ROADWORKS SUMMARY
Baring Road, LONDON, SE12 0DA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Baring Road, SE12 0DA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Baring Road, LONDON, SE12 0DA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Baring Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 08:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Jan 2025 at 12:00.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar 2024 and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:03.

LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 09:23.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 26 May 2025 at 19:46.

LONG TERM
Between
27 May 2024 and 1 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.

LONG TERM
Between
27 May 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Hatherley Crescent

Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Faraday Avenue

Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

LONG TERM
Between
14 Sep 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 16:10.

Thames Water logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are carrying out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:30 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:45.

Thames Water logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are carrying out Utility asset works on Westhorne Avenue, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:24 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:49.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Jan and 19 Jun 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jan and 2 Jul 2025
Details
View Map
Share
Sevenoaks Way

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 2 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 11:11.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 29 Jul 2025
Details
View Map
Share
Cray Avenue

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works were categorised as Major.

The works were originally planned to start 13 January 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:40.

UK Power Networks South Eastern logo
LONG TERM
Between
15 Jan and 14 Aug 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:35.

Transport for London (TfL) logo
LONG TERM
Between
26 Jan 2025 and 28 Jan 2026
Details
View Map
Share
Sidcup By Pass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:21.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2025 at 11:49.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 08:02.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Dec 2024 at 05:36.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2024 at 08:57.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 19 Dec 2024 at 15:52.

Thames Water logo
LONG TERM
Between
10 Feb and 22 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:01.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.

Royal Borough Of Greenwich logo
LONG TERM
Between
15 Feb and 29 Aug 2025
Details
View Map
Share
Follow
Vincent Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Vincent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 Jan 2025 at 16:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Feb and 11 Sep 2025
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.

Network Rail logo
LONG TERM
Between
17 Feb and 4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 8 Jan 2025 at 09:58.

Network Rail logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are carrying out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 07:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Feb 2025 at 08:11.

Thames Water logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are carrying out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are proposing to carry out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2025 at 20:24.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are carrying out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Feb 2025 at 15:12.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 09:22.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:30.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:36.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Wickham Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Stone Park Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Stone Park Avenue, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Wickham Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Follow
Hayes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hayes Lane, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Dec 2024 at 14:15.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 4 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 4 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 11:59.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Way

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:34.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:30.

London Borough Of Bromley logo
LONG TERM
Between
11 Mar and 11 Aug 2025
Details
View Map
Share
Wickham Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Dec 2024 at 12:37.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 20 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
12 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Between
13 Mar and 20 Jul 2025
Details
View Map
Share
Zenoria Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Zenoria Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:26.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:25.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jan 2025 at 14:52.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 13:45.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 08:59.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:13.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Lewisham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar and 14 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 09:16.

Thames Water logo
LONG TERM
Until
30 Aug 2025
Details
View Map
Share
Follow
Kingsman Street

Thames Water are carrying out Utility asset works on Kingsman Street, Woolwich.

The works started on 24 March 2025 at 13:45 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2025 at 10:30 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:23.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 15 Jun 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 11:42.

Transport for London (TfL) logo
LONG TERM
Between
1 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Feb 2025 at 08:13.

Transport for London (TfL) logo
LONG TERM
Between
6 Apr and 4 Jul 2025
Details
View Map
Share
East Rochester Way

Transport for London (TfL) were proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 13:57.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Transport for London (TfL) are carrying out Highway improvement works on Mount Pleasant Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 21:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 11:02.

UK Power Networks South Eastern logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:00 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 12:32.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Wickham Way

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Way, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Stone Park Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Stone Park Avenue, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Wickham Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Wickham Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 20 Feb 2025 at 16:05.

London Borough Of Bromley logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Hayes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hayes Lane, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bromley on 23 Feb 2025 at 19:00.

London Borough Of Bromley logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Ravensbourne Avenue

London Borough Of Bromley are carrying out Highway improvement works on Ravensbourne Avenue, Bromley.

These works are categorised as Major.

The works started on 14 April 2025 at 12:45 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Jun 2025 at 13:50.

