ROADWORKS SUMMARY
Mayow Road, LONDON, SE26 4HW
Introduction

View current and future planned roadworks and road closures for Mayow Road, SE26 4HW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mayow Road, LONDON, SE26 4HW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mayow Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
24 Oct 2025
Thames Water are carrying out roadworks on Vulcan Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.
2 Jul 2024 and 27 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.
These works are categorised as Major.
The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.
Monday
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.
Monday
Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 09:00 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.
17 Feb and 11 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.
Friday
Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:51.
17 Mar and 10 Sep 2025
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:25.
17 Mar and 10 Sep 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Jan 2025 at 14:52.
24 Mar 2025 and 8 Mar 2027
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on The Croydon Flyover, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 11:53.
Friday
London Borough Of Southwark are carrying out Highway improvement works on Manor Grove, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2025 at 00:00 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Aug 2025 at 10:33.
19 May and 3 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.
6 Oct 2025
Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.
19 May and 6 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 08:42.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
13 Sep 2025
London Borough Of Southwark are carrying out Highway improvement works on Clements Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 June 2025 at 00:00 and could run through until 13 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 11 Aug 2025 at 12:31.
17 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Southborough Lane, Bromley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 June 2025 at 13:00 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 15:59.
16 Jun and 12 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:26.
16 Jun and 12 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:27.
12 Sep 2025
London Borough Of Lewisham are carrying out Highway improvement works on Reginald Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 28 Aug 2025 at 15:58.
23 Jun 2025 and 23 Jun 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 23 June 2027. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 17:32.
3 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 June 2025 at 07:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 14:03.
30 Jun and 22 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.
15 Sep 2025
Transport for London (TfL) are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 June 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Aug 2025 at 10:22.
29 Aug 2026
Network Rail are carrying out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 July 2025 at 14:00 and could run through until 29 August 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 1 Sep 2025 at 08:08.
10 Jul and 11 Sep 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Howden Road, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Feb 2025 at 15:51.
14 Jul and 15 Dec 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:18.
14 Jul and 15 Dec 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Park Lane, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Croydon on 9 Jul 2025 at 11:23.
14 Jul and 15 Dec 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Wellesley Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:14.
30 Nov 2025
London Borough Of Croydon are carrying out Highway improvement works on Wellesley Road, Croydon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2025 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 28 Jul 2025 at 09:32.
14 Jul and 1 Dec 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Whitehorse Lane, South Norwood, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 14:00.
12 Sep 2025
Thames Water are carrying out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 July 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jul 2025 at 13:01.
14 Jul and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.
14 Jul 2025 and 12 Jul 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 12:41.
14 Jul 2025 and 12 Jul 2027
Transport for London (TfL) are proposing to carry out roadworks on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 July 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 14:21.
16 Jul and 10 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:29.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.
19 Jul and 18 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.
19 Jul and 18 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.
19 Jul and 18 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.
21 Jul and 26 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 11:44.
21 Jul and 19 Sep 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Jul 2025 at 13:15.
10 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on St Germans Place, Blackheath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 July 2025 at 14:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 10:56.
21 Jul and 10 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 16:16.
30 Sep 2025
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2025 at 00:00 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Aug 2025 at 17:33.
28 Jul 2025 and 30 Jan 2026
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 16:54.
24 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Vectis Road, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 05:41.
20 Feb 2026
London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 20 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 08:07.
Monday
Thames Water are carrying out Utility repair and maintenance works on Lassell Street, Greenwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 09:00 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 05:53.
28 Jul and 17 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.
1 Nov 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Elmers End Road, Penge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 July 2025 at 08:00 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 08:05.
29 Jul 2025 and 20 Jun 2026
Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.
16 Oct 2025
Thames Water are carrying out Utility asset works on Chadwick Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:58.
29 Jul 2025 and 20 Jun 2026
Thames Water are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.
16 Oct 2025
Thames Water are carrying out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.
29 Jul and 16 Oct 2025
Thames Water are proposing to carry out Utility asset works on Linwood Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 16 Jul 2025 at 16:51.
16 Oct 2025
Thames Water are carrying out Utility asset works on Linwood Close, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 July 2025 at 08:30 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:57.
30 Jul and 20 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.
1 Aug and 29 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:13.
29 Sep 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 August 2025 at 13:30 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 13:48.
3 Aug and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.
26 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
3 Aug and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.
3 Aug and 26 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 10:17.
27 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:07.
