ROADWORKS SUMMARY
The Parade, BOURNE END, SL8 5SS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Parade, SL8 5SS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Parade, BOURNE END, SL8 5SS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Parade are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Between
9 Mar 2026 and 6 Sep 2027
Details
View Map
Share
Follow
Brook Street

Buckinghamshire Council are proposing to carry out roadworks on Brook Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2026 and could run through until 6 September 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 3 Feb 2026 at 13:03.

Cadent Gas logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Holtspur Top Lane

Cadent Gas are carrying out Utility asset works on Holtspur Top Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 July 2026 at 08:30 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2026 at 08:56.

Finishing
Sunday
Details
View Map
Share
Follow
Scafell Road

Optimal Power Networks are carrying out Utility repair and maintenance works on Scafell Road, Slough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 07:45 and could run through until 20 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Optimal Power Networks on 1 Sep 2026 at 12:34.

Cadent Gas logo
LONG TERM
Between
5 Sep and 2 Nov 2026
Details
View Map
Share
Follow
St Andrews Way

Cadent Gas are proposing to carry out Utility asset works on St Andrews Way, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2026 at 09:32.

Cadent Gas logo
LONG TERM
Between
7 Sep and 8 Nov 2026
Details
View Map
Share
Follow
Summerleaze Road

Cadent Gas are proposing to carry out Utility asset works on Summerleaze Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 00:10.

Cadent Gas logo
LONG TERM
Until
6 Dec 2026
Details
View Map
Share
Follow
Witheridge Lane

Cadent Gas are carrying out Utility asset works on Witheridge Lane, Penn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:48 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 14:52.

Cadent Gas logo
LONG TERM
Until
18 Oct 2026
Details
View Map
Share
Follow
Green Street

Cadent Gas are carrying out Utility asset works on Green Street, High Wycombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:54 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:05.

Cadent Gas logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Dashwood Avenue

Cadent Gas are carrying out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 16:17 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 16:33.

Cadent Gas logo
Between
7 and 27 Sep 2026
Details
View Map
Share
Follow
Dashwood Avenue

Cadent Gas are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 13:30.

Cadent Gas logo
Until
27 Sep 2026
Details
View Map
Share
Follow
Oakridge Road

Cadent Gas are carrying out Utility asset works on Oakridge Road, High Wycombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 16:21 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 16:34.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Furzefield Road

Affinity Water are carrying out Utility repair and maintenance works on Furzefield Road, Beaconsfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 11:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 07:57.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Cromwell Gardens

Buckinghamshire Council are proposing to carry out Section 50 on Cromwell Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 19 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 25 Aug 2026 at 13:37.

Cadent Gas logo
Until
8 Oct 2026
Details
View Map
Share
Follow
Amersham Road

Cadent Gas are carrying out Utility asset works on Amersham Road, High Wycombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 16:24 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 16:51.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Terry Road

Cadent Gas are carrying out Utility asset works on Terry Road, Totteridge, High Wycombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 16:25 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 16:52.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hillview Road

Thames Water are carrying out Utility repair and maintenance works on Hillview Road, Totteridge, High Wycombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:30 and could run through until 17 September 2026. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:35.

Cadent Gas logo
Between
14 and 28 Sep 2026
Details
View Map
Share
Follow
Lucas Road

Cadent Gas are proposing to carry out Utility asset works on Lucas Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Nov 2025 at 14:11.

Cadent Gas logo
Until
6 Oct 2026
Details
View Map
Share
Follow
Terrys Lane

Cadent Gas are carrying out Utility asset works on Terrys Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:51 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 10:58.

Until
5 Oct 2026
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are carrying out Utility asset works on Farnham Lane, Farnham Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 15 Sep 2026 at 08:27.

Finishing
Saturday
Details
View Map
Share
Follow
Oldfield Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Oldfield Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 12 Jun 2026 at 15:00.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Holtspur Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holtspur Lane, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Sep 2026 at 14:01.

Cadent Gas logo
LONG TERM
Between
17 Sep and 22 Dec 2026
Details
View Map
Share
Follow
Ledborough Lane

Cadent Gas are proposing to carry out Utility asset works on Ledborough Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2026 at 11:43.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Poyle Lane

Thames Water are proposing to carry out New service connection on Poyle Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:12.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Poyle Lane

Thames Water are proposing to carry out New service connection on Poyle Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 15:45.

Cadent Gas logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Amersham Hill

Cadent Gas are proposing to carry out Utility asset works on Amersham Hill, Totteridge, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Nov 2025 at 14:12.

Buckinghamshire Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
The Pastures

Buckinghamshire Council are proposing to carry out Highway improvement works on The Pastures, Downley, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Jul 2026 at 10:33.

Buckinghamshire Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
The Pastures

Buckinghamshire Council are proposing to carry out Highway improvement works on The Pastures, Downley, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Jul 2026 at 10:32.

Buckinghamshire Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
The Pastures

Buckinghamshire Council are proposing to carry out Highway improvement works on The Pastures, Downley, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Jul 2026 at 10:32.

Buckinghamshire Council logo
Between
22 and 25 Sep 2026
Details
View Map
Share
Follow
The Pastures

Buckinghamshire Council are proposing to carry out Highway improvement works on The Pastures, Downley, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Jul 2026 at 10:31.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Lucas Road

Cadent Gas are proposing to carry out Utility asset works on Lucas Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 08:27.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Grubwood Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Grubwood Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jul 2026 at 12:07.

Buckinghamshire Council logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Sep 2026 at 11:37.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Amersham Hill

Cadent Gas are proposing to carry out Utility asset works on Amersham Hill, Totteridge, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 08:28.

