ROADWORKS SUMMARY
Marryat Road, LONDON, SW19 5BN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Marryat Road, SW19 5BN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Marryat Road, LONDON, SW19 5BN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Marryat Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Wandsworth logo
LONG TERM
Until
27 Mar 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 27 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2025 at 08:43.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:06.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2026 at 15:11.

Transport for London (TfL) logo
LONG TERM
Until
3 Feb 2027
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2026 at 12:19.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Welham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Welham Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 08:15.

Thames Water logo
LONG TERM
Between
12 Jan and 6 Oct 2026
Details
View Map
Share
Follow
Willow Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Dec 2025 at 16:30.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2026 at 13:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:14.

Network Rail logo
LONG TERM
Until
30 Aug 2027
Details
View Map
Share
Follow
Old York Road

Network Rail are carrying out Works for Rail Purposes on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 07:00 and could run through until 30 August 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 13:37.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2026
Details
View Map
Share
Follow
Recreation Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Recreation Way, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 10:30 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2026 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
26 Mar 2026 and 25 Mar 2027
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out roadworks on London Road, North Cheam.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 26 March 2026 and could run through until 25 March 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2026 at 15:22.

Network Rail logo
LONG TERM
Until
1 Nov 2026
Details
View Map
Share
Follow
Chiltern Drive

Network Rail are carrying out Works for Rail Purposes on Chiltern Drive, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2026 at 08:00 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Apr 2026 at 08:54.

Thames Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Somerleyton Road

Thames Water are carrying out Disconnection or alteration of supply on Somerleyton Road, Brixton Windrush, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2026 at 10:00 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2026 at 10:24.

Thames Water logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 April 2026 at 11:00 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:50.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Albert Bridge Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2026 at 00:00 and could run through until 28 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Apr 2026 at 16:31.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Wakehurst Road

Thames Water are carrying out Disconnection or alteration of supply on Wakehurst Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 June 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 08:07.

LONG TERM
Between
20 Jul 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Beaconsfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 May 2026 at 09:04.

LONG TERM
Between
20 Jul 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Hollyfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 May 2026 at 12:20.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Jul 2026 at 09:30.

Southern Gas Networks logo
LONG TERM
Until
18 Oct 2026
Details
View Map
Share
Follow
Copse Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Copse Hill, Wimbledon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2026 at 08:28.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Kingsdowne Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Sep 2026 at 07:04.

Southern Gas Networks logo
LONG TERM
Until
1 Nov 2026
Details
View Map
Share
Follow
Orchard Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Way, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:36.

Southern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 07:35.

LONG TERM
Until
25 Jan 2027
Details
View Map
Share
Follow
Ditton Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Jul 2026 at 09:32.

Thames Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Marmion Road

Thames Water are carrying out Disconnection or alteration of supply on Marmion Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 13:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:26.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are carrying out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:04.

London Borough Of Wandsworth logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are carrying out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Jul 2026 at 09:03.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Pump House Lane

London Borough Of Wandsworth are proposing to carry out Section 50 on Pump House Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Aug 2026 at 11:01.

London Borough Of Wandsworth logo
LONG TERM
Between
27 Jul and 28 Sep 2026
Details
View Map
Share
Follow
Kirtling Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Kirtling Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 30 Jun 2026 at 10:40.

LONG TERM
Between
8 Aug 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Paradise Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Paradise Road, Richmond.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2026 and could run through until 26 March 2027. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 May 2026 at 13:19.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Oakhill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oakhill Road, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:21.

Southern Gas Networks logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Brunswick Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brunswick Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 12:15 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:22.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wiltshire Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wiltshire Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 09:00 and could run through until 21 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 10:44.

London Borough Of Lambeth logo
LONG TERM
Between
10 Aug 2026 and 10 Aug 2028
Details
View Map
Share
Follow
Somerleyton Road

London Borough Of Lambeth are proposing to carry out roadworks on Somerleyton Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 10 August 2028. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 31 Jul 2026 at 10:29.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Wisley Road

Thames Water are carrying out Disconnection or alteration of supply on Wisley Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 09:00 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

UK Power Networks Eastern & London are carrying out Utility asset works on Kensington High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2026 at 08:00 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2026 at 09:25.

Southern Gas Networks logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Burnell Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Burnell Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2026 at 12:22.

Southern Gas Networks logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 6 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 10:47.

Between
24 Aug and 18 Sep 2026
Details
View Map
Share
Coombe Road

Last Mile Electricity (formerly Global Utility Connections) carried out Utility asset works on Coombe Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 24 Aug 2026 and 18 Sep 2026 and were actually completed between 25 Aug 2026 (09:30) and 18 Sep 2026 (19:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Sep 2026 at 20:32.

Between
24 Aug and 18 Sep 2026
Details
View Map
Share
Galsworthy Road

Last Mile Electricity (formerly Global Utility Connections) carried out Utility asset works on Galsworthy Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 24 Aug 2026 and 18 Sep 2026 and were actually completed between 24 Aug 2026 (09:30) and 18 Sep 2026 (19:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Sep 2026 at 20:31.

Thames Water logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Holmesdale Road

Thames Water are carrying out Disconnection or alteration of supply on Holmesdale Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 08:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:09.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Monday
Details
View Map
Share
Follow
Robin Hood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Robin Hood Lane, Sutton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 10:01 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Sep 2026 at 07:28.

Thames Water logo
LONG TERM
Between
26 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 12:59.

Thames Water logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Gowrie Road

Thames Water are carrying out Disconnection or alteration of supply on Gowrie Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:45 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:00.

Cadent Gas logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Nine Elms Lane

Cadent Gas are carrying out Utility asset works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 09:51 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:27.

London Borough Of Hounslow logo
LONG TERM
Between
28 Aug 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Clifton Gardens (South)

London Borough Of Hounslow are proposing to carry out Highway improvement works on Clifton Gardens (South), Chiswick, London.