3 Aug and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.
26 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
3 Aug and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.
26 Oct 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2025 at 22:00 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 07:05.
28 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Mitcham Road, Croydon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:32 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 10:31.
4 Aug and 26 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.
18 Sep 2025
Thames Water are carrying out roadworks on Hillsboro Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 10:00 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:51.
3 Nov 2025
Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.
3 Nov 2025
Thames Water are carrying out Remedial works on Glengarry Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 10:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Aug 2025 at 10:50.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Greenwich South Street, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:11.
8 Aug and 26 Sep 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Jun 2025 at 13:29.
11 Aug and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:00.
11 Aug and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 08:34.
11 Aug and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:49.
11 Aug and 15 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 09:41.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2025 at 14:30 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:11.
13 Aug and 10 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on St Saviour's Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:03.
Tomorrow
London Borough Of Bromley are carrying out Highway improvement works on Elmstead Lane, Chislehurst.
The works started on 13 August 2025 at 10:58 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Sep 2025 at 09:39.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Westwood Hill, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 August 2025 at 13:05 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:10.
15 Aug and 12 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxgrove Road, Beckenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:53.
15 Aug 2025 and 20 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.
15 Aug 2025 and 20 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 08:25.
15 Aug 2025 and 9 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:23.
15 Aug 2025 and 9 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.
15 Aug 2025 and 20 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.
18 Aug and 15 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on St Saviour's Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Aug 2025 at 12:29.
18 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 09:49.
18 Aug and 14 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 11:19.
18 Aug and 14 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 09:03.
14 Sep 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:00 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 08:33.
18 Aug and 1 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 06:04.
10 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 10:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 10:51.
Today
UK Power Networks Eastern & London were proposing to carry out New service connection on Bird In Bush Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2025 at 11:44.
18 Aug and 20 Oct 2025
Thames Water were proposing to carry out Utility asset works on Tuskar Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.
18 Aug and 6 Oct 2025
Thames Water were proposing to carry out Utility asset works on Azof Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Bird In Bush Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 11:07.
19 Aug and 24 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.
20 Aug and 19 Sep 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.
20 Aug and 19 Sep 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 11:45.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 10:51.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 13:23.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 23 May 2025 at 09:01.
Friday
UK Power Networks Eastern & London were proposing to carry out New service connection on Bird In Bush Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 12:39.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Bird In Bush Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 August 2025 at 08:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:55.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 18:28 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:13.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.
24 Aug and 9 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.
24 Aug and 17 Sep 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 11:31.
25 Aug and 14 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Therapia Lane, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 06:41.
25 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Stephen's Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.
Saturday
Thames Water were proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 13:58.
25 Aug and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 13:06.
25 Aug and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 August 2025 and could run through until 6 October 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:56.
25 Aug and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:58.
25 Aug and 10 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Aug 2025 at 14:13.
25 Aug and 10 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 12 Aug 2025 at 12:36.
25 Aug and 14 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.
25 Aug and 14 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.
25 Aug and 14 Nov 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 11:47.
26 Aug and 24 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.
26 Aug and 14 Sep 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 15:05.
10 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Shaw Road, Bromley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:30 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:52.
10 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Northover, Bromley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:30 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:52.
26 Aug and 23 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 13:31.
Today
Thames Water are proposing to carry out Utility asset works on Oscar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 11:07.
10 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Tamworth Lane, Mitcham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 14:15 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 08:50.
Today
London Borough Of Bromley are carrying out Highway improvement works on Beckenham Road, Beckenham.
The works started on 27 August 2025 at 12:08 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 15:14.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Anerley Road, Penge.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 23:50 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 15:24.
23 Mar 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 09:00 and could run through until 23 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 09:20.
27 Aug and 31 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 May 2025 at 08:11.
27 Aug and 31 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 27 May 2025 at 08:11.
Tomorrow
London Borough Of Bromley are carrying out Highway improvement works on Crown Lane, Bromley.
The works started on 28 August 2025 at 15:32 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 15:47.
28 Aug and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:05.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Alnwick Road, Eltham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2025 at 09:20 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 08:02.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Station Approach, Hayes.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 10:24 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:11.
11 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 10:00 and could run through until 11 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2025 at 12:37.
12 Sep 2025
Royal Borough Of Greenwich are carrying out Highway improvement works on Lewisham Road, Lewisham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 23:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 31 Aug 2025 at 15:17.
