ROADWORKS SUMMARY
SM3 8HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for SM3 8HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to SM3 8HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.

LONG TERM
Between
25 Aug 2023 and 28 Feb 2025
Details
View Map
Share
Follow
Cromwell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Cromwell Road, Kingston Upon Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2023 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 2 Aug 2023 at 11:45.

Network Rail logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Epsom & Ewell Footpath 67/30

Network Rail are carrying out Works for Rail Purposes on Epsom & Ewell Footpath 67/30, Epsom & Ewell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2023 at 08:30 and could run through until 18 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 06:33.

LONG TERM
Between
13 Jun and 30 Nov 2024
Details
View Map
Share
Follow
Cambridge Grove Road

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Cambridge Grove Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 May 2024 at 14:38.

London Borough Of Wandsworth logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Rosedale Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosedale Road, Stoneleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 14:06.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Princes Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Princes Avenue, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Elgar Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Elgar Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2026
Details
View Map
Share
Follow
Egmont Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Egmont Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:28.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Derby Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Derby Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Douglas Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Douglas Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Broomfield Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Broomfield Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Worthington Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Worthington Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Ditton Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Dec 2025
Details
View Map
Share
Follow
Beaconsfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Kingsdowne Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Hollyfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Jun 2024 at 11:07.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Browns Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Browns Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Nov 2024 at 08:20.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Langley Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Langley Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Oct 2024 at 08:38.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
South Place

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on South Place, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 14:50 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Oct 2024 at 14:50.

LONG TERM
Between
1 Jul 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 18 Jun 2024 at 10:38.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Oak Hill Crescent

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Oak Hill Crescent, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2024 at 08:27.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Mar 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:27.

UK Power Networks South Eastern logo
LONG TERM
Between
31 Jul and 29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Jul 2024 at 11:21.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are carrying out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2024 at 11:45 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2024 at 11:58.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Common Road, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 May 2024 at 12:56.

Thames Water logo
LONG TERM
Between
26 Aug 2024 and 28 Feb 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:15.

Thames Water logo
LONG TERM
Between
26 Aug and 9 Dec 2024
Details
View Map
Share
Follow
Mill Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Mill Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 14:06.

London Borough Of Merton logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Streatham Road

London Borough Of Merton are carrying out Highway improvement works on Streatham Road, Mitcham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 3 Sep 2024 at 15:24.

UK Power Networks South Eastern logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Surbiton Hill Road

UK Power Networks South Eastern are carrying out Utility asset works on Surbiton Hill Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 10:30 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 15:58.

UK Power Networks South Eastern logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Beaufort Road

UK Power Networks South Eastern are carrying out Utility asset works on Beaufort Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 10:30 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 15:57.

Thames Water logo
LONG TERM
Between
3 Sep 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:53.

Southern Gas Networks logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Wilmot Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilmot Way, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 12:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:39.

UK Power Networks South Eastern logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2024 at 12:50.

UK Power Networks South Eastern logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are carrying out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 08:59.

UK Power Networks South Eastern logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2024 at 13:00.

UK Power Networks South Eastern logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are carrying out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 13:56.

Thames Water logo
LONG TERM
Between
10 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 08:26.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:40.

Surrey County Council logo
LONG TERM
Between
15 Sep 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 12 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Jul 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 22 Nov 2024
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 07:47.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 09:27.

UK Power Networks South Eastern logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Fassett Road

UK Power Networks South Eastern are carrying out Utility asset works on Fassett Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 12:51 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Aug 2024 at 11:50.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Gatton Road

Thames Water are carrying out Utility asset works on Gatton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 14:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 12:24.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 25 Nov 2024
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2024 at 14:06.

UK Power Networks South Eastern logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 08:33.

Southern Gas Networks logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Carshalton Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Carshalton Grove, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 13:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 16:30.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Holly Lane West

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane West, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 09:03.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:08.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:56.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 13:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Cromwell Road

Transport for London (TfL) are carrying out Highway improvement works on Cromwell Road, Kingston Upon Thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:05.