These works are categorised as Major.

The works will start on or after 28 August 2026 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 31 Jul 2026 at 08:15.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:25 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2026 at 16:57.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Union Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 09:54.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Crabtree Lane

Cadent Gas are carrying out Utility asset works on Crabtree Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:21 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:56.

Southern Gas Networks logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Vale Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vale Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:30 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 09:51.

UK Power Networks Eastern & London logo
Between
1 and 18 Sep 2026
Details
View Map
Share
Follow
Marryat Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marryat Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:24.

UK Power Networks Eastern & London logo
Between
1 and 18 Sep 2026
Details
View Map
Share
Follow
Burghley Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Burghley Road, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2026 at 09:28.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are carrying out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are carrying out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:12.

Transport for London (TfL) logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are carrying out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:11.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 13:24.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are carrying out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:10.

Thames Water logo
Between
4 and 18 Sep 2026
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Twickenham.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:11.

Southern Gas Networks logo
Until
4 Oct 2026
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 11:30 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2026 at 12:21.

UK Power Networks South Eastern logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Sury Basin

UK Power Networks South Eastern are carrying out Utility asset works on Sury Basin, Kingston Upon Thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are proposing to carry out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2026 at 11:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Street Collier's Wood

Transport for London (TfL) are carrying out Highway improvement works on High Street Collier's Wood, Colliers Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 12:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Sep 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 February 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:29.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are carrying out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:16.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are carrying out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:13.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Yukon Road

Transport for London (TfL) are carrying out Highway improvement works on Yukon Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Thames Water logo
LONG TERM
Between
7 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Trelawn Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 May 2026 at 13:08.

Thames Water logo
Until
26 Sep 2026
Details
View Map
Share
Follow
Mauleverer Road

Thames Water are carrying out Utility repair and maintenance works on Mauleverer Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 13:00 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:04.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Berwyn Road

Cadent Gas are carrying out Utility asset works on Berwyn Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:34 and could run through until 1 October 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:04.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are proposing to carry out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Aug 2026 at 12:50.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Ham Common

Cadent Gas are proposing to carry out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:59.

Transport for London (TfL) logo
Between
10 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Apr 2026 at 12:52.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Brixton Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:45 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 12:48.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kew Road

UK Power Networks South Eastern are carrying out New service connection on Kew Road, Kew.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:45 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2026 at 08:57.

UK Power Networks South Eastern logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Villiers Road

UK Power Networks South Eastern are carrying out Utility asset works on Villiers Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 09:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2026 at 14:53.

UK Power Networks South Eastern logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Canbury Park Road

UK Power Networks South Eastern are carrying out Utility asset works on Canbury Park Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:30 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Sep 2026 at 08:39.

Thames Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are carrying out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 10:30.

Southern Gas Networks logo
Until
18 Sep 2026
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Lane, Tooting, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 05:43 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2026 at 10:18.

Royal Borough Of Kensington And Chelsea logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Fulham Road

Royal Borough Of Kensington And Chelsea are carrying out roadworks on Fulham Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 17:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 15:26.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 16:23.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Courtfield Gardens

UK Power Networks Eastern & London are carrying out New service connection on Courtfield Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 08:30.

Southern Gas Networks logo
Until
27 Sep 2026
Details
View Map
Share
Follow
St Mary's Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St Mary's Road, Wimbledon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 18:06 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2026 at 10:46.

Thames Water logo
Between
13 and 18 Sep 2026
Details
View Map
Share
Wolfington Road

Thames Water were proposing to carry out Utility repair and maintenance works on Wolfington Road, Knight's Hill, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:36.

Thames Water logo
Between
13 and 18 Sep 2026
Details
View Map
Share
Clapham Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Clapham Park Road, Clapham East, London.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:07.

Transport for London (TfL) logo
Between
14 Sep and 13 Oct 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 13 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Finishing
Monday
Details
View Map
Share
Follow
Victoria Road

Royal Borough Of Kingston Upon Thames are carrying out Remedial works on Victoria Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 18 Sep 2026 at 16:25.

Transport for London (TfL) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
St Helier Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 12:59.

Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 10:07.

Until
5 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Sep 2026 at 08:02.

UK Power Networks South Eastern logo
Between
14 Sep and 4 Oct 2026
Details
View Map
Share
Villiers Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on Villiers Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 4 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Aug 2026 at 08:59.

Thames Water logo
Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:55.

Cadent Gas logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Ham Common

Cadent Gas are carrying out Utility asset works on Ham Common, Ham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:35 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 08:57.

Transport for London (TfL) logo
Between
14 and 28 Sep 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:14.

Transport for London (TfL) logo
Between
14 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out roadworks on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Aug 2026 at 15:19.

Thames Water logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Follow
Kingscliffe Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:18.

Thames Water logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Kingscliffe Gardens

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingscliffe Gardens, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:23.

Thames Water logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:46.

Transport for London (TfL) logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Follow
Morrish Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 May 2026 at 11:29.

Transport for London (TfL) logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Brixton Hill

Transport for London (TfL) were proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Aug 2026 at 11:49.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Whitlock Drive

Thames Water are carrying out Utility repair and maintenance works on Whitlock Drive, Southfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 16:16 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 11:56.

Thames Water logo
Until
18 Sep 2026
Details
View Map
Share
Follow
Lynn Road

Thames Water are carrying out Utility repair and maintenance works on Lynn Road, Balham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:03.

Thames Water logo
Until
9 Oct 2026
Details
View Map
Share
Follow
Wroughton Road

Thames Water are carrying out Disconnection or alteration of supply on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:42.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Trelawn Road

Thames Water are carrying out Utility repair and maintenance works on Trelawn Road, Brixton Rush Common, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 19:29 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 17:18.