29 Aug and 12 Sep 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 13:00.
29 Aug and 12 Sep 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 15:16.
1 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashburton Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 14:03.
1 Sep and 7 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 10:06.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:56.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 09:02.
1 Sep and 7 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:23.
7 Dec 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Factory Lane, Croydon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 08:53.
1 and 19 Sep 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Kingsley Road, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Jul 2025 at 14:11.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2025 at 15:14.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Aug 2025 at 10:48.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Chatfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:44.
1 Sep and 31 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 10 Jun 2025 at 09:48.
1 Sep and 28 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 18 Jun 2025 at 10:13.
1 and 28 Sep 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 10:00.
28 Sep 2025
London Borough Of Croydon are carrying out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 08:01.
2 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Rochford Way, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:15 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:05.
1 Sep and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Saxon Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Aug 2025 at 10:00.
1 Sep and 2 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:32.
1 and 11 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Beulah Road, Croydon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 11:41.
Today
Thames Water were proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 15:27.
Today
London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Westminster Avenue, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 12 Aug 2025 at 11:39.
1 and 15 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:39.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fieldend Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:43.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenock Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:26.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchmore Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:41.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockport Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.
1 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:42.
1 and 12 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tudor Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.
12 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Tudor Road, Anerley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 10:10 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:19.
1 and 12 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tudor Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.
1 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seely Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:58.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 18 Jun 2025 at 14:28.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 26 Aug 2025 at 18:42.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 28 Aug 2025 at 11:42.
Friday
T-Mobile (UK) are carrying out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 1 Sep 2025 at 11:12.
1 and 14 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornlaw Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 15:12.
1 and 14 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornlaw Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 09:16.
1 Sep and 14 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 27 May 2025 at 14:20.
1 and 14 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 11:37.
14 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Carson Road, West Dulwich, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:50 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:25.
1 Sep and 13 Oct 2025
Thames Water were proposing to carry out Utility asset works on Lordship Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:00.
13 Oct 2025
Thames Water are carrying out Utility asset works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 14:15 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 16:03.
1 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 13:55.
12 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Dunstans Road, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 14:06.
1 and 26 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Poynders Road, Clapham Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 17:50.
11 Sep 2025
London Borough Of Southwark are carrying out Highway improvement works on Townley Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 August 2025 at 08:00 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 08:03.
1 Sep and 14 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2025 at 09:31.
1 Sep and 14 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2025 at 08:24.
14 Oct 2025
London Borough Of Southwark are carrying out Highway improvement works on Peckham Rye, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 08:05.
Saturday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 21:00 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 08:39.
1 Sep and 6 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:24.
1 Sep and 6 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 08:11.
Today
BT are proposing to carry out Utility asset works on Crescent Lane, Clapham Common & Abbeville, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Jun 2025 at 16:20.
1 Sep and 27 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Champion Grove, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:07.
1 Sep and 27 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Grove Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:05.
1 Sep and 17 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Stories Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 12 Jun 2025 at 08:06.
1 and 29 Sep 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Denman Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:17.
29 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Denman Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 10:30 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 10:58.
1 and 29 Sep 2025
Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Aug 2025 at 12:08.
1 and 26 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:41.
1 and 26 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:43.
1 and 26 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:40.
1 and 15 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 12:51.
1 and 14 Sep 2025
Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:19.
1 and 14 Sep 2025
Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 08:32.
1 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:28.
1 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:19.
Tuesday
Thames Water are proposing to carry out New service connection on Bensham Manor Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Jun 2025 at 07:48.
Friday
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 5 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 10 Jun 2025 at 14:53.
Tomorrow
Cellnex OT UK are proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 19 Jun 2025 at 13:39.
Tomorrow
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 09:55.
Tomorrow
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 15:12.
2 Sep and 30 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 23 May 2025 at 14:25.
2 Sep and 1 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 30 May 2025 at 11:00.
Transport for London (TfL) carried out Highway repair and maintenance works on Westhorne Avenue, Eltham.
The road was closed for some or all of the period.
The works were originally planned between 2 Sep 2025 and 4 Sep 2025 and were actually completed between 2 Sep 2025 (22:33) and 3 Sep 2025 (01:28). The works impacted the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 01:38.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Coldharbour Lane, Brixton Windrush, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 12:00 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:30.
Tuesday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Coldharbour Lane, London.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:29.
3 and 10 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 29 Aug 2025 at 08:41.
3 and 10 Sep 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 29 Aug 2025 at 08:41.
