ROADWORKS SUMMARY
Church Street, ROTHERHAM, S61 4EL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Church Street, S61 4EL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Church Street, ROTHERHAM, S61 4EL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Newhall Road

Sheffield City Council are carrying out Utility asset works on Newhall Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2023 at 03:36 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:14.

Sheffield City Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Carlisle Street East

Sheffield City Council are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2023 at 09:13 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Dec 2024 at 12:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 07:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Apr 2024 at 11:07.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Jun 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frederick Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Frederick Street, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Apr 2024 at 08:21.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Lane, Treeton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 July 2024 at 15:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2024 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
23 Aug 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 21 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2024 at 15:14.

Yorkshire Water logo
LONG TERM
Between
27 Aug 2024 and 20 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2024 at 08:10.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Sep 2024 at 12:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bernard Street

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Bernard Street, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Aug 2024 at 12:29.

Sheffield City Council logo
LONG TERM
Between
9 Sep 2024 and 9 Sep 2025
Details
View Map
Share
Follow
Sheffield Road

Sheffield City Council are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 7 Jun 2024 at 09:18.

Yorkshire Water logo
LONG TERM
Between
23 Sep 2024 and 20 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 07:10.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Sep 2024 and 12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Jul 2024 at 08:36.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Water Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Water Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Oct 2024 at 13:50.

Yorkshire Water logo
LONG TERM
Between
30 Sep 2024 and 27 Jun 2025
Details
View Map
Share
Wath Road

Yorkshire Water were proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 09:29.

Yorkshire Water logo
LONG TERM
Between
30 Sep 2024 and 27 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:49.

Yorkshire Water logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Wath Road

Yorkshire Water are carrying out Statutory Infrastructure Works on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 10:00 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 14:55.

Sheffield City Council logo
LONG TERM
Until
10 Apr 2026
Details
View Map
Share
Follow
Sheffield Road

Sheffield City Council are carrying out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 07:42 and could run through until 10 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Oct 2024 at 07:59.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dundas Road

Sheffield City Council are carrying out Utility asset works on Dundas Road, Sheffield.

These works are categorised as Major.

The works started on 2 December 2024 at 08:00 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Dec 2024 at 11:16.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Town End Road

Sheffield City Council are carrying out Utility asset works on Town End Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:01 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Dec 2024 at 10:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Dec 2024 and 12 Feb 2025
Details
View Map
Share
Follow
Oaks Lane Service Road No 1

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Oaks Lane Service Road No 1, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:15.

Rotherham Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Nursery Drive

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Nursery Drive, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 29 Nov 2024 at 15:40.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
North Road

Cadent Gas are carrying out Utility repair and maintenance works on North Road, East Dene, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 08:32 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 08:53.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Oxford Street

Yorkshire Water are carrying out Utility repair and maintenance works on Oxford Street, Clifton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 12:20 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Dec 2024 at 12:29.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bents Road

Yorkshire Water are carrying out Utility repair and maintenance works on Bents Road, Kimberworth Park, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 December 2024 at 10:58 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Dec 2024 at 11:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Poplar Way

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Way, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Dec 2024 at 12:50.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Remington Road

Cadent Gas are proposing to carry out Utility asset works on Remington Road, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:24.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 15:35.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Wordsworth Avenue

Cadent Gas are proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works are categorised as Major.

The works will start on or after 2 January 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Mar 2025
Details
View Map
Share
Wordsworth Avenue

Cadent Gas were proposing to carry out Utility asset works on Wordsworth Avenue, Sheffield.

These works were categorised as Major.

The works were originally planned to start 2 January 2025 and run through until 6 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 07:59.

Rotherham Metropolitan Borough Council logo
Between
2 and 30 Jan 2025
Details
View Map
Share
Follow
Symonds Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Symonds Avenue, Rawmarsh, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Nov 2024 at 12:06.

Cadent Gas logo
Between
3 and 19 Jan 2025
Details
View Map
Share
Follow
Hollowgate

Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 12:59.

Cadent Gas logo
Between
3 and 19 Jan 2025
Details
View Map
Share
Follow
Hollowgate

Cadent Gas are proposing to carry out Utility asset works on Hollowgate, Wellgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:38.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Black Carr Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Black Carr Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:20.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Black Carr Road

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Black Carr Road, Wickersley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:56.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:58.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:12.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Oct 2024 at 10:27.

