ROADWORKS SUMMARY
Albert Road, WINDSOR, SL4 2HJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Albert Road, SL4 2HJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Albert Road, WINDSOR, SL4 2HJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Albert Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Moor Lane

National Highways are carrying out Works for road purposes on Moor Lane, Staines-upon-thames.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 22:00 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 09:21.

LONG TERM
Between
2 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Optimal Power Networks on 18 Oct 2024 at 11:28.

Cadent Gas logo
LONG TERM
Until
19 Feb 2025
Details
View Map
Share
Follow
Granville Avenue

Cadent Gas are carrying out Utility asset works on Granville Avenue, Slough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:50 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:45.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Bedford Lane

Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Cadent Gas logo
LONG TERM
Until
7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are carrying out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 12:29 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 12:44.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:18.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Stanwell New Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:50.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
London Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:49.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
London Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
8 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
8 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:09.

Cadent Gas logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are carrying out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 07:57 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 07:59.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coworth Close

Cadent Gas are proposing to carry out Utility asset works on Coworth Close, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 13 Dec 2024 at 12:03.

Affinity Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 07:22.

Thames Water logo
Until
28 Jan 2025
Details
View Map
Share
Follow
Roses Lane

Thames Water are carrying out Utility repair and maintenance works on Roses Lane, Windsor.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 16 January 2025 at 11:14 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 14:11.

Energy Assets Pipelines logo
Finishing
Thursday
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are carrying out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 10:30 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 17 Jan 2025 at 11:52.

Energy Assets Pipelines logo
Finishing
Thursday
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 15 Oct 2024 at 16:28.

Cadent Gas logo
Until
28 Jan 2025
Details
View Map
Share
Follow
Dedworth Road

Cadent Gas are carrying out Utility repair and maintenance works on Dedworth Road, Windsor.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 11:08 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 12:43.

Scottish Hydro Electric Power Dis logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Northcroft Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Northcroft Road, Englefield Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Oct 2024 at 10:48.

Scottish Hydro Electric Power Dis logo
Until
10 Feb 2025
Details
View Map
Share
Follow
Northcroft Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Northcroft Road, Englefield Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 07:45 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Jan 2025 at 07:58.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 13:33.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 15:13.

Surrey County Council logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Fairfield Avenue

Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 07:58.

LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 Dec 2024 at 13:13.

LONG TERM
Between
3 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Long Furlong Drive

Optimal Power Networks are proposing to carry out Utility asset works on Long Furlong Drive, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 22 May 2024 at 07:28.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Hythe

Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 07:51.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Hythe

Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:30.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Hythe

Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:16.

Affinity Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Stanwell Moor Road

Affinity Water were proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 14 Jan 2025 at 13:45.

Affinity Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Stanwell Moor Road

Affinity Water were proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Jan 2025 at 09:39.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bath Road

Eunetworks are proposing to carry out Utility asset works on Bath Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 20 Jan 2025 at 11:20.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Bath Road

Eunetworks are proposing to carry out Utility asset works on Bath Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 18 Dec 2024 at 10:56.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
18 Feb and 17 May 2025
Details
View Map
Share
Follow
High Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on High Street, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Nov 2024 at 08:23.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Petersfield Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Petersfield Avenue, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 09:06.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out New service connection on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:51.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:55.

Affinity Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Buckhurst Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Buckhurst Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 16:34.

Buckinghamshire Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are proposing to carry out Highway improvement works on Huntercombe Lane South, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Nov 2024 at 14:13.

Cornerstone Telecommunications Infrastructure logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Lake End Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Lake End Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 25 Nov 2024 at 10:35.

Cornerstone Telecommunications Infrastructure logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Lake End Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Lake End Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 5 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 Jan 2025 at 10:12.

BT logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Bruce Walk

BT were proposing to carry out Utility asset works on Bruce Walk, Windsor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 11:15.

Cadent Gas logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Horton Road

Cadent Gas are proposing to carry out Utility asset works on Horton Road, Colnbrook, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:55.

Buckinghamshire Council logo
Between
5 and 26 Mar 2025
Details
View Map
Share
Follow
Huntercombe Lane South

Buckinghamshire Council are proposing to carry out roadworks on Huntercombe Lane South, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 13 Jan 2025 at 09:11.