Monday
Thames Water are carrying out Utility repair and maintenance works on Boveney Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 09:39 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2025 at 09:39.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:09.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:44.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:44.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 14:55.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:52.
3 Sep and 5 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:59.
Sunday
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 September 2025 and run through until 7 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 18 Jul 2025 at 11:18.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:19.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:39.
Sunday
London Borough Of Southwark are carrying out Highway improvement works on Lower Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 7 September 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jul 2025 at 11:06.
8 Sep 2025 and 30 Apr 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2025 at 13:18.
8 and 10 Sep 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 12:11.
8 and 10 Sep 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 14:31.
8 and 10 Sep 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 16:21.
8 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 11:59.
8 and 21 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:07.
8 and 21 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 15:14.
8 and 21 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 11:11.
8 and 15 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Marischal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 14:35.
8 and 15 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Marischal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:51.
8 and 28 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 10:27.
8 Sep and 27 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Langton Way, Blackheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 15:03.
8 Sep and 8 Oct 2025
Thames Tideway Tunnel are proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.
8 Sep and 2 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 15:37.
9 Sep and 9 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Croydon Road, Keston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 28 Jul 2025 at 17:13.
9 and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Oscar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:12.
11 Sep and 6 Nov 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Jul 2025 at 14:13.
11 and 24 Sep 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 10 Jun 2025 at 15:55.
11 and 24 Sep 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:33.
12 and 23 Sep 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 13:59.
12 and 29 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 20:12.
12 Sep and 11 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:16.
15 Sep 2025 and 30 Jan 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.
15 Sep 2025 and 30 Jan 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on George Street, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:58.
15 Sep and 12 Oct 2025
London Borough Of Croydon were proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:11.
15 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 13:02.
15 Sep and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.
15 Sep and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 09:05.
15 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westminster Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 10:59.
15 and 19 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:49.
15 and 19 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 14:26.
15 and 19 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belvedere Road, Anerley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 13:39.
15 Sep and 2 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:26.
15 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 15:47.
15 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:18.
15 Sep and 13 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 11:38.
15 Sep and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:21.
15 Sep and 7 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Rye Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:54.
15 Sep and 13 Oct 2025
Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:30.
15 and 18 Sep 2025
BT are proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Aug 2025 at 10:23.
15 and 18 Sep 2025
BT are proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Aug 2025 at 09:56.
15 Sep and 12 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Guildford Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 14:59.
15 and 26 Sep 2025
Thames Water were proposing to carry out New service connection on Wilcox Road, Oval, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Jul 2025 at 12:47.
15 Sep and 2 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Grosvenor Terrace, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:00.
15 and 29 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 07:58.
15 Sep 2025 and 9 Jan 2026
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 9 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 15:09.
15 Sep and 10 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.
These works are categorised as Major.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 14 Aug 2025 at 12:55.
15 Sep and 5 Dec 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 09:56.
15 Sep and 26 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Wilson Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:55.
15 Sep and 26 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Wilson Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 10:10.
15 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.
15 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 09:41.
15 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.
15 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 09:38.
16 and 18 Sep 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Rockmount Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 1 Sep 2025 at 11:55.
16 Sep and 10 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Foxes Dale, Blackheath.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:35.
16 Sep and 9 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:16.
16 Sep and 9 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 06:55.
19 Sep and 3 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Tarbert Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.
22 and 26 Sep 2025
London Borough Of Croydon were proposing to carry out Highway improvement works on Wentworth Road, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.
22 and 26 Sep 2025
BT were proposing to carry out Utility asset works on Cloister Gardens, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Jul 2025 at 12:02.
22 and 26 Sep 2025
BT were proposing to carry out Utility asset works on Cleaverholme Close, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Jul 2025 at 12:03.
22 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wiltshire Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 11:38.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.
22 Sep and 13 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jun 2025 at 13:52.
22 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 13:19.
22 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:30.
22 Sep and 5 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Blackwall Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 16:30.
22 Sep and 11 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 11:49.
23 and 27 Sep 2025
London Borough Of Croydon were proposing to carry out Highway improvement works on Outram Road, Croydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:29.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Jun 2025 at 09:17.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Jun 2025 at 13:39.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Jul 2025 at 07:45.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2025 at 10:39.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 12:06.
23 and 26 Sep 2025
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Sep 2025 at 10:03.