Thames Water logo
LONG TERM
Between
14 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 6 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 08:20 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:55.

Network Rail logo
LONG TERM
Between
28 Apr and 15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 Feb 2025 at 10:08.

Thames Water logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are carrying out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 11:30 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 17:07.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 16:44.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 08:18.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:25.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:34.

Network Rail logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Network Rail are carrying out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 May 2025 at 08:17.

Southern Gas Networks logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Charlton Park Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:20.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:19.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:18.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:08.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are carrying out Utility asset works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 06:43.

London Borough Of Southwark logo
LONG TERM
Between
7 May and 4 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:47.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 May 2025 at 09:14.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 May 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
11 May and 22 Jun 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 14:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 08:56.

Thames Water logo
LONG TERM
Between
12 May and 15 Sep 2025
Details
View Map
Share
Old Farm Avenue

Thames Water were proposing to carry out New service connection on Old Farm Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.

Southern Gas Networks logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 13:40 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
12 May and 30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 11:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:12.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Rye Lane

Thames Water are carrying out New service connection on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 13:31 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:05.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 07:47.

LONG TERM
Between
13 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 05:54.

Southern Gas Networks logo
LONG TERM
Between
19 May and 25 Jul 2025
Details
View Map
Share
Follow
Southborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 18:37.

Southern Gas Networks logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Crown Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Crown Lane, Bromley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 09:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:14.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:29.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:15.

Southern Gas Networks logo
Today
Details
View Map
Share
Worsley Bridge Road

Southern Gas Networks carried out Utility repair and maintenance works on Worsley Bridge Road, Beckenham.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 19 May 2025 and 3 Jun 2025 and were actually completed between 19 May 2025 (09:30) and 3 Jun 2025 (12:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 12:51.

UK Power Networks Eastern & London logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Springfield Road, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:15.

London Borough Of Bromley logo
Between
19 May and 17 Jun 2025
Details
View Map
Share
Follow
Hillcrest Road

London Borough Of Bromley are proposing to carry out Utility asset works on Hillcrest Road, Bromley.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Bromley on 12 Mar 2025 at 10:11.

Thames Water logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Mount Adon Park

Thames Water are carrying out roadworks on Mount Adon Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 11:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 12:49.

Network Rail logo
LONG TERM
Between
19 May and 3 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.

Network Rail logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Olyffe Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Olyffe Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:39.

Thames Water logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Olyffe Avenue

Thames Water are carrying out Utility repair and maintenance works on Olyffe Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:35.

Thames Water logo
Finishing
Today
Details
View Map
Share
Olyffe Avenue

Thames Water were proposing to carry out roadworks on Olyffe Avenue, Welling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 08:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Lovel Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:44.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Stadium Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:09.

Southern Gas Networks logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Little Heath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Heath, Charlton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:54.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:09.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.

Transport for London (TfL) logo
Between
22 May and 18 Jun 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:52.

UK Power Networks South Eastern logo
LONG TERM
Between
23 May and 18 Jul 2025
Details
View Map
Share
Follow
Sevenoaks Way

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sevenoaks Way, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.

London Borough Of Southwark logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Elsie Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Elsie Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 08:02.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

Finishing
Monday
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are carrying out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 27 May 2025 at 10:32.

Finishing
Monday
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are carrying out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 27 May 2025 at 10:32.

Southern Gas Networks logo
LONG TERM
Between
25 May and 6 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 14:15.

Southern Gas Networks logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Peckham Rye

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 08:43.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:37.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:17.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:33.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 06:11.

LONG TERM
Between
26 May and 27 Jun 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 14:47.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Bradenham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:06.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Bradenham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:09.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:10.

Southern Gas Networks logo
Between
27 May and 23 Jun 2025
Details
View Map
Share
Follow
Danson Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 08:54.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Roseacre Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:29.

Thames Water logo
LONG TERM
Between
27 May and 2 Jul 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:29.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are carrying out roadworks on Lawrie Park Road, Sydenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 23:53 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:30.

