ROADWORKS SUMMARY
Croft Road, BARNSLEY, S70 3AX
Introduction
View current and future planned roadworks and road closures for Croft Road, S70 3AX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Croft Road, BARNSLEY, S70 3AX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Croft Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
12 Aug 2025
South Yorkshire Passenger Transport Executive are carrying out Works for road purposes on Old Mill Lane, Barnsley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2024 at 00:01 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 8 Apr 2024 at 06:57.
29 Jul 2024 and 10 Feb 2025
Barnsley Metropolitan Borough Council are proposing to carry out Section 50 on Cathill Road, Middlecliffe, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 10 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 28 Jun 2024 at 11:14.
1 Dec 2024
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 August 2024 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 15 Oct 2024 at 12:07.
27 Aug 2024 and 20 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 7 Aug 2024 at 08:10.
23 Sep 2024 and 20 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 07:10.
27 Jun 2025
Yorkshire Water are carrying out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 10:00 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 11:58.
30 Sep 2024 and 27 Jun 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:49.
30 Sep 2024 and 27 Jun 2025
Yorkshire Water were proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 09:29.
5 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Summer Lane, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 October 2024 at 08:00 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 08:00.
7 Oct and 29 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Summer Lane, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2024 at 10:03.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:53.
14 Oct and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cortonwood Drive, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.
14 Oct and 20 Dec 2024
Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Sep 2024 at 08:30.
20 Dec 2024
Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Corton Wood, Brampton Bierlow, Rotherham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Oct 2024 at 14:10.
21 Oct and 1 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 09:39.
28 Oct 2024 and 31 Jan 2025
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:21.
28 Oct 2024 and 31 Jan 2025
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:20.
Tuesday
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Barnsley Road, West Melton, Rotherham.
These works are categorised as Major.
The works started on 29 October 2024 at 11:30 and could run through until 26 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 15:20.
Today
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dearne Valley Parkway, Broomhill, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 10:53.
Monday
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dearne Valley Parkway, Darfield, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 29 Oct 2024 at 10:36.
Monday
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Applehaigh View, Royston, Barnsley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:35.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Applehaigh View, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2024 at 10:11.
Northern Gas Networks carried out Utility repair and maintenance works on New Lodge Crescent, New Lodge, Barnsley.
The road was closed for some or all of the period.
The works were originally planned between 13 Nov 2024 and 22 Nov 2024 and were actually completed between 13 Nov 2024 (21:10) and 21 Nov 2024 (15:30). The works impacted the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 15:37.
Today
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Pearsons Field, Wombwell, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 23:50 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 10:52.
15 and 29 Nov 2024
Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cawthorne Road, Barugh Green, Barnsley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 18 Nov 2024 at 10:48.
Tomorrow
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Hunningley Lane, Stairfoot, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 November 2024 at 18:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 21 Nov 2024 at 15:36.
Tomorrow
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hunningley Lane, Stairfoot, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 15 Nov 2024 at 14:30.
Yorkshire Water carried out Utility repair and maintenance works on Monsal Crescent, Athersley South, Barnsley.
The road was closed for some or all of the period.
The works were originally planned between 18 Nov 2024 and 25 Nov 2024 and were actually completed between 18 Nov 2024 (18:42) and 21 Nov 2024 (11:55). The works impacted the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 13:28.
Tomorrow
Barnsley Metropolitan Borough Council are proposing to carry out Works for road purposes on New Road, Pilley, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:43.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Newhill Road, Smithies, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 21:15 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 10:00.
Tomorrow
Barnsley Metropolitan Borough Council are carrying out Works for road purposes on New Road, Pilley, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:15 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 18 Nov 2024 at 07:28.
Tomorrow
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 22 Oct 2024 at 14:45.
Tomorrow
Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:15 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 18 Nov 2024 at 07:28.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Topcliffe Road, Smithies, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 21:15 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 10:10.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Michael Road, Lundwood, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 13:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 13:56.
Monday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 09:48.
12 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 08:19.
Monday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 14 Oct 2024 at 15:07.
Wednesday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Mell Avenue, Hoyland, Barnsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:48 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 13:02.
Monday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 1 Oct 2024 at 12:21.
Tuesday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 21 Oct 2024 at 09:35.
Tuesday
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 15 Oct 2024 at 09:48.
Tuesday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 23 Oct 2024 at 14:53.
Tuesday
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:14.
Tuesday
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 08:34.
Tuesday
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 26 November 2024. The works will impact the footway only.
This roadwork event was last updated by Telefonica UK on 24 Oct 2024 at 11:22.
Tuesday
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 26 November 2024. The works were due to impact the footway only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:33.
25 and 29 Nov 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 10:48.
25 and 29 Nov 2024
Telefonica UK were proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway only.
This roadwork event was last updated by Telefonica UK on 29 Oct 2024 at 14:35.
25 and 29 Nov 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 4 Nov 2024 at 12:30.
25 Nov 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 14:16.
25 and 29 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Carrs Lane, Cudworth, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:21.
25 and 29 Nov 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Carrs Lane, Cudworth, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 21 Nov 2024 at 09:21.
25 Nov 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 09:22.
25 and 29 Nov 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Frickley Bridge Lane, Brierley, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 15:04.
25 and 29 Nov 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Frickley Bridge Lane, Brierley, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Nov 2024 at 11:41.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 17:55.
2 and 6 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Great Houghton, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 5 Nov 2024 at 11:48.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Nov 2024 at 08:08.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Westwood Road, High Green, Sheffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 12:42.
2 and 6 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aldham House Lane, Wombwell, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 18 Nov 2024 at 16:17.
2 and 6 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, Great Houghton, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 21 Nov 2024 at 15:39.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:48.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Rotherham Road, Cundy Cross, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:26.
9 and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Blacker Hill, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:02.
9 and 13 Dec 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 6 Nov 2024 at 13:09.
9 and 12 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Lee Lane, Royston, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 4 Nov 2024 at 16:02.
9 and 13 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chestnut Avenue, Brierley, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:20.
9 and 13 Dec 2024
Telefonica UK are proposing to carry out Utility asset works on Tankersley Lane, Hoyland Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and verge.
This roadwork event was last updated by Telefonica UK on 14 Nov 2024 at 09:27.
16 and 19 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Vernon Avenue, Worsbrough Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:24.
16 and 19 Dec 2024
Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dickinson Road, Worsbrough Common, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Barnsley Metropolitan Borough Council on 8 Nov 2024 at 14:23.
18 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 08:32.
18 and 20 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollin Moor Lane, Thurgoland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 11:09.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Harwood Terrace, Lundwood, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 12:00.
15 and 23 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Applehaigh View, Royston, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 08:41.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:06.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 28 Oct 2024 at 13:55.
16 and 21 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.
3 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Occupation Road, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:27.
17 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakwood Road, Royston, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:28.
Roadworks Map near to Croft Road, BARNSLEY, S70 3AX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Croft Road, BARNSLEY, S70 3AX (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Nov 2024 - 22 Nov 2024)
(Scheduled: 11 Nov 2024 - 22 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.