ROADWORKS SUMMARY
Stanford Way, LONDON, SW16 4HH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Stanford Way, SW16 4HH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Stanford Way, LONDON, SW16 4HH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stanford Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 1 Jul 2024 at 10:28.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Havelock Terrace

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Bradmead

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

Thames Tideway Tunnel logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
York Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2023 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 2 Jul 2024 at 08:06.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:00.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Taymount Rise

Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 15:17.

Network Rail logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Sydenham Road

Network Rail are carrying out Works for Rail Purposes on Sydenham Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2024 at 10:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Aug 2024 at 13:45.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 11:20.

Thames Water logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Shakespeare Road

Thames Water are carrying out Utility asset works on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:20 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:46.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2024 at 09:54.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:25.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.

Thames Water logo
LONG TERM
Until
13 Feb 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Jews Walk

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.

London Borough Of Wandsworth logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.

Thames Tideway Tunnel logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Riverwalk F - Carnwath Road To Petrofina Wharf

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Riverwalk F - Carnwath Road To Petrofina Wharf, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 24 June 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 11:17.

Thames Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heber Road

Thames Water are carrying out Disconnection or alteration of supply on Heber Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 16:30.

London Borough Of Southwark logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 31 Oct 2024 at 07:47.

London Borough Of Southwark logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are carrying out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 31 Oct 2024 at 07:47.

London Borough Of Southwark logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are carrying out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 31 Oct 2024 at 07:47.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Summerley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerley Street, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Thornsett Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornsett Road, Earlsfield, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:12.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:08.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Mar 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:27.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Mill Lane

Thames Water were proposing to carry out Disconnection or alteration of supply on Mill Lane, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:13.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 14:26.

Thames Water logo
LONG TERM
Between
29 Jul and 28 Nov 2024
Details
View Map
Share
Follow
Keevil Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Keevil Drive, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Dec 2023 at 09:03.

UK Power Networks South Eastern logo
LONG TERM
Between
31 Jul and 29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Jul 2024 at 11:21.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are carrying out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2024 at 11:45 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2024 at 11:58.

Thames Water logo
LONG TERM
Between
26 Aug 2024 and 28 Feb 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:15.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Godson Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Godson Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:08.

Thames Water logo
LONG TERM
Between
26 Aug and 9 Dec 2024
Details
View Map
Share
Follow
Mill Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Mill Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 14:06.

London Borough Of Merton logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Streatham Road

London Borough Of Merton are carrying out Highway improvement works on Streatham Road, Mitcham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 3 Sep 2024 at 15:24.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Landcroft Road

Thames Water are carrying out Disconnection or alteration of supply on Landcroft Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2024 at 17:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:59.

Thames Water logo
LONG TERM
Between
3 Sep 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:53.

UK Power Networks South Eastern logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2024 at 12:50.

UK Power Networks South Eastern logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are carrying out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 08:59.

UK Power Networks South Eastern logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2024 at 13:00.

UK Power Networks South Eastern logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are carrying out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 13:56.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Westwood Hill

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 12:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:29.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:10.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:29.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:11.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:28.

Thames Water logo
LONG TERM
Between
10 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 08:26.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:40.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 09:27.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Voltaire Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Voltaire Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 09:15.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Kirkdale

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kirkdale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:28.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Aug 2024 at 11:50.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Totterdown Street

Thames Water are carrying out Utility asset works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:23.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Gatton Road

Thames Water are carrying out Utility asset works on Gatton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:24.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kellino Street

Thames Water are carrying out Utility asset works on Kellino Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:23.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are carrying out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:50.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Moffat Road

Thames Water are carrying out Utility asset works on Moffat Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 07:07.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Waddon Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waddon Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 11:38.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Waddon Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waddon Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:30.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Jennings Road

Thames Water are carrying out Disconnection or alteration of supply on Jennings Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 13:20 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Waddon Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waddon Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 13:27.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 08:33.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:34.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:16.

Southern Gas Networks logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Carshalton Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Carshalton Grove, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 13:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 16:30.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

Thames Water logo
LONG TERM
Between
4 Oct and 11 Dec 2024
Details
View Map
Share
Hillsboro Road

Thames Water were proposing to carry out roadworks on Hillsboro Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:10.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 07:11.

