ROADWORKS SUMMARY
Wortley Road, ROTHERHAM, S61 1LH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wortley Road, S61 1LH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wortley Road, ROTHERHAM, S61 1LH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wortley Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Until
22 Jul 2031
Details
View Map
Share
Follow
North Church Street

Sheffield City Council are carrying out Section 50 on North Church Street, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2021 at 08:00 and could run through until 22 July 2031. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Aug 2021 at 14:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
16 Apr 2027
Details
View Map
Share
Follow
Henry Street

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Henry Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works started on 15 April 2024 at 08:00 and could run through until 16 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Jul 2026 at 15:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2027
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Mar 2026 at 13:15.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 08:00 and could run through until 19 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jul 2026 at 09:44.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
19 Dec 2026
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 19 December 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2025 at 11:40.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Jan 2026 and 31 Jul 2027
Details
View Map
Share
Follow
Middle Lane South

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Middle Lane South, Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 31 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 14 Apr 2025 at 14:26.

Sheffield City Council logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Attercliffe Road

Sheffield City Council are carrying out Utility asset works on Attercliffe Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 January 2026 at 07:25 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Jan 2026 at 11:18.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Ship Hill

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Ship Hill, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 February 2026 at 08:00 and could run through until 19 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jul 2026 at 09:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Westgate

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Westgate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2026 at 08:00 and could run through until 19 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jul 2026 at 09:40.

Sheffield City Council logo
LONG TERM
Between
1 May and 1 Nov 2026
Details
View Map
Share
Follow
Effingham Street

Sheffield City Council are proposing to carry out Utility asset works on Effingham Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 3 Aug 2026 at 11:21.

Sheffield City Council logo
LONG TERM
Between
1 May and 1 Nov 2026
Details
View Map
Share
Effingham Street

Sheffield City Council were proposing to carry out Utility asset works on Effingham Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 May 2026 and run through until 1 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Sep 2026 at 12:03.

Yorkshire Water logo
LONG TERM
Until
11 Oct 2026
Details
View Map
Share
Follow
Farm View Road

Yorkshire Water are carrying out Utility asset works on Farm View Road, Kimberworth, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2026 at 09:30 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2026 at 12:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Jun 2026 and 1 Sep 2027
Details
View Map
Share
Follow
Fitzwilliam Road Footpath

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Footpath, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 June 2026 and could run through until 1 September 2027. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Oct 2025 at 08:45.

National Grid Electricity Transmission logo
LONG TERM
Until
31 Mar 2027
Details
View Map
Share
Follow
Long Lane

National Grid Electricity Transmission are carrying out roadworks on Long Lane, Whiston, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:30 and could run through until 31 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 4 Sep 2026 at 13:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Jul 2026 at 08:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Moorgate Street

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Moorgate Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2026 at 08:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Jul 2026 at 09:39.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works started on 30 June 2026 at 08:00 and could run through until 17 September 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Jul 2026 at 16:35.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Worry Goose Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Worry Goose Lane, Whiston, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2026 at 07:30 and could run through until 13 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jul 2026 at 09:03.

Sheffield City Council logo
LONG TERM
Between
13 Jul and 13 Oct 2026
Details
View Map
Share
Follow
Saxonlea Crescent

Sheffield City Council are proposing to carry out Utility asset works on Saxonlea Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 15 Apr 2026 at 11:06.

Sheffield City Council logo
LONG TERM
Between
13 Jul and 13 Oct 2026
Details
View Map
Share
Follow
Orgreave Road

Sheffield City Council are proposing to carry out Utility asset works on Orgreave Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 15 Apr 2026 at 10:52.

Sheffield City Council logo
LONG TERM
Between
13 Jul and 13 Oct 2026
Details
View Map
Share
Follow
Rotherham Road

Sheffield City Council are proposing to carry out Utility asset works on Rotherham Road, Handsworth, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 15 Apr 2026 at 13:46.

Sheffield City Council logo
LONG TERM
Between
13 Jul and 13 Oct 2026
Details
View Map
Share
Follow
Greenland Road

Sheffield City Council are proposing to carry out Utility asset works on Greenland Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 15 Apr 2026 at 11:09.

Sheffield City Council logo
LONG TERM
Between
13 Jul and 13 Oct 2026
Details
View Map
Share
Follow
Don Road

Sheffield City Council are proposing to carry out Utility asset works on Don Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 15 Apr 2026 at 10:34.

Yorkshire Water logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Carlisle Street East

Yorkshire Water are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 15:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 14:43.

Yorkshire Water logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Carlisle Road

Yorkshire Water are carrying out Utility asset works on Carlisle Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 15:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 14:43.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Drummond Street

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Drummond Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 08:00 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2026 at 14:26.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
16 Jul and 27 Nov 2026
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Nov 2025 at 11:39.

Yorkshire Water logo
LONG TERM
Until
30 Nov 2026
Details
View Map
Share
Follow
Carlisle Street East

Yorkshire Water are carrying out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:20 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 08:38.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wellgate

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Wellgate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Sep 2026 at 14:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mansfield Road

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Mansfield Road, Wellgate, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Sep 2026 at 14:02.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Scholes Village

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Scholes Village, Scholes, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Sep 2026 at 12:59.

Yorkshire Water logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Kilnhurst Road

Yorkshire Water are carrying out Utility asset works on Kilnhurst Road, Rawmarsh, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 09:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 Aug 2026 at 11:25.

Sheffield City Council logo
LONG TERM
Between
27 Jul and 27 Oct 2026
Details
View Map
Share
Follow
Longley Hall Rise

Sheffield City Council are proposing to carry out Utility asset works on Longley Hall Rise, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 18 May 2026 at 10:39.