Northern Powergrid (Yorkshire) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pear Tree Avenue, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Dec 2024 at 12:27.

Cityfibre Metro Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Paddock Drive

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:14.

Cityfibre Metro Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Paddock Drive

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Paddock Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 14:24.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:21.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:30.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Cadent Gas are proposing to carry out Utility asset works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:41.

Yorkshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Park Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Park Lane, Thrybergh, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 09:59.

Quickline Commucations logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Whiston Lane

Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 26 Nov 2024 at 12:29.

Quickline Commucations logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Whiston Lane

Quickline Commucations are proposing to carry out Utility asset works on Upper Whiston Lane, Upper Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 2 Dec 2024 at 13:44.

Northern Powergrid (Yorkshire) logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 10:09.

Northern Powergrid (Yorkshire) logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 10:22.

Cadent Gas logo
LONG TERM
Between
13 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Treetown Crescent

Cadent Gas are proposing to carry out Utility asset works on Treetown Crescent, Treeton, Rotherham.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:46.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Brightside Lane

Cadent Gas are proposing to carry out Utility asset works on Brightside Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:43.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Brightside Lane

Cadent Gas are proposing to carry out Utility asset works on Brightside Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:38.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:06.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:37.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:41.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:39.

Cadent Gas logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Weedon Street

Cadent Gas are proposing to carry out Utility asset works on Weedon Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:25.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 12:50.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 10:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
13 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Symonds Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Symonds Avenue, Rawmarsh, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Dec 2024 at 08:48.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
13 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Symonds Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Symonds Avenue, Rawmarsh, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 6 Dec 2024 at 08:31.

Yorkshire Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
St Johns Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 08:05.

Northern Powergrid (Yorkshire) logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Church Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Church Street, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Dec 2024 at 13:29.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Searby Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:28.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Elsham Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:42.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Elsham Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Elsham Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:21.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:00.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:29.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:49.

Cityfibre Metro Networks logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 11:00.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 16:35.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Garden Lane

Quickline Commucations are proposing to carry out Utility asset works on Garden Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:46.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Oct 2024 at 10:02.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Oct 2024 at 13:36.

Quickline Commucations logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Arbour Lane

Quickline Commucations are proposing to carry out Utility asset works on Arbour Lane, Ravenfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 08:44.

Yorkshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Harold Croft

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 08:06.

Yorkshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Harold Croft

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harold Croft, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Nov 2024 at 12:58.

Quickline Commucations logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.

Quickline Commucations logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Quickline Commucations are proposing to carry out Utility asset works on Mill Lane, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 28 Oct 2024 at 13:55.

Quickline Commucations logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Newhill Road

Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Oct 2024 at 07:50.

Quickline Commucations logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Newhill Road

Quickline Commucations are proposing to carry out Utility asset works on Newhill Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Oct 2024 at 15:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:47.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
20 Jan and 12 May 2025
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 14:35.

Cityfibre Metro Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Searby Road

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.

Cityfibre Metro Networks logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
St Andrews Close

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on St Andrews Close, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 17 Oct 2024 at 10:56.

Cadent Gas logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Addison Road

Cadent Gas are proposing to carry out Utility asset works on Addison Road, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:05.

Cadent Gas logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Harlington Road

Cadent Gas are proposing to carry out Utility asset works on Harlington Road, Mexborough, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:06.

Cadent Gas logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:04.

Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Hound Hill Lane

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hound Hill Lane, Adwick Upon Dearne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 18 Dec 2024 at 15:26.

Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Hound Hill Lane

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hound Hill Lane, Adwick Upon Dearne, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 19 Dec 2024 at 10:11.

Northern Powergrid (Yorkshire) logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Fernleigh Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Fernleigh Drive, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Nov 2024 at 09:09.

Northern Powergrid (Yorkshire) logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Fernleigh Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Fernleigh Drive, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:27.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:21.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:18.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Belvedere Parade

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:06.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:25.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Grasby Court

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Grasby Court, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 08:35.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 15:24.

Cityfibre Metro Networks logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Belvedere Parade

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:19.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 15:40.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Elder Drive

Cadent Gas are proposing to carry out Utility asset works on Elder Drive, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:13.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Poplar Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 10:54.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Poplar Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 12:54.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pym Road

Cadent Gas are proposing to carry out Utility asset works on Pym Road, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2024 at 20:03.

Yorkshire Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 10:04.

