ROADWORKS SUMMARY
Hordle Lane, LYMINGTON, SO41 0FB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hordle Lane, SO41 0FB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hordle Lane, LYMINGTON, SO41 0FB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hordle Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.

Southern Gas Networks logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 16:57.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 16:59.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:31.

Southern Gas Networks logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 18:00 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:00.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gore Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Gore Road, New Milton.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 16:35 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 10:40.

Wessex Internet logo
Finishing
Friday
Details
View Map
Share
Follow
Barnes Lane

Wessex Internet are proposing to carry out Utility asset works on Barnes Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 20 Nov 2024 at 14:58.

Wessex Internet logo
Until
11 Mar 2025
Details
View Map
Share
Follow
Barnes Lane

Wessex Internet are carrying out Utility asset works on Barnes Lane, Milford-on-sea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 08:00 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 19 Feb 2025 at 08:05.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lyndhurst Road

Hampshire County Council are carrying out Highway repair and maintenance works on Lyndhurst Road, Hinton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:30 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 26 Feb 2025 at 11:00.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Wainsford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Feb 2025 at 17:07.

Southern Gas Networks logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Wainsford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wainsford Road, Pennington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
19 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Wainsford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:11.

Southern Gas Networks logo
LONG TERM
Between
19 Feb and 1 Apr 2025
Details
View Map
Share
Wainsford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 1 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 09:56.

Southern Water logo
Until
14 Mar 2025
Details
View Map
Share
Follow
Lymore Lane

Southern Water are carrying out Utility repair and maintenance works on Lymore Lane, Milford-on-sea.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 21 Feb 2025 at 16:01.

Wessex Internet logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Grebe Close

Wessex Internet are proposing to carry out Utility asset works on Grebe Close, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 21 Nov 2024 at 10:06.

Wessex Internet logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Grebe Close

Wessex Internet are proposing to carry out Utility asset works on Grebe Close, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 20 Nov 2024 at 13:55.

Southern Gas Networks logo
Until
12 Mar 2025
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lymington Road, Milford-on-sea.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2025 at 13:00 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 10:39.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Pilley Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Pilley Street, Pilley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 12:15 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 14:15.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Royden Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Royden Lane, Boldre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 15:28.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Royden Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Royden Lane, Boldre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 17 Jan 2025 at 13:26.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Royden Lane

Hampshire County Council are carrying out Highway repair and maintenance works on Royden Lane, Boldre.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 08:58 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Feb 2025 at 09:08.

Hampshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Royden Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Royden Lane, Boldre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 17:44.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sway Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Sway Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 12:06.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Silver Street

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Silver Street, Sway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Feb 2025 at 09:46.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Silver Street

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Silver Street, Sway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Feb 2025 at 15:07.

Wessex Internet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Angel Lane

Wessex Internet are proposing to carry out Utility asset works on Angel Lane, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 17 Jan 2025 at 13:32.

Wessex Internet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Angel Lane

Wessex Internet are proposing to carry out Utility asset works on Angel Lane, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 24 Feb 2025 at 08:35.

Hampshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Longslade

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Longslade, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2025 at 10:38.

Wessex Internet logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Lymore Lane

Wessex Internet are proposing to carry out Utility asset works on Lymore Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 4 Feb 2025 at 16:06.

Wessex Internet logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Lymore Lane

Wessex Internet are proposing to carry out Utility asset works on Lymore Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 4 Feb 2025 at 10:53.

Hampshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Hampshire County Council are proposing to carry out Highway improvement works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Dec 2024 at 09:31.

Hampshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Longslade

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Longslade, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 7 Feb 2025 at 09:47.

Wessex Internet logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Agarton Lane

Wessex Internet are proposing to carry out Utility asset works on Agarton Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 4 Feb 2025 at 10:54.

Wessex Internet logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Agarton Lane

Wessex Internet are proposing to carry out Utility asset works on Agarton Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 4 Feb 2025 at 16:06.

South West Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Church Lane

South West Water were proposing to carry out Utility repair and maintenance works on Church Lane, Sway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Dec 2024 at 11:02.

Hampshire County Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Arnewood Bridge Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Arnewood Bridge Road, Sway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 27 Feb 2025 at 14:54.