UK Power Networks South Eastern logo
LONG TERM
Between
8 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Jul 2024 at 08:52.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Violet Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Violet Lane, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 10:47.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cherry Hill Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Cherry Hill Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:15.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cherry Hill Gardens

Thames Water are carrying out Disconnection or alteration of supply on Cherry Hill Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:43.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are carrying out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:42.

Thames Water logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:19.

Thames Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are carrying out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:26.

Thames Water logo
LONG TERM
Between
14 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Rigby Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Rigby Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:13.

Thames Water logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Rigby Close

Thames Water are carrying out Disconnection or alteration of supply on Rigby Close, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:57.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Headcorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headcorn Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 15:11.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Headcorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headcorn Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 13:02.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 11:55.

Network Rail logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Lower Downs Road

Network Rail are carrying out Works for Rail Purposes on Lower Downs Road, Raynes Park.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Nov 2024 at 16:16.

London Borough Of Lambeth logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Crownstone Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The works started on 14 October 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 14 Oct 2024 at 08:52.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2024 at 13:25.

Thames Water logo
LONG TERM
Between
15 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:49.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Headcorn Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Headcorn Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:57.

UK Power Networks South Eastern logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are carrying out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 12:29 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Oct 2024 at 12:53.

Thames Water logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are carrying out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 08:00 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:51.

UK Power Networks South Eastern logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 07:30.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Broadway Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broadway Gardens, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 07:49.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Broadway Gardens

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Broadway Gardens, Mitcham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 12:34.

Murphy Power Distribution logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Mulholland Close

Murphy Power Distribution are proposing to carry out Utility asset works on Mulholland Close, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Oct 2024 at 15:15.

Murphy Power Distribution logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Mulholland Close

Murphy Power Distribution are carrying out Utility asset works on Mulholland Close, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Oct 2024 at 10:42.

Murphy Power Distribution logo
Finishing
Saturday
Details
View Map
Share
Follow
Clay Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Clay Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 27 Aug 2024 at 08:09.

Murphy Power Distribution logo
Finishing
Saturday
Details
View Map
Share
Follow
Clay Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Clay Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 23 Sep 2024 at 07:08.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bond Road

Thames Water are carrying out Disconnection or alteration of supply on Bond Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:30 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:39.

Thames Water logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are carrying out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:47.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 24 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:46.

Transport for London (TfL) logo
Between
22 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out roadworks on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

The works will start on or after 22 October 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 11:14.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Waverley Way

UK Power Networks South Eastern are carrying out New service connection on Waverley Way, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:42.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Banstead Road

UK Power Networks South Eastern are carrying out New service connection on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:31 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:42.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are carrying out New service connection on Downside Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 08:44.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Wandsworth High Street

Thames Water are carrying out Utility repair and maintenance works on Wandsworth High Street, Wandsworth, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 15:00 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 12:27.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
North Side Wandsworth Common

Thames Water are carrying out Utility repair and maintenance works on North Side Wandsworth Common, Wandsworth, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:45 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 10:59.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Long Road

Thames Water are carrying out Utility repair and maintenance works on Long Road, Clapham Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:45 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 12:28.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Perry Rise

Southern Gas Networks are carrying out Utility repair and maintenance works on Perry Rise, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 05:15 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 11:02.

Southern Gas Networks logo
LONG TERM
Between
25 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.

Southern Gas Networks logo
Between
25 Oct and 22 Nov 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:13.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Larkhall Rise

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Larkhall Rise, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2024 at 07:54.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 12:33.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:15.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:16.

Southern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are carrying out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:47.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:00.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:37.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Dunstans Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on St Dunstans Hill, Cheam.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:45.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jul 2024 at 10:26.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 14:14.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malden Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 17:10.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:02.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:49.

Southern Gas Networks logo
Until
27 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 08:15.

Southern Gas Networks logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:32 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:45.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are proposing to carry out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:24.

