ROADWORKS SUMMARY
Abbotswood Common Road, ROMSEY, SO51 0DU
Introduction
View current and future planned roadworks and road closures for Abbotswood Common Road, SO51 0DU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Abbotswood Common Road, ROMSEY, SO51 0DU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Abbotswood Common Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:33.
6 Feb and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:52.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Horns Drove, Rownhams.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.
6 Feb and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:47.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.
6 Feb and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:06.
6 Feb and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 15:10.
6 Feb and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 8 Jan 2024 at 14:29.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Feb 2024 at 09:34.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Redbridge Lane, Nursling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.
4 Sep and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Redbridge Lane, Nursling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:37.
4 Sep and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:22.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 08:55.
4 Sep and 6 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Bakers Drove, Rownhams.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 29 Aug 2024 at 08:40.
6 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Bakers Drove, Rownhams.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 4 Sep 2024 at 13:27.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Aldermoor Road, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 09:55 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 10:02.
16 Sep and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aldermoor Road, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 16:05.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 12:10 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 16:15.
14 Oct 2024 and 27 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 27 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:56.
15 Oct 2024 and 25 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Toothill Road, Toothill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2024 and run through until 25 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2024 at 12:51.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Conifer Road, Coxford, Southampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:50 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:01.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Alder Road, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 November 2024 at 18:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:01.
23 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Upton Lane, Nursling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:16.
18 Nov and 13 Dec 2024
Hampshire County Council were proposing to carry out Highway repair and maintenance works on School Lane, Chandler's Ford, Eastleigh.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 14:53.
19 Nov 2024 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakewood Road, Chandler's Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jul 2024 at 17:41.
19 Nov 2024 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Pauncefoot Hill, Romsey.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Aug 2024 at 15:23.
Tomorrow
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 26 Sep 2024 at 15:20.
Tomorrow
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 27 Sep 2024 at 08:46.
25 Nov and 13 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on School Lane, Chandler's Ford, Eastleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 15:24.
Today
Hampshire County Council are carrying out Highway repair and maintenance works on Bengers Lane, Mottisfont.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 25 Nov 2024 at 09:44.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:25.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:11.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:29.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 12:51.
2 and 20 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on School Lane, Chandler's Ford, Eastleigh.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 06:47.
3 and 5 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Nov 2024 at 10:03.
3 and 5 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 14 Nov 2024 at 15:07.
3 and 5 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Gardeners Lane, East Wellow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 15:35.
4 and 11 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Aug 2024 at 10:06.
4 and 11 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 15 Aug 2024 at 12:44.
9 and 12 Dec 2024
BT are proposing to carry out Utility asset works on Bunny Lane, Timsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 8 Nov 2024 at 12:57.
9 and 12 Dec 2024
BT are proposing to carry out Utility asset works on Bunny Lane, Timsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Sep 2024 at 14:03.
9 and 18 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 11:54.
9 and 18 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 15:22.
10 and 13 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on North Millers Dale, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Sep 2024 at 09:00.
16 and 18 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Scantabout Avenue, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 20 Nov 2024 at 17:08.
16 and 18 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Scantabout Avenue, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 15:32.
27 and 31 Dec 2024
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Franconia Drive, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 13:42.
6 and 9 Jan 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 15 Oct 2024 at 13:26.
6 Jan and 16 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 10:39.
6 and 9 Jan 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Springhill Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 19 Oct 2024 at 21:25.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 17:26.
6 and 17 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Haccups Lane, Michelmersh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 26 Sep 2024 at 13:22.
6 and 17 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Haccups Lane, Michelmersh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 3 Oct 2024 at 14:16.
6 and 17 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Haccups Lane, Michelmersh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 10 Oct 2024 at 12:55.
6 Jan and 5 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Hatt Hill, Mottisfont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 25 Nov 2024 at 11:22.
6 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:05.
6 Jan and 16 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 16:23.
6 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:37.
6 and 10 Jan 2025
National Highways are proposing to carry out Works for road purposes on Hill Street, Calmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Oct 2024 at 10:57.
13 Jan and 21 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Chandler's Ford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 08:54.
13 and 27 Jan 2025
Hampshire County Council are proposing to carry out Section 50 on Cupernham Lane, Romsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 11 Oct 2024 at 16:01.
13 Jan and 21 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Chandler's Ford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 08:57.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merdon Avenue, Chandler's Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 17:22.
20 and 24 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Eagle Close, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 16:31.
20 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:50.
23 and 29 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 15:44.
23 and 29 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 15:37.
24 and 30 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 15:51.
24 and 30 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 15:44.
27 and 31 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Regent Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 15:53.
27 and 31 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Regent Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 11:45.
28 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, North Baddesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 11:33.
28 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, Rownhams.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 11:34.
31 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Shaftesbury Avenue, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 15:56.
31 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Shaftesbury Avenue, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 09:53.
31 Jan and 6 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Shaftesbury Avenue, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 11:47.
3 Feb and 4 Apr 2025
Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 12:13.
3 Feb and 4 Apr 2025
Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 09:32.
10 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Mount Lane, Lockerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 16:43.
10 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Mount Lane, Lockerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 09:53.
11 and 20 Feb 2025
Hampshire County Council are proposing to carry out Highway improvement works on Lee Lane, Lee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 12:47.
14 Feb and 18 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 18 April 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 15:16.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 11:24.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:19.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:25.
17 and 21 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 10 Sep 2024 at 11:58.
17 and 21 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Hiltingbury Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 9 Sep 2024 at 13:39.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Oct 2024 at 10:16.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 14:56.
17 Feb and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 12:54.
18 and 24 Feb 2025
Hampshire County Council were proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 11 Oct 2024 at 13:44.
18 and 24 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Oakmount Road, Chandler's Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Sep 2024 at 16:42.
19 Feb and 14 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bournemouth Road, Chandler's Ford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 08:55.
Roadworks Map near to Abbotswood Common Road, ROMSEY, SO51 0DU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Abbotswood Common Road, ROMSEY, SO51 0DU (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
(Scheduled: 23 Nov 2024 - 29 Nov 2024)
(Scheduled: 26 Nov 2024 - 3 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.