Southern Gas Networks logo
Between
28 May and 20 Jun 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 12:14.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Bardsley Lane

Thames Water are carrying out Utility repair and maintenance works on Bardsley Lane, Greenwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:55 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:10.

Transport for London (TfL) logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 21:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 08:17.

Southern Gas Networks logo
LONG TERM
Between
29 May and 30 Jun 2025
Details
View Map
Share
Follow
Bradenham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:14.

Southern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Bradenham Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Bradenham Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:09.

Southern Gas Networks logo
Between
29 May and 26 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:27.

Southern Gas Networks logo
Until
26 Jun 2025
Details
View Map
Share
Follow
Clinton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Clinton Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:14.

Thames Water logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Lovel Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 07:23.

LONG TERM
Between
29 May and 1 Jul 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 29 May 2025 at 13:29.

UK Power Networks South Eastern logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Cray Avenue

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 17:33.

Southern Gas Networks logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Penge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Penge Road, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:36.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:21.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:03.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:47.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Gwillim Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:14.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Birch Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Grove, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:01.

Southern Gas Networks logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Birch Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Grove, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 09:33.

T-Mobile (UK) logo
Finishing
Friday
Details
View Map
Share
Follow
Rochester Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Mar 2025 at 08:32.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grangehill Road

Thames Water are carrying out Utility repair and maintenance works on Grangehill Road, Eltham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:26 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:58.

Southern Gas Networks logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 16:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Blackheath Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 15:46.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Thames Water logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Colomb Street

Thames Water are proposing to carry out Utility asset works on Colomb Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 10:31.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 13:52.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:54.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 12:59.

Electricity Network Company logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are carrying out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 09:11.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Yester Road

Thames Water are carrying out Utility repair and maintenance works on Yester Road, Chislehurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 10:24 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:02.

London Borough Of Bromley logo
Finishing
Friday
Details
View Map
Share
Follow
St David's Close

London Borough Of Bromley are proposing to carry out Highway improvement works on St David's Close, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 13 May 2025 at 13:48.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Manor Grove

Thames Water were proposing to carry out New service connection on Manor Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:14.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Follow
Manor Grove

Thames Water are proposing to carry out New service connection on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 06:45.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:47.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:17.

Transport for London (TfL) logo
Between
6 and 11 Jun 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:15.

London Borough Of Bromley logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crofton Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Crofton Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jan 2025 at 11:34.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Oak Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oak Grove Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 17:03.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Oakfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Oakfield Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2025 at 19:06.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Oakfield Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Oakfield Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:05.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2025 at 19:06.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 13:04.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 12:40.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 13:11.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:42.

Southern Gas Networks logo
Between
9 and 16 Jun 2025
Details
View Map
Share
Follow
Ash Close

Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 10:02.

Southern Gas Networks logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
The Crossway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Crossway, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Court Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:07.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Grove Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:04.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:16.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 11:02.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 May 2025 at 10:52.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:29.

Thames Water logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out New service connection on Barry Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 14:03.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 15:21.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Surrey Road

Thames Water were proposing to carry out New service connection on Surrey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:58.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:09.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 10:40.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 13:54.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:46.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Danson Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 11:30.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Rye Lane

Thames Water were proposing to carry out New service connection on Rye Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:51.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:02.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 06:13.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:17.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Tyler Street

Thames Water are proposing to carry out Utility asset works on Tyler Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 13:28.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Millharbour

Transport for London (TfL) were proposing to carry out Highway improvement works on Millharbour, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 08:59.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Marsh Wall

Transport for London (TfL) were proposing to carry out Highway improvement works on Marsh Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 09:00.

Virgin Media logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Woolwich Road

Virgin Media were proposing to carry out Utility asset works on Woolwich Road, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Mar 2025 at 10:41.

London Borough Of Southwark logo
Between
11 and 20 Jun 2025
Details
View Map
Share
Follow
Tintagel Crescent

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tintagel Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2025 at 16:15.

Southern Gas Networks logo
Between
12 and 27 Jun 2025
Details
View Map
Share
Follow
Turpington Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Turpington Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 18:53.