Thames Water logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are carrying out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenhurst Road

Thames Water are proposing to carry out Utility repair and maintenance works on Greenhurst Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenhurst Road

Thames Water are carrying out Utility repair and maintenance works on Greenhurst Road, Knight's Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:58.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 08:25.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2024 at 08:57.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 07:54.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Penwith Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Penwith Road, Southfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:38 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:43.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Garratt Lane, Tooting, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Duntshill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Duntshill Road, Southfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 07:55.

Southern Gas Networks logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Landor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Landor Road, Clapham East, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 13:20.

Southern Gas Networks logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Landor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Landor Road, Clapham East, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:53.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Clapham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 14:58.

Southern Gas Networks logo
Between
29 Oct and 26 Nov 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 08:37.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Butter Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Butter Hill, Carshalton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 01:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 12:41.

Transport for London (TfL) logo
Between
30 Oct and 19 Nov 2024
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 12:46.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are carrying out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 11:00 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
Until
18 Nov 2024
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Malden Road, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:39.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Layton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layton Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:29.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Layton Crescent

Southern Gas Networks are carrying out Utility repair and maintenance works on Layton Crescent, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 13:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:23.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Elm Grove Parade

Southern Gas Networks are carrying out Utility repair and maintenance works on Elm Grove Parade, Wallington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 20:30 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 12:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 10:49.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 16:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 13:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Streatham Common North

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Common North, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jun 2024 at 07:27.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 07:57.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Rogers Road

London Borough Of Wandsworth are proposing to carry out Section 50 on Rogers Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 28 Oct 2024 at 09:50.

London Borough Of Wandsworth logo
Finishing
Friday
Details
View Map
Share
Follow
Rogers Road

London Borough Of Wandsworth are carrying out Section 50 on Rogers Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Nov 2024 at 08:12.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Thurleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thurleigh Road, Balham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 07:52.

Thames Water logo
Until
18 Nov 2024
Details
View Map
Share
Follow
Eccles Road

Thames Water are carrying out Utility repair and maintenance works on Eccles Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 14:00 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 15:50.

Transport for London (TfL) logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 09:36.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 09:11.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Briar Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Briar Avenue, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 14:45 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 10:13.

London Borough Of Lewisham logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Level Drive

London Borough Of Lewisham are proposing to carry out Highway improvement works on High Level Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 10:14.

Thames Water logo
Between
5 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out roadworks on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 11:56.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are carrying out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acre Lane

Thames Water are proposing to carry out New service connection on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:24.

London Borough Of Southwark logo
LONG TERM
Between
5 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.

Southern Gas Networks logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:31.

Southern Gas Networks logo
Between
6 and 19 Nov 2024
Details
View Map
Share
Byron Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Byron Avenue, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:57.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:43.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2024 at 16:11.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:50.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:43.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 10:26.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

London Borough Of Southwark logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.

Thames Water logo
LONG TERM
Between
8 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out roadworks on Carlwell Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 07:06.

Thames Water logo
LONG TERM
Between
8 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 07:03.

Thames Water logo
LONG TERM
Between
8 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 8 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:45.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Knight's Hill

Thames Water are carrying out Utility repair and maintenance works on Knight's Hill, Knight's Hill, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 20:10 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Nov 2024 at 07:20.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beeches Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Beeches Avenue, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Jul 2024 at 15:54.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Beeches Avenue

Network Rail were proposing to carry out Works for Rail Purposes on Beeches Avenue, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 09:37.

Thames Water logo
Between
10 and 22 Nov 2024
Details
View Map
Share
Follow
Sternhold Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Sternhold Avenue, Streatham Hill West & Thornton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 08:12.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 09:31.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 05:53.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:31.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:58.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:35.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 16:58.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:22.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Grosvenor Avenue

UK Power Networks South Eastern were proposing to carry out New service connection on Grosvenor Avenue, Carshalton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:29.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Grosvenor Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:39.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Grosvenor Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:56.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 09:40.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 07:04.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 13:24.

Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Bensham Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Oct 2024 at 16:10.

Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Bensham Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 12:39.