Thames Water logo
LONG TERM
Until
12 Nov 2026
Details
View Map
Share
Follow
Trelawn Road

Thames Water are carrying out Disconnection or alteration of supply on Trelawn Road, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:30 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:47.

Finishing
Monday
Details
View Map
Share
Follow
The Vineyard

London Borough Of Richmond Upon Thames are carrying out New service connection on The Vineyard, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Sep 2026 at 13:45.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Sep 2026 at 10:17.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:14.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Sep 2026 and 4 Apr 2027
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 4 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 8 Sep 2026 at 08:55.

Southern Gas Networks logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Follow
Parkfields

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Parkfields, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 16:12.

London Borough Of Wandsworth logo
Between
14 and 18 Sep 2026
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 18 Aug 2026 at 08:59.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Felsham Road

London Borough Of Wandsworth are carrying out Highway improvement works on Felsham Road, Putney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 14 Sep 2026 at 08:20.

Cadent Gas logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 12:46.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are carrying out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:02 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:42.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are proposing to carry out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 16:38.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Redesdale Street

Thames Water are carrying out New service connection on Redesdale Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 11:49 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 17:54.

Thames Water logo
Until
18 Sep 2026
Details
View Map
Share
Follow
Chancellors Road

Thames Water are carrying out Utility repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:40 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2026 at 13:34.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Kingston Upon Thames.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 02:45 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 15:35.

Thames Water logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dulka Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dulka Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:56.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stoneleigh Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Stoneleigh Avenue, Worcester Park.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:45 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Sep 2026 at 12:55.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:11.

UK Power Networks South Eastern logo
LONG TERM
Until
20 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are carrying out Utility asset works on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 08:00 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2026 at 09:12.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:00.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Albert Bridge Road

London Borough Of Wandsworth are carrying out Highway improvement works on Albert Bridge Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:30 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Sep 2026 at 09:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Elmwood Close

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Disconnection or alteration of supply on Elmwood Close, Wallington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 07:48 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Sep 2026 at 10:10.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Sibella Road

Thames Water are carrying out Utility repair and maintenance works on Sibella Road, Clapham Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2026 at 09:19.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clifton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clifton Road, Kingston Upon Thames.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2026 at 00:52 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2026 at 15:49.

Transport for London (TfL) logo
Tuesday
Details
View Map
Share
Upper Richmond Road West

Transport for London (TfL) carried out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 18 Sep 2026 and 22 Sep 2026 and were actually completed on 18 Sep 2026 between 21:25 and 22:33. The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2026 at 22:38.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Victoria Grove

Thames Water are carrying out Utility repair and maintenance works on Victoria Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2026 at 09:43 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 16:57.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Mortlake Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Mortlake Road, Kew.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2026 at 00:35 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2026 at 00:38.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Albert Road

UK Power Networks South Eastern are proposing to carry out roadworks on Albert Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:27.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
London Road

UK Power Networks South Eastern were proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2026 at 16:10.

UK Power Networks South Eastern logo
Between
20 Sep and 10 Oct 2026
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:35.

Southern Gas Networks logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Rochester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochester Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 08:57.

Southern Gas Networks logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Sep 2026 at 15:29.

Southern Gas Networks logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Mill Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Mill Lane, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 4 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 10:14.

Between
21 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Dickerage Lane

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Dickerage Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Aug 2026 at 09:18.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Villiers Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Road, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:17.

Between
21 and 29 Sep 2026
Details
View Map
Share
Follow
Washington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Washington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 23 Jun 2026 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2026 at 08:51.

Thames Water logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Burstow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burstow Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:22.

Thames Water logo
LONG TERM
Between
21 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Greyhound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Greyhound Lane, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:41.

London Borough Of Wandsworth logo
Finishing
Wednesday
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 16:07.

London Borough Of Wandsworth logo
Finishing
Wednesday
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Aug 2026 at 14:46.

Transport for London (TfL) logo
LONG TERM
Between
21 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:42.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Bridgend Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bridgend Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:27.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Jul 2026 at 15:25.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 13:45.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 15:06.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Wandsworth Bridge

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Wandsworth Bridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 30 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Aug 2026 at 12:49.

London Borough Of Wandsworth logo
Between
21 and 30 Sep 2026
Details
View Map
Share
Follow
Wandsworth Bridge Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wandsworth Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 17 Aug 2026 at 08:45.

Cadent Gas logo
Between
21 and 29 Sep 2026
Details
View Map
Share
Follow
Mallord Street

Cadent Gas are proposing to carry out Utility asset works on Mallord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 14:54.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 15:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Queensberry Mews West

Thames Water are proposing to carry out Disconnection or alteration of supply on Queensberry Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 17:53.

London Borough Of Hammersmith & Fulham logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:06.

Thames Water logo
Between
22 and 27 Sep 2026
Details
View Map
Share
Follow
Ansell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:45.

Cadent Gas logo
Between
22 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Novello Street

Cadent Gas are proposing to carry out Utility asset works on Novello Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 17:28.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Symons Street

Thames Water are proposing to carry out Utility repair and maintenance works on Symons Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 19:19.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Standish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Standish Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:05.

Vodafone logo
Finishing
Thursday
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 19 Jun 2026 at 10:39.

Vodafone logo
Finishing
Thursday
Details
View Map
Share
Follow
Derry Street

Vodafone are proposing to carry out Utility asset works on Derry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Sep 2026 at 14:12.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Corbet Close

BT are proposing to carry out Utility asset works on Corbet Close, Hackbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jun 2026 at 12:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
School Road

Thames Water are proposing to carry out Utility repair and maintenance works on School Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jul 2026 at 10:21.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Seymour Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seymour Road, Hampton Wick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 08:44.

