ROADWORKS SUMMARY
Winchester Road, ROMSEY, SO51 9BU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Winchester Road, SO51 9BU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Winchester Road, ROMSEY, SO51 9BU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Winchester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 27 Dec 2025
Details
View Map
Share
Follow
Lakewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 27 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:56.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Toothill Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Toothill Road, Toothill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 20:03 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jan 2025 at 06:43.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Feb and 18 Jul 2025
Details
View Map
Share
Follow
Toothill Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Toothill Road, Toothill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 9 Oct 2025
Details
View Map
Share
Main Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Main Road, Colden Common.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 9 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 08:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jan 2025 at 09:57.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Romsey Road, Nursling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 15:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Romsey Road, Nursling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 10:19.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 16:00.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 09:00 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Mar 2025 at 09:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Follow
Southampton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 July 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jan 2025 at 15:28.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Follow
Southampton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 July 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jan 2025 at 10:58.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Southampton Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Southampton Road, Toothill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 09:00 and could run through until 21 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Mar 2025 at 09:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 21 Jul 2025
Details
View Map
Share
Southampton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Southampton Road, Toothill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 15:25.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 13 Jun 2025
Details
View Map
Share
Follow
Stanmore Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:18.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 30 Jun 2025
Details
View Map
Share
Stanmore Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 13:05.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bassett Wood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bassett Wood Road, Bassett, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:31 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 16:15.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Ridgeway

Southern Gas Networks are carrying out Utility repair and maintenance works on Ridgeway, Badger Farm.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 12:12 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:24.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Ridgeway Footpath

Southern Gas Networks are carrying out Utility repair and maintenance works on Ridgeway Footpath, Badger Farm.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 11 April 2025 at 12:20 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
11 Apr and 7 Aug 2025
Details
View Map
Share
Southampton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 April 2025 and run through until 7 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 20:20.

Southampton City Council logo
LONG TERM
Between
14 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Whinchat Close

Southampton City Council are proposing to carry out Highway improvement works on Whinchat Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:52.

Southampton City Council logo
LONG TERM
Between
14 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Whinchat Close

Southampton City Council are proposing to carry out Highway improvement works on Whinchat Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:27.

Southampton City Council logo
LONG TERM
Between
16 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Hawfinch Close

Southampton City Council are proposing to carry out Highway improvement works on Hawfinch Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
16 Apr and 17 Jun 2025
Details
View Map
Share
Follow
Hawfinch Close

Southampton City Council are proposing to carry out Highway improvement works on Hawfinch Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Coxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coxford Road, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 08:51.

Southampton City Council logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Harrier Close

Southampton City Council are proposing to carry out Highway improvement works on Harrier Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Harrier Close

Southampton City Council were proposing to carry out Highway improvement works on Harrier Close, Coxford, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:27.

Southampton City Council logo
LONG TERM
Between
23 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Wryneck Close

Southampton City Council are proposing to carry out Highway improvement works on Wryneck Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
23 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Wryneck Close

Southampton City Council are proposing to carry out Highway improvement works on Wryneck Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:33.

Southampton City Council logo
LONG TERM
Between
24 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Firecrest Close

Southampton City Council are proposing to carry out Highway improvement works on Firecrest Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
24 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Firecrest Close

Southampton City Council are proposing to carry out Highway improvement works on Firecrest Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:33.

Southampton City Council logo
LONG TERM
Between
25 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Warbler Close

Southampton City Council are proposing to carry out Highway improvement works on Warbler Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
25 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Warbler Close

Southampton City Council are proposing to carry out Highway improvement works on Warbler Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:33.

Southampton City Council logo
LONG TERM
Between
25 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Widgeon Close

Southampton City Council are proposing to carry out Highway improvement works on Widgeon Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:52.

Southampton City Council logo
LONG TERM
Between
25 Apr and 24 Jun 2025
Details
View Map
Share
Widgeon Close

Southampton City Council were proposing to carry out Highway improvement works on Widgeon Close, Coxford, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 April 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:33.

Hampshire County Council logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Thurmond Crescent

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Thurmond Crescent, Winchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 15:29.

Hampshire County Council logo
LONG TERM
Between
29 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Thurmond Crescent

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Thurmond Crescent, Winchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Hampshire County Council on 5 Feb 2025 at 19:21.

