Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Packhorse Road, GERRARDS CROSS, SL9 8EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Packhorse Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Denham Way

Thames Water are carrying out Utility asset works on Denham Way, Maple Cross.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 10:00 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:46.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Northern Road

Cadent Gas are carrying out Utility asset works on Northern Road, Slough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 12:03 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:04.

Thames Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Chalfont St Peter Bypass

Thames Water are carrying out roadworks on Chalfont St Peter Bypass, Chalfont St Peter.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 08:17.

Thames Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:28.

Thames Water logo
LONG TERM
Between
14 Oct and 5 Dec 2024
Details
View Map
Share
Follow
Chalfont St Peter Bypass

Thames Water are proposing to carry out roadworks on Chalfont St Peter Bypass, Chalfont St Peter.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:03.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kingsway

Cadent Gas are carrying out Utility asset works on Kingsway, Farnham Common.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 12:58 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 11:15.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:03.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Old Rectory Lane

Thames Water were proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 25 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:03.

London Borough Of Hillingdon logo
Finishing
Sunday
Details
View Map
Share
Follow
Oxford Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Oxford Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:48.

London Borough Of Hillingdon logo
Finishing
Sunday
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Finishing
Sunday
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:58.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 12:09.

Hertfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Victoria Close

Hertfordshire County Council are carrying out Section 50 on Victoria Close, Rickmansworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 07:56 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 08:59.

Buckinghamshire Council logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 12:04.

Buckinghamshire Council logo
LONG TERM
Between
11 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Framewood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Framewood Road, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2024 at 14:05.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Yew Tree Close

Cadent Gas are carrying out Utility asset works on Yew Tree Close, Beaconsfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 14:58 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:31.

Eunetworks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Hawthorn Lane

Eunetworks are carrying out Utility asset works on Hawthorn Lane, Burnham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 15 Nov 2024 at 08:17.

Buckinghamshire Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Wood Lane, Iver Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 12:08.

Eunetworks logo
Between
18 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Hawthorn Lane

Eunetworks are proposing to carry out Utility asset works on Hawthorn Lane, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Aug 2024 at 14:42.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:26.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:43.

London Borough Of Hillingdon logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 7 Nov 2024 at 14:09.

London Borough Of Hillingdon logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 15 Nov 2024 at 10:51.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Orchehill Avenue

Cadent Gas are proposing to carry out Utility asset works on Orchehill Avenue, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 11:37.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
West End Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on West End Lane, Stoke Poges.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 10:08.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Station Parade

Thames Water are proposing to carry out Utility asset works on Station Parade, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:36.

Eunetworks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are carrying out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 23 Nov 2024 at 08:44.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Purton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Sep 2024 at 11:54.

Thames Water logo
Between
25 Nov and 25 Dec 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 16:08.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility asset works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Aug 2024 at 12:53.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility asset works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Sep 2024 at 11:34.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility asset works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 14:09.

UK Power Networks Eastern & London logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Townfield

UK Power Networks Eastern & London are proposing to carry out New service connection on Townfield, Rickmansworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:19.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Quickley Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickley Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Jun 2024 at 11:21.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Quickley Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Quickley Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2024 at 14:42.

Affinity Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Swallow Street

Affinity Water were proposing to carry out Utility asset works on Swallow Street, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 3 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Oct 2024 at 14:05.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Evreham Road

Affinity Water were proposing to carry out Remedial works on Evreham Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 09:52.

Cityfibre Metro Networks logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 15:14.

Cityfibre Metro Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 16:55.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Sep 2024 at 13:19.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:01.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:39.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Highlands End

Cadent Gas are proposing to carry out Utility asset works on Highlands End, Chalfont St Peter.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:18.

Buckinghamshire Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Plough Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Plough Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 12:31.

Buckinghamshire Council logo
Between
4 and 31 Dec 2024
Details
View Map
Share
Follow
Wexham Footpath 2

Buckinghamshire Council are proposing to carry out Highway improvement works on Wexham Footpath 2, Wexham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 31 December 2024. The works will impact the footway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Apr 2024 at 12:30.

Buckinghamshire Council logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Dukes Wood Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:56.

Buckinghamshire Council logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Dukes Wood Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Avenue, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:57.

Scottish Hydro Electric Power Dis logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Black Park Road

Scottish Hydro Electric Power Dis are proposing to carry out Remedial works on Black Park Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Sep 2024 at 09:17.

Cityfibre Metro Networks logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Blackpond Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 16:25.

Cityfibre Metro Networks logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Blackpond Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Blackpond Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 16:26.

Hertfordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Valley Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:46.

Hertfordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Valley Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:40.