Thames Water logo
Between
23 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Melbourne Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Melbourne Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:42.

London Borough Of Wandsworth logo
Between
23 Sep and 20 Oct 2026
Details
View Map
Share
Dulka Road

London Borough Of Wandsworth were proposing to carry out Utility repair and maintenance works on Dulka Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 20 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Sep 2026 at 14:53.

Its Technology Group logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Balham Park Road

Its Technology Group are proposing to carry out New service connection on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 9 Sep 2026 at 08:39.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 13:49.

Transport for London (TfL) logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 16:23.

Thames Water logo
LONG TERM
Between
24 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Freke Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Freke Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

Cadent Gas logo
Between
24 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parsons Green

Cadent Gas are proposing to carry out Utility asset works on Parsons Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

Cadent Gas logo
Between
24 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Parsons Green Lane

Cadent Gas are proposing to carry out Utility asset works on Parsons Green Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:17.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:04.

London Borough Of Wandsworth logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Battersea High Street

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.

T-Mobile (UK) logo
Between
27 and 30 Sep 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 30 Jun 2026 at 05:53.

Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Market Place

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Market Place, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:04.

Southern Gas Networks logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Maryland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2026 at 10:39.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 13:09.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southdean Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Southdean Gardens, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 14:52.

Transport for London (TfL) logo
Between
28 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2026 at 12:49.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:29.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:42.

Transport for London (TfL) logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Southern Gas Networks logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
Concanon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Concanon Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2026 at 14:58.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2026 at 13:21.

Southern Gas Networks logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Santley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Santley Street, Brixton Acre Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 15:19.

Cadent Gas logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 12:07.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Winslow Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Winslow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 08:10.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chancellors Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Chancellors Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

London Borough Of Hammersmith & Fulham logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Distillery Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Distillery Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Aug 2026 at 14:13.

Royal Borough Of Kensington And Chelsea logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Stewart's Grove

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Stewart's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Sep 2026 at 13:15.

Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Burney Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Burney Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 15:51.

Thames Water logo
Between
29 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Dennis Park Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Dennis Park Crescent, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 12:58.

Thames Water logo
LONG TERM
Between
29 Sep and 2 Nov 2026
Details
View Map
Share
Follow
King Edwards Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on King Edwards Grove, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 10:33.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:16.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bedford Hill

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 11:56.

London Borough Of Wandsworth logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Bolingbroke Grove

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Bolingbroke Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 11:52.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:33.

LONG TERM
Between
30 Sep and 1 Dec 2026
Details
View Map
Share
Follow
Washington Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Washington Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 7 Sep 2026 at 16:11.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Villiers Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Villiers Avenue, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 16:06.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Cheyne Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Cheyne Hill, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2026 at 11:12.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Cheyne Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Cheyne Hill, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2026 at 11:35.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Balham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:30.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Alderbrook Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Alderbrook Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Alderbrook Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 09:06.

Thames Water logo
LONG TERM
Between
2 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Burland Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Burland Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:14.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Oct and 3 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2026 and run through until 3 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 09:59.

Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Maple Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on Maple Road, Surbiton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Aug 2026 at 10:05.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Dickerage Lane

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Dickerage Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:52.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 16:45.

Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Sep 2026 at 07:51.

Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Union Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Union Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 16:05.

Southern Gas Networks logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Worple Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worple Road, Raynes Park.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 09:38.

Southern Gas Networks logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Worple Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worple Road, Raynes Park.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2026 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Thames Side

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 12:00.

Southern Gas Networks logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Thames Side

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Thames Side, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 13 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2026 at 11:45.

Thames Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Trevelyan Road

Thames Water were proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 07:31.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:25.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Morrish Road

Thames Water were proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 11:36.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Follow
Morrish Road

Thames Water are proposing to carry out New service connection on Morrish Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 10:21.

T-Mobile (UK) logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

T-Mobile (UK) are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Sep 2026 at 14:35.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2026 at 15:15.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 10:27.

Southern Gas Networks logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2026 at 08:24.

Thames Water logo
LONG TERM
Between
5 Oct 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northcote Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

London Borough Of Wandsworth logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Mar 2026 at 08:57.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:05.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Thames Water are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Perrymead Street

Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:20.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:54.

Thames Water logo
LONG TERM
Between
5 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Studdridge Street

Thames Water are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:34.

Cadent Gas logo
LONG TERM
Between
5 Oct 2026 and 7 Dec 2027
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:10.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Bowerdean Street

Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:18.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:13.

Cadent Gas logo
Between
5 and 14 Oct 2026
Details
View Map
Share
Follow
Lowther Road

Cadent Gas are proposing to carry out Utility asset works on Lowther Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2026 at 15:50.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Farm Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Farm Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2026 at 16:11.

Cadent Gas logo
LONG TERM
Between
5 Oct and 4 Dec 2026
Details
View Map
Share
Follow
North End Road

Cadent Gas are proposing to carry out Utility asset works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:47.

London Borough Of Hammersmith & Fulham logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Beauclerc Road

BT are proposing to carry out Utility asset works on Beauclerc Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Goldhawk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Pennard Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.

Network Rail logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Mar 2026 at 11:50.

Network Rail logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Sep 2026 at 08:34.

London Borough Of Hounslow logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
Cambridge Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cambridge Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 18 Sep 2026 at 11:35.

London Borough Of Hounslow logo
Between
6 and 9 Oct 2026
Details
View Map
Share
Follow
Oxford Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Oxford Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 17 Sep 2026 at 15:55.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 09:47.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 15:19.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Lamberts Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Lamberts Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2026 at 12:10.

Thames Water logo
Between
7 and 30 Oct 2026
Details
View Map
Share
Follow
Dennis Park Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Dennis Park Crescent, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:33.

Thames Water logo
Between
7 and 22 Oct 2026
Details
View Map
Share
Follow
Trowlock Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Trowlock Avenue, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 15:37.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:47.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Ewell Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 15:13.

