ROADWORKS SUMMARY
Willow Drive, MAIDENHEAD, SL6 2JX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Willow Drive, SL6 2JX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Willow Drive, MAIDENHEAD, SL6 2JX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Willow Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bath Road

Thames Water are carrying out Disconnection or alteration of supply on Bath Road, Knowl Hill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 January 2026 at 11:21 and could run through until 25 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Jan 2026 at 11:21.

LONG TERM
Until
18 Sep 2028
Details
View Map
Share
Follow
Farnham Road

Slough Borough Council are carrying out Highway repair and maintenance works on Farnham Road, Slough.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 January 2026 at 08:00 and could run through until 18 September 2028. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Slough Borough Council on 4 Feb 2026 at 14:02.

LONG TERM
Until
18 Sep 2028
Details
View Map
Share
Follow
Bath Road

Slough Borough Council are carrying out Highway improvement works on Bath Road, Slough.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 January 2026 at 08:00 and could run through until 18 September 2028. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Slough Borough Council on 4 Feb 2026 at 14:00.

Buckinghamshire Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are carrying out Highway repair and maintenance works on Huntercombe Lane South, Burnham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2026 at 09:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 May 2026 at 10:12.

Cadent Gas logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Clewer Hill Road

Cadent Gas are carrying out Utility asset works on Clewer Hill Road, Windsor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:54 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 15:04.

Scottish Hydro Electric Power Dis logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tudor Way

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Tudor Way, Windsor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 10:30 and could run through until 23 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 11:42.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Forest Green Road

Cadent Gas are carrying out Utility asset works on Forest Green Road, Holyport, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:39 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 15:07.

Cadent Gas logo
LONG TERM
Between
5 Sep and 2 Nov 2026
Details
View Map
Share
Follow
St Andrews Way

Cadent Gas are proposing to carry out Utility asset works on St Andrews Way, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2026 at 09:32.

Bracknell Forest Council logo
Between
7 and 18 Sep 2026
Details
View Map
Share
Maidenhead Road

Bracknell Forest Council carried out Highway repair and maintenance works on Maidenhead Road, Warfield, Bracknell.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 7 Sep 2026 and 18 Sep 2026 and were actually completed between 7 Sep 2026 (10:45) and 18 Sep 2026 (15:04). The works impacted the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 18 Sep 2026 at 15:57.

Bracknell Forest Council logo
Between
7 and 18 Sep 2026
Details
View Map
Share
Follow
Maidenhead Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Maidenhead Road, Warfield, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Aug 2026 at 10:08.

Cadent Gas logo
LONG TERM
Between
7 Sep and 8 Nov 2026
Details
View Map
Share
Follow
Summerleaze Road

Cadent Gas are proposing to carry out Utility asset works on Summerleaze Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 00:10.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Holyport Street

Cadent Gas are proposing to carry out Utility asset works on Holyport Street, Holyport, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 13:02.

Cadent Gas logo
Between
7 and 28 Sep 2026
Details
View Map
Share
Follow
Holyport Street

Cadent Gas are proposing to carry out Utility asset works on Holyport Street, Holyport, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 11:16.

Cadent Gas logo
Until
6 Oct 2026
Details
View Map
Share
Follow
Terrys Lane

Cadent Gas are carrying out Utility asset works on Terrys Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:51 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 10:58.

Cadent Gas logo
LONG TERM
Until
21 Oct 2026
Details
View Map
Share
Follow
Moneyrow Green

Cadent Gas are carrying out Utility asset works on Moneyrow Green, Holyport, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:21 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 08:31.

Scottish Hydro Electric Power Dis logo
Between
14 and 18 Sep 2026
Details
View Map
Share
East Crescent

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on East Crescent, Windsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 15:46.

Finishing
Wednesday
Details
View Map
Share
Follow
Butchers Lane

Royal Borough Of Windsor And Maidenhead are carrying out Works for road purposes on Butchers Lane, White Waltham, Maidenhead.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 14:30 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 18 Sep 2026 at 11:45.

Until
5 Oct 2026
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are carrying out Utility asset works on Farnham Lane, Farnham Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 15 Sep 2026 at 08:27.

Cadent Gas logo
Thursday
Details
View Map
Share
The Pound

Cadent Gas carried out Utility repair and maintenance works on The Pound, Cookham, Maidenhead.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 16 Sep 2026 and 24 Sep 2026 and were actually completed between 16 Sep 2026 (16:44) and 18 Sep 2026 (15:50). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 15:58.

Finishing
Today
Details
View Map
Share
Follow
Oldfield Road

Royal Borough Of Windsor And Maidenhead are carrying out Works for road purposes on Oldfield Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 20:00 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 17 Sep 2026 at 07:54.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Poyle Lane

Thames Water are carrying out New service connection on Poyle Lane, Burnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2026 at 09:00 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Sep 2026 at 09:31.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Poyle Lane

Thames Water are proposing to carry out New service connection on Poyle Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 15:45.