Buckinghamshire Council logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Market Square

Buckinghamshire Council are proposing to carry out Highway improvement works on Market Square, Marlow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Sep 2026 at 10:58.

Cadent Gas logo
LONG TERM
Between
28 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Kingsmead Road

Cadent Gas are proposing to carry out Utility asset works on Kingsmead Road, Loudwater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Jun 2026 at 13:16.

Cityfibre Metro Networks logo
Between
30 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 23 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Aug 2026 at 11:52.

LONG TERM
Between
1 Oct 2026 and 1 Jul 2027
Details
View Map
Share
Follow
Templewood Lane

Optimal Power Networks are proposing to carry out Utility asset works on Templewood Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 1 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 15 Jun 2026 at 10:15.

Cityfibre Metro Networks logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Templewood Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Templewood Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Nov 2025 at 11:43.

Cadent Gas logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Boyn Valley Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Boyn Valley Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jul 2026 at 09:37.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Lilys Walk

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Lilys Walk, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Aug 2026 at 16:22.

Buckinghamshire Council logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Follow
Cromwell Gardens

Buckinghamshire Council are proposing to carry out Section 50 on Cromwell Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 14 Sep 2026 at 15:34.

Buckinghamshire Council logo
Between
12 and 23 Oct 2026
Details
View Map
Share
Follow
Shelley Road

Buckinghamshire Council are proposing to carry out Section 50 on Shelley Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2026 at 14:13.

Cadent Gas logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Wycombe End

Cadent Gas are proposing to carry out Utility asset works on Wycombe End, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Feb 2026 at 11:11.

Cadent Gas logo
LONG TERM
Between
12 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2026 at 12:03.

BT logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Candlemas Lane

BT are proposing to carry out Utility asset works on Candlemas Lane, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jul 2026 at 07:38.

Cadent Gas logo
LONG TERM
Between
19 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Green Street

Cadent Gas are proposing to carry out Utility asset works on Green Street, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2026 at 10:19.

Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Lee Lane

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Lee Lane, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 9 Jul 2026 at 08:41.

Thames Water logo
LONG TERM
Between
19 Oct and 30 Nov 2026
Details
View Map
Share
West Wycombe Road

Thames Water were proposing to carry out Utility repair and maintenance works on West Wycombe Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 30 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:18.

Buckinghamshire Council logo
Between
19 and 31 Oct 2026
Details
View Map
Share
Follow
Wycombe Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wycombe Lane, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 May 2026 at 08:33.

Scottish Hydro Electric Power Dis logo
Between
26 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersley Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Hammersley Lane, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Jul 2026 at 14:41.

South East Water logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Whyteladyes Lane

South East Water are proposing to carry out Utility repair and maintenance works on Whyteladyes Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 7 Apr 2026 at 13:12.

Buckinghamshire Council logo
Between
29 Oct and 1 Nov 2026
Details
View Map
Share
Follow
High Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on High Street, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2026 at 13:07.

Scottish Hydro Electric Power Dis logo
Between
2 and 27 Nov 2026
Details
View Map
Share
Queen Alexandra Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Queen Alexandra Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 27 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Aug 2026 at 16:20.

South East Water logo
Between
3 and 5 Nov 2026
Details
View Map
Share
Follow
Belmont Road

South East Water are proposing to carry out Utility repair and maintenance works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 5 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 30 Jul 2026 at 16:00.

Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Ray Mead Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Ray Mead Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 8 Jul 2026 at 17:03.

Buckinghamshire Council logo
Between
4 and 20 Nov 2026
Details
View Map
Share
Follow
Hamilton Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hamilton Road, Terriers, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Aug 2026 at 14:36.

Buckinghamshire Council logo
Between
4 and 19 Nov 2026
Details
View Map
Share
Follow
Amersham Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Hill, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Jul 2026 at 12:25.

Buckinghamshire Council logo
Between
4 and 19 Nov 2026
Details
View Map
Share
Follow
Amersham Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 Jul 2026 at 12:23.

South East Water logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Cannondown Road

South East Water are proposing to carry out New service connection on Cannondown Road, Cookham Rise, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Aug 2026 at 08:49.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
New Court

Thames Water are proposing to carry out Utility repair and maintenance works on New Court, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 15:06.

Cadent Gas logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
Wycombe End

Cadent Gas are proposing to carry out Utility asset works on Wycombe End, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 08:36.

Affinity Water logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Burnham Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Burnham Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Sep 2026 at 11:16.

Buckinghamshire Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Laburnum Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Laburnum Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Jun 2026 at 10:41.

Cadent Gas logo
Between
23 Nov and 11 Dec 2026
Details
View Map
Share
Dashwood Avenue

Cadent Gas were proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 11 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 10:13.

Thames Water logo
Between
2 and 4 Dec 2026
Details
View Map
Share
Follow
Coldmoorholme Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 14:46.

Buckinghamshire Council logo
Between
2 and 23 Dec 2026
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Sep 2026 at 14:53.

Cadent Gas logo
Between
7 and 29 Dec 2026
Details
View Map
Share
Follow
Dashwood Avenue

Cadent Gas are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 29 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 10:57.

Thames Water logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Desborough Park Road

Thames Water are proposing to carry out New service connection on Desborough Park Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:36.

Buckinghamshire Council logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Sep 2026 at 14:48.


Roadworks Map near to The Parade, BOURNE END, SL8 5SS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 09:43
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Parade, BOURNE END, SL8 5SS (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MARLOW ROAD 
(0.3 miles)
BT
New service connection - Verge - Some carriageway incursion
Complete
15 Sep 2026 09:47 - 21:37
0.3
Details
Share
2
Scottish Hydro Electric Power Dis logo
BLIND LANE 
(0.7 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 15 Sep 2026 10:40
(Scheduled: 15 Sep 2026 - 20 Sep 2026)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.