ROADWORKS SUMMARY
Leacroft Road, IVER, SL0 9QW
Introduction
View current and future planned roadworks and road closures for Leacroft Road, SL0 9QW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Leacroft Road, IVER, SL0 9QW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Leacroft Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 13:00.
23 May 2024
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Thames Street, Windsor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 00:00 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Apr 2024 at 12:37.
23 May 2024
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Thames Avenue, Windsor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 00:00 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Apr 2024 at 12:37.
23 May 2024
Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Datchet Road, Windsor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 00:00 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Apr 2024 at 12:37.
30 May 2024
London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Mulberry Parade, West Drayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Apr 2024 at 06:55.
4 Mar and 17 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Wexham Street, Stoke Poges.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 17 May 2024. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Buckinghamshire Council on 13 Feb 2024 at 15:47.
12 Jun 2024
Cadent Gas are carrying out Utility asset works on Windsor Road, Gerrards Cross.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 11:20 and could run through until 12 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 11:32.
10 May 2024
Cadent Gas are carrying out Utility asset works on Yew Tree Road, Slough.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 09:30 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 10:41.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Hatton Road North, London Heathrow Airport, Heathrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:35.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Bath Road, Heathrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:36.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on High Street, Harlington, Hayes.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:36.
15 Apr and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Lossie Drive, Iver.
These works are categorised as Major.
The works will start on or after 15 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 14:00.
17 Apr and 17 May 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hewens Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 25 Jan 2024 at 15:02.
Wednesday
ESP Electricity are carrying out Utility asset works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 April 2024 at 07:00 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 18 Apr 2024 at 12:55.
7 May 2024
City Of London Telecomms are carrying out Utility asset works on The Greenway, Uxbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 07:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 24 Apr 2024 at 08:57.
22 Apr and 13 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Moorfield Road, Uxbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2024 at 14:15.
22 Apr and 13 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Peter's Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2024 at 14:12.
22 Apr and 8 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sweetcroft Lane, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 09:47.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Northborough Road, Slough.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 08:24 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 09:15.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Franklin Avenue, Slough.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 07:00 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 09:18.
25 Apr and 21 Jun 2024
Heathrow Airport are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Heathrow Airport on 15 Apr 2024 at 14:08.
Today
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Newtown Road, Denham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Apr 2024 at 14:04.
Today
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bellswood Lane, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Apr 2024 at 14:06.
Tomorrow
Buckinghamshire Council are proposing to carry out Highway improvement works on Love Green Lane, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 13:55.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Cranford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Dec 2023 at 10:34.
Thursday
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Denham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 26 Mar 2024 at 16:30.
Friday
Virgin Media are proposing to carry out Utility asset works on Broadmark Road, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 30 Jan 2024 at 09:26.
1 and 23 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Waterloo Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 24 Apr 2024 at 13:10.
6 and 12 May 2024
London Borough Of Hillingdon are proposing to carry out Utility repair and maintenance works on Villier Street, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2024 at 10:57.
6 and 9 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Blossom Way, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Apr 2024 at 08:34.
6 and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Vine Grove, Uxbridge.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 15:30.
7 and 14 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Avenue, Old Windsor, Windsor.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 13:16.
12 and 30 May 2024
Cadent Gas are proposing to carry out Utility asset works on Kingsway Footpath To 2-44, Hayes.
These works are categorised as Major.
The works will start on or after 12 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
12 May and 29 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:36.
13 May and 21 Jun 2024
Heathrow Airport are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Stanwell.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Heathrow Airport on 22 Apr 2024 at 11:46.
13 May and 21 Jun 2024
Heathrow Airport are proposing to carry out Highway repair and maintenance works on Stanwell Moor Road, Heathrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Heathrow Airport on 24 Apr 2024 at 09:01.
15 and 26 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bilton Way, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 12:23.
17 and 21 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:24.
19 and 22 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Chequers Orchard, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 14:04.
19 and 26 May 2024
BT are proposing to carry out Utility asset works on St Marys Road, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Apr 2024 at 14:29.
20 May and 22 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on North Hyde Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 10:55.
20 and 22 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Brickfield Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Feb 2024 at 12:52.
20 May and 4 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Kingsway Mews, Farnham Common.
These works are categorised as Major.
The works will start on or after 20 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Mar 2024 at 13:42.