South East Water logo
LONG TERM
Between
21 Sep 2026 and 12 Feb 2027
Details
View Map
Share
Follow
Drift Road

South East Water are proposing to carry out Utility asset works on Drift Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 February 2027. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Jul 2026 at 09:46.

South East Water logo
LONG TERM
Between
21 Sep 2026 and 12 Feb 2027
Details
View Map
Share
Follow
Drift Road

South East Water are proposing to carry out Utility asset works on Drift Road, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 February 2027. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Jul 2026 at 09:46.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Holyport Street

Cadent Gas are proposing to carry out Utility asset works on Holyport Street, Holyport, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2026 at 12:43.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Grubwood Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Grubwood Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jul 2026 at 12:07.

Cityfibre Metro Networks logo
Between
30 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Green Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 23 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Aug 2026 at 11:52.

Cadent Gas logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Boyn Valley Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Boyn Valley Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 08:38.

Cadent Gas logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Boyn Valley Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Boyn Valley Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jul 2026 at 09:37.

Cadent Gas logo
Between
12 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Clarence Crescent

Cadent Gas are proposing to carry out Utility asset works on Clarence Crescent, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2026 at 09:13.

Cadent Gas logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Henley Road

Cadent Gas were proposing to carry out Utility asset works on Henley Road, Slough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 18:14.

Cadent Gas logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Buckingham Avenue

Cadent Gas are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 11:18.

Cadent Gas logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Holyport Street

Cadent Gas are proposing to carry out Utility asset works on Holyport Street, Holyport, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 10:50.

Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Lee Lane

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Lee Lane, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 9 Jul 2026 at 08:41.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Chalvey Park

Thames Water were proposing to carry out New service connection on Chalvey Park, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 12:01.

BT logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Common Road

BT are proposing to carry out Utility asset works on Common Road, Eton Wick, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Jul 2026 at 15:18.

South East Water logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Woodlands Park Road

South East Water are proposing to carry out New service connection on Woodlands Park Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Sep 2026 at 12:05.

South East Water logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Woodlands Park Road

South East Water are proposing to carry out New service connection on Woodlands Park Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 11 Aug 2026 at 15:49.

South East Water logo
Between
27 and 29 Oct 2026
Details
View Map
Share
Follow
Whyteladyes Lane

South East Water are proposing to carry out Utility repair and maintenance works on Whyteladyes Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 7 Apr 2026 at 13:12.

Thames Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Alexandra Road

Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Aug 2026 at 08:50.

LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Clarence Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Clarence Road, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 26 Aug 2026 at 12:37.

LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Clarence Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Clarence Road, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Aug 2026 at 13:31.

South East Water logo
Between
3 and 5 Nov 2026
Details
View Map
Share
Follow
Belmont Road

South East Water are proposing to carry out Utility repair and maintenance works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 5 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 30 Jul 2026 at 16:00.

Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Ray Mead Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on Ray Mead Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 8 Jul 2026 at 17:03.

National Highways logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Tuns Lane

National Highways are proposing to carry out Highway repair and maintenance works on Tuns Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Aug 2026 at 11:05.

National Highways logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Tuns Lane

National Highways are proposing to carry out Highway repair and maintenance works on Tuns Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Aug 2026 at 11:08.

South East Water logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Cannondown Road

South East Water are proposing to carry out New service connection on Cannondown Road, Cookham Rise, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Aug 2026 at 08:49.

National Highways logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Follow
Royal Windsor Way

National Highways are proposing to carry out Highway repair and maintenance works on Royal Windsor Way, Eton, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Aug 2026 at 13:12.

Cadent Gas logo
Between
1 and 18 Dec 2026
Details
View Map
Share
Follow
Cox Green Lane

Cadent Gas are proposing to carry out Utility asset works on Cox Green Lane, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:45.


Roadworks Map near to Willow Drive, MAIDENHEAD, SL6 2JX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Sep 2026 23:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Willow Drive, MAIDENHEAD, SL6 2JX (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
BRAYWICK ROAD 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 18 Sep 2026 11:00
(Scheduled: 18 Sep 2026 - 28 Sep 2026)
0.5
Details
Share
Follow
2
HIBBERT ROAD 
(0.5 miles)
Royal Borough Of Windsor And Maidenhead
Works for road purposes - Carriageway - Two-way signals
In Progress
Since: 17 Sep 2026 09:05
(Scheduled: 17 Sep 2026 - 22 Sep 2026)
0.5
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
HOLYPORT STREET, HOLYPORT 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 7 Sep 2026 - 28 Sep 2026
0.7
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
HOLYPORT STREET, HOLYPORT 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 7 Sep 2026 - 28 Sep 2026
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.