UK Power Networks South Eastern logo
LONG TERM
Between
8 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Jul 2024 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:06.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 08:29.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Holly Lane East

Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane East, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 15:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 15:13.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sutton Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Sutton Grove, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 11:30 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 18:07.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Cherry Hill Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Cherry Hill Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:15.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Cherry Hill Gardens

Thames Water are carrying out Disconnection or alteration of supply on Cherry Hill Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:43.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are carrying out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:42.

Thames Water logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:19.

Thames Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are carrying out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:26.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rigby Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Rigby Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:13.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rigby Close

Thames Water are carrying out Disconnection or alteration of supply on Rigby Close, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:24.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:57.

Network Rail logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Lower Downs Road

Network Rail are carrying out Works for Rail Purposes on Lower Downs Road, Raynes Park.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Nov 2024 at 16:16.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2024 at 13:25.

Thames Water logo
LONG TERM
Between
15 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:49.

UK Power Networks South Eastern logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are carrying out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 12:29 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Oct 2024 at 12:53.

UK Power Networks South Eastern logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 8 Dec 2024
Details
View Map
Share
Follow
West Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Gardens, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 07:30.

Murphy Power Distribution logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Mulholland Close

Murphy Power Distribution are proposing to carry out Utility asset works on Mulholland Close, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Oct 2024 at 15:15.

Murphy Power Distribution logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Mulholland Close

Murphy Power Distribution are carrying out Utility asset works on Mulholland Close, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Oct 2024 at 10:42.

Murphy Power Distribution logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clay Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Clay Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 27 Aug 2024 at 08:09.

Murphy Power Distribution logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clay Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Clay Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 23 Sep 2024 at 07:08.

Thames Water logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are carrying out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:47.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 24 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:46.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Waverley Way

UK Power Networks South Eastern are carrying out New service connection on Waverley Way, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:42.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Banstead Road

UK Power Networks South Eastern are carrying out New service connection on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:31 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:42.

UK Power Networks South Eastern logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are carrying out New service connection on Downside Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 14:41.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Chipstead Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chipstead Way, Woodmansterne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Bridle Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Aug 2024 at 15:04.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:58.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:15.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:16.

Southern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are carrying out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:47.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
St Dunstans Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on St Dunstans Hill, Cheam.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:43.

Surrey County Council logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Stoneleigh Crescent

Surrey County Council are carrying out Highway repair and maintenance works on Stoneleigh Crescent, Stoneleigh.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 09:17.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Riverview Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Riverview Road, Ewell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 16 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 26 Sep 2024 at 15:19.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Riverview Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Riverview Road, Ewell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 16 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 11:36.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Riverview Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Riverview Road, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 07:58.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Riverview Road

Surrey County Council are carrying out Highway repair and maintenance works on Riverview Road, Ewell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 09:22.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Riverview Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Riverview Road, Ewell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 16 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 17 Sep 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:02.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 08:15.

Southern Gas Networks logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Friday Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Friday Road, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 08:32 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:45.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 08:25.

Thames Water logo
LONG TERM
Between
28 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2024 at 08:57.

Transport for London (TfL) logo
LONG TERM
Between
30 Oct and 10 Dec 2024
Details
View Map
Share
Malden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Road, New Malden.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 10:19.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 12:46.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 May 2024 at 13:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Hare Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Lane, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Jul 2024 at 07:03.

Southern Gas Networks logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Holly Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
North Acre

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Acre, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:49.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Garratts Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratts Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Albert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Aug 2024 at 15:04.

Southern Gas Networks logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Higher Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Higher Green, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 07:30.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:02.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Malden Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Malden Road, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:39.

Southern Gas Networks logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Red Lion Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Red Lion Road, Tolworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:10 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 10:33.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Rogers Road

London Borough Of Wandsworth are proposing to carry out Section 50 on Rogers Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 28 Oct 2024 at 09:50.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Rogers Road

London Borough Of Wandsworth are carrying out Section 50 on Rogers Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Nov 2024 at 08:12.

Southern Gas Networks logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Westmead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Westmead Road, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:31.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Byron Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Byron Avenue, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:57.

LONG TERM
Between
6 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Rowlls Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Rowlls Road, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Oct 2024 at 15:17.

LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Rowlls Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Rowlls Road, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Nov 2024 at 14:24.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Outwood Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Outwood Lane, Chipstead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:24.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:57.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Oct 2024 at 15:02.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Carlwell Street

Thames Water are carrying out roadworks on Carlwell Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:26.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are carrying out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:26.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Today
Details
View Map
Share
Follow
Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Park Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 12:59.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Today
Details
View Map
Share
Follow
Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Park Road, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:04 and could run through until 15 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Nov 2024 at 09:04.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Little Woodcote Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 18 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 09:43.

Southern Gas Networks logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Little Woodcote Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 15:17.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 24 Dec 2024
Details
View Map
Share
Cheam Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:31.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:58.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:35.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 16:58.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Grosvenor Avenue

UK Power Networks South Eastern were proposing to carry out New service connection on Grosvenor Avenue, Carshalton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:29.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Grosvenor Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:39.

UK Power Networks South Eastern logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Grosvenor Avenue

UK Power Networks South Eastern are carrying out New service connection on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 08:45.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 09:40.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 07:04.

Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Thornhill Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Thornhill Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Oct 2024 at 12:08.

Until
22 Nov 2024
Details
View Map
Share
Follow
Thornhill Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Thornhill Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Nov 2024 at 10:53.

Thames Water logo
Between
11 and 22 Nov 2024
Details
View Map
Share
St Mark's Hill

Thames Water were proposing to carry out Utility repair and maintenance works on St Mark's Hill, Surbiton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 10:08.

Thames Water logo
Finishing
Today
Details
View Map
Share
Blagdon Road

Thames Water were proposing to carry out Utility repair and maintenance works on Blagdon Road, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:12.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Cromford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Cromford Way, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 12:41.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Cromford Way

Thames Water are carrying out Utility repair and maintenance works on Cromford Way, New Malden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 13:29 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 12:00.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Outwood Lane

Surrey County Council are carrying out Highway repair and maintenance works on Outwood Lane, Chipstead.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 13:04 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 08:17.

Thames Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Woodlands Road

Thames Water are carrying out Utility asset works on Woodlands Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 13:45.

Thames Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Wells Road

Thames Water are carrying out Utility asset works on Wells Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:11.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Carshalton Road

Thames Water are carrying out Utility repair and maintenance works on Carshalton Road, Woodmansterne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:47 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 14:25.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
The Mount

Southern Gas Networks are carrying out Utility repair and maintenance works on The Mount, Coulsdon.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 12:00 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:00.

Surrey County Council logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Rosedale Road

Surrey County Council are carrying out Highway repair and maintenance works on Rosedale Road, Stoneleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:56.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:55.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Edinburgh Road, Sutton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 13:06 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 15:01.

Thames Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Portland Road

Thames Water are carrying out roadworks on Portland Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:48.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 22:55.

Thames Water logo
LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 13:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Acre Road

Thames Water are carrying out Utility repair and maintenance works on Acre Road, Kingston Upon Thames.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 10:18 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 16:45.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Byton Road

Thames Water are proposing to carry out New service connection on Byton Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 09:52.

UK Power Networks South Eastern logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Wellesley Road

UK Power Networks South Eastern are carrying out New service connection on Wellesley Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 08:05.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
King Charles Crescent

Southern Gas Networks are carrying out Utility repair and maintenance works on King Charles Crescent, Surbiton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 12:30 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 16:37.

Thames Water logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are carrying out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:36.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cleaveland Road

Thames Water are carrying out Utility repair and maintenance works on Cleaveland Road, Surbiton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 09:05 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:44.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Station Approach

Thames Water were proposing to carry out Utility repair and maintenance works on Station Approach, Raynes Park.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 15:20.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Coombe Lane West

Southern Gas Networks are carrying out Utility repair and maintenance works on Coombe Lane West, Kingston Upon Thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 11:00 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:27.

Surrey County Council logo
LONG TERM
Between
17 Nov 2024 and 17 May 2025
Details
View Map
Share
Follow
Gadesden Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gadesden Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 08:30.

Surrey County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 09:33.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Holly Lane West

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane West, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 13:50.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:46.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:52.

Surrey County Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Links Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 11:00.

Surrey County Council logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Links Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 13:00.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:30.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:43.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:54.

