ROADWORKS SUMMARY
College Avenue, MAIDENHEAD, SL6 6AX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for College Avenue, SL6 6AX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to College Avenue, MAIDENHEAD, SL6 6AX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for College Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:59.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are carrying out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 27 Jan 2025 at 09:41.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.

Cadent Gas logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are carrying out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:41 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 08:46.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

Cadent Gas logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.

Cadent Gas logo
LONG TERM
Until
13 Apr 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are carrying out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 10:37 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:55.

LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 2 Sep 2024 at 00:12.

Eunetworks logo
Finishing
Thursday
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
28 Feb and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 09:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are carrying out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:32 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 09:49.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Harvest Hill

BT are carrying out Utility repair and maintenance works on Harvest Hill, Hedsor.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 11:56 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Mar 2025 at 15:32.

Eunetworks logo
Until
27 Mar 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are carrying out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 3 Mar 2025 at 08:15.

Eunetworks logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:40.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:10.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 10:02.

Buckinghamshire Council logo
Until
26 Mar 2025
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are carrying out roadworks on Huntercombe Lane South, Burnham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 March 2025 at 10:58 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 5 Mar 2025 at 14:49.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Harwood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Harwood Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:10.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Beaufort Gardens

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:49.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Beaufort Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Close, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:50.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Lower Cookham Road

Cadent Gas were proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 13:43.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Little Marlow Road

Buckinghamshire Council were proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Feb 2025 at 10:27.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 14:07.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Feb 2025 at 13:54.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Cippenham Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Cippenham Lane, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 08:42.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Berry Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:35.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Berry Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Feb 2025 at 12:20.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Lock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:32.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Lock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 12:13.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:09.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Mar 2025 at 09:10.

Buckinghamshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Town Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Town Lane, Wooburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Feb 2025 at 12:11.

Buckinghamshire Council logo
Between
14 and 19 Mar 2025
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Highway improvement works on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 13:25.

Buckinghamshire Council logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Riverpark Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:09.

Buckinghamshire Council logo
Between
14 and 19 Mar 2025
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 13:21.

Eunetworks logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 15:57.

Cadent Gas logo
LONG TERM
Between
17 Mar and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 11:36.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2024 at 14:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Aug 2024 at 16:30.

Gigaclear logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Black Boy Lane

Gigaclear were proposing to carry out Utility asset works on Black Boy Lane, Hurley, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 10:42.

Thames Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hitcham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:49.

Buckinghamshire Council logo
Between
20 and 23 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:40.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Eunetworks logo
Between
20 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 12:58.

Eunetworks logo
Between
20 and 25 Mar 2025
Details
View Map
Share
Littleworth Road

Eunetworks were proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 09:23.

Buckinghamshire Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Seymour Court Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Seymour Court Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Mar 2025 at 09:22.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Service Road Off Dropmore Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Service Road Off Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Jan 2025 at 15:12.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Service Road Off Dropmore Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Service Road Off Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 10 Feb 2025 at 08:56.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Dropmore Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Dropmore Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 30 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:02.

Buckinghamshire Council logo
Between
27 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Taplow Common Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Taplow Common Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Feb 2025 at 11:36.

Cadent Gas logo
LONG TERM
Between
31 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 16:23.

Cadent Gas logo
Between
31 Mar and 27 Apr 2025
Details
View Map
Share
Follow
Woodlands Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Woodlands Park Avenue, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 08:36.

Eunetworks logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Follow
Broad Lane

Eunetworks are proposing to carry out Utility asset works on Broad Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:18.

Thames Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Green Dragon Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Green Dragon Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 12:14.

Cityfibre Metro Networks logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Jan 2025 at 12:11.

Buckinghamshire Council logo
Between
6 and 11 Apr 2025
Details
View Map
Share
Follow
Approach Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:09.

Buckinghamshire Council logo
Between
6 and 12 Apr 2025
Details
View Map
Share
Follow
Approach Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Feb 2025 at 14:42.

Cadent Gas logo
LONG TERM
Between
7 Apr and 28 Jul 2025
Details
View Map
Share
Follow
Edinburgh Avenue

Cadent Gas are proposing to carry out Utility asset works on Edinburgh Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 10:33.

Buckinghamshire Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Cambridge Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Cambridge Avenue, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:37.

Buckinghamshire Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Approach Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 13:52.

Buckinghamshire Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Oxford Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Avenue, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:34.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Green Dragon Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Green Dragon Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 11:39.

Nexfibre Networks Limited logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Oxford Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Oxford Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Aug 2024 at 16:30.

Nexfibre Networks Limited logo
Between
7 and 20 Apr 2025
Details
View Map
Share
Follow
Oxford Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Oxford Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Aug 2024 at 14:11.

T-Mobile (UK) logo
Between
8 and 14 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 14 April 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Jan 2025 at 14:01.

Eunetworks logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 11:03.

Eunetworks logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:40.

Eunetworks logo
Between
10 and 24 Apr 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 13:00.