Thames Water logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Farnley Road

Thames Water were proposing to carry out roadworks on Farnley Road, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Blagdon Road

Thames Water were proposing to carry out Utility repair and maintenance works on Blagdon Road, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:12.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Voss Court

Thames Water were proposing to carry out New service connection on Voss Court, Streatham Common & Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:29.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Voss Court

Thames Water are proposing to carry out New service connection on Voss Court, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:24.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 12:01.

Thames Water logo
LONG TERM
Between
11 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:34.

Thames Water logo
LONG TERM
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are proposing to carry out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:35.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Common North Side, Clapham Town, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 09:53.

UK Power Networks Eastern & London logo
Between
11 and 24 Nov 2024
Details
View Map
Share
Cubitt Terrace

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Cubitt Terrace, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Wye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:54.

Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Paradise Road

GTC Pipelines are proposing to carry out Utility asset works on Paradise Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 17 Oct 2024 at 09:23.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:53.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:55.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Sep 2024 at 09:18.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Sep 2024 at 09:23.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 19 Sep 2024 at 08:32.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 22 Oct 2024 at 20:11.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 19 Sep 2024 at 09:11.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Bushey Road

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Bushey Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 24 Sep 2024 at 11:06.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Follow
Grand Drive

London Borough Of Merton are proposing to carry out Highway repair and maintenance works on Grand Drive, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Sep 2024 at 09:21.

London Borough Of Merton logo
Finishing
Thursday
Details
View Map
Share
Grand Drive

London Borough Of Merton were proposing to carry out Highway repair and maintenance works on Grand Drive, Raynes Park.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Sep 2024 at 11:33.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 22:55.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:38.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Byton Road

Thames Water are proposing to carry out New service connection on Byton Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 09:52.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Homefield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Homefield Road, Wimbledon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:00.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Wellesley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Wellesley Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 14:27.

UK Power Networks Eastern & London logo
Between
13 and 21 Nov 2024
Details
View Map
Share
Follow
Croydon Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Feb 2024 at 13:59.

Thames Water logo
LONG TERM
Between
13 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:33.

Thames Water logo
LONG TERM
Between
14 Nov 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:19.

Thames Water logo
LONG TERM
Between
15 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:33.

UK Power Networks Eastern & London logo
Between
15 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Thorne Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thorne Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 14:57.

BT logo
Between
16 and 24 Nov 2024
Details
View Map
Share
Thurlow Park Road

BT were proposing to carry out Utility asset works on Thurlow Park Road, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 24 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 16:01.

BT logo
Between
16 and 24 Nov 2024
Details
View Map
Share
Follow
Thurlow Park Road

BT are proposing to carry out Utility asset works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 16:05.

BT logo
Between
16 and 24 Nov 2024
Details
View Map
Share
Follow
Avenue Park Road

BT are proposing to carry out Utility asset works on Avenue Park Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 07:45.

BT logo
Between
16 and 24 Nov 2024
Details
View Map
Share
Follow
Birkbeck Hill

BT are proposing to carry out Utility asset works on Birkbeck Hill, Thurlow Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 07:44.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:30.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:43.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Violet Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Violet Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 07:27.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Carshalton Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 14:05.

Southern Gas Networks logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Coldharbour Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coldharbour Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 09:24.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:14.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 16:39.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 23:08.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are proposing to carry out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:38.

Southern Gas Networks logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are proposing to carry out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 08:28.

London Borough Of Wandsworth logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Trevelyan Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 13 Aug 2024 at 15:52.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Lansdowne Hill

Thames Water were proposing to carry out New service connection on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:18.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Cavendish Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:05.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Cavendish Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 09:06.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Old Devonshire Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Devonshire Road, Balham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 16:02.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:47.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:44.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

UK Power Networks Eastern & London logo
Between
19 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Chillerton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Chillerton Road, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 2 December 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 14:42.

Thames Water logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Dewey Street

Thames Water are proposing to carry out New service connection on Dewey Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:24.

London Borough Of Lambeth logo
Between
19 and 23 Nov 2024
Details
View Map
Share
Follow
Clapham Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 15:38.

London Borough Of Lambeth logo
Between
19 and 23 Nov 2024
Details
View Map
Share
Follow
Triangle Place

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Triangle Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 15:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2024 at 10:20.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2024 at 09:03.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 2 Sep 2024 at 09:29.