London Borough Of Sutton logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Church Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 11 Nov 2024 at 17:01.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Carshalton Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 14:05.

Southern Gas Networks logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Coldharbour Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coldharbour Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 09:24.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:14.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hook Rise South

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2024 at 11:12.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hook Rise South

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 11:22.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hook Rise North

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise North, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2024 at 11:12.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hook Rise North

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise North, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 16:39.

Southern Gas Networks logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
Hawks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawks Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:41.

Southern Gas Networks logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
Hawks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawks Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:43.

Southern Gas Networks logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:42.

Southern Gas Networks logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
Cambridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:46.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 23:08.

Thames Water logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:11.

Thames Water logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Thornton Hill

Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:09.

Thames Water logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:04.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
New Road

BT are proposing to carry out Utility asset works on New Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Aug 2024 at 15:09.

BT logo
Finishing
Wednesday
Details
View Map
Share
New Road

BT were proposing to carry out Utility asset works on New Road, Kingston Upon Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 13 Nov 2024 at 14:02.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility asset works on Kings Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Aug 2024 at 15:19.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility asset works on Kings Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Sep 2024 at 11:47.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility asset works on Kings Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Sep 2024 at 14:00.

London Borough Of Wandsworth logo
Finishing
Thursday
Details
View Map
Share
Follow
Trevelyan Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 13 Aug 2024 at 15:52.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:47.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:44.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

UK Power Networks Eastern & London logo
Between
19 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Chillerton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Chillerton Road, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 2 December 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 14:42.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Dewey Street

Thames Water are proposing to carry out New service connection on Dewey Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:24.

Surrey County Council logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Poole Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Poole Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 17:31.

Surrey County Council logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Poole Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Poole Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 13:42.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 5 Sep 2024 at 10:20.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Aug 2024 at 09:03.

London Borough Of Wandsworth logo
Between
20 and 26 Nov 2024
Details
View Map
Share
Follow
Longley Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 2 Sep 2024 at 09:29.

London Borough Of Sutton logo
Between
21 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Mulgrave Road

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Mulgrave Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 13 Nov 2024 at 14:13.

Southern Gas Networks logo
Between
21 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:01.

Transport for London (TfL) logo
Between
21 Nov and 10 Dec 2024
Details
View Map
Share
Malden Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Malden Way, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 10:20.

Thames Water logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 06:47.

Thames Water logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 07:22.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:01.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:54.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:34.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:41.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:13.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 11:49.

Network Rail logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Claygate Lane

Network Rail are proposing to carry out Works for Rail Purposes on Claygate Lane, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 08:47.

Network Rail logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Claygate Lane

Network Rail are proposing to carry out Works for Rail Purposes on Claygate Lane, Thames Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 14:05.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Tolworth Rise South

Thames Water were proposing to carry out Utility repair and maintenance works on Tolworth Rise South, Tolworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 16:23.

Thames Water logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Commonside East

Thames Water are proposing to carry out Utility asset works on Commonside East, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:34.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 27 Jan 2025
Details
View Map
Share
Kingston Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingston Hill, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:08.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 09:11.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 09:36.

Thames Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Broughton Road

Thames Water are proposing to carry out New service connection on Broughton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:34.

Thames Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Broughton Road

Thames Water are proposing to carry out New service connection on Broughton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:39.

Thames Water logo
Between
29 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Bronson Road

Thames Water are proposing to carry out Utility asset works on Bronson Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:57.

Surrey County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 09:36.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Holly Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 13:30.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:55.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:51.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:51.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:49.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:54.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:07.

Southern Gas Networks logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Alberta Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Kingston Road (Service Road 395-427)

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Kingston Road (Service Road 395-427), Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 14:58.

London Borough Of Sutton logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:57.

London Borough Of Sutton logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:56.

Surrey County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 15:42.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 10:07.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2024 at 09:09.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Sep 2024 at 09:24.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:43.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Richmond Road

Thames Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 13:16.

Thames Water logo
Between
3 and 13 Dec 2024
Details
View Map
Share
Follow
Pollards Hill North

Thames Water are proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:19.

Thames Water logo
Between
3 and 13 Dec 2024
Details
View Map
Share
Pollards Hill North

Thames Water were proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:21.