Cadent Gas logo
LONG TERM
Between
14 Apr and 24 Jul 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:25.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Spencers Road

Cadent Gas are proposing to carry out Utility asset works on Spencers Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.

Cadent Gas logo
Between
14 and 27 Apr 2025
Details
View Map
Share
Follow
Bestobell Road

Cadent Gas are proposing to carry out Utility asset works on Bestobell Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
14 Apr and 22 Jun 2025
Details
View Map
Share
Follow
Courthouse Road

Cadent Gas are proposing to carry out Utility asset works on Courthouse Road, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 12:52.

Vodafone logo
On
14 Apr 2025
Details
View Map
Share
Follow
Marlow Boat 28

Vodafone are proposing to carry out Utility repair and maintenance works on Marlow Boat 28, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 14 April 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Feb 2025 at 15:09.

Cadent Gas logo
LONG TERM
Between
16 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 13:26.

Thames Water logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Hatch Gate Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Hatch Gate Lane, Cockpole Green, Wargrave.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 10:06.

Vodafone logo
On
21 Apr 2025
Details
View Map
Share
Follow
Marlow Boat 28

Vodafone are proposing to carry out Utility repair and maintenance works on Marlow Boat 28, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 21 April 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 12 Feb 2025 at 09:09.

Neoscorp logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
Coldmoorholme Lane

Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Neoscorp on 6 Feb 2025 at 14:56.

T-Mobile (UK) logo
Between
21 and 25 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 20 Jan 2025 at 16:34.

T-Mobile (UK) logo
Between
21 and 26 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 21 Jan 2025 at 16:45.

T-Mobile (UK) logo
Between
21 and 26 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 4 Mar 2025 at 16:18.

T-Mobile (UK) logo
Between
21 and 26 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 10 Mar 2025 at 15:14.

Cityfibre Metro Networks logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 10:07.

Cityfibre Metro Networks logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Jan 2025 at 10:25.

Buckinghamshire Council logo
Between
24 and 27 Apr 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 14:12.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Queen Street

BT are proposing to carry out Utility asset works on Queen Street, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jan 2025 at 10:35.

BT logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Ferry Road

BT are proposing to carry out Utility asset works on Ferry Road, Bray, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Jan 2025 at 09:17.

T-Mobile (UK) logo
On
30 Apr 2025
Details
View Map
Share
Follow
Public Right Of Way Slough Bridleway Number 6

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Public Right Of Way Slough Bridleway Number 6, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 30 April 2025 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 4 Mar 2025 at 11:02.

Buckinghamshire Council logo
Between
1 and 6 May 2025
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Oct 2024 at 14:59.

Cadent Gas logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Footpath North Off Hungerford Drive Spur 1

Cadent Gas are proposing to carry out Utility asset works on Footpath North Off Hungerford Drive Spur 1, Maidenhead.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 10:19.

Cityfibre Metro Networks logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Feb 2025 at 15:37.

Cityfibre Metro Networks logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 11:34.

Thames Water logo
Between
6 and 8 May 2025
Details
View Map
Share
Green Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Green Lane, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 13:52.

Between
6 and 20 May 2025
Details
View Map
Share
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 10:05.

Between
6 and 20 May 2025
Details
View Map
Share
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 10:06.

Between
6 and 20 May 2025
Details
View Map
Share
Follow
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Feb 2025 at 11:10.

Buckinghamshire Council logo
Between
8 and 12 May 2025
Details
View Map
Share
Follow
Dropmore Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 15:51.

Buckinghamshire Council logo
Between
10 and 13 May 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Feb 2025 at 09:24.

Cadent Gas logo
Between
12 and 18 May 2025
Details
View Map
Share
Follow
Bestobell Road

Cadent Gas are proposing to carry out Utility asset works on Bestobell Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 09:28.

Cadent Gas logo
Between
12 and 25 May 2025
Details
View Map
Share
Follow
Bestobell Road

Cadent Gas are proposing to carry out Utility asset works on Bestobell Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 11:54.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Belmont Road

BT are proposing to carry out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Dec 2024 at 12:15.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Belmont Road

BT are proposing to carry out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Dec 2024 at 12:15.

Buckinghamshire Council logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Highway improvement works on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 15:35.

Buckinghamshire Council logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 15:47.

Thames Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Monks Road

Thames Water are proposing to carry out Utility repair and maintenance works on Monks Road, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 14:55.

Cityfibre Metro Networks logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 14:31.

Buckinghamshire Council logo
On
14 May 2025
Details
View Map
Share
Follow
Chapman Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Chapman Lane, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 14 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Mar 2025 at 14:02.

Buckinghamshire Council logo
Between
15 and 19 May 2025
Details
View Map
Share
Follow
Seymour Court Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Seymour Court Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 15:50.

Buckinghamshire Council logo
Between
16 and 20 May 2025
Details
View Map
Share
Follow
Taplow Common Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Taplow Common Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 15:22.

