ROADWORKS SUMMARY
Hill Waye, GERRARDS CROSS, SL9 8BH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hill Waye, SL9 8BH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hill Waye, GERRARDS CROSS, SL9 8BH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hill Waye are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:43.

UK Power Networks Eastern & London logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Townfield

UK Power Networks Eastern & London are carrying out New service connection on Townfield, Rickmansworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:30 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 10:27.

Cadent Gas logo
LONG TERM
Until
19 Feb 2025
Details
View Map
Share
Follow
Granville Avenue

Cadent Gas are carrying out Utility asset works on Granville Avenue, Slough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:50 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:45.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Grange Way

Cadent Gas are proposing to carry out Utility asset works on Grange Way, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:38.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Thames Water logo
LONG TERM
Between
20 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 13:02.

Thames Water logo
LONG TERM
Between
27 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:58.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Clayton Way

Cadent Gas are carrying out Utility repair and maintenance works on Clayton Way, Uxbridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 12:36 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 12:49.

Buckinghamshire Council logo
Between
3 and 14 Jan 2025
Details
View Map
Share
Denham Avenue

Buckinghamshire Council were proposing to carry out Highway improvement works on Denham Avenue, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 14 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 09:21.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Sep 2024 at 13:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
Deanway

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:13.

Buckinghamshire Council logo
Between
4 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 14:14.

Cadent Gas logo
Until
14 Jan 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are carrying out Utility repair and maintenance works on Nottingham Road, Heronsgate.

The works started on 4 January 2025 at 15:31 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jan 2025 at 15:32.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:13.

Thames Water logo
Until
17 Jan 2025
Details
View Map
Share
Follow
Chalfont St Peter Bypass

Thames Water are carrying out Utility repair and maintenance works on Chalfont St Peter Bypass, Chalfont St Peter.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 18:30 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jan 2025 at 09:49.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Purton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Sep 2024 at 15:53.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:38 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Jan 2025 at 08:38.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 08:54.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Aug 2024 at 16:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Moorfield Road

Cadent Gas were proposing to carry out Utility asset works on Moorfield Road, Denham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:09.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Marsham Lane

BT are proposing to carry out Utility asset works on Marsham Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
West Common

Cadent Gas are proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
West Common

Cadent Gas were proposing to carry out Utility asset works on West Common, Gerrards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:13.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 11:52.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are carrying out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 Jan 2025 at 08:28.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Bottrells Lane

Buckinghamshire Council are proposing to carry out Section 50 on Bottrells Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 14:40.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Bottrells Lane

Buckinghamshire Council are carrying out Section 50 on Bottrells Lane, Chalfont St Giles.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Jan 2025 at 09:02.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Plough Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Plough Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Dec 2024 at 11:17.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

Cityfibre Metro Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Mount Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Mount Hill Lane, Hedgerley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Dec 2024 at 10:51.

UK Power Networks Eastern & London logo
Between
7 and 28 Jan 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 13:36.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:04.

Cadent Gas logo
LONG TERM
Between
10 Jan and 20 Feb 2025
Details
View Map
Share
Hedgerley Lane

Cadent Gas were proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:17.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Middle Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Middle Green Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 12:18.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Love Lane

Cadent Gas were proposing to carry out Utility asset works on Love Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:38.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:15.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:19.

Hertfordshire County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chalfont Lane

Hertfordshire County Council are proposing to carry out Section 50 on Chalfont Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 19:52.

Hertfordshire County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Chalfont Lane

Hertfordshire County Council are proposing to carry out Section 50 on Chalfont Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 21:26.

Cadent Gas logo
LONG TERM
Between
14 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:16.

Buckinghamshire Council logo
On
15 Jan 2025
Details
View Map
Share
Follow
Oak End Way

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Oak End Way, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 January 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 08:38.

Cadent Gas logo
Between
16 and 30 Jan 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 10:39.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:07.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 09:58.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:36.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:37.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:34.

Affinity Water logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:47.

Cadent Gas logo
LONG TERM
Between
20 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:16.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:20.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 11:05.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Shepherds Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 14:53.

Buckinghamshire Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 09:01.

Buckinghamshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maxwell Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Maxwell Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 13:17.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 14:35.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 14:30.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Gordon Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Gordon Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 15:50.

Cityfibre Metro Networks logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Bangors Road South

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 10:47.

Buckinghamshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hedgerley Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 10:53.

Cadent Gas logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:07.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:24.

Buckinghamshire Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Southlands Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Southlands Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Nov 2024 at 10:19.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

G2 Energy IDNO logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Hillingdon Hill

G2 Energy IDNO are proposing to carry out Utility asset works on Hillingdon Hill, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 15:00.

G2 Energy IDNO logo
Between
3 and 18 Feb 2025
Details
View Map
Share
Follow
Hillingdon Hill

G2 Energy IDNO are proposing to carry out Utility asset works on Hillingdon Hill, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 3 Jan 2025 at 15:15.

Buckinghamshire Council logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Purton Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Purton Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Sep 2024 at 11:32.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:54.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
3 Feb and 15 Apr 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:19.

Buckinghamshire Council logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bottom Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:15.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Buckinghamshire Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Black Park Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Black Park Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 09:37.

Buckinghamshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Dec 2024 at 13:39.

Buckinghamshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:02.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fine Bush Lane

BT are proposing to carry out Utility asset works on Fine Bush Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:24.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:59.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:07.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodhurst Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhurst Drive, Denham Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 14:00.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodhurst Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhurst Drive, Denham Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 13:05.

G2 Energy IDNO logo
LONG TERM
Between
14 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Court Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Court Drive, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Dec 2024 at 14:59.