Sheffield City Council logo
LONG TERM
Between
27 Jul and 27 Oct 2026
Details
View Map
Share
Follow
Southey Green Road

Sheffield City Council are proposing to carry out Utility asset works on Southey Green Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 18 May 2026 at 10:41.

Sheffield City Council logo
LONG TERM
Between
27 Jul and 27 Oct 2026
Details
View Map
Share
Follow
Bellhouse Road

Sheffield City Council are proposing to carry out Utility asset works on Bellhouse Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 18 May 2026 at 10:35.

Yorkshire Water logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Claypit Lane

Yorkshire Water are carrying out Utility asset works on Claypit Lane, Rawmarsh, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:33.

Sheffield City Council logo
LONG TERM
Between
3 Aug and 30 Sep 2026
Details
View Map
Share
Follow
Lady's Bridge

Sheffield City Council are proposing to carry out Utility asset works on Lady's Bridge, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 21 Aug 2026 at 11:55.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
3 Aug 2026 and 26 Mar 2027
Details
View Map
Share
Follow
Effingham Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Effingham Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 26 March 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2026 at 09:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Doncaster Road

Rotherham Metropolitan Borough Council are carrying out Permanent reinstatement on Doncaster Road, Thrybergh, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Aug 2026 at 11:29.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
7 Aug 2026 and 2 Feb 2027
Details
View Map
Share
Follow
Little Common Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Little Common Lane, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2026 and could run through until 2 February 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 May 2026 at 09:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
7 Aug and 7 Oct 2026
Details
View Map
Share
Follow
Moorhouse Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Moorhouse Lane, Whiston, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2026 and could run through until 7 October 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 May 2026 at 10:52.

Yorkshire Water logo
LONG TERM
Between
10 Aug and 31 Oct 2026
Details
View Map
Share
Follow
Shirecliffe Road

Yorkshire Water are proposing to carry out Utility asset works on Shirecliffe Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2026 at 16:36.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
10 Aug and 20 Nov 2026
Details
View Map
Share
Follow
Middle Lane South

Rotherham Metropolitan Borough Council are proposing to carry out roadworks on Middle Lane South, Herringthorpe, Rotherham.

These works are categorised as Major.

The works will start on or after 10 August 2026 and could run through until 20 November 2026. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Jul 2026 at 12:06.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Brompton Road

Sheffield City Council are carrying out Utility asset works on Brompton Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 00:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2026 at 10:57.

National Grid Electricity Transmission logo
LONG TERM
Until
31 Mar 2027
Details
View Map
Share
Follow
Long Lane

National Grid Electricity Transmission are carrying out Utility repair and maintenance works on Long Lane, Whiston, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 16:35 and could run through until 31 March 2027. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 4 Sep 2026 at 13:08.

Yorkshire Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Webster Crescent

Yorkshire Water are carrying out Utility asset works on Webster Crescent, Kimberworth, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2026 at 17:00 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2026 at 09:16.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Longley Avenue West

Sheffield City Council are proposing to carry out Utility asset works on Longley Avenue West, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sheffield City Council on 28 Jul 2026 at 09:46.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Holywell Road

Sheffield City Council are carrying out Utility asset works on Holywell Road, Sheffield.

These works are categorised as Major.

The works started on 15 August 2026 at 00:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 14 Sep 2026 at 08:44.

Yorkshire Water logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Gower Street

Yorkshire Water are carrying out Utility asset works on Gower Street, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:52.

Sheffield City Council logo
LONG TERM
Between
24 Aug and 26 Oct 2026
Details
View Map
Share
Follow
Greenland Road

Sheffield City Council are proposing to carry out Utility asset works on Greenland Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Aug 2026 at 09:18.

Sheffield City Council logo
LONG TERM
Between
24 Aug and 26 Oct 2026
Details
View Map
Share
Follow
Greenland Road

Sheffield City Council are proposing to carry out Utility asset works on Greenland Road, Sheffield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 25 Aug 2026 at 12:18.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dun Street

Sheffield City Council are carrying out Utility asset works on Dun Street, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 00:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2026 at 12:05.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Canklow Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Canklow Road, Canklow, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 10:15 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Sep 2026 at 07:17.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Farm View Road

Yorkshire Water are carrying out Utility asset works on Farm View Road, Kimberworth, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 09:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2026 at 09:56.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Batworth Road

Yorkshire Water are proposing to carry out Utility asset works on Batworth Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 20 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2026 at 16:47.

Yorkshire Water logo
Between
31 Aug and 27 Sep 2026
Details
View Map
Share
Follow
Firshill Rise

Yorkshire Water are proposing to carry out Utility asset works on Firshill Rise, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2026 at 16:38.

Sheffield City Council logo
LONG TERM
Between
1 Sep and 1 Dec 2026
Details
View Map
Share
Follow
Baker Street

Sheffield City Council are proposing to carry out Utility asset works on Baker Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 15:32.

Sheffield City Council logo
LONG TERM
Between
1 Sep and 1 Dec 2026
Details
View Map
Share
Follow
Otter Street

Sheffield City Council are proposing to carry out Utility asset works on Otter Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 16:04.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Carwood Road

Yorkshire Water were proposing to carry out Utility asset works on Carwood Road, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 20 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 11:49.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Maltkiln Street

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Maltkiln Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 09:18 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2026 at 09:18.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gregg House Road

Sheffield City Council are proposing to carry out Utility asset works on Gregg House Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Aug 2026 at 11:24.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2026 and 30 Jun 2027
Details
View Map
Share
Follow
Effingham Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Effingham Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works will start on or after 1 September 2026 and could run through until 30 June 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 3 Jul 2026 at 10:15.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2026 and 30 Jun 2027
Details
View Map
Share
Follow
Howard Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Howard Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works will start on or after 1 September 2026 and could run through until 30 June 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 1 May 2026 at 08:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2026 and 30 Jun 2027
Details
View Map
Share
Follow
Henry Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Henry Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works will start on or after 1 September 2026 and could run through until 30 June 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Jul 2026 at 15:57.