Between
10 and 14 Oct 2026
Details
View Map
Share
Follow
Sydney Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Sydney Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Sep 2026 at 16:31.

Transport for London (TfL) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingston Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2026 at 13:31.

Transport for London (TfL) logo
Between
12 and 20 Oct 2026
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingston Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2026 at 10:30.

Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
The Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Section 50 on The Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Jul 2026 at 14:57.

Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Fife Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Fife Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 4 Sep 2026 at 07:02.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Manorgate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manorgate Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Thames Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Clifton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clifton Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:55.

Cadent Gas logo
LONG TERM
Between
12 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:37.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Aug 2026 at 16:07.

BT logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Carminia Road

BT are proposing to carry out Utility asset works on Carminia Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Sep 2026 at 07:09.

Thames Water logo
LONG TERM
Between
12 Oct and 14 Dec 2026
Details
View Map
Share
Follow
Chivalry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Chivalry Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 11:35.

UK Power Networks Eastern & London logo
Between
12 and 29 Oct 2026
Details
View Map
Share
Follow
Sheen Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Sheen Lane, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2026 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
King's Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2026 at 12:23.

Scottish Hydro Electric Power Dis logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 12:55.

Scottish Hydro Electric Power Dis logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2026 at 12:35.

London Borough Of Hammersmith & Fulham logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Sinclair Gardens

Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
Arras Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Arras Avenue, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
Connaught Gardens

Transport for London (TfL) were proposing to carry out Highway improvement works on Connaught Gardens, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:17.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 25 Nov 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

London Borough Of Wandsworth logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Aug 2026 at 13:12.

London Borough Of Wandsworth logo
Between
13 and 20 Oct 2026
Details
View Map
Share
Follow
Merton Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Merton Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 08:57.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:01.

Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
George Street

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on George Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:02.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Oct and 28 Nov 2026
Details
View Map
Share
Follow
Ewell Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 15:06.

LONG TERM
Between
14 Oct and 20 Nov 2026
Details
View Map
Share
Cambridge Road

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2026 and run through until 20 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:32.

LONG TERM
Between
14 Oct and 20 Nov 2026
Details
View Map
Share
Gloucester Road

Royal Borough Of Kingston Upon Thames were proposing to carry out roadworks on Gloucester Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2026 and run through until 20 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 27 Aug 2026 at 11:27.

Thames Water logo
LONG TERM
Between
14 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Regent Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Regent Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 14:19.

Thames Water logo
LONG TERM
Between
14 Oct 2026 and 16 Apr 2027
Details
View Map
Share
Follow
St Matthew's Road

Thames Water are proposing to carry out Disconnection or alteration of supply on St Matthew's Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2026 at 10:31.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:43.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2026 at 14:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Oct and 14 Dec 2026
Details
View Map
Share
St Julian's Farm Road

UK Power Networks Eastern & London were proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2026 and run through until 14 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:07.

UK Power Networks South Eastern logo
Between
17 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Oldfields Road

UK Power Networks South Eastern are proposing to carry out New service connection on Oldfields Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Aug 2026 at 09:50.

Cadent Gas logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Dawes Road

Cadent Gas are proposing to carry out New service connection on Dawes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 12:00.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Ditton Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ditton Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 11:20.

Thames Water logo
Between
18 and 22 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 09:16.

Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2026 at 14:28.

Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 15 Sep 2026 at 10:27.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Rectory Lane

Thames Water are proposing to carry out Remedial works on Rectory Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:59.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 08:55.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out New service connection on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2026 at 12:56.

Cadent Gas logo
Between
19 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are proposing to carry out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 14:38.

Cadent Gas logo
Between
19 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Strawberry Vale

Cadent Gas are proposing to carry out Utility asset works on Strawberry Vale, Twickenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 13:56.

Thames Water logo
Between
19 and 27 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 27 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 07:43.

Thames Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:22.

ESP Electricity logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

ESP Electricity are proposing to carry out Utility asset works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 11:36.

London Borough Of Wandsworth logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Bridges Court Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Bridges Court Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 13:52.

Cadent Gas logo
Between
19 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Chipstead Street

Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:21.

Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
The Terrace

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on The Terrace, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Jun 2026 at 12:03.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 08:45.

Thames Water logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2026 at 15:45.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Star Road

Cadent Gas are proposing to carry out Utility asset works on Star Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 08:35.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Vereker Road

Cadent Gas are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.

Transport for London (TfL) logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Stonecot Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stonecot Hill, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 13:24.

London Borough Of Wandsworth logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Blackshaw Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Blackshaw Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
LONG TERM
Between
20 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Keildon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keildon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2026 at 12:15.

Thames Water logo
Between
21 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Gomer Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Gomer Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jul 2026 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Oct and 21 Dec 2026
Details
View Map
Share
Follow
St Julian's Farm Road

UK Power Networks Eastern & London are proposing to carry out New service connection on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 09:59.

Between
24 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Cadogan Road

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Cadogan Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Aug 2026 at 10:41.

Southern Gas Networks logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Tamworth Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tamworth Lane, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2026 at 08:54.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Princes Way

Thames Water were proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 11:55.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Follow
Princes Way

Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:23.

Thames Water logo
Between
24 and 30 Oct 2026
Details
View Map
Share
Follow
Princes Way

Thames Water are proposing to carry out Utility asset works on Princes Way, Southfields, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 08:15.

Transport for London (TfL) logo
Between
24 Oct and 12 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Thames Water logo
Between
25 and 27 Oct 2026
Details
View Map
Share
Follow
Amyand Park Road

Thames Water are proposing to carry out Remedial works on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2026 at 09:27.

Transport for London (TfL) logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Carshalton Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 20:31.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Farmington Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Farmington Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Jun 2026 at 12:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Fellowes Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out roadworks on Fellowes Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 22 Jun 2026 at 12:35.

Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on London Road, North Cheam.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Aug 2026 at 14:22.

London Borough Of Sutton logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Winchcombe Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Winchcombe Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 27 Mar 2026 at 11:50.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Combermere Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Combermere Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Aug 2026 at 15:36.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Oct 2026 and 3 Mar 2027
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on London Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 3 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Aug 2026 at 13:51.

Hutchinson 3G logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Coombe Lane West

Hutchinson 3G are proposing to carry out Utility asset works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 11 Aug 2026 at 10:40.

Hutchinson 3G logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Coombe Lane West

Hutchinson 3G are proposing to carry out Utility asset works on Coombe Lane West, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 26 Aug 2026 at 16:19.

Hutchinson 3G logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Robin Hood Way

Hutchinson 3G are proposing to carry out Utility asset works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 4 Aug 2026 at 14:18.

Hutchinson 3G logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Robin Hood Way

Hutchinson 3G are proposing to carry out Utility asset works on Robin Hood Way, Coombe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Hutchinson 3G on 14 Sep 2026 at 11:31.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 29 Nov 2026
Details
View Map
Share
Follow
Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Road, Streatham Wells, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Southern Gas Networks logo
Between
26 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Wellfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellfield Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:06.

Cadent Gas logo
Between
26 Oct and 25 Nov 2026
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Ham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 11:19.

Transport for London (TfL) logo
LONG TERM
Between
26 Oct and 4 Dec 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2026 at 11:54.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 15:08.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2026 at 12:48.

Transport for London (TfL) logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Rinaldo Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rinaldo Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:51.

Thames Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2026 at 12:14.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Solna Avenue

BT are proposing to carry out Utility asset works on Solna Avenue, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jul 2026 at 08:45.

BT logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Preston Place

BT are proposing to carry out Utility asset works on Preston Place, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jul 2026 at 08:06.

Thames Water logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wymond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wymond Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 15:05.

London Borough Of Wandsworth logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wickersley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Aug 2026 at 11:17.

London Borough Of Wandsworth logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Wickersley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Wickersley Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 16 Sep 2026 at 09:41.

Cadent Gas logo
Between
26 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Chiddingstone Street

Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:22.

Cadent Gas logo
Between
26 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Quarrendon Street

Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:22.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Munster Road

Thames Water are proposing to carry out New service connection on Munster Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 07:48.

Cadent Gas logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Woodlawn Road

Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 10:15.

Cadent Gas logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Harbord Street

Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 10:15.

Cadent Gas logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Onslow Square

Cadent Gas are proposing to carry out New service connection on Onslow Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:30.

London Borough Of Hammersmith & Fulham logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.

London Borough Of Hammersmith & Fulham logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Shepherd's Bush Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wright's Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wright's Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:31.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:29.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 16:38.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hornton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Hornton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 11:11.

UK Power Networks South Eastern logo
Between
27 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Wickham Avenue

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Wickham Avenue, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2026 at 07:39.

London Borough Of Croydon logo
Between
28 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Manor Farm Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Manor Farm Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Jun 2026 at 14:43.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:39.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
New King's Road

Thames Water are proposing to carry out Utility repair and maintenance works on New King's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 07:44.

London Borough Of Sutton logo
Between
2 and 22 Nov 2026
Details
View Map
Share
Follow
Central Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Central Road, Worcester Park.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Sutton on 18 Sep 2026 at 13:44.

UK Power Networks South Eastern logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Selwood Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Selwood Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2026 at 17:20.

UK Power Networks South Eastern logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Aug 2026 at 12:04.

Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Clarence Street

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clarence Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Jun 2026 at 15:08.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grenfell Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 05:59.

London Borough Of Wandsworth logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway improvement works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 6 Aug 2026 at 09:55.

Thames Water logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2026 at 13:25.

London Borough Of Wandsworth logo
Between
2 and 8 Nov 2026
Details
View Map
Share
Follow
Grayshott Road

London Borough Of Wandsworth are proposing to carry out Utility repair and maintenance works on Grayshott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Aug 2026 at 14:47.

Cadent Gas logo
Between
2 and 30 Nov 2026
Details
View Map
Share
Follow
Bradbourne Street

Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:24.

Cadent Gas logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Parke Road

Cadent Gas are proposing to carry out Utility asset works on Parke Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 15:19.

BT logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2026 at 13:48.

Thames Water logo
Between
3 and 4 Nov 2026
Details
View Map
Share
Follow
Coval Passage

Thames Water are proposing to carry out Utility repair and maintenance works on Coval Passage, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 12:48.

UK Power Networks South Eastern logo
Between
4 and 22 Nov 2026
Details
View Map
Share
Kew Road

UK Power Networks South Eastern were proposing to carry out New service connection on Kew Road, Kew.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2026 and run through until 22 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2026 at 10:01.

London Borough Of Hammersmith & Fulham logo
Between
4 and 7 Nov 2026
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Sep 2026 at 14:40.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Oaklands Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Oaklands Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:15.

Transport for London (TfL) logo
Between
5 and 7 Nov 2026
Details
View Map
Share
Follow
Headcorn Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Headcorn Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 09:28.

On
8 Nov 2026
Details
View Map
Share
Follow
Unnamed Footpath - Petersham Road To Petersham Meadows

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Unnamed Footpath - Petersham Road To Petersham Meadows, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 November 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 16 Sep 2026 at 15:14.

Thames Water logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
Benhill Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Benhill Avenue, Sutton.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Aug 2026 at 09:18.

Southern Gas Networks logo
LONG TERM
Between
9 Nov and 13 Dec 2026
Details
View Map
Share
Follow
West Street Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2026 at 16:06.

Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 5 Aug 2026 at 10:27.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Dolphin Street

Thames Water were proposing to carry out Remedial works on Dolphin Street, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 13:53.