Thames Water logo
Between
20 and 27 Nov 2024
Details
View Map
Share
Follow
Osward Road

Thames Water are proposing to carry out New service connection on Osward Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 07:37.

Thames Water logo
Between
20 and 27 Nov 2024
Details
View Map
Share
Osward Road

Thames Water were proposing to carry out New service connection on Osward Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 13:09.

Thames Water logo
Between
20 and 29 Nov 2024
Details
View Map
Share
Follow
Osward Road

Thames Water are proposing to carry out Utility asset works on Osward Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:53.

Thames Water logo
Between
20 and 29 Nov 2024
Details
View Map
Share
Follow
Osward Road

Thames Water are proposing to carry out Utility asset works on Osward Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:12.

Thames Water logo
Between
20 and 27 Nov 2024
Details
View Map
Share
Boundaries Road

Thames Water were proposing to carry out New service connection on Boundaries Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 13:54.

Transport for London (TfL) logo
Between
21 Nov and 10 Dec 2024
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 10:20.

UK Power Networks Eastern & London logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Aug 2024 at 14:52.

Network Rail logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Oct 2024 at 14:49.

Network Rail logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 09:12.

Network Rail logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Godstone Road

Network Rail are proposing to carry out Works for Rail Purposes on Godstone Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 12:10.

Thames Water logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 06:47.

Thames Water logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 09:04.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:54.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:58.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:34.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:47.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:41.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:13.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 11:49.

London Borough Of Croydon logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Dingwall Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Croydon on 8 Nov 2024 at 11:54.

London Borough Of Croydon logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Dingwall Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Dingwall Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Croydon on 8 Nov 2024 at 12:02.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:00.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:40.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 16:11.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:46.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Nursery Road

Thames Water were proposing to carry out Utility repair and maintenance works on Nursery Road, Thornton Heath, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:58.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 09:11.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Gipsy Hill

Thames Water are proposing to carry out New service connection on Gipsy Hill, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:41.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 11:00.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hardel Rise

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hardel Rise, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 10:57.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Tulse Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 11:05.

London Borough Of Lambeth logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:11.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Jephtha Road

Southern Gas Networks were proposing to carry out New service connection on Jephtha Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 12:27.

London Borough Of Lambeth logo
Between
25 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 15:34.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 10:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Wye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 16:29.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Brighton Road

Thames Water were proposing to carry out New service connection on Brighton Road, South Croydon, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:05.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Brighton Road

Thames Water are proposing to carry out New service connection on Brighton Road, South Croydon, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:32.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 09:36.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Lyndhurst Road

Thames Water were proposing to carry out New service connection on Lyndhurst Road, Thornton Heath, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:09.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Lyndhurst Road

Thames Water are proposing to carry out New service connection on Lyndhurst Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:11.

Thames Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Broughton Road

Thames Water are proposing to carry out New service connection on Broughton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:34.

Thames Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Broughton Road

Thames Water are proposing to carry out New service connection on Broughton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:02.

London Borough Of Southwark logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 17:07.

London Borough Of Southwark logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 17:07.

London Borough Of Southwark logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 17:07.

London Borough Of Southwark logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 17:07.

Southern Gas Networks logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 13:15.

London Borough Of Lambeth logo
Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Thorncliffe Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:14.

London Borough Of Lambeth logo
Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:12.

Thames Water logo
Between
29 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Bronson Road

Thames Water are proposing to carry out Utility asset works on Bronson Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:57.

London Borough Of Croydon logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Portland Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Portland Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Sep 2024 at 14:34.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:07.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:57.

Southern Gas Networks logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Alberta Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.

London Borough Of Sutton logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:57.

London Borough Of Sutton logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:29.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 10:07.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 09:34.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:13.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2024 at 09:09.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Sep 2024 at 09:24.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 08:45.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Anerley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Anerley Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:00.

Thames Water logo
Between
3 and 13 Dec 2024
Details
View Map
Share
Follow
Pollards Hill North

Thames Water are proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:19.