Sheffield City Council logo
LONG TERM
Between
3 Sep and 3 Dec 2026
Details
View Map
Share
Follow
Castle Street

Sheffield City Council are proposing to carry out Utility asset works on Castle Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 15:51.

Sheffield City Council logo
LONG TERM
Between
3 Sep and 3 Dec 2026
Details
View Map
Share
Follow
Furnival Road

Sheffield City Council are proposing to carry out Utility asset works on Furnival Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 15:42.

Sheffield City Council logo
LONG TERM
Between
3 Sep and 3 Dec 2026
Details
View Map
Share
Follow
Green Lane

Sheffield City Council are proposing to carry out Utility asset works on Green Lane, Shalesmoor, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 15:49.

Sheffield City Council logo
LONG TERM
Between
3 Sep and 3 Dec 2026
Details
View Map
Share
Follow
Dun Street

Sheffield City Council are proposing to carry out Utility asset works on Dun Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 13:22.

Sheffield City Council logo
LONG TERM
Between
3 Sep and 3 Dec 2026
Details
View Map
Share
Follow
Penistone Road North

Sheffield City Council are proposing to carry out Utility asset works on Penistone Road North, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Jun 2026 at 16:15.

Yorkshire Water logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Ash Grove

Yorkshire Water are carrying out Utility asset works on Ash Grove, Rawmarsh, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:34.

Yorkshire Water logo
Until
25 Sep 2026
Details
View Map
Share
Follow
Willowgarth

Yorkshire Water are carrying out Utility asset works on Willowgarth, Rawmarsh, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 10:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:35.

Yorkshire Water logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Kilnhurst Road Service Road

Yorkshire Water are carrying out Utility asset works on Kilnhurst Road Service Road, Rawmarsh, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 09:30 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:34.

Sheffield City Council logo
LONG TERM
Between
5 Sep and 5 Dec 2026
Details
View Map
Share
Follow
Newhall Road

Sheffield City Council are proposing to carry out Utility asset works on Newhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 12 Jun 2026 at 16:50.

Sheffield City Council logo
Between
7 and 27 Sep 2026
Details
View Map
Share
Follow
City Road

Sheffield City Council are proposing to carry out Utility asset works on City Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 23 Jul 2026 at 17:28.

The Environment Agency logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Treeton Lane

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 27 Aug 2026 at 08:18.

The Environment Agency logo
LONG TERM
Between
7 Sep and 20 Nov 2026
Details
View Map
Share
Follow
Treeton Lane

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Treeton Lane, Treeton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 3 Sep 2026 at 12:10.

Yorkshire Water logo
LONG TERM
Between
7 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Firshill Rise

Yorkshire Water are proposing to carry out Utility asset works on Firshill Rise, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 11:26.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Jenkin Road

Sheffield City Council are proposing to carry out Utility asset works on Jenkin Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2026 at 08:14.

Northern Powergrid (Yorkshire) logo
Between
9 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Cottenham Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Cottenham Road, Eastwood, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 08:32.

Yorkshire Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Droppingwell Road

Yorkshire Water are carrying out Utility asset works on Droppingwell Road, Kimberworth, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 08:30 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2026 at 08:59.

Sheffield City Council logo
Between
10 and 25 Sep 2026
Details
View Map
Share
Follow
Penistone Road North

Sheffield City Council are proposing to carry out Utility asset works on Penistone Road North, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Aug 2026 at 09:02.

Sheffield City Council logo
Between
11 and 30 Sep 2026
Details
View Map
Share
Follow
Lady's Bridge

Sheffield City Council are proposing to carry out Utility asset works on Lady's Bridge, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 10 Sep 2026 at 12:17.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
West Close

Yorkshire Water are carrying out Utility repair and maintenance works on West Close, Kimberworth Park, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 20:14 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 07:33.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Springwood Lane

Sheffield City Council are proposing to carry out Utility asset works on Springwood Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Sep 2026 at 10:19.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Horsewood Road

Sheffield City Council are proposing to carry out Utility asset works on Horsewood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2026 at 17:00.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Horsewood Road

Sheffield City Council are proposing to carry out Utility asset works on Horsewood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 3 Sep 2026 at 15:03.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Sundown Road

Sheffield City Council are proposing to carry out Utility asset works on Sundown Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 3 Sep 2026 at 15:52.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Sundown Road

Sheffield City Council are proposing to carry out Utility asset works on Sundown Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 10 Sep 2026 at 14:57.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Bramley Park Road

Sheffield City Council are proposing to carry out Utility asset works on Bramley Park Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2026 at 17:02.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Athelstan Close

Sheffield City Council are proposing to carry out Utility asset works on Athelstan Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2026 and could run through until 21 September 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Sheffield City Council on 3 Sep 2026 at 16:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brinsford Road

Cadent Gas are carrying out Utility repair and maintenance works on Brinsford Road, Brinsworth, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 10:00 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 07:42.

Vodafone logo
Finishing
Monday
Details
View Map
Share
Follow
Julian Road

Vodafone are carrying out Utility asset works on Julian Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 20:00 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 13 Sep 2026 at 08:50.

Northern Powergrid (Yorkshire) logo
Between
13 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Castlebeck Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Castlebeck Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2026 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Aug 2026 at 10:22.