Between
16 and 23 May 2025
Details
View Map
Share
Follow
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 14:31.

Between
16 and 23 May 2025
Details
View Map
Share
Follow
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Harvest Hill Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 14:12.

Buckinghamshire Council logo
On
17 May 2025
Details
View Map
Share
Follow
Chapman Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Chapman Lane, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 17 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 08:35.

Cadent Gas logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 08:46.

Cadent Gas logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:09.

Cadent Gas logo
LONG TERM
Between
19 May and 22 Jun 2025
Details
View Map
Share
Follow
Dedmere Road

Cadent Gas are proposing to carry out Utility asset works on Dedmere Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:38.

Cadent Gas logo
Between
19 May and 1 Jun 2025
Details
View Map
Share
Dedmere Road

Cadent Gas were proposing to carry out Utility asset works on Dedmere Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 16:23.

Buckinghamshire Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Hill Farm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hill Farm Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 11:51.

Cityfibre Metro Networks logo
Between
19 and 25 May 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Feb 2025 at 13:44.

Thames Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Gore Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 15:23.

Buckinghamshire Council logo
Between
24 and 28 May 2025
Details
View Map
Share
Follow
Spinfield Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Spinfield Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Feb 2025 at 15:06.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Sep 2025
Details
View Map
Share
Follow
Edinburgh Avenue

Cadent Gas are proposing to carry out Utility asset works on Edinburgh Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 08:48.

Cityfibre Metro Networks logo
Between
26 May and 2 Jun 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Feb 2025 at 12:55.

Cityfibre Metro Networks logo
Between
26 May and 2 Jun 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 09:18.

Cadent Gas logo
LONG TERM
Between
27 May and 27 Jun 2025
Details
View Map
Share
Follow
Belmont Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Belmont Park Avenue, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:24.

Cadent Gas logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Hawthorn Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Hawthorn Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:34.

Buckinghamshire Council logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Feb 2025 at 12:48.

South East Water logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Maidenhead Road

South East Water are proposing to carry out Utility repair and maintenance works on Maidenhead Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 1 Nov 2024 at 13:56.

South East Water logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Maidenhead Road

South East Water are proposing to carry out Utility repair and maintenance works on Maidenhead Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 6 Jan 2025 at 16:03.

Buckinghamshire Council logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Beaufort Close

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaufort Close, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 11:53.

Buckinghamshire Council logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Beaufort Close

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaufort Close, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 16:26.

Buckinghamshire Council logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Beaufort Gardens

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaufort Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 11:52.

Buckinghamshire Council logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Beaufort Gardens

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Beaufort Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 16:25.

Buckinghamshire Council logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Riverpark Drive

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 11:54.

Buckinghamshire Council logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Riverpark Drive

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 16:27.

Gigaclear logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Cherry Garden Lane

Gigaclear are proposing to carry out Utility asset works on Cherry Garden Lane, Littlewick Green, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 10 Mar 2025 at 16:22.

Cadent Gas logo
LONG TERM
Between
6 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Lower Cookham Road

Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 13:26.


Roadworks Map near to College Avenue, MAIDENHEAD, SL6 6AX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Mar 2025 03:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to College Avenue, MAIDENHEAD, SL6 6AX (39 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
CRESCENT DRIVE 
(0.1 miles)
BT
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 10 Mar 2025 11:32
(Scheduled: 10 Mar 2025 - 11 Mar 2025)
0.1
Details
Share
Follow
2
BT logo
MAJOR
  
CRESCENT DRIVE 
(0.1 miles)
BT
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 10 Mar 2025 - 11 Mar 2025
0.1
Details
Share
Follow
3
BT logo
CRESCENT DRIVE 
(0.1 miles)
BT
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 10 Mar 2025 - 12 Mar 2025)
0.1
Details
Share
4
NORFOLK ROAD 
(0.1 miles)
Royal Borough Of Windsor And Maidenhead
Works for road purposes - Verge - Multi-way signals
Cancelled
(Scheduled: 11 Mar 2025)
0.1
Details
Share
5
Cadent Gas logo
MAJOR
  
BELMONT ROAD 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 24 Feb 2025 - 9 May 2025
0.1
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
BELMONT ROAD 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 24 Feb 2025 10:41
(Scheduled: 24 Feb 2025 - 9 May 2025)
0.1
Details
Share
Follow
7
Cadent Gas logo
HARGRAVE ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 4 Mar 2025 - 17 Mar 2025)
0.2
Details
Share
8
Cadent Gas logo
HARGRAVE ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 5 Mar 2025 09:10
(Scheduled: 4 Mar 2025 - 18 Mar 2025)
0.2
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
VICARAGE ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 13 Mar 2025
0.2
Details
Share
Follow
10
Cadent Gas logo
BELMONT PARK AVENUE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 11 Mar 2025 - 24 Mar 2025
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.