ROADWORKS SUMMARY
Alston Close, BARNSLEY, S75 4NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Alston Close, S75 4NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Alston Close, BARNSLEY, S75 4NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alston Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are proposing to carry out Highway improvement works on Wakefield Road, Denby Dale, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 24 Mar 2025 at 14:29.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are carrying out Highway improvement works on Wakefield Road, Denby Dale, Huddersfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 19 May 2025 at 09:39.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Smith Road

Sheffield City Council are carrying out Utility asset works on Smith Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 07:56 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Sep 2025 at 14:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
28 Jul and 1 Dec 2025
Details
View Map
Share
Manchester Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2025 at 12:09.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fox Valley Way

Sheffield City Council are carrying out Utility asset works on Fox Valley Way, Sheffield.

The works started on 28 July 2025 at 00:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 10:26.

Yorkshire Water logo
LONG TERM
Between
7 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Yorkshire Water are proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 1 Jul 2025 at 09:22.

Yorkshire Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Yorkshire Water are carrying out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2025 at 09:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 09:55.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 26 Sep 2025
Details
View Map
Share
Roughbirchworth Lane

Yorkshire Water were proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Jun 2025 at 10:46.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hartcliff Road

Yorkshire Water are carrying out Utility asset works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 09:45 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2025 at 09:17.

Cadent Gas logo
LONG TERM
Between
25 Aug and 27 Oct 2025
Details
View Map
Share
Burton Road

Cadent Gas were proposing to carry out Utility asset works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 27 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:04.

Cadent Gas logo
LONG TERM
Between
25 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Burton Road

Cadent Gas are proposing to carry out Utility asset works on Burton Road, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 12:41.

Barnsley Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coates Lane

Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Coates Lane, Silkstone Common, Barnsley.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:30 and could run through until 19 September 2025. The works will impact the verge only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 26 Aug 2025 at 15:53.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawthorne Avenue

Sheffield City Council are carrying out Utility asset works on Hawthorne Avenue, Sheffield.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 27 August 2025 at 07:55 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Sep 2025 at 15:52.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Byron Drive

Yorkshire Water are proposing to carry out Utility asset works on Byron Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 10:49.

Yorkshire Water logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Bodmin Court

Yorkshire Water are carrying out Utility asset works on Bodmin Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2025 at 12:02.

Yorkshire Water logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Burton Road

Yorkshire Water were proposing to carry out Utility asset works on Burton Road, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 09:26.

Yorkshire Water logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Byron Drive

Yorkshire Water are carrying out Utility asset works on Byron Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2025 at 10:20.

Northern Powergrid (Yorkshire) logo
Between
12 and 28 Sep 2025
Details
View Map
Share
Follow
Manchester Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2025 at 10:00.

Northern Powergrid (Yorkshire) logo
Tomorrow
Details
View Map
Share
Greenside

Northern Powergrid (Yorkshire) carried out Utility repair and maintenance works on Greenside, Staincross, Barnsley.

The road was closed for some or all of the period.

The works were originally planned between 13 Sep 2025 and 19 Sep 2025 and were actually completed between 13 Sep 2025 (08:30) and 18 Sep 2025 (13:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Sep 2025 at 15:15.

Northern Powergrid (Yorkshire) logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Manchester Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 09:39.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Olive Road

Yorkshire Water are carrying out Utility repair and maintenance works on Olive Road, Stocksbridge, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 12:55 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 15:47.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Old Mill Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Old Mill Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 16:38.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Old Mill Lane

Northern Powergrid (Yorkshire) are carrying out New service connection on Old Mill Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:30 and could run through until 19 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 10:44.

Quickline Commucations logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Rookery Way

Quickline Commucations are proposing to carry out Utility asset works on Rookery Way, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 21 Aug 2025 at 16:23.

Quickline Commucations logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Rookery Way

Quickline Commucations are carrying out Utility asset works on Rookery Way, Thurgoland, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 10:21.

BT logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Thurgoland Bank

BT were proposing to carry out Utility asset works on Thurgoland Bank, Thurgoland, Barnsley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 28 Aug 2025 at 10:18.

BT logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Sheffield Road

BT were proposing to carry out Utility asset works on Sheffield Road, Oxspring, Barnsley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 28 Aug 2025 at 10:22.