23 Sep and 14 Oct 2025
Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Aug 2025 at 08:50.
23 Sep and 14 Oct 2025
Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 09:34.
24 Sep and 15 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 15:27.
25 and 30 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Street, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Jul 2025 at 12:25.
26 and 30 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Spring Park Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:43.
26 and 30 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wickham Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:35.
26 and 30 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Way Gardens, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.
26 and 30 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Verdayne Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 08:42.
26 Sep and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Whitehorse Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:23.
26 Sep and 2 Oct 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Jun 2025 at 09:31.
26 Sep and 2 Oct 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Jun 2025 at 08:02.
29 Sep and 21 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 22 Aug 2025 at 11:02.
29 Sep and 21 Oct 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 16:09.
29 Sep and 2 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Balfour Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:39.
29 Sep and 13 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagnall Park, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Aug 2025 at 11:40.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
29 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 13:18.
29 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:44.
29 Sep and 2 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 18:43.
29 Sep and 2 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 15:44.
29 Sep and 30 Nov 2025
Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cellnex OT UK on 12 Jun 2025 at 12:06.
29 Sep and 30 Nov 2025
Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cellnex OT UK on 19 Jun 2025 at 11:29.
29 Sep and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:39.
29 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:19.
29 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 16:02.
29 Sep and 13 Oct 2025
Thames Water are proposing to carry out Utility asset works on Plough Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:56.
29 Sep and 3 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 30 Jun 2025 at 13:31.
29 Sep and 12 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:14.
29 Sep and 12 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 11:28.
29 Sep and 12 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 07:03.
29 Sep and 12 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.
29 Sep and 19 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 12:33.
29 Sep and 19 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:04.
29 Sep and 19 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.
29 Sep and 12 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:16.
29 Sep and 19 Dec 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 14:22.
29 Sep 2025 and 18 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 16:28.
29 Sep 2025 and 18 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 09:40.
29 Sep 2025 and 18 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:56.
29 Sep 2025 and 18 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 16:40.
29 Sep 2025 and 26 Jan 2026
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:05.
29 Sep 2025 and 26 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:06.
29 Sep and 29 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 15:15.
30 Sep and 2 Oct 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:57.
30 Sep and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on St Julian's Farm Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jun 2025 at 10:00.
30 Sep and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Casewick Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:59.
30 Sep and 2 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ferndale Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Jul 2025 at 10:32.
1 and 15 Oct 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 14:56.
1 Oct and 11 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rushey Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 15:54.
1 and 21 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Brookway, Blackheath.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:52.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Aug 2025 at 10:13.
3 Oct 2025 and 1 Oct 2026
Network Rail were proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 October 2025 and run through until 1 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 08:44.
3 and 6 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:18.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 10:24.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 13:31.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:43.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:54.
6 and 8 Oct 2025
BT are proposing to carry out Utility asset works on Oak Avenue, Shirley, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 30 Jul 2025 at 13:34.
6 and 8 Oct 2025
BT are proposing to carry out Utility asset works on Oak Avenue, Shirley, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Aug 2025 at 14:50.
6 and 10 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Greenways, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:42.
6 and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridport Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 12:08.
6 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 13:33.
6 and 11 Oct 2025
Thames Water are proposing to carry out New service connection on High Street, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.
6 and 10 Oct 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Westow Hill, Gipsy Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 09:56.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Jun 2025 at 16:29.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:10.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2025 at 14:35.
6 and 8 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Mildreds Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Jun 2025 at 11:09.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 09:43.
6 and 17 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 08:57.
6 and 17 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on The Pavement, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 15:28.
6 Oct and 3 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Denman Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:28.
6 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:21.
6 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:22.
6 Oct 2025 and 20 Feb 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 14:00.
6 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 07:46.
6 and 27 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 12:10.
7 Oct 2025 and 30 Apr 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Pawsons Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 14:44.
7 and 11 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 09:40.
7 and 11 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:24.
7 and 11 Oct 2025
London Borough Of Wandsworth were proposing to carry out Highway improvement works on Jerningham Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2025 and run through until 11 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 11 Jun 2025 at 15:01.
9 and 13 Oct 2025
BT are proposing to carry out Utility asset works on Abbey Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Aug 2025 at 13:41.
9 and 20 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by BT on 29 Jul 2025 at 07:31.
9 and 20 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by BT on 4 Aug 2025 at 12:36.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 09:14.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 11:45.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 12:11.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 13:30.
13 and 31 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Sydenham Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jul 2025 at 09:29.
