ROADWORKS SUMMARY
Grenfell Road, MAIDENHEAD, SL6 1HE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Grenfell Road, SL6 1HE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Grenfell Road, MAIDENHEAD, SL6 1HE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Grenfell Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.

Eunetworks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 7 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:08.

LONG TERM
Between
2 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Optimal Power Networks on 18 Oct 2024 at 11:28.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:09.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out Highway improvement works on Bourne End Road, Hedsor.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 13:27 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Jan 2025 at 14:30.

Eunetworks logo
Between
1 and 29 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:05.

BT logo
Between
4 and 26 Jan 2025
Details
View Map
Share
Follow
Bray Road

BT are proposing to carry out Utility asset works on Bray Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 Sep 2024 at 10:09.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Sep 2024 at 13:13.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Sep 2024 at 09:13.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:05.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Holyport Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Holyport Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

LONG TERM
Between
6 Jan and 24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 13 Aug 2024 at 12:04.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Windsor Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Windsor Road, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 24 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Jan 2025 at 08:19.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wessex Way

Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.

Cadent Gas logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Wessex Way

Cadent Gas are carrying out Utility asset works on Wessex Way, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 12:56 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:24.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Huntercombe Lane South

Thames Water are proposing to carry out New service connection on Huntercombe Lane South, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 14:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Birdwood Road

Cadent Gas are proposing to carry out Utility asset works on Birdwood Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:20.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:26.

Cadent Gas logo
Until
24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are carrying out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 11:06 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:55.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:15.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:04.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:01.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:31.

Finishing
Tomorrow
Details
View Map
Share
Follow
North Dean

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on North Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 4 Oct 2024 at 11:12.

Finishing
Tomorrow
Details
View Map
Share
Follow
North Dean

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on North Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 2 Dec 2024 at 12:05.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 14:40.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:33.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:59.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:07.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 10:25.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:29.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:09.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 10:25.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:29.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 08:54.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 23 Aug 2024 at 16:07.

Eunetworks logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:38.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:18.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Eunetworks logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Eunetworks are carrying out Utility asset works on Broad Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 6 Jan 2025 at 08:19.

Eunetworks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Broad Lane

Eunetworks were proposing to carry out roadworks on Broad Lane, Beaconsfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 28 Nov 2024 at 13:01.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:35.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 15:15.

Eunetworks logo
Between
7 and 23 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:21.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Maidenhead Road

Network Rail were proposing to carry out Works for Rail Purposes on Maidenhead Road, Cookham, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 16:01.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Hedsor Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Hedsor Hill, Hedsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:43.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Harvest Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Harvest Hill, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Dec 2024 at 11:53.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:42.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 09:33.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 09:44.

Eunetworks logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Gore Road

Eunetworks are proposing to carry out Utility asset works on Gore Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 25 Oct 2024 at 13:27.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:46.

Scottish Hydro Electric Power Dis logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Brook Path

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Brook Path, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 13:48.

Scottish Hydro Electric Power Dis logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Brook Path

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Brook Path, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 10:24.

Buckinghamshire Council logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Institute Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Institute Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Dec 2024 at 14:14.

LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Dec 2024 at 12:03.

Cadent Gas logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Berry Hill

Cadent Gas are proposing to carry out Utility asset works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:00.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 12:38.

Cadent Gas logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:17.

Buckinghamshire Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Lock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jan 2025 at 08:56.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:36.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:26.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 13:01.

Thames Water logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out New service connection on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:45.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:07.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 09:58.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:36.

Eunetworks logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 13:37.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.

South East Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Victoria Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Oct 2024 at 14:27.

Buckinghamshire Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 13:43.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 Dec 2024 at 13:13.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cliveden Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cliveden Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:11.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:54.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 14:54.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 10:31.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:05.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Glade Road

Thames Water were proposing to carry out New service connection on Glade Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:34.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:23.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Core Sampling on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:09.

Eunetworks logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 14:57.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hawks Hill

BT are proposing to carry out Utility asset works on Hawks Hill, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:01.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kiln Lane

BT are proposing to carry out Utility asset works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:00.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 09:00.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Windsor Road

Cadent Gas were proposing to carry out Utility asset works on Windsor Road, Maidenhead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:15.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:09.

Eunetworks logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Curriers Lane

Eunetworks are proposing to carry out Utility asset works on Curriers Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 10:11.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:17.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 16:16.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 15:25.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 26 Nov 2024 at 12:57.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Thames Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
River Road

Thames Water are proposing to carry out Utility repair and maintenance works on River Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:17.

Between
19 and 28 Feb 2025
Details
View Map
Share
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Nov 2024 at 10:40.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out New service connection on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:51.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.

Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Harvest Hill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Permanent reinstatement on Harvest Hill Road, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 16:36.

Buckinghamshire Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are proposing to carry out Highway improvement works on Huntercombe Lane South, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Nov 2024 at 14:13.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Lake End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 25 Nov 2024 at 10:35.