Hampshire County Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Thurmond Crescent

Hampshire County Council are carrying out Highway repair and maintenance works on Thurmond Crescent, Winchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 07:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 22 May 2025 at 08:49.

Southampton City Council logo
LONG TERM
Between
30 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Brambling Close

Southampton City Council are proposing to carry out Highway improvement works on Brambling Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Mar 2025 at 13:53.

Southampton City Council logo
LONG TERM
Between
30 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Brambling Close

Southampton City Council are proposing to carry out Highway improvement works on Brambling Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 3 Apr 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
12 May and 7 Jul 2025
Details
View Map
Share
Follow
Coxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coxford Road, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 14:46.

Southern Gas Networks logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Stanmore Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Stanmore Lane, Winchester.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:45 and could run through until 20 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 08:45.

Hampshire County Council logo
LONG TERM
Between
15 May and 23 Jun 2025
Details
View Map
Share
Follow
Chalvington Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Chalvington Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 20 Mar 2025 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
18 May and 23 Jun 2025
Details
View Map
Share
Southdown Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Southdown Road, Shawford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 May 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Between
18 May and 23 Jun 2025
Details
View Map
Share
Follow
Southdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southdown Road, Shawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Southdown Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Southdown Road, Shawford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:45 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 09:55.

Scottish Hydro Electric Power Dis logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Boyatt Lane

Scottish Hydro Electric Power Dis are carrying out Highway repair and maintenance works on Boyatt Lane, Otterbourne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:00 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 May 2025 at 09:47.

Hampshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Spring Lane

Hampshire County Council are proposing to carry out Highway improvement works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Feb 2025 at 19:21.

Hampshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Spring Lane

Hampshire County Council are proposing to carry out Highway improvement works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Feb 2025 at 15:58.

Southern Gas Networks logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Follow
Fallow Field Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fallow Field Footpath, Badger Farm.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 20:39.

Southern Gas Networks logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Fallow Field Footpath

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fallow Field Footpath, Badger Farm.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 15:06.

Southern Gas Networks logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Coxford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Coxford Road, Coxford, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:21.

Hampshire County Council logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Chalvington Road

Hampshire County Council are carrying out Highway repair and maintenance works on Chalvington Road, Chandler's Ford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:30 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 27 May 2025 at 15:43.

Southern Water logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Poles Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Poles Lane, Hursley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 28 Apr 2025 at 12:10.

Southampton City Council logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Springford Road Footpaths

Southampton City Council are carrying out Highway improvement works on Springford Road Footpaths, Coxford, Southampton.

The works started on 2 June 2025 at 20:43 and could run through until 27 June 2025. The works will impact the verge only.

This roadwork event was last updated by Southampton City Council on 3 Jun 2025 at 10:39.

Southern Gas Networks logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Glen Eyre Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glen Eyre Road, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 14:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Jun and 7 Oct 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jan 2025 at 12:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Jun and 7 Oct 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 May 2025 at 17:19.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
7 Oct 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Shaftesbury Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 15:00 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 15:59.

Scottish Hydro Electric Power Dis logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Bournemouth Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Bournemouth Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jan 2025 at 12:21.

Scottish Hydro Electric Power Dis logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Bournemouth Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Bournemouth Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 May 2025 at 12:33.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Eagle Close

Hampshire County Council are proposing to carry out Highway improvement works on Eagle Close, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Mar 2025 at 16:47.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Winchester Road

Network Rail are proposing to carry out Works for Rail Purposes on Winchester Road, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Feb 2025 at 09:13.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Winchester Road

Network Rail are proposing to carry out Works for Rail Purposes on Winchester Road, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 17 Nov 2025
Details
View Map
Share
Follow
Otterbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Otterbourne Road, Compton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Otterbourne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Otterbourne Road, Compton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 15:50 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 18 Aug 2025
Details
View Map
Share
Otterbourne Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Otterbourne Road, Compton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 18 Aug 2025
Details
View Map
Share
Otterbourne Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Otterbourne Road, Compton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 14:05.

Hampshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Shawford Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Shawford Road, Shawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 May 2025 at 23:14.

Hampshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Shawford Road

Hampshire County Council are carrying out Highway repair and maintenance works on Shawford Road, Shawford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:04 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Jun 2025 at 09:11.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Mainstone

Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Sep 2024 at 12:25.

Hampshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Mainstone

Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Sep 2024 at 10:22.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Sep 2024 at 12:28.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Sep 2024 at 10:23.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Sep 2024 at 12:29.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Sep 2024 at 10:23.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Sep 2024 at 12:30.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 20 Sep 2024 at 10:24.

Southern Gas Networks logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Willis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Road, Swaythling, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 15:02.

Southern Gas Networks logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Willis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Road, Swaythling, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:24.

Southern Gas Networks logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Glen Eyre Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glen Eyre Road, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:26.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 4 Aug 2025
Details
View Map
Share
Halterworth Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 13:14.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Halterworth Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 15:53.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Halterworth Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 7 Apr 2025 at 15:48.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Halterworth Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 15:50.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 4 Aug 2025
Details
View Map
Share
Winchester Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 13:15.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Winchester Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 31 Mar 2025 at 10:36.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 7 Apr 2025 at 15:32.

Hampshire County Council logo
LONG TERM
Between
9 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 10 Apr 2025 at 14:08.

Southern Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Ashley Road

Southern Water were proposing to carry out Utility repair and maintenance works on Ashley Road, Ashley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Feb 2025 at 09:55.

Southern Gas Networks logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Shawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 20:36.

Southern Gas Networks logo
Between
19 Jun and 11 Jul 2025
Details
View Map
Share
Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Grove Road, Shawford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 12:10.

Southern Gas Networks logo
Between
19 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Shawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 23:06.

Southampton City Council logo
LONG TERM
Between
21 Jun and 21 Sep 2025
Details
View Map
Share
Follow
Woburn Road

Southampton City Council are proposing to carry out Highway improvement works on Woburn Road, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 8 May 2025 at 09:18.

Southampton City Council logo
LONG TERM
Between
21 Jun and 21 Sep 2025
Details
View Map
Share
Follow
Tintagel Close

Southampton City Council are proposing to carry out Highway improvement works on Tintagel Close, Coxford, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 8 May 2025 at 09:06.

Southampton City Council logo
LONG TERM
Between
21 Jun and 21 Sep 2025
Details
View Map
Share
Rownhams Road North

Southampton City Council were proposing to carry out Highway improvement works on Rownhams Road North, Coxford, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 June 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 8 May 2025 at 08:47.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 2 Sep 2025
Details
View Map
Share
Lordswood Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lordswood Road, Bassett, Southampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 2 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 16:08.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Twyford Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Twyford Road, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 22 May 2025 at 16:12.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Twyford Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Twyford Road, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 23 May 2025 at 16:52.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Allbrook Hill

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Allbrook Hill, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 22 May 2025 at 16:12.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Allbrook Hill

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Allbrook Hill, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 23 May 2025 at 16:53.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Allbrook Way

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Allbrook Way, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 22 May 2025 at 16:12.

Hampshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Allbrook Way

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Allbrook Way, Eastleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 23 May 2025 at 16:53.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Shawford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 10:26.

Vodafone logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Upper Toothill Road

Vodafone were proposing to carry out Utility asset works on Upper Toothill Road, Rownhams.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 8 Apr 2025 at 15:32.

Scottish Hydro Electric Power Dis logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Highbridge Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Highbridge Road, Highbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 10:15.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Spring Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 17:25.

Southern Gas Networks logo
LONG TERM
Between
14 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Spring Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Lane, Colden Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 17:22.

Network Rail logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Pound Lane

Network Rail are proposing to carry out Works for Rail Purposes on Pound Lane, Ampfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 Apr 2025 at 16:13.

Southern Water logo
Between
15 and 28 Jul 2025
Details
View Map
Share
Follow
Paulson Close

Southern Water are proposing to carry out Utility repair and maintenance works on Paulson Close, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 May 2025 at 16:19.

Hampshire County Council logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Halterworth Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 20 May 2025 at 15:19.

Hampshire County Council logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Halterworth Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 21 May 2025 at 09:18.

Hampshire County Council logo
Between
16 and 19 Jul 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 20 May 2025 at 15:19.

Hampshire County Council logo
Between
16 and 19 Jul 2025
Details
View Map
Share
Follow
Winchester Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 21 May 2025 at 09:18.