Northern Powergrid (Yorkshire) logo
Between
13 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Castlebeck Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Castlebeck Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2026 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:13.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Castlebeck Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Castlebeck Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2026 and could run through until 14 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 17:18.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Castlebeck Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Castlebeck Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2026 and could run through until 14 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 11:07.

Northern Powergrid (Yorkshire) logo
Between
13 Sep and 9 Oct 2026
Details
View Map
Share
Packman Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Packman Road, West Melton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 September 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Aug 2026 at 14:03.

Sheffield City Council logo
LONG TERM
Between
14 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Harborough Avenue

Sheffield City Council are proposing to carry out Section 50 on Harborough Avenue, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Aug 2026 at 11:55.

Sheffield City Council logo
LONG TERM
Between
14 Sep and 6 Nov 2026
Details
View Map
Share
Follow
The Circle

Sheffield City Council are proposing to carry out Section 50 on The Circle, Manor, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Aug 2026 at 09:03.

Northern Powergrid (Yorkshire) logo
Between
14 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Burngreave Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Burngreave Road, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Aug 2026 at 15:43.

Yorkshire Water logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Firshill Glade

Yorkshire Water are proposing to carry out Utility asset works on Firshill Glade, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 27 Jul 2026 at 16:31.

Cadent Gas logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Tyler Street

Cadent Gas are proposing to carry out Utility asset works on Tyler Street, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2026 at 16:57.

Cadent Gas logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Tyler Street

Cadent Gas are proposing to carry out Utility asset works on Tyler Street, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:52.

Cadent Gas logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Tyler Street

Cadent Gas are proposing to carry out Utility asset works on Tyler Street, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 09:00.

Cadent Gas logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Tyler Street

Cadent Gas are carrying out Utility asset works on Tyler Street, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 11:20 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 12:19.

Yorkshire Water logo
Between
14 and 25 Sep 2026
Details
View Map
Share
Follow
Kilnhurst Road Service Road

Yorkshire Water are proposing to carry out Utility asset works on Kilnhurst Road Service Road, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2026 at 09:17.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Tor Way

Yorkshire Water are carrying out Utility repair and maintenance works on Tor Way, Brinsworth, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:36 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 11:19.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Merlin Way

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Merlin Way, Sheffield.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 21 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:44.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Merlin Way

Yorkshire Water are carrying out Utility repair and maintenance works on Merlin Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:09 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:53.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kinnaird Road

Yorkshire Water are carrying out Utility repair and maintenance works on Kinnaird Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:30 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 08:53.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chapel Walk

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Chapel Walk, Rotherham Town Centre, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 11:30 and could run through until 22 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2026 at 11:37.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Belvedere Parade

Yorkshire Water are carrying out Utility repair and maintenance works on Belvedere Parade, Bramley, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 11:31.

Yorkshire Water logo
Between
16 and 29 Sep 2026
Details
View Map
Share
Follow
Ingshead Avenue

Yorkshire Water are proposing to carry out Utility asset works on Ingshead Avenue, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 09:40.

Northern Powergrid (Yorkshire) logo
Between
17 and 23 Sep 2026
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Station Road, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Aug 2026 at 14:34.

Northern Powergrid (Yorkshire) logo
Between
17 and 23 Sep 2026
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Station Road, Catcliffe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 14:43.

Sheffield City Council logo
Between
17 and 27 Sep 2026
Details
View Map
Share
Follow
Springwood Lane

Sheffield City Council are proposing to carry out Utility asset works on Springwood Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Sep 2026 at 15:32.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hartley Brook Road

Sheffield City Council are carrying out Utility asset works on Hartley Brook Road, Sheffield.

The works are scheduled for 18 September 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2026 at 08:52.

Northern Powergrid (Yorkshire) logo
Between
18 Sep and 16 Oct 2026
Details
View Map
Share
Cottenham Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Cottenham Road, Eastwood, Rotherham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 16:04.

Telefonica UK logo
Finishing
Monday
Details
View Map
Share
Follow
Petre Street

Telefonica UK are proposing to carry out Utility asset works on Petre Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 4 Aug 2026 at 16:37.

Telefonica UK logo
Finishing
Monday
Details
View Map
Share
Follow
Petre Street

Telefonica UK are proposing to carry out Utility asset works on Petre Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 2 Sep 2026 at 16:20.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Barnsley Road

BT are proposing to carry out Utility asset works on Barnsley Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Jun 2026 at 09:56.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
Barnsley Road

BT are proposing to carry out Utility asset works on Barnsley Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Jul 2026 at 11:47.

Yorkshire Water logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Lyons Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lyons Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2026 at 16:12.

Yorkshire Water logo
Between
21 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Lyons Street

Yorkshire Water are proposing to carry out Utility asset works on Lyons Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 11:19.

Yorkshire Water logo
Between
21 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Carwood Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2026 at 16:13.

Yorkshire Water logo
Between
21 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Carwood Road

Yorkshire Water are proposing to carry out Utility asset works on Carwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 11:21.

Yorkshire Water logo
Between
21 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Petre Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Petre Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2026 at 16:13.

Yorkshire Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Norborough Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Norborough Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 23 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 15:54.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Sheffield Road

Yorkshire Water are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 16:08.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Sheffield Road

Yorkshire Water are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 10:46.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Sheffield Road

Yorkshire Water are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 11:56.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Albion Road

Yorkshire Water were proposing to carry out New service connection on Albion Road, Clifton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:36.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Albion Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Albion Road, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2026 at 08:35.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Albion Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Albion Road, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2026 at 08:53.

Yorkshire Water logo
LONG TERM
Between
21 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Lord Street

Yorkshire Water are proposing to carry out Utility asset works on Lord Street, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Aug 2026 at 13:23.

Sheffield City Council logo
Between
26 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

The works will start on or after 26 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 26 Aug 2026 at 13:41.

