell Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 07:26.

Thames Water logo
Between
2 and 6 Aug 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:13.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Askew Road

Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.

Southern Gas Networks logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Claremont Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Avenue, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:09.

Southern Gas Networks logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:10.

UK Power Networks Eastern & London logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Heath Drive

UK Power Networks Eastern & London were proposing to carry out New service connection on Heath Drive, Raynes Park.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 20:14.

UK Power Networks Eastern & London logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Heath Drive

UK Power Networks Eastern & London are proposing to carry out New service connection on Heath Drive, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 11:24.

London Borough Of Merton logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Dorset Road

London Borough Of Merton are proposing to carry out Highway improvement works on Dorset Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Apr 2025 at 09:15.

London Borough Of Merton logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Dorset Road

London Borough Of Merton are proposing to carry out Highway improvement works on Dorset Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 17 Apr 2025 at 11:28.

Cadent Gas logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Latchmere Lane

Cadent Gas are proposing to carry out Utility asset works on Latchmere Lane, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 13:00.

London Borough Of Lambeth logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.

Virgin Media logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Holly Road

Virgin Media are proposing to carry out Utility asset works on Holly Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 May 2025 at 16:00.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 20:57.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Anselm Road

Thames Water are proposing to carry out New service connection on Anselm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 09:42.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Onslow Gardens

Cadent Gas are proposing to carry out Utility asset works on Onslow Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:28.

Thames Water logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:02.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 09:33.

Transport for London (TfL) logo
Between
5 and 22 Aug 2025
Details
View Map
Share
Follow
Malden Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Malden Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 11:47.

Thames Water logo
LONG TERM
Between
5 Aug 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Between
5 Aug and 16 Oct 2025
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

City Of Westminster logo
Between
5 and 18 Aug 2025
Details
View Map
Share
Follow
Lyall Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lyall Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 15:37.

UK Power Networks Eastern & London logo
Between
5 and 24 Aug 2025
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:54.

Southern Gas Networks logo
Between
6 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Fullbrooks Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullbrooks Avenue, Worcester Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 11:08.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Vereker Road

BT are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 May 2025 at 09:30.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 09:55.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 15:26.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Queensmere Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Queensmere Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 May 2025 at 09:31.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 May 2025 at 07:16.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Bessborough Road

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Bessborough Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 May 2025 at 14:30.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Wroughton Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 May 2025 at 08:24.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Eastfields Road

Thames Water are proposing to carry out Utility asset works on Eastfields Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:32.

Between
11 and 23 Aug 2025
Details
View Map
Share
Follow
Washington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Washington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 12 May 2025 at 16:20.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Fieldend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:36.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 13:41.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Greenock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 14:38.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Bedgebury Gardens

BT are proposing to carry out Utility asset works on Bedgebury Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 May 2025 at 09:18.

Network Rail logo
Between
11 and 16 Aug 2025
Details
View Map
Share
Follow
Upper Richmond Road

Network Rail are proposing to carry out Works for Rail Purposes on Upper Richmond Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 14:43.

Network Rail logo
Between
11 and 16 Aug 2025
Details
View Map
Share
Follow
Upper Richmond Road

Network Rail are proposing to carry out Works for Rail Purposes on Upper Richmond Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 May 2025 at 08:53.

UK Power Networks Eastern & London logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Electric Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Electric Lane, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 09:59.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out New service connection on Ashburnham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 14:15.

Thames Water logo
Between
11 and 20 Aug 2025
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 14:43.

Scottish Hydro Electric Power Dis logo
Between
11 and 21 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 12:04.

Thames Water logo
LONG TERM
Between
12 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Winsham Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Thames Water logo
LONG TERM
Between
12 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Transport for London (TfL) logo
Between
12 and 18 Aug 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 13:10.

London Borough Of Merton logo
Between
13 and 16 Aug 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Merton are proposing to carry out Highway improvement works on Church Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Apr 2025 at 07:59.

BT logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Princes Way

BT are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 May 2025 at 09:16.

Thames Water logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:51.

Southern Gas Networks logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Worcester Park.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:42.

