ROADWORKS SUMMARY
Wheeler Place, DEVIZES, SN10 2QT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wheeler Place, SN10 2QT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wheeler Place, DEVIZES, SN10 2QT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wheeler Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
St Johns Street

Wiltshire Council are carrying out roadworks on St Johns Street, Devizes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 07:00 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 30 Oct 2024 at 08:43.

Wiltshire Council logo
LONG TERM
Between
18 Dec 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Northgate Street

Wiltshire Council are proposing to carry out roadworks on Northgate Street, Devizes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 12 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 19 Dec 2024 at 11:13.

Wessex Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Wine Street

Wessex Water were proposing to carry out Utility repair and maintenance works on Wine Street, Devizes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Jan 2025 at 14:12.

Wiltshire Council logo
Until
8 Mar 2025
Details
View Map
Share
Follow
Sandridge Hill

Wiltshire Council are carrying out Highway repair and maintenance works on Sandridge Hill, Sandridge Common.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 19:00 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Feb 2025 at 13:08.

Wiltshire Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Sandridge Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sandridge Hill, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Nov 2024 at 11:44.

Wiltshire Council logo
Until
8 Mar 2025
Details
View Map
Share
Follow
Sandridge Hill

Wiltshire Council are carrying out Highway repair and maintenance works on Sandridge Hill, Bromham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 19:00 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Feb 2025 at 13:08.

Wiltshire Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Sandridge Road Northeast To Sandridge Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sandridge Road Northeast To Sandridge Hill, Sandridge Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Dec 2024 at 17:14.

Wiltshire Council logo
Until
8 Mar 2025
Details
View Map
Share
Follow
Sandridge Road Northeast To Sandridge Hill

Wiltshire Council are carrying out Highway repair and maintenance works on Sandridge Road Northeast To Sandridge Hill, Sandridge Common.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 19:00 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 Feb 2025 at 13:07.

Wiltshire Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Sandridge Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Sandridge Hill, Sandridge Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Dec 2024 at 17:15.

Giganet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Castle Lane

Giganet are proposing to carry out Utility asset works on Castle Lane, Devizes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Giganet on 11 Dec 2024 at 10:10.

Giganet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Castle Lane

Giganet are proposing to carry out Utility asset works on Castle Lane, Devizes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Giganet on 18 Feb 2025 at 09:24.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
A361 Dual Carriageway East To Caen Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A361 Dual Carriageway East To Caen Hill, Devizes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 09:34.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
A361 Hooks Lane East To Dual Carriageway

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A361 Hooks Lane East To Dual Carriageway, Poulshot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 09:34.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
A361 Dual Carriage Way West From Caen Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A361 Dual Carriage Way West From Caen Hill, Devizes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 09:34.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lower Foxhangers

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Foxhangers, Rowde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 09:34.

Wessex Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Chandlers Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Chandlers Lane, Bishops Cannings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Dec 2024 at 14:39.

Wessex Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Chandlers Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Chandlers Lane, Bishops Cannings.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Jan 2025 at 09:48.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
The Crescent

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Crescent, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
The Common

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Common, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
Brick Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Brick Hill, Kennet, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
The Pound

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Pound, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
Church Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Church Hill, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on High Street, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:04.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
Horsepool

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Horsepool, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:03.

Wiltshire Council logo
Between
26 and 31 Mar 2025
Details
View Map
Share
Follow
Highfield

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highfield, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Feb 2025 at 12:03.

Wiltshire Council logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Snowberry Lane

Wiltshire Council are proposing to carry out Highway improvement works on Snowberry Lane, Melksham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Feb 2025 at 15:12.

Wiltshire Council logo
LONG TERM
Between
7 Apr and 30 May 2025
Details
View Map
Share
Follow
Hartmoor

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hartmoor, Devizes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 30 May 2025. The works will impact the verge only.

This roadwork event was last updated by Wiltshire Council on 7 Feb 2025 at 16:32.

Scottish Hydro Electric Power Dis logo
Between
22 Apr and 8 May 2025
Details
View Map
Share
Roundway Park

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Roundway Park, Devizes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 8 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 16:41.

Scottish Hydro Electric Power Dis logo
Between
22 Apr and 8 May 2025
Details
View Map
Share
London Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Devizes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 8 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jan 2025 at 15:56.

Scottish Hydro Electric Power Dis logo
Between
22 Apr and 8 May 2025
Details
View Map
Share
London Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Devizes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 8 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jan 2025 at 09:56.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
The Common

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Common, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:42.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
The Crescent

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Crescent, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:42.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Brick Hill

Wiltshire Council are proposing to carry out Highway improvement works on Brick Hill, Kennet, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:42.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
The Pound

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Pound, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:42.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Horsepool

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Horsepool, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:41.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Church Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Church Hill, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:41.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
High Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on High Street, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:41.

Wiltshire Council logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Highfield

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Highfield, Bromham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 Feb 2025 at 11:41.

Wiltshire Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Stockley Lane

Wiltshire Council are proposing to carry out Section 50 on Stockley Lane, Calne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 16:35.

Wiltshire Council logo
Between
28 Apr and 5 May 2025
Details
View Map
Share
Follow
Snowberry Lane

Wiltshire Council are proposing to carry out New service connection on Snowberry Lane, Melksham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Feb 2025 at 11:52.

Wiltshire Council logo
Between
1 and 3 May 2025
Details
View Map
Share
Follow
The Strand

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Strand, Keevil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 29 Jan 2025 at 20:05.

Wiltshire Council logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Stockley Lane

Wiltshire Council are proposing to carry out Section 50 on Stockley Lane, Calne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Feb 2025 at 16:35.

Wales And West Utilities logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
New Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Park Road, Devizes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 28 Feb 2025 at 16:10.

Wales And West Utilities logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
New Park Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Park Road, Devizes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 19 Feb 2025 at 09:19.

Wiltshire Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A361 Dual Carriageway East To Caen Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A361 Dual Carriageway East To Caen Hill, Devizes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 28 Feb 2025 at 13:34.

Wiltshire Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Court Hill

Wiltshire Council are proposing to carry out Section 50 on Court Hill, Potterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Feb 2025 at 15:46.

Wiltshire Council logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Court Hill

Wiltshire Council are proposing to carry out Section 50 on Court Hill, Potterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Feb 2025 at 13:33.

Wessex Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Close Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on Close Lane, Marston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Feb 2025 at 14:33.


Roadworks Map near to Wheeler Place, DEVIZES, SN10 2QT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 1 Mar 2025 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wheeler Place, DEVIZES, SN10 2QT (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.