Northern Powergrid (Yorkshire) logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Crabtree Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Crabtree Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Aug 2026 at 15:35.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
28 Sep 2026 and 31 Jan 2027
Details
View Map
Share
Follow
Eastwood Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Eastwood Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works will start on or after 28 September 2026 and could run through until 31 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Sep 2026 at 08:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
28 Sep 2026 and 31 Jan 2027
Details
View Map
Share
Follow
Howard Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Howard Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works will start on or after 28 September 2026 and could run through until 31 January 2027. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Sep 2026 at 08:14.

Yorkshire Water logo
LONG TERM
Between
28 Sep and 29 Nov 2026
Details
View Map
Share
Follow
Lowfield Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lowfield Avenue, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 10:23.

Yorkshire Water logo
LONG TERM
Between
28 Sep and 29 Nov 2026
Details
View Map
Share
Follow
Lowfield Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lowfield Avenue, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 15:51.

Rotherham Metropolitan Borough Council logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bawtry Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Sep 2026 at 09:45.

Northern Powergrid (Yorkshire) logo
Between
1 and 15 Oct 2026
Details
View Map
Share
Follow
Danebrook Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 11:57.

Northern Powergrid (Yorkshire) logo
Between
1 and 15 Oct 2026
Details
View Map
Share
Follow
Danebrook Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 17:50.

Northern Powergrid (Yorkshire) logo
Between
1 and 15 Oct 2026
Details
View Map
Share
Follow
Danebrook Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2026 at 11:22.

Sheffield City Council logo
Between
1 and 13 Oct 2026
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Jul 2026 at 15:41.

Sheffield City Council logo
Between
1 and 13 Oct 2026
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Jul 2026 at 15:42.

Sheffield City Council logo
Between
1 and 13 Oct 2026
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Jul 2026 at 15:42.

Northern Powergrid (Yorkshire) logo
Between
1 and 22 Oct 2026
Details
View Map
Share
Follow
Spring Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Spring Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2026 at 09:37.

Sheffield City Council logo
Between
2 and 11 Oct 2026
Details
View Map
Share
Follow
Herries Avenue

Sheffield City Council are proposing to carry out Utility asset works on Herries Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 17:45.

Sheffield City Council logo
Between
2 and 11 Oct 2026
Details
View Map
Share
Follow
Everingham Road

Sheffield City Council are proposing to carry out Utility asset works on Everingham Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 17:46.

Sheffield City Council logo
Between
2 and 11 Oct 2026
Details
View Map
Share
Follow
Longley Crescent

Sheffield City Council are proposing to carry out Utility asset works on Longley Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 17:49.

Sheffield City Council logo
Between
2 and 11 Oct 2026
Details
View Map
Share
Follow
Kinharvie Road

Sheffield City Council are proposing to carry out Utility asset works on Kinharvie Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 17:45.

Sheffield City Council logo
Between
2 and 11 Oct 2026
Details
View Map
Share
Follow
Crowder Road

Sheffield City Council are proposing to carry out Utility asset works on Crowder Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 11 October 2026. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 17:47.

Sheffield City Council logo
LONG TERM
Between
3 Oct 2026 and 3 Jan 2027
Details
View Map
Share
Follow
Raynald Road

Sheffield City Council are proposing to carry out Utility asset works on Raynald Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 3 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Jun 2026 at 17:09.

Sheffield City Council logo
Between
3 and 12 Oct 2026
Details
View Map
Share
Follow
Southey Avenue

Sheffield City Council are proposing to carry out Utility asset works on Southey Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
3 and 12 Oct 2026
Details
View Map
Share
Follow
Southey Avenue

Sheffield City Council are proposing to carry out Utility asset works on Southey Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
3 and 12 Oct 2026
Details
View Map
Share
Follow
Southey Hall Road

Sheffield City Council are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
3 and 12 Oct 2026
Details
View Map
Share
Follow
Southey Hall Road

Sheffield City Council are proposing to carry out Utility asset works on Southey Hall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
3 and 12 Oct 2026
Details
View Map
Share
Follow
Follett Road

Sheffield City Council are proposing to carry out Utility asset works on Follett Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
4 and 13 Oct 2026
Details
View Map
Share
Follow
Molineaux Road

Sheffield City Council are proposing to carry out Utility asset works on Molineaux Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
4 and 13 Oct 2026
Details
View Map
Share
Follow
Mason Lathe Road

Sheffield City Council are proposing to carry out Utility asset works on Mason Lathe Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
4 and 13 Oct 2026
Details
View Map
Share
Follow
Mason Lathe Road

Sheffield City Council are proposing to carry out Utility asset works on Mason Lathe Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
4 and 13 Oct 2026
Details
View Map
Share
Follow
Keppel Road

Sheffield City Council are proposing to carry out Utility asset works on Keppel Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Sheffield City Council logo
Between
4 and 13 Oct 2026
Details
View Map
Share
Follow
Hesley Terrace

Sheffield City Council are proposing to carry out Utility asset works on Hesley Terrace, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2026 at 11:19.

Yorkshire Water logo
Between
5 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Petre Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Petre Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 17:56.

Northern Powergrid (Yorkshire) logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
North Road

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on North Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Jul 2026 at 12:34.

Cadent Gas logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Fenton Way

Cadent Gas are proposing to carry out Utility asset works on Fenton Way, Munsbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 13:37.

Cadent Gas logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Woodside Walk

Cadent Gas are proposing to carry out Utility asset works on Woodside Walk, Munsbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2026 at 10:20.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Wagon Road

Cadent Gas are proposing to carry out Utility asset works on Wagon Road, Greasbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 13:36.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Hollybush Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollybush Street, Parkgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 13:14.