Thames Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Cippenham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Cippenham Lane, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jan 2025 at 12:17.

Buckinghamshire Council logo
Between
20 and 24 Mar 2025
Details
View Map
Share
Follow
Blackpond Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Oct 2024 at 10:10.

Thames Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Lydford Avenue

Thames Water are proposing to carry out New service connection on Lydford Avenue, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Dec 2024 at 12:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Mar and 11 May 2025
Details
View Map
Share
Follow
Church Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Church Street, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 08:40.

Thames Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Slough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Slough Road, Datchet, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:24.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Gresham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gresham Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 09:20.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
South Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Road, Englefield Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 12:53.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Mayfield Gardens

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mayfield Gardens, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 11:25.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Langton Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Langton Way, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 12:29.

Scottish Hydro Electric Power Dis logo
Between
7 and 26 Apr 2025
Details
View Map
Share
Follow
Stanwell New Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jan 2025 at 10:20.

Network Rail logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Thorpe Road

Network Rail are proposing to carry out Works for Rail Purposes on Thorpe Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 16:09.

Cadent Gas logo
LONG TERM
Between
7 Apr and 28 Jul 2025
Details
View Map
Share
Follow
Edinburgh Avenue

Cadent Gas are proposing to carry out Utility asset works on Edinburgh Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 16:30.

Cadent Gas logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Ledgers Road

Cadent Gas are proposing to carry out Utility asset works on Ledgers Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:25.

Cadent Gas logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
The Frithe

Cadent Gas are proposing to carry out Utility asset works on The Frithe, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 12:30.

Cadent Gas logo
Between
7 and 18 Apr 2025
Details
View Map
Share
The Frithe

Cadent Gas were proposing to carry out Utility asset works on The Frithe, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 08:11.

Affinity Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Service Road Fronting 155 To 171 Horton Road

Affinity Water are proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jan 2025 at 09:46.

Cadent Gas logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:53.

Cadent Gas logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 12:50.

Surrey County Council logo
Between
10 and 17 Apr 2025
Details
View Map
Share
Follow
Mayfield Gardens

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mayfield Gardens, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 14:51.

Surrey County Council logo
Between
17 and 23 Apr 2025
Details
View Map
Share
Follow
Langton Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Langton Way, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Dec 2024 at 14:47.


Roadworks Map near to Albert Road, WINDSOR, SL4 2HJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Jan 2025 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Albert Road, WINDSOR, SL4 2HJ (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
National Highways logo
MAJOR
  
ALBERT ROAD, OLD WINDSOR 
(0.1 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.1
Details
Share
Follow
2
National Highways logo
MAJOR
  
ALBERT ROAD, OLD WINDSOR 
(0.1 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.1
Details
Share
Follow
3
National Highways logo
MAJOR
  
ALBERT ROAD, OLD WINDSOR 
(0.1 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Complete
13 Jan 2025 22:00 - 21 Jan 2025 05:00
0.1
Details
Share
4
National Highways logo
MAJOR
  
KINGS ROAD 
(0.5 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.5
Details
Share
Follow
5
National Highways logo
MAJOR
  
KINGS ROAD 
(0.5 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.5
Details
Share
Follow
6
National Highways logo
MAJOR
  
KINGS ROAD 
(0.5 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Complete
13 Jan 2025 22:00 - 21 Jan 2025 05:00
0.5
Details
Share
7
National Highways logo
MAJOR
  
STRAIGHT ROAD, OLD WINDSOR 
(0.6 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.6
Details
Share
Follow
8
National Highways logo
MAJOR
  
STRAIGHT ROAD, OLD WINDSOR 
(0.6 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.6
Details
Share
Follow
9
National Highways logo
MAJOR
  
STRAIGHT ROAD, OLD WINDSOR 
(0.6 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Complete
13 Jan 2025 22:00 - 21 Jan 2025 05:00
0.6
Details
Share
10
National Highways logo
MAJOR
  
OSBORNE ROAD 
(0.8 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 13 Jan 2025 - 1 Feb 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.