Yorkshire Water logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Coleridge Avenue

Yorkshire Water are proposing to carry out Utility asset works on Coleridge Avenue, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 10:50.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hollin Edge

Yorkshire Water are carrying out Utility repair and maintenance works on Hollin Edge, Denby Dale, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:10 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 07:01.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kirkstall Road

Yorkshire Water are carrying out Utility repair and maintenance works on Kirkstall Road, New Lodge, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 13:21 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 14:30.

Yorkshire Water logo
Tuesday
Details
View Map
Share
Sparkfields

Yorkshire Water carried out Utility repair and maintenance works on Sparkfields, Mapplewell, Barnsley.

The road was closed for some or all of the period.

The works were originally planned between 17 Sep 2025 and 23 Sep 2025 and were actually completed between 17 Sep 2025 (12:31) and 18 Sep 2025 (16:40). The works impacted the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 16:42.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Saville Road

Yorkshire Water are carrying out Utility repair and maintenance works on Saville Road, Skelmanthorpe, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 07:40 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 08:23.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
High Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on High Lee Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
High Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on High Lee Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Sep 2025 at 14:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road A628

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road A628, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:02.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road A628

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road A628, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 18 Sep 2025 at 14:44.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road, Penistone, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:03.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road, Penistone, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 08:54.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Halifax Road

Quickline Commucations are proposing to carry out Utility asset works on Halifax Road, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Halifax Road

Quickline Commucations are proposing to carry out Utility asset works on Halifax Road, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 18 Sep 2025 at 14:45.

Quickline Commucations logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Copster Close

Quickline Commucations are proposing to carry out Utility asset works on Copster Close, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 28 Aug 2025 at 10:15.

Quickline Commucations logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Copster Close

Quickline Commucations are proposing to carry out Utility asset works on Copster Close, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 13:51.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hartcliff Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 21 Jul 2025 at 12:34.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hartcliff Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 4 Aug 2025 at 14:29.

Barnsley Metropolitan Borough Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cat Hill Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cat Hill Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Sep 2025 at 14:49.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Dobie Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dobie Street, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jul 2025 at 09:45.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Dobie Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dobie Street, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2025 at 08:35.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cooper Lane

Quickline Commucations are proposing to carry out Utility asset works on Cooper Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 12:35.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cooper Lane

Quickline Commucations are proposing to carry out Utility asset works on Cooper Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 12:37.

Yorkshire Water logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Coleridge Avenue

Yorkshire Water are proposing to carry out Utility asset works on Coleridge Avenue, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 12:04.

Northern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Aug 2025 at 12:58.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Oxspring Road

Yorkshire Water were proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Jun 2025 at 08:48.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Yorkshire Water are proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jul 2025 at 16:36.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Yorkshire Water are proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 10:24.

Barnsley Metropolitan Borough Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Brockholes Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brockholes Lane, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Sep 2025 at 07:56.

Quickline Commucations logo
Between
24 and 30 Sep 2025
Details
View Map
Share
North Lane

Quickline Commucations were proposing to carry out Utility asset works on North Lane, Cawthorne, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 30 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Aug 2025 at 12:27.

Barnsley Metropolitan Borough Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Howden Close

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Howden Close, Darton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Aug 2025 at 08:11.

Barnsley Metropolitan Borough Council logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Pogmoor Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pogmoor Lane, Pogmoor, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Aug 2025 at 08:23.

Barnsley Metropolitan Borough Council logo
Between
27 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Don Hill Height

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Don Hill Height, Green Moor, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 27 Aug 2025 at 11:59.

Barnsley Metropolitan Borough Council logo
Between
28 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Burton Bank Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Bank Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Aug 2025 at 08:11.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Cross Lane

Sheffield City Council were proposing to carry out Utility asset works on Cross Lane, Stocksbridge, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 10:50.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Unsliven Road

Sheffield City Council were proposing to carry out Utility asset works on Unsliven Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 10:50.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Underbank Lane

Sheffield City Council were proposing to carry out Utility asset works on Underbank Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 10:50.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Roper House Lane

Quickline Commucations are proposing to carry out Utility asset works on Roper House Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 28 Aug 2025 at 09:14.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Roper House Lane

Quickline Commucations are proposing to carry out Utility asset works on Roper House Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 11:23.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Thurgoland Bank

Quickline Commucations are proposing to carry out Utility asset works on Thurgoland Bank, Thurgoland, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 28 Aug 2025 at 09:18.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Thurgoland Bank

Quickline Commucations are proposing to carry out Utility asset works on Thurgoland Bank, Thurgoland, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 09:40.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Roper Lane

Quickline Commucations are proposing to carry out Utility asset works on Roper Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 28 Aug 2025 at 09:17.