Northern Powergrid (Yorkshire) logo
Between
8 and 28 Oct 2026
Details
View Map
Share
Follow
Danebrook Drive

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:16.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
8 Oct and 8 Nov 2026
Details
View Map
Share
Follow
Cottenham Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Cottenham Road, Eastwood, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2026 at 08:39.

Sheffield City Council logo
Between
9 and 19 Oct 2026
Details
View Map
Share
Follow
Orgreave Road

Sheffield City Council are proposing to carry out Utility asset works on Orgreave Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 10 Sep 2026 at 12:26.

Northern Powergrid (Yorkshire) logo
Between
9 and 30 Oct 2026
Details
View Map
Share
Follow
St Leonards Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on St Leonards Road, Eastwood, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 08:33.

Yorkshire Water logo
Between
10 and 12 Oct 2026
Details
View Map
Share
Follow
Norborough Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norborough Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 15:54.

Sheffield City Council logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Mowbray Street

Sheffield City Council are proposing to carry out Utility asset works on Mowbray Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 09:43.

Sheffield City Council logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Mowbray Street

Sheffield City Council are proposing to carry out Utility asset works on Mowbray Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2026 at 17:04.

Sheffield City Council logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Mowbray Street

Sheffield City Council were proposing to carry out Utility asset works on Mowbray Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 13 Sep 2026 at 21:13.

Sheffield City Council logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Harvest Lane

Sheffield City Council are proposing to carry out Utility asset works on Harvest Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2026 at 17:07.

Sheffield City Council logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Harvest Lane

Sheffield City Council are proposing to carry out Utility asset works on Harvest Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 13 Sep 2026 at 20:35.

Sheffield City Council logo
Between
12 and 17 Oct 2026
Details
View Map
Share
Follow
Shirland Lane

Sheffield City Council are proposing to carry out Utility asset works on Shirland Lane, Sheffield.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2026 at 14:19.

Cadent Gas logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Beacon Close

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beacon Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 16:35.

Cadent Gas logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Beacon Close

Cadent Gas are proposing to carry out New service connection on Beacon Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 16:20.

Cadent Gas logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Beacon Close

Cadent Gas are proposing to carry out New service connection on Beacon Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:32.

Cadent Gas logo
Between
12 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Acorn Croft

Cadent Gas are proposing to carry out Utility asset works on Acorn Croft, Greasbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 14:53.

Yorkshire Water logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Ash Grove

Yorkshire Water are proposing to carry out Utility asset works on Ash Grove, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Jun 2026 at 07:20.

Northern Powergrid (Yorkshire) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Haugh Green

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Haugh Green, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Jul 2026 at 13:50.

Northern Powergrid (Yorkshire) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Pine Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pine Walk, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Aug 2026 at 09:42.

Northern Powergrid (Yorkshire) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Pine Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pine Walk, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Aug 2026 at 09:43.

Northern Powergrid (Yorkshire) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Pine Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pine Walk, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2026 at 10:56.

Northern Powergrid (Yorkshire) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Pine Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Pine Walk, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Aug 2026 at 14:36.

Northern Powergrid (Yorkshire) logo
Between
12 and 21 Oct 2026
Details
View Map
Share
Follow
Packman Way

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Packman Way, West Melton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jul 2026 at 11:05.

Sheffield City Council logo
Between
14 and 29 Oct 2026
Details
View Map
Share
Follow
Furnival Road

Sheffield City Council are proposing to carry out Utility asset works on Furnival Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2026 at 16:35.

Sheffield City Council logo
LONG TERM
Between
17 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are proposing to carry out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 17 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Jul 2026 at 10:32.

Sheffield City Council logo
LONG TERM
Between
17 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are proposing to carry out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 17 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Jul 2026 at 10:31.

Sheffield City Council logo
LONG TERM
Between
17 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Ecclesfield Road

Sheffield City Council are proposing to carry out Utility asset works on Ecclesfield Road, Shiregreen, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 17 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Jul 2026 at 10:28.

Sheffield City Council logo
LONG TERM
Between
17 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Halifax Road

Sheffield City Council are proposing to carry out Utility asset works on Halifax Road, Wadsley Bridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 17 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Jul 2026 at 10:11.

Sheffield City Council logo
LONG TERM
Between
17 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Blackburn Crescent

Sheffield City Council are proposing to carry out Utility asset works on Blackburn Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 17 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Jul 2026 at 15:05.

Northern Powergrid (Yorkshire) logo
Between
19 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Danewood Croft

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Croft, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:17.

Northern Powergrid (Yorkshire) logo
Between
19 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Danewood Croft

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Croft, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2026 at 10:12.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Attercliffe Common

Yorkshire Water are proposing to carry out Utility asset works on Attercliffe Common, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2026 at 16:17.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Leigh Street

Yorkshire Water are proposing to carry out Utility asset works on Leigh Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2026 at 16:08.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Leigh Street

Yorkshire Water are proposing to carry out Utility asset works on Leigh Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 10:55.

Yorkshire Water logo
Between
19 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Garter Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Garter Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 15 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2026 at 15:27.

Yorkshire Water logo
LONG TERM
Between
19 Oct 2026 and 31 Mar 2027
Details
View Map
Share
Follow
Carlisle Street East

Yorkshire Water are proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 31 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 Jun 2026 at 16:52.

ESP Electricity logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Clifton Terrace

ESP Electricity were proposing to carry out Utility asset works on Clifton Terrace, Clifton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Aug 2026 at 14:36.

ES Pipelines logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Clifton Terrace

ES Pipelines were proposing to carry out Utility asset works on Clifton Terrace, Clifton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 27 Aug 2026 at 13:24.

