ROADWORKS SUMMARY
Newbury, GILLINGHAM, SP8 4HG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Newbury, SP8 4HG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Newbury, GILLINGHAM, SP8 4HG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Newbury are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Dorset Council logo
LONG TERM
Until
18 Apr 2025
Details
View Map
Share
Follow
New Road

Dorset Council are carrying out roadworks on New Road, Gillingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:00 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 17 Mar 2025 at 09:25.

G2 Energy IDNO logo
Finishing
Today
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are proposing to carry out Permanent reinstatement on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Mar 2025 at 10:50.

G2 Energy IDNO logo
Finishing
Today
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are proposing to carry out Permanent reinstatement on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 11 Mar 2025 at 09:40.

G2 Energy IDNO logo
Finishing
Today
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are proposing to carry out Permanent reinstatement on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 11 Mar 2025 at 11:35.

Dorset Council logo
Finishing
Friday
Details
View Map
Share
Follow
New Lane

Dorset Council are proposing to carry out Highway improvement works on New Lane, Stour Provost.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 18 Feb 2025 at 11:35.

Dorset Council logo
Friday
Details
View Map
Share
New Lane

Dorset Council carried out Highway improvement works on New Lane, Stour Provost.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 17 Mar 2025 and 28 Mar 2025 and were actually completed between 17 Mar 2025 (08:22) and 25 Mar 2025 (14:07). The works impacted the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Mar 2025 at 14:10.

G2 Energy IDNO logo
Finishing
Friday
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are carrying out Permanent reinstatement on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:20 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 17 Mar 2025 at 08:20.

G2 Energy IDNO logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are proposing to carry out Permanent reinstatement on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 11 Mar 2025 at 14:39.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wavering Lane East

Wessex Water are carrying out Utility repair and maintenance works on Wavering Lane East, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:40 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 24 Mar 2025 at 09:55.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wavering Lane East

Wessex Water are proposing to carry out Utility repair and maintenance works on Wavering Lane East, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Mar 2025 at 11:49.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
French Mill Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on French Mill Lane, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Mar 2025 at 09:40.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Underhill

Wessex Water are proposing to carry out Utility repair and maintenance works on Underhill, Pen Selwood, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Mar 2025 at 12:43.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Underhill

Wessex Water are proposing to carry out Utility repair and maintenance works on Underhill, Pen Selwood, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Mar 2025 at 13:28.

Wessex Water logo
Between
31 Mar and 10 Apr 2025
Details
View Map
Share
Follow
School Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on School Hill, Cucklington, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 10 Feb 2025 at 10:52.

Wessex Water logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Babwell Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Babwell Road, Cucklington, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 10 Feb 2025 at 10:52.

Wessex Water logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Common Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Common Road, Cucklington, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 10 Feb 2025 at 10:52.

Wessex Water logo
LONG TERM
Between
1 Apr and 16 May 2025
Details
View Map
Share
Follow
Browns Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Browns Lane, East Stour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Water on 4 Mar 2025 at 16:25.

Wessex Water logo
LONG TERM
Between
1 Apr and 9 May 2025
Details
View Map
Share
Follow
Browns Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Browns Lane, East Stour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Water on 18 Feb 2025 at 11:30.

Wessex Water logo
LONG TERM
Between
1 Apr and 16 May 2025
Details
View Map
Share
Follow
Front Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Front Street, East Stour.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 4 Mar 2025 at 16:25.

Wessex Water logo
LONG TERM
Between
1 Apr and 9 May 2025
Details
View Map
Share
Follow
Front Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Front Street, East Stour.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 18 Feb 2025 at 11:30.

Wessex Water logo
LONG TERM
Between
1 Apr and 9 May 2025
Details
View Map
Share
Follow
Front Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Front Street, East Stour.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 28 Jan 2025 at 09:41.

Dorset Council logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
New Road

Dorset Council are proposing to carry out roadworks on New Road, Shaftesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 13 Mar 2025 at 11:20.

Wiltshire Council logo
Between
7 and 10 May 2025
Details
View Map
Share
Follow
Salisbury Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 11:10.

Wiltshire Council logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Salisbury Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:01.

Wiltshire Council logo
Between
7 and 9 May 2025
Details
View Map
Share
Salisbury Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Salisbury Road, Shaftesbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 12 Feb 2025 at 11:37.

Wessex Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Long Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Long Hill, Cucklington, Wincanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 10 Feb 2025 at 10:52.

Wessex Water logo
LONG TERM
Between
20 May and 30 Jun 2025
Details
View Map
Share
Follow
Front Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Front Street, East Stour.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 20 Feb 2025 at 10:15.

Wessex Water logo
LONG TERM
Between
20 May and 30 Jun 2025
Details
View Map
Share
Follow
Front Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Front Street, East Stour.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 18 Feb 2025 at 11:26.

LONG TERM
Between
16 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Salisbury Road

GTC Pipelines are proposing to carry out Utility asset works on Salisbury Road, Shaftesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 20 Mar 2025 at 09:55.


Roadworks Map near to Newbury, GILLINGHAM, SP8 4HG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Mar 2025 20:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Newbury, GILLINGHAM, SP8 4HG (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
OAKE WOODS 
(0.2 miles)
BT
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Mar 2025 - 27 Mar 2025
0.2
Details
Share
Follow
2
Wessex Water logo
THE MEADOWS 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Mar 2025 - 28 Mar 2025
0.3
Details
Share
Follow
3
Wessex Water logo
SHAFTESBURY ROAD 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 25 Mar 2025
0.4
Details
Share
Follow
4
Dorset Council logo
MAJOR
  
NEW ROAD 
(0.5 miles)
Dorset Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
In Progress
Since: 24 Feb 2025 09:00
(Scheduled: 24 Feb 2025 - 18 Apr 2025)
0.5
Details
Share
Follow
5
Wessex Water logo
LOCKWOOD TERRACE 
(0.5 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Mar 2025 - 28 Mar 2025
0.5
Details
Share
Follow
6
Dorset Council logo
SHAFTESBURY ROAD 
(0.7 miles)
Dorset Council
Highway improvement works - Carriageway, Verge - Stop/go boards
Planned
Scheduled: 24 Mar 2025 - 31 Mar 2025
0.7
Details
Share
Follow
7
Wessex Water logo
MAJOR
  
WAVERING LANE EAST 
(0.7 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 24 Mar 2025 - 26 Mar 2025
0.7
Details
Share
Follow
8
Wessex Water logo
MAJOR
  
WAVERING LANE EAST 
(0.7 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 24 Mar 2025 09:40
(Scheduled: 24 Mar 2025 - 26 Mar 2025)
0.7
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
KINGSMEAD BUSINESS PARK 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
26 Jul 2024 08:30 - 5 Dec 2024 08:53
0.8
Details
Share
10
BT logo
SHAFTESBURY ROAD 
(0.8 miles)
BT
Remedial works - Carriageway - Two-way signals
Planned
Scheduled: 24 Mar 2025 - 25 Mar 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.