13 Oct and 14 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Emmanuel Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 3 Jul 2025 at 11:26.
13 Oct and 3 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:00.
13 Oct and 3 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbeville Road, Clapham Common & Abbeville, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:03.
13 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:41.
13 and 15 Oct 2025
London Borough Of Lambeth are proposing to carry out Core Sampling on Cottage Grove, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 9 Jul 2025 at 15:59.
13 Oct and 10 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:57.
13 Oct and 10 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 11:15.
13 and 16 Oct 2025
BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 13 Aug 2025 at 10:17.
13 Oct and 12 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:48.
13 Oct and 12 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Macleod Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:53.
13 Oct and 4 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 12:29.
13 Oct and 14 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 07:56.
13 Oct and 14 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 14 Aug 2025 at 13:04.
14 and 16 Oct 2025
BT are proposing to carry out Utility asset works on The Gardens, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Jul 2025 at 09:06.
14 and 16 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Lordship Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 14:33.
14 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:49.
14 and 27 Oct 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Billington Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:32.
15 and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:54.
16 Oct 2025 and 10 Mar 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:16.
16 Oct 2025 and 10 Mar 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on Lansdowne Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 09:59.
16 Oct 2025 and 10 Mar 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 2 Jun 2025 at 13:17.
16 Oct 2025 and 10 Mar 2026
London Borough Of Croydon are proposing to carry out Highway improvement works on Dingwall Road, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 10 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 15 Jul 2025 at 10:08.
16 and 18 Oct 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on East Dulwich Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 19:55.
19 Oct 2025 and 8 Feb 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 10:09.
20 and 24 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Oakwood Avenue, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:44.
20 Oct and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 08:31.
20 Oct and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:04.
20 Oct and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 08:31.
20 Oct and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:04.
20 Oct and 21 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:32.
20 Oct and 21 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 16:17.
20 and 22 Oct 2025
London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:13.
20 and 22 Oct 2025
London Borough Of Lambeth were proposing to carry out Core Sampling on Gleneldon Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:16.
20 and 22 Oct 2025
London Borough Of Lambeth are proposing to carry out Works for road purposes on Gleneldon Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Jul 2025 at 13:22.
20 and 23 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 10:48.
20 Oct and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 15:12.
20 Oct and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 15:12.
20 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.
20 and 24 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Fernbrook Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 3 Sep 2025 at 12:12.
20 Oct and 8 Nov 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Bellenden Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 8 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 24 Jun 2025 at 08:30.
20 Oct and 6 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Maxted Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:44.
20 Oct and 6 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Danby Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 10:00.
20 and 29 Oct 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lilford Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 19 Jun 2025 at 16:13.
20 and 24 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 5 Jun 2025 at 13:47.
20 and 24 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 10:11.
20 Oct and 2 Nov 2025
Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.
20 Oct and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:10.
20 Oct and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:09.
20 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:56.
20 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:57.
20 and 24 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Caradoc Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:10.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Ferry Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:49.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Westferry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 31 Jul 2025 at 12:18.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Manchester Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 08:05.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on East Ferry Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:51.
20 Oct and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.
20 Oct and 7 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.
21 Oct and 20 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Duppas Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:05.
21 Oct and 14 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jul 2025 at 07:10.
21 Oct and 3 Nov 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.
21 and 23 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Bestwood Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:52.
21 and 23 Oct 2025
London Borough Of Lewisham were proposing to carry out Highway improvement works on Bestwood Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:32.
22 Oct and 10 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Ampere Way, Croydon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 08:38.
22 and 24 Oct 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Ampere Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 13 Aug 2025 at 10:10.
22 and 24 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:46.
22 and 28 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Whitworth Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:09.
23 and 27 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 10:48.
23 and 25 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:42.
24 Oct 2025 and 23 Jan 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2025 and run through until 23 January 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
24 Oct and 24 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
25 Oct and 19 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lower Addiscombe Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 12:45.
25 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bert Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:57.
25 and 29 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jun 2025 at 08:57.
25 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:23.
25 Oct and 1 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:56.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 10:46.
26 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Barrhill Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 12:17.
27 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:06.
27 Oct and 28 Nov 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.
27 and 30 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:47.
27 and 30 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 15:33.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:28.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:38.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 22:40.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:35.
27 Oct 2025 and 17 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Telford Avenue, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 15:42.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 09:37.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tierney Road, Streatham Hill West & Thornton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 11:52.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 12:14.