Thames Water logo
Between
3 and 13 Dec 2024
Details
View Map
Share
Pollards Hill North

Thames Water were proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:21.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

UK Power Networks South Eastern logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

Southern Gas Networks logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:19.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Remedial works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 08:44.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

ESP Electricity logo
Between
5 and 11 Dec 2024
Details
View Map
Share
Follow
Bramwell Place

ESP Electricity are proposing to carry out Utility asset works on Bramwell Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 12 Sep 2024 at 15:03.

London Borough Of Lambeth logo
Between
6 and 11 Dec 2024
Details
View Map
Share
Follow
Union Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 10:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Bridle Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on The Bridle Way, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 13:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Sep 2024 at 07:26.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:01.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:36.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are proposing to carry out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 15:47.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are proposing to carry out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 16:34.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Lansdowne Hill

Thames Water were proposing to carry out New service connection on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 08:39.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Mexfield Road

Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:07.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Mexfield Road

Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 14:37.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.

London Borough Of Merton logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 11:41.

Virgin Media logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Jasper Road

Virgin Media are proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 9 Sep 2024 at 08:41.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:09.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 15:34.

Southern Gas Networks logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out roadworks on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:59.

Southern Gas Networks logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:14.

Southern Gas Networks logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:49.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 10:51.

Vodafone logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
London Road

Vodafone are proposing to carry out Utility repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 16 Sep 2024 at 15:16.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:51.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:05.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:29.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:46.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:07.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:23.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Oct 2024 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Dec 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Ingrave Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:52.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 14:33.

Thames Water logo
Between
23 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Carnwath Road

Thames Water were proposing to carry out New service connection on Carnwath Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 15:40.

ESP Electricity logo
Between
24 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 10:14.

ESP Electricity logo
Between
26 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 11:49.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Streatham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 09:39.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:42.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:43.

Southern Gas Networks logo
LONG TERM
Between
27 Dec 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:50.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 17:26.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:21.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:26.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:11.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Selkirk Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Apr 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 09:44.

London Borough Of Lambeth logo
LONG TERM
Between
3 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crownstone Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 10:20.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:19.

ESP Electricity logo
Between
4 and 12 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 14:12.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:48.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 07:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 10:35.

London Borough Of Sutton logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are proposing to carry out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 7 Nov 2024 at 16:39.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Ampere Way

UK Power Networks South Eastern are proposing to carry out New service connection on Ampere Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:56.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:07.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:45.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:00.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 17:35.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 12:43.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Pitcairn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:47.

London Borough Of Merton logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Grenfell Road

London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Nov 2024 at 11:56.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Voss Court

Thames Water are proposing to carry out New service connection on Voss Court, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 15:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2024 at 08:52.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 10:25.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:42.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Penwith Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwith Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 06:14.

Southern Gas Networks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 14:37.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 13:46.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cottage Grove

Thames Water are proposing to carry out New service connection on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:52.

Thames Water logo
LONG TERM
Between
7 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:57.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:47.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:18.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:28.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:24.

UK Power Networks South Eastern logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Oct 2024 at 09:20.

UK Power Networks South Eastern logo
Between
10 and 29 Jan 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 11:12.

Thames Water logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Pawsons Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:33.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.

Thames Water logo
Between
11 and 16 Jan 2025
Details
View Map
Share
Follow
Willett Place

Thames Water are proposing to carry out New service connection on Willett Place, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:15.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Clapham Park Road

Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 13:14.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:39.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 13:55.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 08:37.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 11:42.

Transport for London (TfL) logo
LONG TERM
Between
12 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:29.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:28.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:10.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:48.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:37.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 16:04.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 16:03.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Thornton Hill

Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

London Borough Of Merton logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Links Road

London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Nov 2024 at 11:53.

Thames Water logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Carlwell Street

Thames Water were proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:51.

Thames Water logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:43.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Culvert Road

Thames Water are proposing to carry out New service connection on Culvert Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:25.

Network Rail logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 08:39.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 14:41.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:23.

