ROADWORKS SUMMARY
Post Office Lane, SWINDON, SN4 9PB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Post Office Lane, SN4 9PB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Post Office Lane, SWINDON, SN4 9PB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Post Office Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Croft Road

National Highways are carrying out Highway improvement works on Croft Road, Swindon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2023 at 00:00 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 13 Feb 2025 at 10:00.

Swindon Borough Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Marlborough Road

Swindon Borough Council are carrying out Highway repair and maintenance works on Marlborough Road, Wroughton, Swindon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 May 2024 at 09:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Swindon Borough Council on 13 Mar 2025 at 16:32.

Wiltshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are carrying out Highway improvement works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 07:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 3 Mar 2025 at 15:33.

Wiltshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Coped Hall Roundabout South West A3102 To High Street

Wiltshire Council are carrying out Highway improvement works on Coped Hall Roundabout South West A3102 To High Street, Royal Wootton Bassett.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 3 Mar 2025 at 15:34.

Wiltshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Marlowe Way

Wiltshire Council are carrying out Highway improvement works on Marlowe Way, Royal Wootton Bassett.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 07:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 20 Mar 2025 at 15:32.

Wiltshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Coped Hall Roundabout South West A3102 To High Street

Wiltshire Council are carrying out Highway improvement works on Coped Hall Roundabout South West A3102 To High Street, Royal Wootton Bassett.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 07:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 10 Mar 2025 at 13:26.

Wales And West Utilities logo
Between
10 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Chalgrove Field

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Chalgrove Field, Freshbrook, Swindon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 10 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 3 Dec 2024 at 11:02.

Wiltshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are proposing to carry out Highway improvement works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 15:48.

Wiltshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Coped Hall Roundabout South West A3102 To High Street

Wiltshire Council are proposing to carry out Highway improvement works on Coped Hall Roundabout South West A3102 To High Street, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 15:48.

Swindon Borough Council logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Great Western Way

Swindon Borough Council are proposing to carry out Highway repair and maintenance works on Great Western Way, Swindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Swindon Borough Council on 25 Mar 2025 at 15:38.

Wiltshire Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Highway

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highway, Hilmarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 26 Feb 2025 at 13:25.

Wiltshire Council logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Highway

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highway, Hilmarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 12:23.

Wales And West Utilities logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Wood Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Wood Street, Royal Wootton Bassett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 12 Feb 2025 at 16:47.

Wiltshire Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Longleaze

Wiltshire Council are proposing to carry out Highway improvement works on Longleaze, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 11:30.

Wiltshire Council logo
Between
7 and 27 Apr 2025
Details
View Map
Share
Follow
Longleaze

Wiltshire Council are proposing to carry out Highway improvement works on Longleaze, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 27 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:17.

Wiltshire Council logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Highway

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highway, Hilmarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 10:58.

Wiltshire Council logo
LONG TERM
Between
22 Apr and 30 May 2025
Details
View Map
Share
Follow
Coped Hall Roundabout South West A3102 To High Street

Wiltshire Council are proposing to carry out Highway improvement works on Coped Hall Roundabout South West A3102 To High Street, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 13:29.

Wiltshire Council logo
LONG TERM
Between
22 Apr and 30 May 2025
Details
View Map
Share
Coped Hall Roundabout South West A3102 To High Street

Wiltshire Council were proposing to carry out Highway improvement works on Coped Hall Roundabout South West A3102 To High Street, Royal Wootton Bassett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 30 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 20 Mar 2025 at 15:49.

Wiltshire Council logo
LONG TERM
Between
22 Apr and 30 May 2025
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are proposing to carry out Highway improvement works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 13:29.

Wiltshire Council logo
LONG TERM
Between
22 Apr and 30 May 2025
Details
View Map
Share
Coped Hall

Wiltshire Council were proposing to carry out Highway improvement works on Coped Hall, Royal Wootton Bassett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Mar 2025 at 15:50.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Post Office Lane

BT are proposing to carry out Utility asset works on Post Office Lane, Broad Hinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 25 Feb 2025 at 10:41.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Post Office Lane

BT are proposing to carry out Utility asset works on Post Office Lane, Broad Hinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Feb 2025 at 16:06.

BT logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Post Office Lane

BT are proposing to carry out Utility asset works on Post Office Lane, Broad Hinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Jan 2025 at 13:59.

Wiltshire Council logo
Between
22 Apr and 9 May 2025
Details
View Map
Share
Follow
Bincknoll Lane West Of Roundabout

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bincknoll Lane West Of Roundabout, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 08:50.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Bushton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 13:22.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Bushton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 25 Feb 2025 at 10:06.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 13:22.

BT logo
Between
23 Apr and 14 May 2025
Details
View Map
Share
Follow
Breach Lane

BT are proposing to carry out Utility asset works on Breach Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 25 Feb 2025 at 10:07.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Highway

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highway, Hilmarton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Mar 2025 at 13:27.

