ROADWORKS SUMMARY
South Street, SALISBURY, SP2 0NN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for South Street, SP2 0NN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to South Street, SALISBURY, SP2 0NN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Netherhampton Road

Wiltshire Council are carrying out Section 50 on Netherhampton Road, Salisbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 Aug 2025 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Netherhampton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netherhampton Road, Salisbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 16:01.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Netherhampton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netherhampton Road, Salisbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 08:13.

Southern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Upper Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Street, Harnham, Salisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 08:13.

Wessex Internet logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Snow Hill

Wessex Internet are proposing to carry out Utility asset works on Snow Hill, Dinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 5 Jun 2025 at 11:16.

Wessex Internet logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Snow Hill

Wessex Internet are carrying out Utility asset works on Snow Hill, Dinton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 15 Sep 2025 at 08:49.

Wessex Internet logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Snow Hill

Wessex Internet are proposing to carry out Utility asset works on Snow Hill, Dinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 30 Jul 2025 at 10:04.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Butts Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Butts Road, Salisbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:20.

Southern Gas Networks logo
LONG TERM
Between
1 Oct 2025 and 4 Mar 2026
Details
View Map
Share
Follow
Netherhampton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Netherhampton Road, Salisbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 4 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 08:04.

Southern Gas Networks logo
Between
6 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Butts Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Butts Road, Salisbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:14.

Wessex Internet logo
Between
13 and 17 Oct 2025
Details
View Map
Share
St Marys Road

Wessex Internet were proposing to carry out Utility asset works on St Marys Road, Dinton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 29 Jul 2025 at 15:27.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Rambridge Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Rambridge Crescent, Bemerton Heath, Salisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Jul 2025 at 13:56.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Rambridge Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Rambridge Crescent, Bemerton Heath, Salisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jul 2025 at 16:08.

Wessex Internet logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Snow Hill

Wessex Internet were proposing to carry out Utility asset works on Snow Hill, Dinton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 29 Jul 2025 at 15:30.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Upper Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Street, Harnham, Salisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 11:18.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Upper Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Street, Harnham, Salisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:20.

Wiltshire Council logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Wylye Road Hanging Langford East C10 To Entrance To Bailiffs House Little Langford

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wylye Road Hanging Langford East C10 To Entrance To Bailiffs House Little Langford, Hanging Langford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 22 Sep 2025 at 10:07.

Wiltshire Council logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Wylye Road Hanging Langford East C10 To Entrance To Bailiffs House Little Langford

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Wylye Road Hanging Langford East C10 To Entrance To Bailiffs House Little Langford, Hanging Langford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 22 Sep 2025 at 10:02.

Wiltshire Council logo
Between
17 and 22 Dec 2025
Details
View Map
Share
Langford Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Langford Road, Great Wishford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2025 and run through until 22 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 22 Sep 2025 at 10:41.


Roadworks Map near to South Street, SALISBURY, SP2 0NN (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 04:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to South Street, SALISBURY, SP2 0NN (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
ST ANDREWS ROAD 
(0.6 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 22 Sep 2025 10:02
(Scheduled: 22 Sep 2025 - 24 Sep 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.