Yorkshire Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Whitley Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Whitley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 16:33.

Sheffield City Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Padley Walk

Sheffield City Council are proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 11:30.

Sheffield City Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Padley Walk

Sheffield City Council are proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 16:38.

Cadent Gas logo
Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Searby Road

Cadent Gas are proposing to carry out Utility asset works on Searby Road, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:47.

Northern Powergrid (Yorkshire) logo
Between
2 and 9 Feb 2025
Details
View Map
Share
Follow
Common Lane

Northern Powergrid (Yorkshire) are proposing to carry out Works for road purposes on Common Lane, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 10:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Sheffield Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 23 Dec 2024 at 11:40.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:04.

Northern Powergrid (Yorkshire) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheffield Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:03.

Rotherham Metropolitan Borough Council logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Symonds Avenue

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Symonds Avenue, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Dec 2024 at 12:12.

Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Olympus Way

UK Power Distribution are proposing to carry out Remedial works on Olympus Way, Hoyland Common, Barnsley.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 19 Dec 2024 at 16:30.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
College Road

Cadent Gas are proposing to carry out Utility asset works on College Road, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:04.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Mexborough Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Mexborough Road, Adwick Upon Dearne, Doncaster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:38.

Northern Powergrid (Yorkshire) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stubbs Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Stubbs Road, Wombwell, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 12:18.

Quickline Commucations logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 9 Dec 2024 at 15:34.

Quickline Commucations logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Quickline Commucations are proposing to carry out Utility repair and maintenance works on The Green, Old Denaby, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 14:57.

Vodafone logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grange Lane

Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 24 Oct 2024 at 09:56.

Vodafone logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grange Lane

Vodafone are proposing to carry out Utility asset works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 19 Dec 2024 at 12:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Main Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 Feb and 6 May 2025
Details
View Map
Share
Brook Lane

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:47.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Thrybergh Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 08:48.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Thrybergh Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thrybergh Lane, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 4 Dec 2024 at 10:03.

Quickline Commucations logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Crossland Street

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Crossland Street, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 12 Dec 2024 at 12:05.

Northern Powergrid (Yorkshire) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Grove Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Grove Road, West Melton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 09:23.

Northern Powergrid (Yorkshire) logo
Between
11 and 17 Feb 2025
Details
View Map
Share
Follow
Old Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Old Doncaster Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Nov 2024 at 10:58.

Northern Powergrid (Yorkshire) logo
Between
11 and 17 Feb 2025
Details
View Map
Share
Follow
Old Doncaster Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Old Doncaster Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Dec 2024 at 09:26.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Holmes Crescent

Cadent Gas are proposing to carry out Utility asset works on Holmes Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:06.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bole Hill

Cadent Gas are proposing to carry out Utility asset works on Bole Hill, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:26.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Spa Well Crescent

Cadent Gas are proposing to carry out Utility asset works on Spa Well Crescent, Treeton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:27.

Yorkshire Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Russell Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Russell Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 13:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Main Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Flanderwell Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:45.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
27 Feb and 27 May 2025
Details
View Map
Share
Follow
Brook Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Nov 2024 at 16:50.

Sheffield City Council logo
Between
28 Feb and 28 Mar 2025
Details
View Map
Share
Padley Walk

Sheffield City Council were proposing to carry out Utility asset works on Padley Walk, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 28 March 2025. The works were due to impact the footway and footpath.

This roadwork event was last updated by Sheffield City Council on 27 Nov 2024 at 12:03.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Old Farm Court

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Farm Court, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:12.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Fontwell Drive

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fontwell Drive, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:11.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Epsom Close

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Epsom Close, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:11.

LONG TERM
Between
28 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Wetherby Drive

Doncaster Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wetherby Drive, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 23 Dec 2024 at 10:12.

Yorkshire Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
St Johns Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Dec 2024 at 13:13.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Treeton Lane

Cadent Gas are proposing to carry out Utility asset works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 09:35.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 12:41.

Cadent Gas logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Well Lane

Cadent Gas are proposing to carry out Utility asset works on Well Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 09:25.

Telefonica UK logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Sheffield Road

Telefonica UK are proposing to carry out Utility asset works on Sheffield Road, Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 11 Dec 2024 at 13:35.


Roadworks Map near to Church Street, ROTHERHAM, S61 4EL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Dec 2024 04:03
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Church Street, ROTHERHAM, S61 4EL (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.