27 and 31 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 14:41.
27 Oct 2025 and 8 Feb 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:01.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 17:18.
27 Oct 2025 and 16 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 17:36.
27 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:19.
27 Oct and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:04.
27 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:25.
27 Oct and 7 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
27 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:30.
27 and 29 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:44.
27 Oct and 11 Nov 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 4 Aug 2025 at 11:38.
27 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Dover Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 07:49.
27 Oct and 12 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:47.
27 Oct and 14 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 10:51.
27 Oct and 14 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:45.
27 Oct and 21 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.
28 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham Road, Oval, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:47.
28 Oct and 12 Nov 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:42.
28 Oct and 12 Nov 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:45.
28 Oct and 12 Nov 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:52.
29 Oct and 12 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Dagmar Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 12:07.
29 and 31 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:23.
29 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:52.
29 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:55.
29 and 31 Oct 2025
BT are proposing to carry out Utility asset works on Bournville Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Jul 2025 at 14:51.
29 and 31 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Fentiman Road, Oval, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 12:51.
29 Oct 2025 and 26 Jan 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Jun 2025 at 19:24.
29 Oct 2025 and 26 Jan 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 08:24.
30 Oct 2025 and 16 Jan 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Bungalow Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 16 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 15:10.
30 Oct and 1 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2025 at 12:41.
30 Oct and 1 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 15:32.
30 Oct and 1 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:50.
31 Oct and 19 Dec 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Feb 2025 at 15:00.
2 and 6 Nov 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2025 and could run through until 6 November 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.
3 and 23 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 14:32.
3 and 20 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:57.
3 and 7 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Leighton Street, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 11:28.
3 and 14 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 08:31.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 3 Sep 2025 at 07:24.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 25 Jun 2025 at 11:05.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 23 Jul 2025 at 07:32.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 30 Jul 2025 at 12:57.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 7 Aug 2025 at 11:44.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 15 Aug 2025 at 15:06.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sutherland Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 21 Aug 2025 at 16:37.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 24 Jun 2025 at 12:53.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 22 Jul 2025 at 14:11.
3 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Canterbury Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 14:51.
3 and 27 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Aug 2025 at 11:58.
3 and 27 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Aug 2025 at 10:40.
3 Nov and 1 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2025 at 14:44.
3 Nov and 1 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:35.
3 Nov and 1 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:34.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:08.
3 and 28 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 08:10.
3 and 28 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 07:23.
3 and 28 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2025 at 07:07.
3 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:27.
3 and 26 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 13:08.
3 and 26 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 14:24.
3 and 28 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.
3 and 28 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Sep 2025 at 07:00.
3 and 28 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Aug 2025 at 15:59.
3 and 26 Nov 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Cope Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 09:34.
3 and 7 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:40.
3 and 7 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:10.
4 and 20 Nov 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Princess Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:26.
5 and 7 Nov 2025
BT are proposing to carry out Utility asset works on Thesiger Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Aug 2025 at 12:16.
5 and 7 Nov 2025
BT are proposing to carry out Utility asset works on Thesiger Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Aug 2025 at 13:39.
7 Nov and 24 Dec 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2025 at 13:12.
7 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chesterfield Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.
10 and 12 Nov 2025
Thames Water are proposing to carry out New service connection on Glenthorne Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Aug 2025 at 13:38.
10 and 12 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 11:32.
10 and 15 Nov 2025
Thames Water are proposing to carry out New service connection on High Street, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 12:31.
10 and 21 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:26.
10 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:09.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:10.
10 and 13 Nov 2025
BT are proposing to carry out Utility asset works on Chudleigh Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2025 at 10:20.
10 Nov and 5 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gilkes Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2025 at 14:49.
10 and 13 Nov 2025
BT are proposing to carry out Utility asset works on Gordonbrock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Aug 2025 at 15:13.
10 and 18 Nov 2025
Southern Gas Networks are proposing to carry out New service connection on Colwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:41.
10 and 21 Nov 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 Aug 2025 at 10:41.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grenada Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:32.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:04.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Indus Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:31.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 06:38.
10 and 21 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:41.
10 Nov 2025 and 17 Jan 2026
London Borough Of Southwark were proposing to carry out Highway improvement works on Aylesbury Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 17 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 23 Jun 2025 at 12:27.
10 Nov 2025 and 17 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Aylesbury Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:22.
