ROADWORKS SUMMARY
Farmhouse Lane, BARNSLEY, S75 2LH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Farmhouse Lane, S75 2LH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Farmhouse Lane, BARNSLEY, S75 2LH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Farmhouse Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Old Mill Lane

South Yorkshire Passenger Transport Executive are carrying out Works for road purposes on Old Mill Lane, Barnsley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2024 at 00:01 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 8 Apr 2024 at 06:57.

Barnsley Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Barugh Green Road

Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 13 Dec 2024 at 10:14.

Barnsley Metropolitan Borough Council logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Higham Common Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:21.

Barnsley Metropolitan Borough Council logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Higham Common Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:20.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Buckingham Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 14:16.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Buckingham Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 09:22.

Northern Gas Networks logo
LONG TERM
Until
9 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are carrying out Utility repair and maintenance works on High Street, Clayton West, Huddersfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 09:00 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 10:20.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rotherham Road

Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Cundy Cross, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:26.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Pantry Green

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Pantry Green, Worsbrough Dale, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 14:40 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 07:49.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Burton Road

Cadent Gas are carrying out Utility repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:26.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Oakwell Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Oakwell Lane, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 10:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Dec 2024 at 13:00.

Barnsley Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dickinson Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dickinson Road, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:23.

Barnsley Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dickinson Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dickinson Road, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 10 Dec 2024 at 08:50.

Barnsley Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Mount Vernon Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Vernon Avenue, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 10 Dec 2024 at 08:46.

Barnsley Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Mount Vernon Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Vernon Avenue, Worsbrough Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:24.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Kitchin Road

Yorkshire Water are carrying out Utility repair and maintenance works on Kitchin Road, Wombwell, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 17:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 07:59.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Hollin Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 08:18.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Hollin Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 08:32.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Burton Avenue

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Avenue, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 26 Nov 2024 at 10:43.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Burton Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Avenue, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 10:35.

Barnsley Metropolitan Borough Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Burton Road

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 5 Dec 2024 at 14:40.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Burton Road

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 11:09.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Burton Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 11:15.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Burton Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 10 Dec 2024 at 10:04.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Low Cudworth Green

Barnsley Metropolitan Borough Council are proposing to carry out Section 50 on Low Cudworth Green, Cudworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 12:46.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Low Cudworth Green

Barnsley Metropolitan Borough Council are proposing to carry out Section 50 on Low Cudworth Green, Cudworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 12:46.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bentham Drive

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bentham Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 10:37.

Northern Powergrid (Yorkshire) logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Lane Head Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lane Head Road, Cawthorne, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 07:43.

Barnsley Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Pinehall Drive

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pinehall Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 13:31.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bank End Lane

Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Dec 2024 at 13:43.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bank End Lane

Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 13:36.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Harwood Terrace

Cadent Gas are proposing to carry out Utility asset works on Harwood Terrace, Lundwood, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:01.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Harwood Terrace

Cadent Gas are proposing to carry out Utility asset works on Harwood Terrace, Lundwood, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:48.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Harwood Terrace

Cadent Gas are proposing to carry out Utility asset works on Harwood Terrace, Lundwood, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:14.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Bank End Lane

Quickline Commucations were proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 14:36.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Upperfield Lane

Quickline Commucations were proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 15:12.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Upperfield Lane

Quickline Commucations are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 13:52.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Upperfield Lane

Quickline Commucations are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Dec 2024 at 08:31.

Northern Powergrid (Yorkshire) logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Follow
Applehaigh View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Applehaigh View, Royston, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 14:56.

Quickline Commucations logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on Lee Lane, Royston, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Dec 2024 at 10:41.

Northern Powergrid (Yorkshire) logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Hollin Moor Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 08:57.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Manor Occupation Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Occupation Road, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:27.

Northern Powergrid (Yorkshire) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stubbs Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Stubbs Road, Wombwell, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 12:18.

Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Olympus Way

UK Power Distribution are proposing to carry out Remedial works on Olympus Way, Hoyland Common, Barnsley.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 12 Dec 2024 at 15:25.

Quickline Commucations logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Pit Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Pit Lane, Wombwell, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 5 Dec 2024 at 10:42.

Northern Gas Networks logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Oakwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakwood Road, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:28.

LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Higham Common Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 17 Dec 2024 at 12:26.

Cadent Gas logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Rotherham Road

Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Cundy Cross, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Nov 2024 at 12:30.

Network Rail logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Summer Lane

Network Rail are proposing to carry out Works for Rail Purposes on Summer Lane, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 15:59.

LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Higham Common Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 11 Nov 2024 at 15:13.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 08:40.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 15:46.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 13:39.

Northern Gas Networks logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Greenwood Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenwood Crescent, Royston, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 15:49.


Roadworks Map near to Farmhouse Lane, BARNSLEY, S75 2LH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Farmhouse Lane, BARNSLEY, S75 2LH (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BRSK logo
WHARFEDALE ROAD, POGMOOR 
(0.2 miles)
BRSK
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
2
BRSK logo
WHARFEDALE ROAD, POGMOOR 
(0.2 miles)
BRSK
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
3
BRSK logo
OAKFIELD WALK, POGMOOR 
(0.2 miles)
BRSK
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
4
BRSK logo
OAKFIELD WALK, POGMOOR 
(0.2 miles)
BRSK
Utility asset works - Footway, Verge - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
5
BRSK logo
WHARFEDALE ROAD, GAWBER 
(0.2 miles)
BRSK
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
6
BRSK logo
WHARFEDALE ROAD, GAWBER 
(0.2 miles)
BRSK
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
7
Cadent Gas logo
DODWORTH ROAD 
(0.6 miles)
Cadent Gas
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.6
Details
Share
Follow
8
BRSK logo
GAWBER ROAD, OLD TOWN 
(0.6 miles)
BRSK
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
0.6
Details
Share
Follow
9
Barnsley Metropolitan Borough Council logo
MAJOR
  
HIGHAM COMMON ROAD, HIGHAM 
(0.6 miles)
Barnsley Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 28 Oct 2024 - 31 Jan 2025
0.6
Details
Share
Follow
10
Barnsley Metropolitan Borough Council logo
MAJOR
  
HIGHAM COMMON ROAD, HIGHAM 
(0.6 miles)
Barnsley Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 28 Oct 2024 - 31 Jan 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.