Hampshire County Council logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Brookley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Brookley Road, Brockenhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 24 Feb 2025 at 08:39.

Scottish Hydro Electric Power Dis logo
Between
31 Mar and 12 Apr 2025
Details
View Map
Share
Follow
Kivernell Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Kivernell Road, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 12 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jan 2025 at 14:00.

Scottish Hydro Electric Power Dis logo
Between
31 Mar and 12 Apr 2025
Details
View Map
Share
Follow
Kivernell Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Kivernell Road, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 12 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Jan 2025 at 13:44.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 22 Aug 2025
Details
View Map
Share
Follow
Walkford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walkford Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2025 at 12:08.

South West Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Church Lane

South West Water were proposing to carry out Utility repair and maintenance works on Church Lane, Sway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 20 Dec 2024 at 11:35.

Scottish Hydro Electric Power Dis logo
Between
11 Apr and 2 May 2025
Details
View Map
Share
Follow
Brighton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Brighton Road, Sway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 08:46.

Scottish Hydro Electric Power Dis logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Lymington Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lymington Road, Milford-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 13:32.

Hampshire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Bashley Common Road

Hampshire County Council are proposing to carry out Highway improvement works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Feb 2025 at 17:23.

Hampshire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Bashley Common Road

Hampshire County Council are proposing to carry out Highway improvement works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 24 Jan 2025 at 16:43.

Hampshire County Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Old Milton Road

Hampshire County Council are proposing to carry out Highway improvement works on Old Milton Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 11:11.

Hampshire County Council logo
Between
24 Apr and 8 May 2025
Details
View Map
Share
Follow
North Close

Hampshire County Council are proposing to carry out Highway improvement works on North Close, Lymington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 24 Jan 2025 at 16:34.

Hampshire County Council logo
Between
24 Apr and 8 May 2025
Details
View Map
Share
Follow
Frys Lane

Hampshire County Council are proposing to carry out Highway improvement works on Frys Lane, Everton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 17 Jan 2025 at 10:36.

Hampshire County Council logo
Between
24 Apr and 8 May 2025
Details
View Map
Share
Follow
Frys Lane

Hampshire County Council are proposing to carry out Highway improvement works on Frys Lane, Everton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 15:58.

Hampshire County Council logo
Between
24 Apr and 8 May 2025
Details
View Map
Share
Follow
North Close

Hampshire County Council are proposing to carry out Highway improvement works on North Close, Lymington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Jan 2025 at 11:11.

South West Water logo
Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
Compton Road

South West Water are proposing to carry out Utility repair and maintenance works on Compton Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 10 Jan 2025 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Gore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gore Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:20.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 12 Sep 2025
Details
View Map
Share
Follow
Gore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gore Road, New Milton.

These works are categorised as Major.

The works will start on or after 28 April 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Feb 2025 at 16:45.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 29 Aug 2025
Details
View Map
Share
Follow
Walkford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walkford Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 12 Sep 2025
Details
View Map
Share
Follow
Walkford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walkford Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 10:49.

South West Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Holly Lane

South West Water are proposing to carry out Utility repair and maintenance works on Holly Lane, Pilley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Jan 2025 at 12:36.

Hampshire County Council logo
Between
7 and 23 May 2025
Details
View Map
Share
Follow
Norley Wood Road

Hampshire County Council are proposing to carry out Highway improvement works on Norley Wood Road, Norley Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Feb 2025 at 13:40.

Hampshire County Council logo
Between
7 and 23 May 2025
Details
View Map
Share
Follow
Norley Wood Road

Hampshire County Council are proposing to carry out Highway improvement works on Norley Wood Road, Norley Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Feb 2025 at 12:35.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Wootton Road

BT are proposing to carry out Utility asset works on Wootton Road, Tiptoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Feb 2025 at 16:55.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Wootton Road

BT are proposing to carry out Utility asset works on Wootton Road, Tiptoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Feb 2025 at 14:45.


Roadworks Map near to Hordle Lane, LYMINGTON, SO41 0FB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hordle Lane, LYMINGTON, SO41 0FB (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Internet logo
MAJOR
  
VAGGS LANE 
(0.6 miles)
Wessex Internet
Utility asset works - Carriageway, Verge - Give and take
Cancelled
(Scheduled: 7 Oct 2024 - 9 Oct 2025)
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.