Quickline Commucations logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Roper Lane

Quickline Commucations are proposing to carry out Utility asset works on Roper Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 12:21.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Sheffield Road, Birdwell, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 11:10.

Yorkshire Water logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Cross Lane

Yorkshire Water were proposing to carry out Utility asset works on Cross Lane, Snowden Hill, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Jun 2025 at 10:47.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Bagger Wood Hill

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Bagger Wood Hill, Hood Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Aug 2025 at 11:25.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Bagger Wood Hill

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Bagger Wood Hill, Hood Green, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Aug 2025 at 14:02.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Bagger Wood Hill

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Bagger Wood Hill, Hood Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 14:59.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Pinfold Hill Lane

Quickline Commucations are proposing to carry out Utility asset works on Pinfold Hill Lane, Silkstone Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:59.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Pinfold Hill Lane

Quickline Commucations are proposing to carry out Utility asset works on Pinfold Hill Lane, Silkstone Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 12:31.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Royd Avenue

Quickline Commucations are proposing to carry out Utility asset works on Royd Avenue, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:39.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Royd Avenue

Quickline Commucations are proposing to carry out Utility asset works on Royd Avenue, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 11:58.

Barnsley Metropolitan Borough Council logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Racecommon Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Racecommon Lane, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Aug 2025 at 08:14.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Georges Road

Yorkshire Water are proposing to carry out New service connection on St Georges Road, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2025 at 14:52.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
St Georges Road

Yorkshire Water are proposing to carry out New service connection on St Georges Road, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2025 at 13:22.

Yorkshire Water logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Truro Court

Yorkshire Water are proposing to carry out Utility asset works on Truro Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 12:01.

Yorkshire Water logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Burton Road

Yorkshire Water were proposing to carry out Utility asset works on Burton Road, Barnsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 09:27.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bark House Lane

Quickline Commucations are proposing to carry out Utility asset works on Bark House Lane, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 11:45.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bark House Lane

Quickline Commucations are proposing to carry out Utility asset works on Bark House Lane, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:29.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Byron Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Byron Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Sep 2025 at 12:25.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Byron Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Byron Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 10:29.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
New Road

Quickline Commucations are proposing to carry out Utility asset works on New Road, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 12:13.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
New Road

Quickline Commucations are proposing to carry out Utility asset works on New Road, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:30.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Hoyland Lane

Quickline Commucations are proposing to carry out Utility asset works on High Hoyland Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 11:50.

Quickline Commucations logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Hoyland Lane

Quickline Commucations are proposing to carry out Utility asset works on High Hoyland Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:31.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
New Row Lane

Quickline Commucations are proposing to carry out Utility asset works on New Row Lane, Ingbirchworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:22.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
New Row Lane

Quickline Commucations are proposing to carry out Utility asset works on New Row Lane, Ingbirchworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 12:16.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
North Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on North Lane, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 15:03.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
North Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on North Lane, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Aug 2025 at 11:41.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
North Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on North Lane, Cawthorne, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Aug 2025 at 14:06.

Northern Gas Networks logo
Between
30 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 13:45.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Greenside

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Greenside, Staincross, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2025 at 16:14.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Shaw Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Shaw Lane, Staincross, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2025 at 16:13.

Quickline Commucations logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
House Carr Lane

Quickline Commucations are proposing to carry out Utility asset works on House Carr Lane, Silkstone Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:55.

Quickline Commucations logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
House Carr Lane

Quickline Commucations are proposing to carry out Utility asset works on House Carr Lane, Silkstone Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 11:58.

Barnsley Metropolitan Borough Council logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Oaklea

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oaklea, Worsbrough Bridge, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 27 Aug 2025 at 10:27.

Cadent Gas logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Cliffe Court

Cadent Gas are proposing to carry out Utility asset works on Cliffe Court, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 07:24.