Southern Gas Networks logo
Between
18 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Worcester Park.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 11:04.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 16:18.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:10.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Hawkes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawkes Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 16:30.

Energy Assets Pipelines logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 21 May 2025 at 11:36.

Energy Assets Pipelines logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 29 May 2025 at 15:20.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 21 May 2025 at 11:37.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Merton Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Merton Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 May 2025 at 15:24.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Princes Way

BT are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 08:27.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Beaumont Road

BT are proposing to carry out Utility asset works on Beaumont Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 08:18.

Thames Water logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:40.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Abercairn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abercairn Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:08.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Abercairn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abercairn Road, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:37.

Thames Water logo
Between
22 and 31 Aug 2025
Details
View Map
Share
Sydney Street

Thames Water were proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 16:59.

Thames Water logo
Between
23 and 27 Aug 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:40.

Network Rail logo
Between
23 and 30 Aug 2025
Details
View Map
Share
Vine Road

Network Rail were proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 August 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 May 2025 at 10:56.

Network Rail logo
Between
23 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Grove Park Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 May 2025 at 10:41.

Transport for London (TfL) logo
Between
24 and 28 Aug 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:10.

Thames Water logo
Between
25 and 30 Aug 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 23:48.

Thames Water logo
Between
25 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:43.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Elizabeth Street

Thames Water were proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:34.

Scottish Hydro Electric Power Dis logo
Between
25 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Colville Road

Scottish Hydro Electric Power Dis are proposing to carry out Highway repair and maintenance works on Colville Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 09:45.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Princes Way

BT are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Jun 2025 at 08:55.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Beaumont Road

BT were proposing to carry out Utility asset works on Beaumont Road, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 11:54.

Virgin Media logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Yeoman's Row

Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 May 2025 at 16:02.

UK Power Networks Eastern & London logo
Between
26 Aug and 8 Sep 2025
Details
View Map
Share
Wood Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:25.

Thames Water logo
Between
27 Aug and 1 Sep 2025
Details
View Map
Share
Swaffield Road

Thames Water were proposing to carry out New service connection on Swaffield Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:51.

Transport for London (TfL) logo
Between
29 Aug and 3 Sep 2025
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 14:10.

Thames Water logo
Between
29 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:22.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Doria Road

Thames Water were proposing to carry out Utility asset works on Doria Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:13.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Follow
Doria Road

Thames Water are proposing to carry out Utility asset works on Doria Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:57.

Thames Water logo
Between
29 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:37.

Transport for London (TfL) logo
Between
31 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 15 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:33.

Transport for London (TfL) logo
Between
31 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 15 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:25.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Cremorne Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cremorne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:58.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:22.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:20.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 16:31.


Roadworks Map near to Chapman Square, LONDON, SW19 5QU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chapman Square, LONDON, SW19 5QU (41 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
QUEENSMERE CLOSE 
(0.1 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 16:57
(Scheduled: 30 May 2025 - 4 Jun 2025)
0.1
Details
Share
Follow
2
London Borough Of Wandsworth logo
MAJOR
  
BLINCOE CLOSE, SOUTHFIELDS 
(0.2 miles)
London Borough Of Wandsworth
Works for road purposes - Footway - No carriageway incursion
Planned
Scheduled: 22 May 2025 - 20 Jun 2025
0.2
Details
Share
Follow
3
BT logo
QUEENSMERE ROAD, SOUTHFIELDS 
(0.2 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
4
BT logo
QUEENSMERE ROAD 
(0.2 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
5
Southern Gas Networks logo
URGENT
  
SEYMOUR ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 23 May 2025 09:50
(Scheduled: 23 May 2025 - 3 Jun 2025)
0.3
Details
Share
Follow
6
BT logo
PENNER CLOSE, SOUTHFIELDS 
(0.4 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
7
BT logo
BATHGATE ROAD, SOUTHFIELDS 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.5
Details
Share
Follow
8
BT logo
CHURCH ROAD 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 16:54
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.5
Details
Share
Follow
9
BT logo
BATHGATE ROAD 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.5
Details
Share
Follow
10
BT logo
SOMERSET ROAD 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data