View current and future planned roadworks and road closures for Ascot Road, SL6 3LD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ascot Road, MAIDENHEAD, SL6 3LD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ascot Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jan and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.
24 Jul 2025
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Windsor Road, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.
24 Jul 2025
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Holyport Road, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.
6 Jan and 24 Jul 2025
Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.
28 Feb 2025
Cadent Gas are carrying out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 12:56 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:24.
7 Apr 2025
Cadent Gas are carrying out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 12:29 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:14.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:56.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:18.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Birdwood Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:20.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:46.
6 Feb 2025
Cadent Gas are carrying out Utility asset works on Mill Lane, Taplow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:35 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 08:32.
Today
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 12:38.
14 Feb 2025
Cadent Gas are carrying out Utility asset works on Birdwood Road, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:57 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:06.
14 Feb 2025
Cadent Gas are carrying out Utility asset works on Hitcham Lane, Burnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 11:12 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 11:22.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:54.
20 Feb 2025
Thames Water are carrying out Utility repair and maintenance works on Berkshire Way, Bracknell.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 06:41 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jan 2025 at 12:04.
6 Feb 2025
Cadent Gas are carrying out Utility repair and maintenance works on Marlow Road, Maidenhead.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 09:34 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 09:49.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.
3 Feb and 22 May 2025
Thames Water are proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 16:18.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 10:24.
3 Feb and 22 May 2025
Thames Water were proposing to carry out Utility asset works on Goddard Way, Warfield, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 15:13.
3 Feb and 22 May 2025
Thames Water were proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 16:17.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:09.
10 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Windsor Road, Maidenhead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:15.
17 and 21 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 16:16.
18 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on River Road, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:17.
19 and 28 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 10:40.
24 and 28 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 25 Nov 2024 at 10:35.
24 Feb and 5 Mar 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Lake End Road, Burnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 5 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 Jan 2025 at 10:12.
24 and 27 Feb 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Huntercombe Lane South, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Nov 2024 at 14:13.
24 Feb and 7 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 16:36.
24 Feb and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jan 2025 at 10:49.
3 and 7 Mar 2025
BT were proposing to carry out Utility asset works on Bruce Walk, Windsor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and verge.
This roadwork event was last updated by BT on 2 Dec 2024 at 11:15.
5 and 26 Mar 2025
Buckinghamshire Council are proposing to carry out roadworks on Huntercombe Lane South, Burnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Buckinghamshire Council on 13 Jan 2025 at 09:11.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cippenham Lane, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Jan 2025 at 12:17.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:43.
10 Mar and 16 May 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 20 Sep 2024 at 09:11.
10 Mar and 16 May 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 12 Sep 2024 at 09:14.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 14:28.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Market Street, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 23 Jan 2025 at 09:18.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 20 Jan 2025 at 09:25.
10 and 21 Mar 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Way, Bracknell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 20 Jan 2025 at 09:29.
11 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Berry Hill, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:35.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 14:51.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Dec 2024 at 16:05.
17 Mar and 30 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jan 2025 at 12:36.
19 and 21 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Lane, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:49.
24 and 26 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Milley Lane, Hare Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:24.
24 and 26 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Milley Lane, Hare Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:38.
24 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 16:56.
2 and 4 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Jan 2025 at 12:11.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Castle End Road, Ruscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 16:52.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Castle End Road, Ruscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 12:20.
6 and 11 Apr 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:09.
7 and 11 Apr 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Cambridge Avenue, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:37.
7 and 11 Apr 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Avenue, Burnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2024 at 15:34.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 22 Jan 2025 at 12:42.
7 and 11 Apr 2025
Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 13:52.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 9 Dec 2024 at 15:32.
7 and 10 Apr 2025
Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 16 Dec 2024 at 11:12.
7 and 29 Apr 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Locks Ride, Ascot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Nexfibre Networks Limited on 7 Jan 2025 at 09:49.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 11:35.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 14 Jan 2025 at 08:09.
7 and 10 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 16:09.
8 and 14 Apr 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 14 April 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 14 Jan 2025 at 14:01.
14 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Spencers Road, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.
14 and 17 Apr 2025
South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 13 Jan 2025 at 10:42.
21 and 26 Apr 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 29 Jan 2025 at 13:29.
21 and 26 Apr 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 26 April 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 21 Jan 2025 at 16:45.
21 and 25 Apr 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 20 Jan 2025 at 16:34.
22 and 24 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blakes Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 07:22.
22 and 24 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blakes Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 15:25.
23 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 21 Jan 2025 at 10:25.
23 and 25 Apr 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Jan 2025 at 10:07.
28 and 30 Apr 2025
BT are proposing to carry out Utility asset works on Queen Street, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 24 Jan 2025 at 10:35.
29 Apr and 1 May 2025
BT are proposing to carry out Utility asset works on Ferry Road, Bray, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Jan 2025 at 09:17.
Roadworks Map near to Ascot Road, MAIDENHEAD, SL6 3LD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ascot Road, MAIDENHEAD, SL6 3LD (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.