Southern Gas Networks logo
Between
12 and 25 Jun 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 May 2025 at 19:23.

London Borough Of Bromley logo
Between
12 and 14 Jun 2025
Details
View Map
Share
Follow
Beckenham Lane

London Borough Of Bromley are proposing to carry out Highway repair and maintenance works on Beckenham Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 29 May 2025 at 11:38.

London Borough Of Bromley logo
Between
12 and 14 Jun 2025
Details
View Map
Share
Follow
Beckenham Lane

London Borough Of Bromley are proposing to carry out Highway repair and maintenance works on Beckenham Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 2 Jun 2025 at 13:04.

Thames Water logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Boveney Road

Thames Water are proposing to carry out New service connection on Boveney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 09:05.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Mar 2025 at 20:42.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:45.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:09.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:30.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
East Dulwich Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 15:10.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

London Borough Of Bromley logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Crofton Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Crofton Lane, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jan 2025 at 11:34.

Southern Gas Networks logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Court Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:23.

Southern Gas Networks logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Esher Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Esher Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 08:51.

Thames Water logo
LONG TERM
Between
16 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility asset works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:06.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Gwillim Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:14.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Danson Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:55.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Roseacre Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:12.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
South Gipsy Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Gipsy Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:55.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Palmeira Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Palmeira Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:56.

Southern Gas Networks logo
Between
16 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Westbrooke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:56.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 09:48.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:10.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 May 2025 at 13:18.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Vanbrugh Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Park, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:25.

London Borough Of Bromley logo
Between
17 Jun and 2 Jul 2025
Details
View Map
Share
Elmfield Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Elmfield Road, Bromley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 17 Feb 2025 at 12:22.

London Borough Of Bromley logo
Between
17 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Elmfield Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Elmfield Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 18 Feb 2025 at 13:52.

London Borough Of Croydon logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Long Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:43.

London Borough Of Croydon logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Long Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 26 Mar 2025 at 14:30.

UK Power Networks Eastern & London logo
Between
18 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 08:28.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:13.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:12.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:47.

Transport for London (TfL) logo
Between
19 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:46.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Lordship Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Lordship Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 14:21.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Follow
Bellenden Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Bellenden Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Apr 2025 at 13:45.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:12.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 15:07.

Southern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cloisters Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloisters Avenue, Bickley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 May 2025 at 19:23.

Southern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cloisters Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloisters Avenue, Bickley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 16:09.

London Borough Of Bromley logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Widmore Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Widmore Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 15 Jan 2025 at 11:18.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 14:32.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 11 Apr 2025 at 11:23.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 15 Apr 2025 at 11:05.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility asset works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 17 Apr 2025 at 14:50.

Cellnex OT UK logo
LONG TERM
Between
23 Jun and 17 Aug 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility asset works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 1 May 2025 at 08:51.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.

London Borough Of Lewisham logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Dartmouth Place

London Borough Of Lewisham are proposing to carry out Highway improvement works on Dartmouth Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 3 Jun 2025 at 11:04.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Stansted Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stansted Crescent, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 11:22.

Southern Gas Networks logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Shoreham Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shoreham Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 12:24.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:39.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:38.

Thames Water logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2025 at 07:52.

Thames Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Burnt Oak Lane

Thames Water are proposing to carry out New service connection on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:10.

London Borough Of Lewisham logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 1 May 2025 at 15:57.

Thames Water logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Tunnel Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 06:21.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:36.

Thames Water logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Cedars Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cedars Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 18:02.

Transport for London (TfL) logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:56.

London Borough Of Southwark logo
Between
26 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Jasper Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Jasper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2025 at 10:49.

Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Dock Road

London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 26 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:42.

LONG TERM
Between
26 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 4 Apr 2025 at 17:16.

Thames Water logo
Between
27 and 30 Jun 2025
Details
View Map
Share
Follow
Baring Road

Thames Water are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:24.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:36.

Transport for London (TfL) logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:01.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Forest Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest Hill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 15:31.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Northdown Road

Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:02.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Northdown Road

Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:58.