ES Pipelines logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Clifton Terrace

ES Pipelines are proposing to carry out Utility asset works on Clifton Terrace, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 28 Aug 2026 at 14:44.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Firth Street

Cadent Gas are proposing to carry out Utility asset works on Firth Street, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2026 at 14:39.

Yorkshire Water logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Wheatcroft Road

Yorkshire Water are proposing to carry out Utility asset works on Wheatcroft Road, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Jun 2026 at 07:20.

Yorkshire Water logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Old Wortley Road

Yorkshire Water are proposing to carry out Utility asset works on Old Wortley Road, Kimberworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2026 at 13:00.

Yorkshire Water logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Grange View Road

Yorkshire Water are proposing to carry out Utility asset works on Grange View Road, Kimberworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2026 at 13:00.

Northern Powergrid (Yorkshire) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Archdale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Archdale Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2026 at 16:37.

Sheffield City Council logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Orgreave Road

Sheffield City Council are proposing to carry out Utility asset works on Orgreave Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2026 at 11:19.

ES Pipelines logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Clifton Terrace

ES Pipelines are proposing to carry out Utility asset works on Clifton Terrace, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 1 Sep 2026 at 15:11.

ES Pipelines logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Clifton Terrace

ES Pipelines are proposing to carry out Utility asset works on Clifton Terrace, Clifton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 3 Sep 2026 at 09:19.

Rotherham Metropolitan Borough Council logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
The Lanes

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on The Lanes, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 11 Aug 2026 at 08:16.

Northern Powergrid (Yorkshire) logo
Between
26 Oct and 4 Nov 2026
Details
View Map
Share
Follow
The Crescent East

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Crescent East, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Aug 2026 at 10:33.

Northern Powergrid (Yorkshire) logo
Between
26 Oct and 4 Nov 2026
Details
View Map
Share
Follow
The Crescent West

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Crescent West, Sunnyside, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Aug 2026 at 10:36.

LONG TERM
Between
26 Oct 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Doncaster Road

South Yorkshire Passenger Transport Executive are proposing to carry out Works for road purposes on Doncaster Road, Dalton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 22 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 17 Jun 2026 at 09:59.

Cadent Gas logo
LONG TERM
Between
26 Oct and 7 Dec 2026
Details
View Map
Share
Follow
Munsbrough Lane

Cadent Gas are proposing to carry out Utility asset works on Munsbrough Lane, Munsbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 7 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 15:46.

Sheffield City Council logo
LONG TERM
Between
30 Oct 2026 and 30 Jan 2027
Details
View Map
Share
Follow
Smelter Wood Road

Sheffield City Council are proposing to carry out Utility asset works on Smelter Wood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2026 at 11:00.

Sheffield City Council logo
LONG TERM
Between
30 Oct 2026 and 30 Jan 2027
Details
View Map
Share
Follow
Smelter Wood Road

Sheffield City Council are proposing to carry out Utility asset works on Smelter Wood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2026 at 11:00.

Sheffield City Council logo
LONG TERM
Between
30 Oct 2026 and 30 Jan 2027
Details
View Map
Share
Follow
Ravenscroft Road

Sheffield City Council are proposing to carry out Utility asset works on Ravenscroft Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2026 at 11:00.

Sheffield City Council logo
LONG TERM
Between
30 Oct 2026 and 30 Jan 2027
Details
View Map
Share
Follow
Ravenscroft Road

Sheffield City Council are proposing to carry out Utility asset works on Ravenscroft Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2026 at 10:59.

Sheffield City Council logo
LONG TERM
Between
30 Oct 2026 and 30 Jan 2027
Details
View Map
Share
Follow
Ravenscroft Road

Sheffield City Council are proposing to carry out Utility asset works on Ravenscroft Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 30 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Jul 2026 at 10:33.

Northern Powergrid (Yorkshire) logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Danewood Grove

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Grove, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:18.

Northern Powergrid (Yorkshire) logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Danewood Grove

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Grove, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 18:08.

Northern Powergrid (Yorkshire) logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Danewood Grove

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Grove, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2026 at 13:54.

Yorkshire Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Main Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Street, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 12:04.

Yorkshire Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Main Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Street, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:32.

Quickline Commucations logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Cortworth Lane

Quickline Commucations are proposing to carry out Utility asset works on Cortworth Lane, Wentworth, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2026 at 13:09.

Northern Powergrid (Yorkshire) logo
Between
8 and 29 Nov 2026
Details
View Map
Share
Follow
Danewood Gardens

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Gardens, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:18.

Northern Powergrid (Yorkshire) logo
Between
8 and 29 Nov 2026
Details
View Map
Share
Follow
Danewood Gardens

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Danewood Gardens, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2026 at 10:15.

Yorkshire Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Binsted Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Binsted Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Aug 2026 at 16:03.

Yorkshire Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Delta Place

Yorkshire Water are proposing to carry out New service connection on Delta Place, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 14:23.

Yorkshire Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Delta Place

Yorkshire Water are proposing to carry out New service connection on Delta Place, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 16:45.

Northern Powergrid (Yorkshire) logo
Between
9 and 16 Nov 2026
Details
View Map
Share
Follow
Coleridge Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Coleridge Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2026 at 15:14.

Northern Powergrid (Yorkshire) logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Harold Croft

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Harold Croft, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jul 2026 at 13:21.

Northern Powergrid (Yorkshire) logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Rig Drive

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Rig Drive, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Jul 2026 at 14:41.

Yorkshire Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Sheffield Road

Yorkshire Water are proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Jul 2026 at 16:29.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Dale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Dale Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Aug 2026 at 07:49.

Northern Powergrid (Yorkshire) logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Dale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Dale Road, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 13:30.

Northern Powergrid (Yorkshire) logo
Between
23 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Romandale Gardens

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Romandale Gardens, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Sep 2026 at 16:00.