Surrey County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Kingston Bypass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingston Bypass, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 15:47.

UK Power Networks South Eastern logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:08.

BT logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
York Road

BT are proposing to carry out Utility asset works on York Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Nov 2024 at 14:56.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Horsecroft

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 14:00.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Fir Tree Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Fir Tree Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Oct 2024 at 10:59.

Southern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Lynwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lynwood Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jun 2024 at 11:35.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
College Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on College Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jun 2024 at 11:26.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:26.

Transport for London (TfL) logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Leatherhead Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leatherhead Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 11:36.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Bridle Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on The Bridle Way, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 13:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Bridle Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on The Bridle Way, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Nov 2024 at 15:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Sep 2024 at 07:26.

Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 8 Oct 2024 at 12:40.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are proposing to carry out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 15:47.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are proposing to carry out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 16:34.

Network Rail logo
Between
10 and 14 Dec 2024
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Sep 2024 at 14:10.

London Borough Of Merton logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 11:35.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:09.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 15:34.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:57.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:07.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:09.

Transport for London (TfL) logo
Between
16 and 21 Dec 2024
Details
View Map
Share
Follow
Leatherhead Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leatherhead Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 10:21.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Streatham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 07:28.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:42.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:43.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:31.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:56.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:07.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 17:26.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:03.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:21.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:26.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:11.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Selkirk Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 10:20.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:19.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 13:57.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Nov 2024 at 12:58.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 15:00.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:38.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 13:36.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 07:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 10:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 07:32.

London Borough Of Sutton logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are proposing to carry out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 7 Nov 2024 at 16:39.

Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Thornhill Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Thornhill Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Oct 2024 at 13:53.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pyne Road

Thames Water are proposing to carry out New service connection on Pyne Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 16:18.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Ampere Way

UK Power Networks South Eastern are proposing to carry out New service connection on Ampere Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:56.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:07.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:45.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:00.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 17:35.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 12:43.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:13.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Pitcairn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:47.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 17:00.

London Borough Of Merton logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Grenfell Road

London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 15:52.

London Borough Of Merton logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Grenfell Road

London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 10:00.

London Borough Of Merton logo
Between
6 and 16 Jan 2025
Details
View Map
Share
Follow
Haydon Park Road

London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 15:46.

Thames Water logo
LONG TERM
Between
7 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:57.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:47.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:18.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:28.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:24.

UK Power Networks South Eastern logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Oct 2024 at 09:20.

UK Power Networks South Eastern logo
Between
10 and 29 Jan 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Nov 2024 at 16:30.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:29.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:24.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Park Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Park Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 11:31.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:28.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:18.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:29.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:28.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:10.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Plough Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:48.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:37.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 16:04.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
St Mark's Hill

Thames Water are proposing to carry out Utility repair and maintenance works on St Mark's Hill, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:16.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Eden Street

UK Power Networks South Eastern are proposing to carry out Remedial works on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:10.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lady Booth Road

UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:18.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 16:03.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Thornton Hill

Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.

London Borough Of Merton logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Links Road

London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 12 Nov 2024 at 16:45.

London Borough Of Merton logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Links Road

London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 14:29.

Thames Water logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Carlwell Street

Thames Water were proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:51.

Thames Water logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:43.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:31.

Thames Water logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:07.

Thames Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Fullers Way South

Thames Water were proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:36.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 08:18.

LONG TERM
Between
18 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Eden Street

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Aug 2024 at 15:36.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:18.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:15.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:06.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:58.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:09.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 15:16.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 13:43.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sandy Lane South

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 11:53.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 16:39.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:05.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:55.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fullers Way South

Thames Water are proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Oct 2024 at 12:13.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
West Barnes Lane

Network Rail were proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Sep 2024 at 16:40.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 08:04.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Martin Way

London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Nov 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:43.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Willow View

BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 15:24.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:49.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Holly Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 13:28.

Surrey County Council logo
Between
22 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:38.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
King Charles Road

Network Rail are proposing to carry out Works for Rail Purposes on King Charles Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:01.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:32.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:45.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:40.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Plough Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 16:55.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:59.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:02.