Cadent Gas logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Cliffe Court

Cadent Gas are proposing to carry out Utility asset works on Cliffe Court, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 16:11.

Cadent Gas logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Cliffe Court

Cadent Gas were proposing to carry out Utility asset works on Cliffe Court, Monk Bretton, Barnsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:02.

Cadent Gas logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Bishops Way

Cadent Gas were proposing to carry out Utility asset works on Bishops Way, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:03.

Quickline Commucations logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Millhouse Lane

Quickline Commucations are proposing to carry out Utility asset works on Millhouse Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 09:35.

Quickline Commucations logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Millhouse Lane

Quickline Commucations are proposing to carry out Utility asset works on Millhouse Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 10:15.

Quickline Commucations logo
Between
3 and 7 Oct 2025
Details
View Map
Share
Follow
Woolley Edge Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woolley Edge Lane, Woolley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 7 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 10:21.

BRSK logo
Between
5 and 12 Oct 2025
Details
View Map
Share
Follow
Barugh Lane

BRSK are proposing to carry out Utility asset works on Barugh Lane, Barugh Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BRSK on 12 Sep 2025 at 13:52.

BRSK logo
Between
5 and 12 Oct 2025
Details
View Map
Share
Follow
Barugh Lane

BRSK are proposing to carry out Utility asset works on Barugh Lane, Barugh Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BRSK on 12 Sep 2025 at 15:29.

Barnsley Metropolitan Borough Council logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Rockley View

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rockley View, Pilley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 27 Aug 2025 at 11:22.

Quickline Commucations logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Pilley Lane

Quickline Commucations are proposing to carry out Utility asset works on Pilley Lane, Pilley, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:40.

Quickline Commucations logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
The Walk

Quickline Commucations are proposing to carry out Utility asset works on The Walk, Birdwell, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:36.

Quickline Commucations logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Rockley Lane

Quickline Commucations are proposing to carry out Utility asset works on Rockley Lane, Birdwell, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:41.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Long Lane

Quickline Commucations are proposing to carry out Utility asset works on Long Lane, Penistone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 08:49.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Quickline Commucations are proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 09:11.

Quickline Commucations logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Rockley Lane

Quickline Commucations are proposing to carry out Utility asset works on Rockley Lane, Worsbrough, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 11:38.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hill Side Lane

Quickline Commucations are proposing to carry out Utility asset works on Hill Side Lane, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 14:09.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hill Side Lane

Quickline Commucations are proposing to carry out Utility asset works on Hill Side Lane, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 15:48.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hornthwaite Hill Road

Quickline Commucations are proposing to carry out Utility asset works on Hornthwaite Hill Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 14:04.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hornthwaite Hill Road

Quickline Commucations are proposing to carry out Utility asset works on Hornthwaite Hill Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 15:50.

Quickline Commucations logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Round Green Lane

Quickline Commucations are proposing to carry out Utility asset works on Round Green Lane, Stainborough, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 10:56.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Perseverance Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Perseverance Street, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2025 at 09:53.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Perseverance Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Perseverance Street, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 12:45.

Yorkshire Water logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Yorkshire Water are proposing to carry out Utility asset works on Tennyson Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 08:57.

Yorkshire Water logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Wordsworth Road

Yorkshire Water are proposing to carry out Utility asset works on Wordsworth Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 12:08.

Northern Gas Networks logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Wilthorpe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilthorpe Road, Redbrook, Barnsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 9 Jun 2025 at 08:45.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jun 2025 at 08:42.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Barugh Green Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 14:19.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 12:29.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Back Lane

Quickline Commucations were proposing to carry out Utility asset works on Back Lane, Woolley, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 20 Aug 2025 at 14:19.

Barnsley Metropolitan Borough Council logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
The Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Avenue, Pilley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Aug 2025 at 07:59.

Quickline Commucations logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 15:07.

Northern Gas Networks logo
LONG TERM
Between
7 Oct and 20 Nov 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Aug 2025 at 12:53.

Northern Powergrid (Yorkshire) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Copster Close

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Copster Close, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Aug 2025 at 13:34.

Quickline Commucations logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Jockey Road

Quickline Commucations are proposing to carry out Utility asset works on Jockey Road, Oxspring, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:04.