Cornerstone Telecommunications Infrastructure logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Lake End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Nov 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:24.

LONG TERM
Between
24 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 2 Sep 2024 at 00:12.

Cadent Gas logo
LONG TERM
Between
28 Feb and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.

BT logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Bruce Walk

BT were proposing to carry out Utility asset works on Bruce Walk, Windsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 11:15.

Eunetworks logo
Between
3 and 27 Mar 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 15 Nov 2024 at 13:54.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:10.

Eunetworks logo
LONG TERM
Between
3 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 2 Sep 2024 at 10:02.

Eunetworks logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Hedsor Lane

Eunetworks are proposing to carry out Utility asset works on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:40.

Buckinghamshire Council logo
Between
7 and 13 Mar 2025
Details
View Map
Share
Follow
Harwood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Harwood Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:10.

Buckinghamshire Council logo
Between
7 and 13 Mar 2025
Details
View Map
Share
Follow
Beaufort Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Close, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:50.

Buckinghamshire Council logo
Between
7 and 13 Mar 2025
Details
View Map
Share
Follow
Beaufort Gardens

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaufort Gardens, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:49.

Thames Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:37.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Cookham Road

Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:43.

Buckinghamshire Council logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Dec 2024 at 14:07.

Thames Water logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Follow
Berry Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Berry Hill, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:35.

Thames Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Lock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:32.

Thames Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Lock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 12:13.

Buckinghamshire Council logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Riverpark Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 12:09.

Eunetworks logo
Between
14 and 20 Mar 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 15:57.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2024 at 14:30.

LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Farnham Lane

Optimal Power Networks are proposing to carry out Utility asset works on Farnham Lane, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Aug 2024 at 16:30.

Gigaclear logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Black Boy Lane

Gigaclear were proposing to carry out Utility asset works on Black Boy Lane, Hurley, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 10:42.

Thames Water logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Hitcham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:49.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Eunetworks logo
Between
20 and 25 Mar 2025
Details
View Map
Share
Littleworth Road

Eunetworks were proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 09:23.

Eunetworks logo
Between
20 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 12:58.

Buckinghamshire Council logo
Between
20 and 23 Mar 2025
Details
View Map
Share
Follow
Little Marlow Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Little Marlow Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Dec 2024 at 13:40.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Dropmore Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Dropmore Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 30 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:02.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 30 Mar 2025
Details
View Map
Share
Follow
Service Road Off Dropmore Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Service Road Off Dropmore Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Dec 2024 at 10:07.

Eunetworks logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Follow
Broad Lane

Eunetworks are proposing to carry out Utility asset works on Broad Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:18.

Cityfibre Metro Networks logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
St Marks Crescent

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Marks Crescent, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Jan 2025 at 12:11.

Buckinghamshire Council logo
Between
6 and 11 Apr 2025
Details
View Map
Share
Follow
Approach Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Approach Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 13 Dec 2024 at 11:09.


Roadworks Map near to Grenfell Road, MAIDENHEAD, SL6 1HE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 7 Jan 2025 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Grenfell Road, MAIDENHEAD, SL6 1HE (39 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HIGH TOWN ROAD 
(0.0 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 8 Jan 2025 - 9 Jan 2025)
0.0
Details
Share
2
BT logo
VALLEY WALK 
(0.1 miles)
BT
Utility asset works - Footpath - No carriageway incursion
Cancelled
(Scheduled: 6 Jan 2025 - 10 Jan 2025)
0.1
Details
Share
3
Cadent Gas logo
EMERGENCY
  
GRENFELL ROAD 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Complete
27 Dec 2024 09:44 - 28 Dec 2024 11:40
0.1
Details
Share
4
BT logo
BOYN VALLEY ROAD 
(0.2 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 6 Jan 2025 11:20
(Scheduled: 6 Jan 2025 - 7 Jan 2025)
0.2
Details
Share
Follow
5
BT logo
BOYN VALLEY ROAD 
(0.2 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 7 Jan 2025 - 8 Jan 2025
0.2
Details
Share
Follow
6
Cityfibre Metro Networks logo
LYNTON GREEN 
(0.3 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 6 Jan 2025 - 17 Jan 2025
0.3
Details
Share
Follow
7
Cityfibre Metro Networks logo
LYNTON GREEN 
(0.3 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 6 Jan 2025 - 17 Jan 2025)
0.3
Details
Share
8
Virgin Media logo
COURTLANDS 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 7 Jan 2025
0.3
Details
Share
Follow
9
Scottish Hydro Electric Power Dis logo
URGENT
  
WEST STREET 
(0.3 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
27 Dec 2024 09:33 - 30 Dec 2024 10:00
0.3
Details
Share
10
Virgin Media logo
STAFFERTON WAY 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 7 Jan 2025
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.