London Borough Of Sutton logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Throwley Way

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Throwley Way, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 16:25.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 2 Mar 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 13:49.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Alexandra Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Nov 2024 at 13:08.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 12 Nov 2024 at 10:13.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:48.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 10:43.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:27.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 15:20.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:39.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:27.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:40.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:28.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 1 Nov 2024 at 11:11.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Maybury Street

Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 11:42.

UK Power Networks South Eastern logo
Between
28 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:55.

UK Power Networks South Eastern logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 08:58.

Thames Water logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Sutherland Road

Thames Water are proposing to carry out Utility asset works on Sutherland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:01.

Southern Gas Networks logo
Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Fairview Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fairview Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:01.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:23.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:52.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:11.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 11:17.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:04.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:18.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:19.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 18:11.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Farm Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:57.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 07:50.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.

Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Orchard Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Orchard Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Oct 2024 at 11:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:08.

Surrey County Council logo
Between
6 and 18 Feb 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 16:03.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 10:29.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:32.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:02.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:28.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:22.

Southern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:36.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:50.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 07:40.

UK Power Networks South Eastern logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sumner Road South

UK Power Networks South Eastern are proposing to carry out New service connection on Sumner Road South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Nov 2024 at 16:03.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:17.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:27.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thornton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:24.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:19.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.

Southern Gas Networks logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Hazelwood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 11:04.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:54.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 13:59.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:50.

UK Power Networks South Eastern logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Montpelier Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Montpelier Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 14:26.

Thames Water logo
LONG TERM
Between
11 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Lodge Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:01.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Longley Road

Thames Water are proposing to carry out Utility asset works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:37.


Roadworks Map near to SM3 8HY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 15 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to SM3 8HY (32 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Transport for London (TfL) logo
MAJOR
  
LONDON ROAD 
(0.0 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 26 Mar 2024 - 25 Mar 2025
0.0
Details
Share
Follow
2
London Borough Of Sutton logo
WRAYFIELD ROAD 
(0.3 miles)
London Borough Of Sutton
Highway repair and maintenance works - Carriageway - Priority working
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.3
Details
Share
Follow
3
Ses Water (formerly Sutton & East Surrey Water Company) logo
GLYN ROAD 
(0.3 miles)
Ses Water (formerly Sutton & East Surrey Water Company)
Utility repair and maintenance works - Footway, Carriageway, Verge - Priority working
In Progress
Since: 12 Nov 2024 09:40
(Scheduled: 12 Nov 2024 - 18 Nov 2024)
0.3
Details
Share
Follow
4
Ses Water (formerly Sutton & East Surrey Water Company) logo
URGENT
  
OAKS AVENUE 
(0.3 miles)
Ses Water (formerly Sutton & East Surrey Water Company)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 14 Nov 2024 07:30
(Scheduled: 14 Nov 2024 - 20 Nov 2024)
0.3
Details
Share
Follow
5
Virgin Media logo
WINDSOR AVENUE 
(0.4 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 15 Nov 2024 - 18 Nov 2024
0.4
Details
Share
Follow
6
London Borough Of Sutton logo
BURNHAM DRIVE 
(0.5 miles)
London Borough Of Sutton
Highway repair and maintenance works - Carriageway - Priority working
Planned
Scheduled: 14 Nov 2024 - 18 Nov 2024
0.5
Details
Share
Follow
7
Ses Water (formerly Sutton & East Surrey Water Company) logo
BROCKS DRIVE 
(0.5 miles)
Ses Water (formerly Sutton & East Surrey Water Company)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 11 Nov 2024 08:25
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.5
Details
Share
Follow
8
London Borough Of Sutton logo
ABBOTTS ROAD 
(0.6 miles)
London Borough Of Sutton
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 15 Nov 2024 - 19 Nov 2024
0.6
Details
Share
Follow
9
Virgin Media logo
URGENT
  
ABBOTTS ROAD 
(0.6 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
14 Nov 2024 14:00 - 14:40
0.6
Details
Share
10
London Borough Of Sutton logo
ALBERTA AVENUE 
(0.7 miles)
London Borough Of Sutton
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 15 Nov 2024 - 19 Nov 2024
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data