21 May and 25 Jun 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cowley Mill Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 25 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 08:21.
21 and 23 May 2024
Affinity Water are proposing to carry out Remedial works on Swallow Street, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Feb 2024 at 08:52.
25 and 27 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Queens Road, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 22 Apr 2024 at 14:13.
27 and 31 May 2024
BT are proposing to carry out Utility asset works on Dukes Lane, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2024 at 07:12.
27 and 29 May 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:30.
27 and 31 May 2024
Affinity Water are proposing to carry out Permanent reinstatement on Station Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Feb 2024 at 15:11.
28 May and 2 Jun 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pinkwell Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Feb 2024 at 16:00.
28 and 31 May 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Middle Green Road, Wexham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 14:49.
28 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hemmen Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jan 2024 at 08:24.
29 and 31 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on St Stephens Road, Yiewsley, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 31 Jan 2024 at 12:36.
2 and 6 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Swakeleys Road, Ickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 11 Apr 2024 at 09:41.
3 Jun and 3 Aug 2024
National Highways are proposing to carry out Highway repair and maintenance works on Moor Lane, Staines-upon-thames.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 3 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Apr 2024 at 09:44.
3 Jun and 11 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 11:35.
3 Jun and 11 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 11:03.
3 Jun and 11 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:57.
4 and 6 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Willoughby Road, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 10:01.
9 and 27 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Stanwell Road, Horton, Slough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 15:31.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Star Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Mar 2024 at 15:09.
11 and 13 Jun 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane Close, Iver Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 08:41.
15 Jun and 8 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Hedgerley Lane, Gerrards Cross.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jan 2024 at 10:44.
17 Jun and 6 Jul 2024
National Highways are proposing to carry out Highway repair and maintenance works on A4 M4 Junction 5 Roundabout, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 6 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Apr 2024 at 12:05.
17 and 19 Jun 2024
Vodafone are proposing to carry out Utility asset works on Golden Crescent, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 21 Mar 2024 at 11:37.
17 and 21 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Remedial works on Vine Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Mar 2024 at 21:52.
24 and 28 Jun 2024
BT are proposing to carry out New service connection on Ruscombe Gardens, Datchet, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Mar 2024 at 11:11.
24 and 26 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Marsham Lane, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Apr 2024 at 08:43.
24 and 26 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Minet Drive, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 09:06.
25 Jun and 16 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Bevin Road Footpath To Morrison Road, Hayes.
These works are categorised as Major.
The works will start on or after 25 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 14:16.
28 Jun and 1 Jul 2024
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Datchet Road, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 5 Apr 2024 at 14:50.
1 and 22 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Wellington Street, Slough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 14:00.
3 and 5 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Elliman Avenue, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2024 at 12:29.
14 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Wesley Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 10:14.
15 Jul and 8 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Galvin Road, Slough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 14:00.
15 and 17 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Laurel Avenue, Slough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Apr 2024 at 11:46.
16 and 19 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Bulstrode Way, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 13:23.
16 and 18 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Billet Lane, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2024 at 08:17.
17 and 21 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on West Common Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 13:38.
21 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sweetcroft Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 15:00.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Blackpond Lane, Farnham Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:57.
22 Jul and 22 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Feb 2024 at 08:50.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Syke Cluan, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 23 Apr 2024 at 08:15.
22 Jul and 22 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Feb 2024 at 08:40.
22 and 26 Jul 2024
Buckinghamshire Council are proposing to carry out Core Sampling on Dale Side, Gerrards Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2024 at 08:56.
22 Jul and 2 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Beaconsfield Road, Farnham Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Feb 2024 at 15:17.
22 Jul and 22 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Feb 2024 at 08:36.
22 Jul and 22 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Feb 2024 at 08:26.
22 Jul and 2 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Farnham Road, Farnham Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 2 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Feb 2024 at 15:17.
22 Jul and 22 Oct 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 15 Feb 2024 at 08:30.
26 and 30 Jul 2024
Buckinghamshire Council are proposing to carry out Highway improvement works on Syke Cluan, Iver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 14:55.
Roadworks Map near to Leacroft Road, IVER, SL0 9QW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Leacroft Road, IVER, SL0 9QW (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Feb 2024 - 22 May 2024)
(Scheduled: 25 Apr 2024 - 9 May 2024)
(Scheduled: 23 Apr 2024 - 7 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.