Thames Water logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ingrave Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 16:27.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:51.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 15:16.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 13:43.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sandy Lane South

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 11:53.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:05.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
West Barnes Lane

Network Rail were proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Sep 2024 at 16:40.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 08:04.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Martin Way

London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Nov 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:43.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 14:21.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Willow View

BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 15:24.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Garratt Lane

Thames Water are proposing to carry out New service connection on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:59.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sangora Road

Thames Water are proposing to carry out New service connection on Sangora Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:08.

London Borough Of Lambeth logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 11:40.

London Borough Of Lambeth logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:01.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:32.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:45.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:40.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:35.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:59.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:02.

London Borough Of Sutton logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Throwley Way

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Throwley Way, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 16:25.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 2 Mar 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 13:49.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 10:43.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 15:20.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:39.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:27.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:40.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:28.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 1 Nov 2024 at 11:11.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:25.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:49.

UK Power Networks Eastern & London logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Old York Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 14:32.

UK Power Networks South Eastern logo
Between
28 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:55.

T-Mobile (UK) logo
LONG TERM
Between
28 Jan and 15 Apr 2025
Details
View Map
Share
Follow
Grosvenor Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 15:22.

London Borough Of Lambeth logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:25.

London Borough Of Lambeth logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thornbury Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.

Thames Water logo
Between
29 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Red Post Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dog Kennel Hill

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:46.

UK Power Networks South Eastern logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 08:58.

Thames Water logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Sutherland Road

Thames Water are proposing to carry out Utility asset works on Sutherland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:01.

Southern Gas Networks logo
Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Fairview Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fairview Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Normanhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normanhurst Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Nuthurst Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuthurst Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:52.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:14.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:04.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:18.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:19.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 18:11.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Farm Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:57.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 07:50.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 14:33.

London Borough Of Bromley logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Lennard Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Lennard Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

London Borough Of Bromley logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kent House Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

Thames Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:57.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:02.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kingston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:41.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
West Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:40.

Thames Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Camborne Road

Thames Water are proposing to carry out New service connection on Camborne Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 08:53.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Casino Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:54.

London Borough Of Lambeth logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Union Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 08:28.


Roadworks Map near to Stanford Way, LONDON, SW16 4HH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 10 Nov 2024 03:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Stanford Way, LONDON, SW16 4HH (43 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Merton logo
STANFORD WAY, STREATHAM 
(0.0 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 8 Nov 2024 - 12 Nov 2024
0.0
Details
Share
Follow
2
UK Power Networks Eastern & London logo
URGENT
  
ST OLAVE'S WALK, STREATHAM 
(0.0 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 6 Nov 2024 09:39
(Scheduled: 6 Nov 2024 - 13 Nov 2024)
0.0
Details
Share
Follow
3
UK Power Networks Eastern & London logo
AVENUE ROAD, STREATHAM 
(0.1 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 8 Nov 2024 - 15 Nov 2024
0.1
Details
Share
Follow
4
Thames Water logo
URGENT
  
LONGTHORNTON ROAD, STREATHAM 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 7 Nov 2024 16:54
(Scheduled: 7 Nov 2024 - 11 Nov 2024)
0.2
Details
Share
Follow
5
London Borough Of Merton logo
MANOR ROAD 
(0.2 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
8 Nov 2024 10:30 - 11:00
0.2
Details
Share
6
London Borough Of Merton logo
MANOR ROAD 
(0.2 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
8 Nov 2024 10:18 - 10:41
0.2
Details
Share
7
London Borough Of Merton logo
MANOR ROAD 
(0.2 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
8 Nov 2024 10:52 - 11:04
0.2
Details
Share
8
Thames Water logo
URGENT
  
WINDERMERE ROAD, STREATHAM 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 29 Oct 2024 14:44
(Scheduled: 29 Oct 2024 - 11 Nov 2024)
0.2
Details
Share
Follow
9
London Borough Of Merton logo
MANOR ROAD 
(0.2 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
8 Nov 2024 13:00 - 14:00
0.2
Details
Share
10
London Borough Of Merton logo
MANOR ROAD 
(0.3 miles)
London Borough Of Merton
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
8 Nov 2024 11:10 - 11:20
0.3
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data