Thames Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 15:28.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:45.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:48.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:47.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 16:10.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 13:40.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:24.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:12.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Bexhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:16.

Southern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 15:52.

Thames Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:28.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:05.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:40.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:06.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:08.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:13.

Transport for London (TfL) logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:41.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:07.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:16.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:38.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:11.

Transport for London (TfL) logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:42.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:44.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 09:09.

Transport for London (TfL) logo
Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:19.

Southern Gas Networks logo
Between
6 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

London Borough Of Bromley logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 17 Feb 2025 at 11:10.

Southern Gas Networks logo
Between
7 and 28 Jul 2025
Details
View Map
Share
Follow
Durham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Avenue, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Southern Gas Networks logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
South Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Hill Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Old Bromley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Bromley Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 14:28.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 19:10.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:11.

Transport for London (TfL) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 15 Oct 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 July 2025 and could run through until 15 October 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Kidbrooke Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:18.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 1 Sep 2025
Details
View Map
Share
Follow
St Germans Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:27.

Thames Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Westfield Road

Thames Water are proposing to carry out New service connection on Westfield Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 08:47.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:20.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:35.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:09.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:17.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:34.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 11:20.

Transport for London (TfL) logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:07.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 13:09.

London Borough Of Bexley logo
Between
9 and 12 Jul 2025
Details
View Map
Share
Follow
Maidstone Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Maidstone Road, Foots Cray, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 11 Mar 2025 at 10:35.

Southern Gas Networks logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Sydenham Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydenham Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:29.

London Borough Of Southwark logo
LONG TERM
Between
9 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:48.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Apr 2025 at 11:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 10:56.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 24 Apr 2025 at 13:27.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Apr 2025 at 07:19.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Jul and 11 Sep 2025
Details
View Map
Share
Howden Road

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Howden Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Feb 2025 at 15:51.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 21:04.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 11:49.

BT logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Cherry Tree Walk

BT are proposing to carry out Utility asset works on Cherry Tree Walk, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 May 2025 at 18:53.

Southern Gas Networks logo
LONG TERM
Between
11 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Bursdon Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursdon Close, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 13:42.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Sandy Lane

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 May 2025 at 16:22.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
South Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Hill Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:02.

London Borough Of Bromley logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Mays Hill Road

London Borough Of Bromley were proposing to carry out Highway improvement works on Mays Hill Road, Shortlands.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 9 Apr 2025 at 13:44.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 1 Dec 2025
Details
View Map
Share
Whitehorse Lane

UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Whitehorse Lane, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2025 at 14:00.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:47.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 14:09.

Transport for London (TfL) logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 10:23.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:52.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 12:47.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:54.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:18.

Transport for London (TfL) logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:57.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:36.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 10:57.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 11:40.

Electricity Network Company logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Apr 2025 at 07:15.

BT logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Kelsey Lane

BT are proposing to carry out Utility asset works on Kelsey Lane, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Jun 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
16 and 23 Jul 2025
Details
View Map
Share
Follow
Burrell Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Burrell Row, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
16 and 23 Jul 2025
Details
View Map
Share
Follow
Burrell Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Burrell Row, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 16:18.

UK Power Networks South Eastern logo
LONG TERM
Between
18 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Hayes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 10:59.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Church Row

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Row, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
School Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on School Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:53.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility asset works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 09:45.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Farmstead Road

Thames Water are proposing to carry out New service connection on Farmstead Road, Bellingham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 06:52.

Southern Gas Networks logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Chinbrook Road

Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 14:06.

Southern Gas Networks logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Chinbrook Road

Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 15:20.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Derby Hill

Thames Water were proposing to carry out New service connection on Derby Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:42.

Thames Water logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 14:45.

Cornerstone Telecommunications Infrastructure logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Avery Hill Road

Cornerstone Telecommunications Infrastructure were proposing to carry out roadworks on Avery Hill Road, Avery Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 09:12.

Cornerstone Telecommunications Infrastructure logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Avery Hill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Avery Hill Road, Avery Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 12:53.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Leyland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Leyland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 11:36.