Cadent Gas logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Bawtry Road

Cadent Gas are proposing to carry out Utility asset works on Bawtry Road, Brinsworth, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:19.

Cadent Gas logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Bawtry Road Service Road

Cadent Gas are proposing to carry out Utility asset works on Bawtry Road Service Road, Brinsworth, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:52.

Cadent Gas logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Brookfield Avenue

Cadent Gas were proposing to carry out Utility asset works on Brookfield Avenue, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 7 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:42.

Cadent Gas logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Cliffefield Road

Cadent Gas were proposing to carry out Utility asset works on Cliffefield Road, Swinton, Rotherham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 7 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Cadent Gas logo
Between
30 Nov and 14 Dec 2026
Details
View Map
Share
Brookfield Avenue

Cadent Gas were proposing to carry out Utility asset works on Brookfield Avenue, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 14 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:44.

Northern Powergrid (Yorkshire) logo
Between
30 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Wath Road

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Wath Road, Elsecar, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 6 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Sep 2026 at 10:18.

Northern Powergrid (Yorkshire) logo
Between
4 and 18 Dec 2026
Details
View Map
Share
Follow
Carlisle Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Carlisle Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2026 at 10:44.

Northern Powergrid (Yorkshire) logo
Between
4 and 18 Dec 2026
Details
View Map
Share
Follow
Carlisle Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Carlisle Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Aug 2026 at 09:25.

Northern Powergrid (Yorkshire) logo
Between
7 and 23 Dec 2026
Details
View Map
Share
Follow
Danebrook Court

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Court, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 17:50.

Northern Powergrid (Yorkshire) logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Danebrook Court

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Court, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 17:26.

Northern Powergrid (Yorkshire) logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Danebrook Court

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Danebrook Court, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2026 at 13:20.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Normanville Avenue

Cadent Gas are proposing to carry out Utility asset works on Normanville Avenue, Brinsworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:30.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Roughwood Way

Cadent Gas are proposing to carry out Utility asset works on Roughwood Way, Wingfield, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 08:17.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Roughwood Road

Cadent Gas are proposing to carry out Utility asset works on Roughwood Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 08:16.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Munsbrough Rise

Cadent Gas are proposing to carry out Utility asset works on Munsbrough Rise, Greasbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 10:21.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
St Marys View

Cadent Gas are proposing to carry out Utility asset works on St Marys View, Greasbrough, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 14:24.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Brookfield Avenue

Cadent Gas were proposing to carry out Utility asset works on Brookfield Avenue, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 21 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:45.

Yorkshire Water logo
Between
9 and 11 Dec 2026
Details
View Map
Share
Follow
Far View Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Far View Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:18.

Yorkshire Water logo
Between
9 and 11 Dec 2026
Details
View Map
Share
Follow
Far View Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Far View Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 09:54.

Cadent Gas logo
Between
11 and 24 Dec 2026
Details
View Map
Share
Brookfield Avenue

Cadent Gas were proposing to carry out Utility asset works on Brookfield Avenue, Swinton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2026 and run through until 24 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:46.

Northern Powergrid (Yorkshire) logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Cowley Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cowley Drive, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Sep 2026 at 08:39.


Roadworks Map near to Wortley Road, ROTHERHAM, S61 1LH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 12:18
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wortley Road, ROTHERHAM, S61 1LH (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
KIMBERWORTH PARK ROAD, KIMBERWORTH PARK 
(0.5 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 16 Sep 2026 11:30
(Scheduled: 16 Sep 2026 - 22 Sep 2026)
0.5
Details
Share
Follow
2
Rotherham Metropolitan Borough Council logo
MAJOR
  
OLD WORTLEY ROAD, KIMBERWORTH 
(0.6 miles)
Rotherham Metropolitan Borough Council
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 24 Aug 2026 - 4 Oct 2026
0.6
Details
Share
Follow
3
Yorkshire Water logo
URGENT
  
MEADOW BANK ROAD, MEADOWBANK 
(0.6 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
15 Sep 2026 20:30 - 16 Sep 2026 07:00
0.6
Details
Share
4
Yorkshire Water logo
URGENT
  
WEST CLOSE, KIMBERWORTH PARK 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 11 Sep 2026 20:14
(Scheduled: 11 Sep 2026 - 17 Sep 2026)
0.7
Details
Share
Follow
5
Yorkshire Water logo
MAJOR
  
FARM VIEW ROAD, KIMBERWORTH 
(0.8 miles)
Yorkshire Water
Utility asset works - Carriageway - Multi-way signals
In Progress
Since: 26 Aug 2026 09:00
(Scheduled: 26 Aug 2026 - 22 Sep 2026)
0.8
Details
Share
Follow
6
Northern Powergrid (Yorkshire) logo
FARM VIEW ROAD, KIMBERWORTH 
(0.8 miles)
Northern Powergrid (Yorkshire)
Disconnection or alteration of supply - Footway - Two-way signals
Planned
Scheduled: 14 Sep 2026 - 18 Sep 2026
0.8
Details
Share
Follow
7
Northern Powergrid (Yorkshire) logo
URGENT
  
CHAPEL WALK, ROTHERHAM TOWN CENTRE 
(0.8 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Carriageway, Verge - Road closure
In Progress
Since: 16 Sep 2026 11:30
(Scheduled: 16 Sep 2026 - 22 Sep 2026)
0.8
Details
Share
Follow
8
Yorkshire Water logo
MAJOR
  
FARM VIEW ROAD, KIMBERWORTH 
(1.0 miles)
Yorkshire Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 13 May 2026 09:30
(Scheduled: 11 May 2026 - 11 Oct 2026)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.