Quickline Commucations logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
South Lane

Quickline Commucations are proposing to carry out Utility asset works on South Lane, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 08:14.

Northern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 1 May 2025 at 11:02.

Northern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 12:16.

Northern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2025 at 11:16.

Northern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Barugh Green Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Jul 2025 at 08:37.

Northern Gas Networks logo
Between
21 and 27 Oct 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 09:15.

Northern Gas Networks logo
Between
21 and 27 Oct 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 13:12.

Quickline Commucations logo
Between
24 and 28 Oct 2025
Details
View Map
Share
Follow
Shore Hall Lane

Quickline Commucations are proposing to carry out Utility asset works on Shore Hall Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 28 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:21.

Northern Powergrid (Yorkshire) logo
Between
25 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Hay Green Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Hay Green Lane, Birdwell, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 14:26.

Cadent Gas logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Cliffe Lane

Cadent Gas were proposing to carry out Utility asset works on Cliffe Lane, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:07.

Cadent Gas logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Burton Road

Cadent Gas were proposing to carry out Utility asset works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 09:08.

Quickline Commucations logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Crane Moor Road

Quickline Commucations are proposing to carry out Utility asset works on Crane Moor Road, Crane Moor, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 12:11.

BT logo
Between
27 Oct and 13 Nov 2025
Details
View Map
Share
Thurgoland Bank

BT were proposing to carry out Utility asset works on Thurgoland Bank, Thurgoland, Barnsley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 13 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 31 Jul 2025 at 17:35.

BT logo
Between
27 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Thurgoland Bank

BT are proposing to carry out Utility asset works on Thurgoland Bank, Thurgoland, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 13 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Aug 2025 at 10:24.

BT logo
Between
27 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Sheffield Road

BT are proposing to carry out Utility asset works on Sheffield Road, Oxspring, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 13 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Aug 2025 at 10:28.

BT logo
Between
27 Oct and 13 Nov 2025
Details
View Map
Share
Sheffield Road

BT were proposing to carry out Utility asset works on Sheffield Road, Oxspring, Barnsley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 13 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 31 Jul 2025 at 17:35.

Quickline Commucations logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Crabtree Hill Lane

Quickline Commucations are proposing to carry out Utility asset works on Crabtree Hill Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 Sep 2025 at 08:25.

Quickline Commucations logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Renald Lane

Quickline Commucations are proposing to carry out Utility asset works on Renald Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 Sep 2025 at 08:27.

Barnsley Metropolitan Borough Council logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Agnes Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Agnes Road, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Sep 2025 at 08:37.

Barnsley Metropolitan Borough Council logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
New Street

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Street, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Sep 2025 at 08:32.

Northern Powergrid (Yorkshire) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Queens Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Queens Drive, Old Town, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 12:14.

Yorkshire Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bodmin Court

Yorkshire Water are proposing to carry out Utility asset works on Bodmin Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 15:50.

Yorkshire Water logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Burton Road

Yorkshire Water were proposing to carry out Utility asset works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 09:27.

Yorkshire Water logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Warwick Road

Yorkshire Water are proposing to carry out Utility asset works on Warwick Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 12:06.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 11:50.

Cadent Gas logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:00.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Cross Street

Cadent Gas are proposing to carry out Utility asset works on Cross Street, Monk Bretton, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 12:15.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Hunt Close

Cadent Gas were proposing to carry out Utility asset works on Hunt Close, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 13:14.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Judy Row

Cadent Gas are proposing to carry out Utility asset works on Judy Row, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 11:14.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Judy Row

Cadent Gas are proposing to carry out Utility asset works on Judy Row, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 09:30.

Yorkshire Water logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Pinfold Hill Lane

Yorkshire Water are proposing to carry out New service connection on Pinfold Hill Lane, Silkstone Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2025 at 13:10.

Quickline Commucations logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Woolley Edge Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woolley Edge Lane, Woolley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 13:28.

Quickline Commucations logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Woolley Edge Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woolley Edge Lane, Woolley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 08:51.

Quickline Commucations logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Woolley Edge Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Woolley Edge Lane, Woolley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 15 Sep 2025 at 12:32.