London Borough Of Southwark logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

Southern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 13:36.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Charlton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:43.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:16.

Southern Gas Networks logo
Between
22 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Kingswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:38.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
South Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Hill Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
South Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Hill Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:16.

Southern Gas Networks logo
Between
22 Jul and 3 Aug 2025
Details
View Map
Share
Follow
South Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Hill Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:38.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
22 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:16.

Southern Gas Networks logo
Between
22 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Den Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 16:17.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 11:20.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 13 Mar 2025 at 16:23.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Baring Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 12:23.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Baring Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 11 Mar 2025 at 09:44.

Southern Gas Networks logo
Between
23 and 30 Jul 2025
Details
View Map
Share
Follow
Pine Avenue

Southern Gas Networks are proposing to carry out New service connection on Pine Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 08:21.

UK Power Networks South Eastern logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Forest Way

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Forest Way, St Mary Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 29 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Apr 2025 at 14:22.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 30 Sep 2025
Details
View Map
Share
Follow
Selborne Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Newstead Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newstead Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Newstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 13:33.

Southern Gas Networks logo
Between
23 and 29 Jul 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 15:10.

Southern Gas Networks logo
Between
23 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 07:06.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lower Gravel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Gravel Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2024 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Overmead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Overmead, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 16:39.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Overmead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Overmead, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:07.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Holmesdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmesdale Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:42.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Gipsy Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gipsy Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

Southern Gas Networks logo
Between
25 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Gates Green Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gates Green Road, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:59.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:49.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Elsa Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsa Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Forest Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Forest Way, St Mary Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 16:34.

Thames Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
South Eden Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on South Eden Park Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 21:04.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Saxville Road

Thames Water are proposing to carry out New service connection on Saxville Road, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 08:28.

UK Power Networks South Eastern logo
Between
28 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Auckland Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Apr 2025 at 12:27.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:57.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Royal Parade

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Royal Parade, Chislehurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 16:15.

Southern Gas Networks logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Kemnal Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kemnal Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 07:30.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Bromley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Lane, Chislehurst.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2024 at 17:13.

London Borough Of Bexley logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Onslow Drive

London Borough Of Bexley were proposing to carry out Highway improvement works on Onslow Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 24 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 12:01.

London Borough Of Bexley logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Onslow Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Onslow Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Mar 2025 at 13:17.

London Borough Of Bexley logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Dulverton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:33.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:25.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
East Rochester Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 10:54.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Penshurst Avenue

BT are proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Apr 2025 at 11:21.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Penshurst Avenue

BT were proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 10:35.

London Borough Of Southwark logo
Between
28 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:47.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:39.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 14:32.

London Borough Of Southwark logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2025 at 16:16.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 12:08.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 13:48.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Cumberland Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Court, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 15:20.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 16:19.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:50.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Budleigh Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 09:37.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:44.

Southern Gas Networks logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Highcombe

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 21:07.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 17:48.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:01.

Southern Gas Networks logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Masons Hill

Southern Gas Networks are proposing to carry out New service connection on Masons Hill, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 1 Nov 2025
Details
View Map
Share
Follow
Elmers End Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elmers End Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 11:29.

London Borough Of Bexley logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Dulverton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Oakley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:41.

Southern Gas Networks logo
Between
29 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Ellison Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:49.

Thames Water logo
Between
29 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Brightfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brightfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:26.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 13:16.

Southern Gas Networks logo
LONG TERM
Between
29 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Millbrook Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millbrook Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:45.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Chadwick Road

Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Grove Park

Thames Water are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Southern Gas Networks logo
LONG TERM
Between
30 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:18.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

Transport for London (TfL) logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:31.

Southern Gas Networks logo
Between
30 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Palmeira Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Palmeira Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 16:14.

Thames Water logo
Between
3 and 5 Aug 2025
Details
View Map
Share
Follow
Fox Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Fox Lane, Keston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jul 2023 at 12:06.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Princes Plain

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princes Plain, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2024 at 09:13.

Thames Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Brabourne Rise

Thames Water are proposing to carry out roadworks on Brabourne Rise, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 18:37.