Wiltshire Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Withy Bed North East To Junction At Thornbush View Nursery

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Withy Bed North East To Junction At Thornbush View Nursery, Clyffe Pypard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 4 Mar 2025 at 20:51.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Heron Pond House South To Greenway

BT are proposing to carry out Utility asset works on Heron Pond House South To Greenway, West Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Feb 2025 at 13:42.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Heron Pond House South To Greenway

BT are proposing to carry out Utility asset works on Heron Pond House South To Greenway, West Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:08.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Primrose Hill To Junction At Heron Pond House

BT are proposing to carry out Utility asset works on Primrose Hill To Junction At Heron Pond House, Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Feb 2025 at 09:08.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Primrose Hill To Junction At Heron Pond House

BT are proposing to carry out Utility asset works on Primrose Hill To Junction At Heron Pond House, Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Feb 2025 at 13:42.

Swindon Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Woodland View

Swindon Borough Council are proposing to carry out Highway improvement works on Woodland View, Wroughton, Swindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 1 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Swindon Borough Council on 10 Feb 2025 at 16:12.

BT logo
Between
11 and 30 May 2025
Details
View Map
Share
Follow
Chaddington Lane

BT are proposing to carry out Utility asset works on Chaddington Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 30 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Feb 2025 at 09:35.

BT logo
Between
11 and 30 May 2025
Details
View Map
Share
Follow
Bincknoll

BT are proposing to carry out Utility asset works on Bincknoll, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 30 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Feb 2025 at 09:34.

BT logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Chaddington Lane

BT are proposing to carry out Utility asset works on Chaddington Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 13 Mar 2025 at 08:46.

BT logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Bincknoll

BT are proposing to carry out Utility asset works on Bincknoll, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 13 Mar 2025 at 08:46.

Wiltshire Council logo
Between
12 and 27 May 2025
Details
View Map
Share
Follow
Bincknoll Lane West Of Roundabout

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bincknoll Lane West Of Roundabout, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 11:13.

Wiltshire Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Withy Bed North East To Junction At Thornbush View Nursery

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Withy Bed North East To Junction At Thornbush View Nursery, Clyffe Pypard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 5 Mar 2025 at 11:15.

Wiltshire Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Withy Bed North East To Junction At Thornbush View Nursery

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Withy Bed North East To Junction At Thornbush View Nursery, Clyffe Pypard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 6 Mar 2025 at 15:36.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Bath Road

Wiltshire Council are proposing to carry out Highway improvement works on Bath Road, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:36.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway improvement works on High Street, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:36.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Whitehill Lane

Wiltshire Council are proposing to carry out Highway improvement works on Whitehill Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:45.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Whitehill Lane

Wiltshire Council are proposing to carry out Highway improvement works on Whitehill Lane, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:36.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Bath Road

Wiltshire Council are proposing to carry out Highway improvement works on Bath Road, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:46.

Wiltshire Council logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway improvement works on High Street, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Mar 2025 at 15:47.

Scottish Hydro Electric Power Dis logo
Between
26 and 30 May 2025
Details
View Map
Share
Chalgrove Field

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Chalgrove Field, Freshbrook, Swindon.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 30 May 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Mar 2025 at 16:15.

Thames Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Greenway

Thames Water were proposing to carry out New service connection on Greenway, Tockenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 5 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 11:08.

Thames Water logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Withy Bed

Thames Water are proposing to carry out Utility repair and maintenance works on Withy Bed, Bushton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 10:25.

Thames Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Greenway

Thames Water are proposing to carry out New service connection on Greenway, Tockenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 12:11.

Wiltshire Council logo
Between
7 and 11 Jun 2025
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:40.

Wiltshire Council logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:41.

Scottish Hydro Electric Power Dis logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Chalgrove Field

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chalgrove Field, Freshbrook, Swindon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Mar 2025 at 11:23.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Chapel Lane, Broad Town.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 20:00.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
St Peters Church South And West To Junction At Seedcroft

Thames Water are proposing to carry out Utility repair and maintenance works on St Peters Church South And West To Junction At Seedcroft, Clyffe Pypard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 13:44.

BT logo
Between
13 and 19 Jun 2025
Details
View Map
Share
Follow
Pye Lane

BT are proposing to carry out Utility asset works on Pye Lane, Broad Town.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 19 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Mar 2025 at 12:22.

Wiltshire Council logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Coped Hall

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Coped Hall, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 19 Feb 2025 at 09:41.

BT logo
Between
20 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Thornhill

BT are proposing to carry out Utility asset works on Thornhill, Royal Wootton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Mar 2025 at 08:24.


Roadworks Map near to Post Office Lane, SWINDON, SN4 9PB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Mar 2025 20:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Post Office Lane, SWINDON, SN4 9PB (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HIGH STREET 
(0.2 miles)
BT
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 24 Mar 2025 09:30
(Scheduled: 24 Mar 2025 - 26 Mar 2025)
0.2
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.