Thames Water logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Broom Water West

Thames Water are proposing to carry out Disconnection or alteration of supply on Broom Water West, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:35.

Cadent Gas logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Coniger Road

Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:26.

Cadent Gas logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Anderson Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anderson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 17:42.

UK Power Networks Eastern & London logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Petersham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Petersham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 09:40.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Glenburnie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:53.

Thames Water logo
Between
10 and 24 Nov 2026
Details
View Map
Share
Follow
Cornwall Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cornwall Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:26.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 09:04.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Chiswick Mall

Thames Water are proposing to carry out Utility asset works on Chiswick Mall, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 16:32.

Southern Gas Networks logo
Between
12 and 29 Nov 2026
Details
View Map
Share
Follow
Gleneldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gleneldon Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2026 at 10:07.

Cadent Gas logo
Between
12 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Temple Sheen

Cadent Gas are proposing to carry out Utility asset works on Temple Sheen, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 15:17.

Thames Water logo
Between
14 and 22 Nov 2026
Details
View Map
Share
Lower Richmond Road

Thames Water were proposing to carry out New service connection on Lower Richmond Road, Putney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2026 and run through until 22 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 16:51.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:16.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2026 at 13:13.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Holmewood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Holmewood Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:22.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:56.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:25.

Transport for London (TfL) logo
Between
15 and 17 Nov 2026
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:23.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:32.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Wandsworth Plain

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Plain, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:35.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Ram Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Ram Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:40.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Fairfield Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fairfield Street, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:43.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Frogmore

Transport for London (TfL) are proposing to carry out Highway improvement works on Frogmore, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:08.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Old York Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:29.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Dormay Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Dormay Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 09:09.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Armoury Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Armoury Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:24.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Putney Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Putney Bridge Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Jul 2026 at 08:59.

Transport for London (TfL) logo
Between
15 and 26 Nov 2026
Details
View Map
Share
Follow
Swandon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swandon Way, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 13:45.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 16:32.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Sep 2026 at 16:20.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Kingston Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Kingston Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 11:42.

Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Cambridge Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Sep 2026 at 11:31.

T-Mobile (UK) logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Longley Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Sep 2026 at 08:08.

Southern Gas Networks logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Aug 2026 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
16 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:52.

Network Rail logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Bedford Hill

Network Rail are proposing to carry out Works for Rail Purposes on Bedford Hill, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2026 at 09:00.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Pickets Street

Thames Water are proposing to carry out New service connection on Pickets Street, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:11.

Thames Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Park House Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Park House Gardens, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2026 at 16:28.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Winthorpe Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2026 and run through until 11 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:10.

Thames Water logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Winthorpe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Winthorpe Road, Putney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:48.

Thames Water logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Fownes Street

Thames Water are proposing to carry out roadworks on Fownes Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2026 at 16:00.

Cadent Gas logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:27.

Cadent Gas logo
Between
16 and 26 Nov 2026
Details
View Map
Share
Follow
Cumberland Road

Cadent Gas are proposing to carry out Utility asset works on Cumberland Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 15:19.

Cadent Gas logo
Between
16 and 30 Nov 2026
Details
View Map
Share
Follow
Rainville Road

Cadent Gas are proposing to carry out Utility asset works on Rainville Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:28.

Thames Water logo
LONG TERM
Between
17 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Udney Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Udney Park Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:15.

Transport for London (TfL) logo
LONG TERM
Between
17 Nov 2026 and 14 Jan 2027
Details
View Map
Share
Follow
Balham Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 14 January 2027. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 May 2026 at 11:49.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:27.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:42.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 16:38.

Transport for London (TfL) logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2026 at 13:28.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2026 at 09:26.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tooting High Street, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:54.

Transport for London (TfL) logo
Between
20 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Aldis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Aldis Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 14:35.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Vine Road

Network Rail are proposing to carry out Works for Rail Purposes on Vine Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2026 at 14:20.

Thames Water logo
Between
21 and 29 Nov 2026
Details
View Map
Share
Follow
Stanbridge Road

Thames Water are proposing to carry out Utility asset works on Stanbridge Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 15:26.

Thames Water logo
Between
21 and 29 Nov 2026
Details
View Map
Share
Follow
Ashlone Road

Thames Water are proposing to carry out Utility asset works on Ashlone Road, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 15:26.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Mortlake Road

Cadent Gas are proposing to carry out Utility asset works on Mortlake Road, Kew.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 12:30.

Thames Water logo
Between
24 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Haggard Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Haggard Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2026 at 11:28.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:38.

Transport for London (TfL) logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 14:37.

Transport for London (TfL) logo
Between
25 Nov and 7 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2026 and run through until 7 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

BT logo
Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Colet Gardens

BT are proposing to carry out Utility asset works on Colet Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 08:55.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Bramblewood Close

UK Power Networks South Eastern are proposing to carry out Utility asset works on Bramblewood Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2026 at 15:50.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Tweeddale Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tweeddale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Sep 2026 at 15:52.

UK Power Networks South Eastern logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Tweeddale Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tweeddale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 14:09.

Southern Gas Networks logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Warren Drive South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Drive South, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2026 at 07:26.

Southern Gas Networks logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Tolworth Rise South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tolworth Rise South, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2026 at 13:42.

Southern Gas Networks logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Gomer Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gomer Gardens, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 08:28.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Knollys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Knollys Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2026 at 09:20.

Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Lebanon Road

GRID LINE POWER NETWORKS LIMITED are proposing to carry out New service connection on Lebanon Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by GRID LINE POWER NETWORKS LIMITED on 27 Aug 2026 at 09:06.

Thames Water logo
Between
30 Nov and 3 Dec 2026
Details
View Map
Share
Richmond Hill

Thames Water were proposing to carry out New service connection on Richmond Hill, Richmond.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 3 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 12:21.