Thames Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Romanhurst Gardens

Thames Water are proposing to carry out roadworks on Romanhurst Gardens, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 18:37.

UK Power Networks Eastern & London logo
Between
4 and 20 Aug 2025
Details
View Map
Share
Follow
Anerley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Road, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 08:57.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Derby Hill

Thames Water are proposing to carry out New service connection on Derby Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:22.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 9 Mar 2025 at 18:57.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 05:47.

London Borough Of Lewisham logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 07:56.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Plough Lane

Thames Water are proposing to carry out Utility asset works on Plough Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:16.

Thames Water logo
LONG TERM
Between
4 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are proposing to carry out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Transport for London (TfL) logo
Between
4 and 9 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:09.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are proposing to carry out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:18.

LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Albert Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 12 May 2025 at 09:46.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:30.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:24.

Southern Gas Networks logo
Between
6 and 25 Aug 2025
Details
View Map
Share
Follow
Avery Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avery Hill Road, Avery Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 13:14.

Thames Water logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Woodland Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Woodland Terrace, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 07:23.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
South Norwood Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on South Norwood Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:59.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
South Norwood Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on South Norwood Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:57.

UK Power Networks South Eastern logo
LONG TERM
Between
7 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 11:59.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
Grange Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Grange Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 20 Feb 2025 at 10:52.

London Borough Of Croydon logo
Between
7 and 9 Aug 2025
Details
View Map
Share
Follow
Grange Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Grange Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 1 Apr 2025 at 06:51.

Southern Gas Networks logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Darwin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darwin Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:35.

Southern Gas Networks logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:33.

Southern Gas Networks logo
Between
7 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Westwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westwood Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:38.

UK Power Networks Eastern & London logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
Friary Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Friary Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 15:39.

Thames Water logo
Between
8 and 18 Aug 2025
Details
View Map
Share
Follow
Broadfield Road

Thames Water are proposing to carry out New service connection on Broadfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:16.

Southern Gas Networks logo
Between
8 and 29 Aug 2025
Details
View Map
Share
Follow
Cornwall Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:34.

London Borough Of Southwark logo
LONG TERM
Between
8 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 13:24.

Southern Gas Networks logo
Between
10 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:47.

Network Rail logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Stanhope Grove

Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Grove, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Apr 2025 at 15:35.

Network Rail logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Stanhope Grove

Network Rail are proposing to carry out Works for Rail Purposes on Stanhope Grove, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 16:34.

Thames Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:49.

Thames Water logo
Between
11 and 27 Aug 2025
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:26.

London Borough Of Southwark logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Croxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Croxted Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 16:23.

Southern Gas Networks logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Upper Wickham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wickham Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:37.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Bideford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bideford Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Totnes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Totnes Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:37.

Thames Water logo
Between
12 and 31 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:12.

Thames Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Wilmount Street

Thames Water are proposing to carry out New service connection on Wilmount Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:54.

Southern Gas Networks logo
Between
14 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Cumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 09:37.

Southern Gas Networks logo
Between
15 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:53.

Southern Gas Networks logo
Between
15 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Foxgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxgrove Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 09:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Mar 2025 at 08:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Aug 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 09:52.

Southern Gas Networks logo
Between
15 and 28 Aug 2025
Details
View Map
Share
Follow
Ingleton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:54.

Southern Gas Networks logo
Between
15 and 28 Aug 2025
Details
View Map
Share
Follow
Wendover Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:40.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:46.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:53.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 09:54.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 10:19.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 11:21.

London Borough Of Bexley logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
The Park

London Borough Of Bexley are proposing to carry out Highway improvement works on The Park, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:27.

Transport for London (TfL) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:06.

Thames Water logo
Between
18 and 27 Aug 2025
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:34.

Transport for London (TfL) logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:20.

UK Power Networks Eastern & London logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Ealdham Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:10.

Network Rail logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Deptford High Street

Network Rail are proposing to carry out Works for Rail Purposes on Deptford High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 13:10.

Royal Borough Of Greenwich logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Timbercroft Lane

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.