Hampshire County Council logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Highbridge Road, Highbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 25 Apr 2025 at 10:09.

Hampshire County Council logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Highbridge Road, Highbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Apr 2025 at 23:02.

Hampshire County Council logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Highbridge Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Highbridge Road, Highbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Apr 2025 at 16:41.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Twyford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 11:40.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Lordswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordswood Road, Bassett, Southampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 15:28.

Hampshire County Council logo
LONG TERM
Between
23 Jul and 3 Oct 2025
Details
View Map
Share
Oakmount Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 08:46.

Hampshire County Council logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Botley Road, North Baddesley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 9 Jan 2025 at 15:31.

Hampshire County Council logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Botley Road

Hampshire County Council are proposing to carry out Highway improvement works on Botley Road, North Baddesley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 7 Apr 2025 at 09:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Malwood Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Malwood Avenue, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Apr 2025 at 11:45.

Hampshire County Council logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Oakmount Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 7 Nov 2024 at 22:26.

Hampshire County Council logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Oakmount Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 09:51.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Merdon Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 11 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 08:22.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Merdon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 22:56.

Hampshire County Council logo
LONG TERM
Between
28 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Stockbridge Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Stockbridge Road, Timsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Dec 2024 at 11:29.

Hampshire County Council logo
LONG TERM
Between
28 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Stockbridge Road

Hampshire County Council are proposing to carry out Highway improvement works on Stockbridge Road, Timsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 6 Dec 2024 at 13:18.

Southampton City Council logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Lordswood Road

Southampton City Council were proposing to carry out Highway improvement works on Lordswood Road, Bassett, Southampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southampton City Council on 16 May 2025 at 14:51.

Hampshire County Council logo
Between
4 and 14 Aug 2025
Details
View Map
Share
Halterworth Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 14 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 13:15.

Southern Water logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Poles Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Poles Lane, Hursley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 2 Jun 2025 at 15:24.

Hampshire County Council logo
Between
13 and 22 Aug 2025
Details
View Map
Share
Follow
Brownhill Road

Hampshire County Council are proposing to carry out Highway improvement works on Brownhill Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Feb 2025 at 15:48.

Hampshire County Council logo
LONG TERM
Between
13 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Brownhill Road

Hampshire County Council are proposing to carry out Highway improvement works on Brownhill Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 May 2025 at 16:05.

Hampshire County Council logo
Between
15 and 29 Aug 2025
Details
View Map
Share
Halterworth Lane

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Halterworth Lane, Crampmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 13:15.

Hampshire County Council logo
Between
15 and 29 Aug 2025
Details
View Map
Share
Winchester Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Winchester Road, Crampmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 26 Mar 2025 at 13:16.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Broomhill Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broomhill Way, Eastleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 22:57.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Broomhill Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broomhill Way, Eastleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 20:34.

Southern Gas Networks logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Bosville

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bosville, Eastleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 22:57.

Southern Gas Networks logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Bosville

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bosville, Eastleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 20:39.

Southern Gas Networks logo
LONG TERM
Between
26 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Boyatt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boyatt Lane, Eastleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 20:34.

Southern Gas Networks logo
Between
27 Aug and 24 Sep 2025
Details
View Map
Share
Queen Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Queen Street, Twyford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 August 2025 and run through until 24 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:46.

Southampton City Council logo
Between
1 and 3 Sep 2025
Details
View Map
Share
Lordswood Road

Southampton City Council were proposing to carry out Highway improvement works on Lordswood Road, Bassett, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 16 May 2025 at 14:52.

Hampshire County Council logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Oakmount Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 7 Nov 2024 at 22:26.

Hampshire County Council logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Oakmount Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 09:52.


Roadworks Map near to Winchester Road, ROMSEY, SO51 9BU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 4 Jun 2025 01:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Winchester Road, ROMSEY, SO51 9BU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Water logo
HOOK ROAD 
(0.7 miles)
Southern Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 27 May 2025 - 4 Jun 2025
0.7
Details
Share
Follow
2
Southern Water logo
HOOK ROAD 
(0.7 miles)
Southern Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 27 May 2025 00:41
(Scheduled: 27 May 2025 - 4 Jun 2025)
0.7
Details
Share
Follow