Thames Water logo
Between
30 Nov and 9 Dec 2026
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:45.

Thames Water logo
Between
30 Nov and 3 Dec 2026
Details
View Map
Share
Stanbridge Road

Thames Water were proposing to carry out Utility asset works on Stanbridge Road, Putney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 3 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 11:11.

Thames Water logo
Between
30 Nov and 3 Dec 2026
Details
View Map
Share
Ashlone Road

Thames Water were proposing to carry out Utility asset works on Ashlone Road, Putney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 3 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 11:16.

Thames Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Bromfelde Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bromfelde Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Slip Road Leading From Atkins Road To Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Slip Road Leading From Atkins Road To Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2026 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
3 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Follow
Poynders Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 6 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 17:31.

UK Power Networks South Eastern logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Poulton Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Poulton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2026 at 07:43.

UK Power Networks South Eastern logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Tewkesbury Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Tewkesbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2026 at 14:40.

Transport for London (TfL) logo
Between
7 and 19 Dec 2026
Details
View Map
Share
St Helier Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Helier Avenue, Morden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 19 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 17:18.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Cromwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:04.

Southern Gas Networks logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Kingston Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingston Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2026 at 15:03.

Transport for London (TfL) logo
LONG TERM
Between
7 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 25 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 12:53.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are proposing to carry out Utility asset works on Peterborough Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:34.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Coniger Road

Cadent Gas are proposing to carry out Utility asset works on Coniger Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bradbourne Street

Cadent Gas are proposing to carry out Utility asset works on Bradbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Chiddingstone Street

Cadent Gas are proposing to carry out Utility asset works on Chiddingstone Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Quarrendon Street

Cadent Gas are proposing to carry out Utility asset works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Chipstead Street

Cadent Gas are proposing to carry out Utility asset works on Chipstead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Perrymead Street

Cadent Gas are proposing to carry out Utility asset works on Perrymead Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:49.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 7 Feb 2027
Details
View Map
Share
Follow
Studdridge Street

Cadent Gas are proposing to carry out Utility asset works on Studdridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Cadent Gas logo
Between
7 and 28 Dec 2026
Details
View Map
Share
Follow
Bowerdean Street

Cadent Gas are proposing to carry out Utility asset works on Bowerdean Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:37.

Thames Water logo
Between
8 and 10 Dec 2026
Details
View Map
Share
Follow
Lyham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lyham Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:21.

Vodafone logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
West Street

Vodafone are proposing to carry out New service connection on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 17 Sep 2026 at 13:14.

UK Power Networks Eastern & London logo
Between
14 and 22 Dec 2026
Details
View Map
Share
Follow
Petersfield Rise

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Petersfield Rise, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 14:49.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Woodlawn Road

Cadent Gas are proposing to carry out Utility asset works on Woodlawn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 12:15.

Cadent Gas logo
Between
14 and 21 Dec 2026
Details
View Map
Share
Follow
Harbord Street

Cadent Gas are proposing to carry out Utility asset works on Harbord Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 12:15.

London Borough Of Hounslow logo
Between
15 and 17 Dec 2026
Details
View Map
Share
Follow
Cambridge Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cambridge Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2026 and could run through until 17 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 11:37.


Roadworks Map near to Marryat Road, LONDON, SW19 5BN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Sep 2026 23:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Marryat Road, LONDON, SW19 5BN (34 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Merton logo
HOME PARK ROAD 
(0.3 miles)
London Borough Of Merton
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2026 - 22 Sep 2026
0.3
Details
Share
Follow
2
Virgin Media logo
URGENT
  
ARTHUR ROAD 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Sep 2026 09:00 - 14:00
0.3
Details
Share
3
London Borough Of Merton logo
HOME PARK ROAD 
(0.3 miles)
London Borough Of Merton
Optional permit (no fee) e.g. for traffic management etc - Footway - Some carriageway incursion
In Progress
Since: 14 Sep 2026 08:00
(Scheduled: 14 Sep 2026 - 25 Sep 2026)
0.3
Details
Share
Follow
4
BT logo
BELVEDERE SQUARE 
(0.4 miles)
BT
Remedial works - Footway - No carriageway incursion
Complete
17 Sep 2026 13:16 - 14:00
0.4
Details
Share
5
Southern Gas Networks logo
EMERGENCY
  
ST MARY'S ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 13 Sep 2026 18:06
(Scheduled: 13 Sep 2026 - 27 Sep 2026)
0.4
Details
Share
Follow
6
London Borough Of Merton logo
HOME PARK ROAD 
(0.4 miles)
London Borough Of Merton
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 14 Sep 2026 08:00
(Scheduled: 14 Sep 2026 - 21 Sep 2026)
0.4
Details
Share
Follow
7
Southern Gas Networks logo
EMERGENCY
  
BELVEDERE DRIVE 
(0.4 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
Complete
14 Sep 2026 12:24 - 17 Sep 2026 10:32
0.4
Details
Share
8
London Borough Of Wandsworth logo
MAJOR
  
CAMPEN CLOSE, SOUTHFIELDS 
(0.5 miles)
London Borough Of Wandsworth
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 14 Sep 2026 08:00
(Scheduled: 14 Sep 2026 - 12 Oct 2026)
0.5
Details
Share
Follow
9
UK Power Networks Eastern & London logo
LEOPOLD ROAD 
(0.5 miles)
UK Power Networks Eastern & London
Utility asset works - Footway, Carriageway - Two-way signals
In Progress
Since: 11 Sep 2026 06:39
(Scheduled: 10 Sep 2026 - 21 Sep 2026)
0.5
Details
Share
Follow
10
BT logo
DORA ROAD 
(0.6 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Complete
18 Sep 2026 09:34 - 12:54
0.6
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data