Southern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Dec 2024 at 07:18.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Follow
Tuskar Street

Thames Water are proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:58.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Azof Street

Thames Water are proposing to carry out Utility asset works on Azof Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:54.

Thames Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Mauritius Road

Thames Water are proposing to carry out New service connection on Mauritius Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 07:17.

Thames Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Kent Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kent Road, Orpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:59.

Southern Gas Networks logo
Between
19 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Cumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:35.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Canterbury Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Canterbury Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 16:11.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Foots Cray Lane

London Borough Of Bexley were proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Apr 2025 at 09:06.

London Borough Of Bexley logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Foots Cray Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 15:58.

London Borough Of Southwark logo
Between
20 and 27 Aug 2025
Details
View Map
Share
Townley Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Townley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 27 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2025 at 11:29.

London Borough Of Southwark logo
Between
20 and 29 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 14:26.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 15 Apr 2025 at 11:08.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Meaford Way

Cellnex OT UK were proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 17 Apr 2025 at 14:55.

Cellnex OT UK logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Meaford Way

Cellnex OT UK are proposing to carry out Utility repair and maintenance works on Meaford Way, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cellnex OT UK on 1 May 2025 at 08:51.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 13:06.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:26.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Elsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Avondale Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Ivedon Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ivedon Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Hazeldene Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hazeldene Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Kenmere Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Kenmere Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Teignmouth Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Teignmouth Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Okehampton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:28.

Thames Water logo
Between
26 Aug and 6 Sep 2025
Details
View Map
Share
Blackfen Road

Thames Water were proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 6 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 14:25.

Thames Water logo
Between
27 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Westwood Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Westwood Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 06:29.

London Borough Of Bexley logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Groombridge Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Groombridge Close, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:17.

London Borough Of Bexley logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Sutherland Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Sutherland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:20.

London Borough Of Bexley logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Ingleton Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Ingleton Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:15.

London Borough Of Bexley logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Wendover Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Wendover Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:12.

London Borough Of Bexley logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Westwood Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Westwood Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:09.

London Borough Of Southwark logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 12:56.


Roadworks Map near to Baring Road, LONDON, SE12 0DA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 15:38
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Baring Road, LONDON, SE12 0DA (28 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Lewisham logo
URGENT
  
EDWARD TYLER ROAD, GROVE PARK 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
3 Jun 2025 07:36 - 07:36
0.2
Details
Share
2
Thames Water logo
URGENT
  
SHROFFOLD ROAD 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
29 May 2025 14:02 - 3 Jun 2025 13:11
0.5
Details
Share
3
Virgin Media logo
SHROFFOLD ROAD 
(0.6 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025
0.6
Details
Share
Follow
4
London Borough Of Lewisham logo
MAJOR
  
WINN ROAD 
(0.6 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 20 Jan 2025 - 20 Jan 2026
0.6
Details
Share
Follow
5
London Borough Of Lewisham logo
MAJOR
  
WINN ROAD 
(0.6 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 20 Jan 2025 - 20 Jan 2026
0.6
Details
Share
Follow
6
London Borough Of Lewisham logo
MAJOR
  
MARVELS LANE, GROVE PARK 
(0.7 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 10 Feb 2025 08:00
(Scheduled: 10 Feb 2025 - 4 Jun 2025)
0.7
Details
Share
Follow
7
London Borough Of Lewisham logo
MAJOR
  
CLAYHILL CRESCENT, GROVE PARK 
(0.7 miles)
London Borough Of Lewisham
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 10 Feb 2025 07:30
(Scheduled: 10 Feb 2025 - 4 Jun 2025)
0.7
Details
Share
Follow
8
London Borough Of Bromley logo
MAJOR
  
HILLCREST ROAD 
(0.7 miles)
London Borough Of Bromley
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 19 May 2025 - 17 Jun 2025
0.7
Details
Share
Follow
9
Thames Water logo
URGENT
  
CAPSTONE ROAD 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
30 May 2025 13:11 - 13:15
0.7
Details
Share
10
Thames Water logo
URGENT
  
MARVELS LANE, GROVE PARK 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Jun 2025 12:40
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data