10 Nov 2025 and 6 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 14:33.
10 Nov 2025 and 16 Feb 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 13:33.
10 Nov 2025 and 16 Feb 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 09:23.
10 Nov 2025 and 18 Jan 2026
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:08.
10 Nov 2025 and 18 Jan 2026
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 13:36.
10 Nov 2025 and 18 Jan 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 18 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 16:50.
11 and 24 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Casewick Road, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 15:52.
11 and 13 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:39.
11 and 13 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:12.
12 and 14 Nov 2025
Thames Water are proposing to carry out Remedial works on Willett Place, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:14.
13 and 15 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.
15 and 21 Nov 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 08:20.
17 Nov and 12 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Newhaven Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2025 at 12:43.
17 and 21 Nov 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 15 Jul 2025 at 11:58.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 08:53.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 10:43.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 09:46.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 14:55.
17 Nov and 19 Dec 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Everthorpe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 17 Jul 2025 at 11:20.
17 and 19 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hanover Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2025 at 12:26.
17 Nov 2025 and 26 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Cooks Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Jul 2025 at 12:30.
18 and 20 Nov 2025
BT are proposing to carry out Utility asset works on Cresswell Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Aug 2025 at 06:27.
18 and 20 Nov 2025
BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 06:24.
18 Nov 2025 and 20 Jan 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 09:20.
18 Nov 2025 and 20 Jan 2026
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2025 and run through until 20 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 17 Jun 2025 at 10:06.
18 Nov 2025 and 20 Jan 2026
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 12:30.
19 and 21 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 13:28.
19 and 21 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Gedling Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 29 Aug 2025 at 15:05.
21 and 23 Nov 2025
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2025 and run through until 23 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 31 Jul 2025 at 08:38.
21 and 23 Nov 2025
Cellnex OT UK are proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 12 Aug 2025 at 08:46.
21 and 24 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Kent House Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Aug 2025 at 08:08.
21 and 24 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Half Moon Lane, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 09:07.
21 and 24 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on Shakespeare Road, Herne Hill & Loughborough Junction, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2025 at 15:45.
24 Nov and 7 Dec 2025
London Borough Of Croydon are proposing to carry out Highway improvement works on Bingham Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Croydon on 28 Aug 2025 at 09:44.
24 and 28 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Apr 2025 at 16:20.
24 and 28 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 May 2025 at 16:34.
24 and 28 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on South Eden Park Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Jun 2025 at 13:07.
24 Nov and 5 Dec 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Croydon Road, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 16:51.
24 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glasbrook Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:56.
24 Nov 2025 and 26 Jan 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:28.
24 Nov 2025 and 26 Jan 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:36.
24 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lytcott Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:38.
24 and 27 Nov 2025
Thames Water are proposing to carry out New service connection on Costa Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:08.
24 and 29 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 08:10.
24 and 29 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 14:42.
24 Nov 2025 and 13 Mar 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 13 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 14:28.
24 Nov 2025 and 20 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Elephant Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 21 Aug 2025 at 14:38.
25 Nov 2025 and 19 Jan 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.
26 and 28 Nov 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.
27 Nov 2025 and 19 Dec 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2025 and could run through until 19 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:20.
27 Nov 2025 and 26 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Lorrimore Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2025 and could run through until 26 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.
30 Nov and 7 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Hailsham Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:44.
30 Nov and 7 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 28 Aug 2025 at 15:43.
30 Nov and 5 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Mantle Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:43.
1 and 5 Dec 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Greenways, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2025 at 11:59.
1 Dec 2025 and 30 Jan 2026
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on South Norwood Hill, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 30 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 16:35.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Spekehill, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Woodcroft, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Larchwood Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:47.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:26.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Faygate Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:02.
1 and 3 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 08:56.
1 and 18 Dec 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Palace Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 18 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by London Borough Of Lambeth on 21 Jul 2025 at 10:46.
1 and 21 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.
1 and 21 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Well Hall Parade, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:46.
1 and 5 Dec 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 09:46.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Welland Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 10:41.
1 and 4 Dec 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 4 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 07:34.
Roadworks Map near to Mayow Road, LONDON, SE26 4HW (63 Events)














































































































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mayow Road, LONDON, SE26 4HW (63 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.