Eunetworks logo
Between
10 and 23 Dec 2024
Details
View Map
Share
Follow
Thompkins Lane

Eunetworks are proposing to carry out Utility asset works on Thompkins Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 15:26.

Cityfibre Metro Networks logo
Between
12 and 18 Dec 2024
Details
View Map
Share
Follow
Love Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Love Hill Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 15:46.

Buckinghamshire Council logo
Between
12 and 19 Dec 2024
Details
View Map
Share
Follow
Gold Hill East

Buckinghamshire Council are proposing to carry out Highway improvement works on Gold Hill East, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:20.

Scottish Hydro Electric Power Dis logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Black Park Road

Scottish Hydro Electric Power Dis were proposing to carry out Remedial works on Black Park Road, Wexham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 22 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2024 at 14:54.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Parsonage Lane

Thames Water are proposing to carry out New service connection on Parsonage Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 12:11.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Thames Water logo
LONG TERM
Between
20 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:02.

Buckinghamshire Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Purton Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Sep 2024 at 15:16.

Thames Water logo
LONG TERM
Between
27 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:31.

Buckinghamshire Council logo
Between
3 and 14 Jan 2025
Details
View Map
Share
Denham Avenue

Buckinghamshire Council were proposing to carry out Highway improvement works on Denham Avenue, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 14 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 09:21.

Buckinghamshire Council logo
Between
4 and 7 Jan 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Sep 2024 at 13:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:14.

Buckinghamshire Council logo
Between
5 and 8 Jan 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:13.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Granville Avenue

Cadent Gas are proposing to carry out Utility asset works on Granville Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:01.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Purton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Sep 2024 at 15:53.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 11:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 08:54.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Aug 2024 at 16:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Moorfield Road

Cadent Gas were proposing to carry out Utility asset works on Moorfield Road, Denham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:09.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Marsham Lane

BT are proposing to carry out Utility asset works on Marsham Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
West Common

Cadent Gas are proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:05.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station Approach

Buckinghamshire Council are proposing to carry out Highway improvement works on Station Approach, Gerrards Cross.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 12:40.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 11:52.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 13:28.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

UK Power Networks Eastern & London logo
Between
7 and 28 Jan 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:13.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Greenhills Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:47.

Hertfordshire County Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Greenhills Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Greenhills Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:04.

Cadent Gas logo
LONG TERM
Between
10 Jan and 20 Feb 2025
Details
View Map
Share
Hedgerley Lane

Cadent Gas were proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Love Lane

Cadent Gas were proposing to carry out Utility asset works on Love Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:38.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:15.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:19.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:31.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:33.

Hertfordshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Shire Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Shire Lane, Chorleywood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 20 Nov 2024 at 07:40.

Cadent Gas logo
LONG TERM
Between
14 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:16.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:07.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 09:58.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:36.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:37.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:34.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:47.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:20.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 14:53.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 09:01.

Buckinghamshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 13:17.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:35.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 14:30.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 15:50.

Cadent Gas logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:07.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Station Roundabout

UK Power Networks Eastern & London are proposing to carry out New service connection on Station Roundabout, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:12.

Buckinghamshire Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Southlands Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Southlands Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Nov 2024 at 10:19.

Buckinghamshire Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Purton Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 11:32.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:54.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
3 Feb and 15 Apr 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:32.

Buckinghamshire Council logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bottom Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:15.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Buckinghamshire Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 09:37.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fine Bush Lane

BT are proposing to carry out Utility asset works on Fine Bush Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:24.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:59.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:07.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodhurst Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhurst Drive, Denham Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 14:00.

Eunetworks logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 10:11.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:11.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:53.

Affinity Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Deanway

Affinity Water are proposing to carry out Utility repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 11:39.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:19.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:22.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.


Roadworks Map near to Packhorse Road, GERRARDS CROSS, SL9 8EJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 23:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Packhorse Road, GERRARDS CROSS, SL9 8EJ (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
OAK END WAY 
(0.4 miles)
Affinity Water
Utility repair and maintenance works - Verge - Multi-way signals
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.4
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
WEST COMMON 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Complete
22 Oct 2024 09:00 - 21 Nov 2024 14:39
0.4
Details
Share
3
Cadent Gas logo
MAJOR
  
BULSTRODE WAY 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 11 Nov 2024 11:09
(Scheduled: 7 Nov 2024 - 16 Jan 2025)
0.5
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
ORCHEHILL AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 9 Dec 2024
0.6
Details
Share
Follow
5
Buckinghamshire Council logo
PRIORY ROAD 
(0.9 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 8 Dec 2024
0.9
Details
Share
Follow
6
Buckinghamshire Council logo
OXFORD ROAD 
(1.0 miles)
Buckinghamshire Council
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.