ROADWORKS SUMMARY
Seven Acres Close, UTTOXETER, ST14 8EE
Introduction
View current and future planned roadworks and road closures for Seven Acres Close, ST14 8EE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Seven Acres Close, UTTOXETER, ST14 8EE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Seven Acres Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
4 Nov 2024 and 29 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 10:13.
4 Nov 2024 and 29 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on High Street, Uttoxeter.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 10:31.
6 Jan and 10 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 12:14.
6 Jan and 10 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on High Street, Uttoxeter.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:27.
6 Jan and 10 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:41.
10 Mar 2025
Staffordshire County Council are carrying out Highway improvement works on High Street, Uttoxeter.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 00:00 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 20 Jan 2025 at 12:02.
Staffordshire County Council carried out Highway improvement works on Marchington Cliff, Marchington Woodlands.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 Jan 2025 and 31 Jan 2025 and were actually completed between 27 Jan 2025 (10:28) and 30 Jan 2025 (12:34). The works impacted the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Jan 2025 at 13:04.
Tomorrow
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Wood Lane, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Jan 2025 at 09:12.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Hobb Lane, Scounslow Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Scounslow Green Road, Scounslow Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.
Today
Staffordshire County Council are carrying out Highway improvement works on Hollington Road, Croxden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 12:24 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Jan 2025 at 10:25.
Staffordshire County Council carried out Highway improvement works on Denstone Lane, Denstone.
The road was closed for some or all of the period.
The works were completed on 30 January 2025 The works impacted the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Jan 2025 at 09:56.
Staffordshire County Council carried out Highway improvement works on Leigh Road, Bramshall.
The road was closed for some or all of the period.
The works were completed on 30 January 2025 The works impacted the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Jan 2025 at 11:12.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stone Road, Bramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:40.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Highwood Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 12:48.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Highwood, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 12:48.
3 and 7 Feb 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Marston Bank, Rocester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 13 Dec 2024 at 06:23.
4 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Alton Lane, Greatgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 11:19.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hothill Lane, Field.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 13:13.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lane From Field Lane To Dodsleigh, Dodsleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 13:13.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Kingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 13:13.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Nobut Road, Withington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 13:00.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bents Lane, Church Leigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 12:46.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Quarry Bank, Greatgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 14:10.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Quarry Bank Road, Hollington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 14:10.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Stone Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Jan 2025 at 14:38.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Marchington Cliff, Marchington Woodlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:07.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hobb Lane, Scounslow Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:07.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Scounslow Green Road, Scounslow Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 08:54.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lane From A518 Near Loxley To Woodcock Heath, Kingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 08:26.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Springfield Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Dec 2024 at 12:14.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Smithfield Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Dec 2024 at 12:14.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Stone Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Dec 2024 at 12:14.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blythe Bridge Bank, Stowe By Chartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 08:26.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stone Road, Bramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 09:19.
25 and 27 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Wood Lane, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 23 Dec 2024 at 11:31.
25 and 27 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Wood Lane, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 14:21.
3 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Beamhurst, Uttoxeter.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 14:08.
3 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Beamhurst, Uttoxeter.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 12:02.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Highwood, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 11:39.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Highwood Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 11:08.
4 and 6 Mar 2025
South Staffordshire Water are proposing to carry out Remedial works on Moisty Lane, Marchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 10 Dec 2024 at 16:30.
10 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Balance Street, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 09:28.
10 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Marchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 09:28.
10 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wood Lane, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 09:28.
10 and 12 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hollington Lane, Stramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Jan 2025 at 09:15.
10 and 12 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hollington Road, Croxden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Jan 2025 at 09:43.
12 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stock Lane, Marchington Woodlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 14:20.
12 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tinkers Lane, Marchington Woodlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 14:20.
12 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Jacks Lane, Marchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 14:35.
12 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodroffes Cliff, Marchington Woodlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 14:35.
12 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Moisty Lane, Marchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 14:21.
19 and 21 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Quarry Bank, Greatgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 16 Jan 2025 at 21:30.
19 and 21 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Quarry Bank Road, Hollington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Jan 2025 at 21:30.
31 Mar and 4 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hollington Road, Croxden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 14:07.
31 Mar and 4 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hollington Lane, Stramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 14:23.
3 and 9 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pigeonhay Lane, Beamhurst, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 15:01.
4 and 8 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Wood Lane, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 10 Jan 2025 at 13:18.
5 and 7 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stone Road, Bramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 25 Nov 2024 at 14:35.
5 and 7 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stone Road, Bramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Jan 2025 at 14:55.
7 and 11 Apr 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Balance Hill, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 14 Jan 2025 at 11:07.
7 and 9 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hook Lane, Stramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 08:27.
7 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lane From A518 Near Loxley To Woodcock Heath, Kingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 12:49.
8 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Old Lane, Checkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 08:50.
8 and 10 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Stramshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 12:29.
8 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Croxden Lane, Hollington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 08:27.
8 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stubwood Lane, Denstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 12:36.
8 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Manor Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 14:08.
9 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hothill Lane, Field.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 12:44.
11 and 14 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stafford Road, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Jan 2025 at 15:02.
14 and 17 Apr 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dove Bank, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 13:10.
14 and 18 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Uttoxeter Road, Kingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 22 Jan 2025 at 13:47.
14 and 17 Apr 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dove Bank, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 11:42.
21 and 25 Apr 2025
Cadent Gas are proposing to carry out New service connection on Dove Bank, Uttoxeter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 14:43.
21 and 25 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lane From A518 Near Loxley To Woodcock Heath, Kingstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 11:08.
Roadworks Map near to Seven Acres Close, UTTOXETER, ST14 8EE (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Seven Acres Close, UTTOXETER, ST14 8EE (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Jan 2025 - 10 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.