Yorkshire Water logo
Between
30 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Old Mill Lane

Yorkshire Water are proposing to carry out Utility asset works on Old Mill Lane, Barnsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 18 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 09:48.

BT logo
Between
2 and 9 Nov 2025
Details
View Map
Share
Follow
Cemetery Road

BT are proposing to carry out Utility asset works on Cemetery Road, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2025 at 07:59.

Northern Powergrid (Yorkshire) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Royd Moor Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Royd Moor Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 10:10.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Tennyson Road

Yorkshire Water are proposing to carry out Utility asset works on Tennyson Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 11:05.

Yorkshire Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Sheridan Court

Yorkshire Water are proposing to carry out Utility asset works on Sheridan Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 12:09.

Quickline Commucations logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Pilley Hills

Quickline Commucations are proposing to carry out Utility asset works on Pilley Hills, Pilley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2025 at 13:20.

Quickline Commucations logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Jockey Road

Quickline Commucations are proposing to carry out Utility asset works on Jockey Road, Oxspring, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2025 at 13:33.

Quickline Commucations logo
Between
6 and 10 Nov 2025
Details
View Map
Share
Follow
Crane Moor Road

Quickline Commucations are proposing to carry out Utility asset works on Crane Moor Road, Crane Moor, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 10 November 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:54.

Yorkshire Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Truro Court

Yorkshire Water are proposing to carry out Utility asset works on Truro Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 15:51.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Westgate

Cadent Gas are proposing to carry out Utility asset works on Westgate, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 11:14.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Westgate

Cadent Gas are proposing to carry out Utility asset works on Westgate, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 09:00.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
The Ridings

Cadent Gas are proposing to carry out Utility asset works on The Ridings, Monk Bretton, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 12:04.

Northern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Cannon Way

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Cannon Way, Barugh Green, Barnsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 13:25.

Yorkshire Water logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Sheridan Court

Yorkshire Water are proposing to carry out Utility asset works on Sheridan Court, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 10:55.

Yorkshire Water logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Warwick Road

Yorkshire Water are proposing to carry out Utility asset works on Warwick Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 10:40.


Roadworks Map near to Alston Close, BARNSLEY, S75 4NW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 20:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Alston Close, BARNSLEY, S75 4NW (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
HIGH STREET, SILKSTONE 
(0.2 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 15 Sep 2025 - 23 Sep 2025
0.2
Details
Share
Follow
2
Quickline Commucations logo
SILKSTONE LANE, SILKSTONE 
(0.3 miles)
Quickline Commucations
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.3
Details
Share
Follow
3
Quickline Commucations logo
WHINMOOR VIEW, SILKSTONE 
(0.3 miles)
Quickline Commucations
Utility asset works - Footway - Stop/go boards
In Progress
Since: 16 Sep 2025 08:39
(Scheduled: 15 Sep 2025 - 29 Sep 2025)
0.3
Details
Share
Follow
4
Quickline Commucations logo
CONE LANE, SILKSTONE COMMON 
(0.3 miles)
Quickline Commucations
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2025 - 18 Sep 2025
0.3
Details
Share
Follow
5
Quickline Commucations logo
CONE LANE, SILKSTONE COMMON 
(0.3 miles)
Quickline Commucations
Utility asset works - Footway - Give and take
In Progress
Since: 17 Sep 2025 15:00
(Scheduled: 16 Sep 2025 - 19 Sep 2025)
0.3
Details
Share
Follow
6
Northern Powergrid (Yorkshire) logo
BARNSLEY ROAD, SILKSTONE 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Verge - Multi-way signals
Planned
Scheduled: 15 Sep 2025 - 23 Sep 2025
0.3
Details
Share
Follow
7
Quickline Commucations logo
MAYBERRY DRIVE, SILKSTONE 
(0.3 miles)
Quickline Commucations
Utility asset works - Footway, Carriageway - Stop/go boards
In Progress
Since: 15 Sep 2025 10:33
(Scheduled: 15 Sep 2025 - 26 Sep 2025)
0.3
Details
Share
Follow
8
Northern Powergrid (Yorkshire) logo
BARNSLEY ROAD, SILKSTONE 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Verge - Multi-way signals
Planned
Scheduled: 15 Sep 2025 - 23 Sep 2025
0.4
Details