G2 Energy IDNO logo
LONG TERM
Between
14 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Court Drive

G2 Energy IDNO are proposing to carry out Utility asset works on Court Drive, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Jan 2025 at 14:33.

Eunetworks logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 10:11.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:11.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:53.

Affinity Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Deanway

Affinity Water are proposing to carry out Utility repair and maintenance works on Deanway, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 11:39.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:19.

UK Power Networks Eastern & London logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Berry Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Berry Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 09:45.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Love Green Lane

Cadent Gas were proposing to carry out Utility asset works on Love Green Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:36.

Cadent Gas logo
LONG TERM
Between
24 Feb and 21 Apr 2025
Details
View Map
Share
Swallow Street

Cadent Gas were proposing to carry out Utility asset works on Swallow Street, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:34.

LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 2 Sep 2024 at 00:12.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 14:05.

Buckinghamshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Dec 2024 at 14:39.

Affinity Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Bulstrode Way

Affinity Water are proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 08:54.

Buckinghamshire Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Rickmansworth Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Rickmansworth Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2024 at 14:33.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Farthing Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 15:19.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Farthing Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:41.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Farthing Green Lane

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Farthing Green Lane, Stoke Poges.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 13:18.

Buckinghamshire Council logo
Between
16 and 19 Mar 2025
Details
View Map
Share
Follow
Bangors Road South

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 10:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2024 at 14:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Aug 2024 at 16:30.

Buckinghamshire Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Deans Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Deans Close, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:29.

Cadent Gas logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 13:51.

National Highways logo
Between
17 and 29 Mar 2025
Details
View Map
Share
Follow
Oxford Road

National Highways are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Dec 2024 at 10:47.

National Highways logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Oxford Road

National Highways are proposing to carry out Works for road purposes on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:02.

Buckinghamshire Council logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:01.

Affinity Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Bulstrode Way

Affinity Water were proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 07:42.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:18.

Affinity Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Maltmans Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Maltmans Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 11:25.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Eunetworks logo
Between
20 and 25 Mar 2025
Details
View Map
Share
Littleworth Road

Eunetworks were proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 09:23.

Buckinghamshire Council logo
Between
23 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 11:11.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Lydford Avenue

Thames Water are proposing to carry out New service connection on Lydford Avenue, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Dec 2024 at 12:25.

Buckinghamshire Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Oct 2024 at 15:30.

Buckinghamshire Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Jordans Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Jordans Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 14:01.

Buckinghamshire Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Rickmansworth Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Rickmansworth Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:11.

Cadent Gas logo
Between
24 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Nightingale Road

Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:09.

Buckinghamshire Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Collinswood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Collinswood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:15.

Buckinghamshire Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Dorney Hill North

Buckinghamshire Council are proposing to carry out Highway improvement works on Dorney Hill North, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:15.

Affinity Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Dec 2024 at 11:27.

Affinity Water logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Bowstridge Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bowstridge Lane, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 10:30.

Hertfordshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Shepherds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 11:22.

Hertfordshire County Council logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Shepherds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Shepherds Lane, Chorleywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 12:58.

Buckinghamshire Council logo
Between
27 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Jordans Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Jordans Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:41.

Buckinghamshire Council logo
Between
27 and 29 Mar 2025
Details
View Map
Share
Follow
Rawlings Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Rawlings Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:31.

Buckinghamshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Hedgerley Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedgerley Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:46.

Buckinghamshire Council logo
Between
3 and 12 Apr 2025
Details
View Map
Share
Follow
Windsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Windsor Road, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:43.

Buckinghamshire Council logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
The Paddock

Buckinghamshire Council are proposing to carry out Highway improvement works on The Paddock, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Dec 2024 at 08:42.


Roadworks Map near to Hill Waye, GERRARDS CROSS, SL9 8BH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 7 Jan 2025 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hill Waye, GERRARDS CROSS, SL9 8BH (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
EAST COMMON 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - Give and take
Complete
1 Jan 2025 08:04 - 5 Jan 2025 12:39
0.2
Details
Share
2
BT logo
MAJOR
  
MARSHAM LANE 
(0.3 miles)
BT
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 Jan 2025 - 10 Jan 2025
0.3
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
WEST COMMON CLOSE 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 6 Jan 2025 - 31 Jan 2025)
0.5
Details
Share
4
Buckinghamshire Council logo
OXFORD ROAD 
(0.5 miles)
Buckinghamshire Council
Highway improvement works - Footway, Carriageway - Multi-way signals
In Progress
Since: 6 Jan 2025 09:30
(Scheduled: 6 Jan 2025 - 10 Jan 2025)
0.5
Details
Share
Follow
5
Cityfibre Metro Networks logo
OXFORD ROAD 
(0.5 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Carriageway, Verge - Two-way signals
Planned
Scheduled: 6 Jan 2025 - 7 Jan 2025
0.5
Details
Share
Follow
6
Scottish Hydro Electric Power Dis logo
URGENT
  
DUKES WOOD DRIVE 
(0.6 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Jan 2025 10:20
(Scheduled: 3 Jan 2025 - 9 Jan 2025)
0.6
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
WEST COMMON 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 Jan 2025 - 7 Feb 2025
0.7
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
WEST COMMON 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 6 Jan 2025 - 7 Feb 2025)
0.7
Details
Share
9
Cadent Gas logo
MAJOR
  
BULSTRODE WAY 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 11 Nov 2024 11:09
(Scheduled: 7 Nov 2024 - 7 Feb 2025)
0.9
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
BULSTRODE WAY 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 10 Mar 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.