ROADWORKS SUMMARY
Howard Street, ROTHERHAM, S60 1QU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Howard Street, S60 1QU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Howard Street, ROTHERHAM, S60 1QU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Howard Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 08:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 12 Aug 2025 at 12:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2026
Details
View Map
Share
Follow
Rotherham Gateway

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rotherham Gateway, Catcliffe, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 20:00 and could run through until 21 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Jun 2025 at 10:05.

Sheffield City Council logo
LONG TERM
Until
10 Apr 2026
Details
View Map
Share
Follow
Sheffield Road

Sheffield City Council are carrying out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 07:42 and could run through until 10 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Oct 2024 at 07:59.

The Environment Agency logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Retford Road

The Environment Agency are carrying out Statutory Infrastructure Works on Retford Road, Woodhouse Mill, Rotherham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 08:00 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 11 Aug 2025 at 14:22.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heppenstall Lane

Sheffield City Council are carrying out Utility asset works on Heppenstall Lane, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 07:50 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 13:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Apr 2025 and 31 May 2026
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Apr 2025 at 14:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Apr 2025 and 31 May 2026
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Apr 2025 at 16:12.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Apr 2025 and 31 May 2026
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Apr 2025 at 15:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Apr and 19 Dec 2025
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Apr 2025 at 09:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Corporation Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 08:00 and could run through until 28 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 26 Jun 2025 at 14:14.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
6 May 2025 and 5 Jun 2026
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 5 June 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Apr 2025 at 15:54.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
19 Dec 2026
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 19 December 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 May 2025 at 10:15.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Corporation Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:17.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
14 May 2025 and 1 May 2026
Details
View Map
Share
Follow
Ulley Lane

Rotherham Metropolitan Borough Council are proposing to carry out Utility repair and maintenance works on Ulley Lane, Ulley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 1 May 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Mar 2025 at 12:54.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 11:25.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
Fitzwilliam Road

Cadent Gas are proposing to carry out Utility asset works on Fitzwilliam Road, Eastwood, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 11:24.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 10:05.

Cadent Gas logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 10:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
19 May and 18 Nov 2025
Details
View Map
Share
Follow
Dun Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dun Street, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Apr 2025 at 14:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
18 Nov 2025
Details
View Map
Share
Follow
Dun Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Dun Street, Swinton, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 August 2025 at 08:00 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Aug 2025 at 09:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Jun 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 July 2026. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Apr 2025 at 14:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Main Street

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Main Street, Bramley, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jun 2025 at 08:30.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Flanderwell Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Flanderwell Lane, Sunnyside, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jun 2025 at 08:31.

Rotherham Metropolitan Borough Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Brook Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Brook Lane, Bramley, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Sep 2025 at 10:24.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Sutherland Street

Sheffield City Council were proposing to carry out Utility asset works on Sutherland Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Carlisle Street East

Sheffield City Council were proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Atlas Way

Sheffield City Council were proposing to carry out Utility asset works on Atlas Way, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Ruthin Street

Sheffield City Council were proposing to carry out Utility asset works on Ruthin Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Wincobank Lane

Sheffield City Council were proposing to carry out Utility asset works on Wincobank Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Firth Park Road

Sheffield City Council were proposing to carry out Utility asset works on Firth Park Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Owler Lane

Sheffield City Council were proposing to carry out Utility asset works on Owler Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Beacon Road

Sheffield City Council were proposing to carry out Utility asset works on Beacon Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Roman Ridge Road

Sheffield City Council were proposing to carry out Utility asset works on Roman Ridge Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Bellhouse Road

Sheffield City Council were proposing to carry out Utility asset works on Bellhouse Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Standon Road

Sheffield City Council were proposing to carry out Utility asset works on Standon Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
4 Jul and 1 Oct 2025
Details
View Map
Share
Hatfield House Lane

Sheffield City Council were proposing to carry out Utility asset works on Hatfield House Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Jul 2025 at 10:18.

Sheffield City Council logo
LONG TERM
Between
8 Jul and 8 Oct 2025
Details
View Map
Share
Wensley Street

Sheffield City Council were proposing to carry out Utility asset works on Wensley Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Jul 2025 at 08:28.

Sheffield City Council logo
LONG TERM
Between
8 Jul and 8 Oct 2025
Details
View Map
Share
Longley Lane

Sheffield City Council were proposing to carry out Utility asset works on Longley Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Jul 2025 at 08:28.

Sheffield City Council logo
LONG TERM
Between
8 Jul and 8 Oct 2025
Details
View Map
Share
Barrow Road

Sheffield City Council were proposing to carry out Utility asset works on Barrow Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Jul 2025 at 08:28.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Clun Street

Sheffield City Council are carrying out Utility asset works on Clun Street, Sheffield.

These works are categorised as Major.

The works started on 9 July 2025 at 07:50 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 13:50.

Sheffield City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Holywell Road

Sheffield City Council are carrying out Highway repair and maintenance works on Holywell Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 09:30 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 17:02.

Sheffield City Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
High Street

Sheffield City Council are carrying out Utility asset works on High Street, Ecclesfield, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 07:50 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 12:26.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Sheffield City Council are carrying out Utility asset works on Station Road, Woodhouse, Sheffield.

These works are categorised as Major.

The works started on 28 July 2025 at 08:11 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 13:50.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lyons Road

Sheffield City Council are carrying out Utility asset works on Lyons Road, Sheffield.

These works are categorised as Major.

The works started on 28 July 2025 at 08:11 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 13:50.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Crabtree Road

Sheffield City Council are carrying out Utility asset works on Crabtree Road, Sheffield.

These works are categorised as Major.

The works started on 28 July 2025 at 08:10 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 13:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Poplar Way

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Way, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 6 May 2025 at 10:14.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Beaumont Road North

Sheffield City Council are carrying out Utility asset works on Beaumont Road North, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2025 at 07:51 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 09:39.

Sheffield City Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Greenwood Avenue

Sheffield City Council are carrying out Utility asset works on Greenwood Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2025 at 07:43 and could run through until 23 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 10:43.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heppenstall Lane

Sheffield City Council are carrying out Utility asset works on Heppenstall Lane, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 07:49 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:44.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Baltic Road

Sheffield City Council are carrying out Utility asset works on Baltic Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 07:52 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:45.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Sheffield Road

Rotherham Metropolitan Borough Council are carrying out Highway improvement works on Sheffield Road, Templeborough, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 4 October 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 11 Aug 2025 at 15:13.

Sheffield City Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Greaves Road

Sheffield City Council are carrying out Utility asset works on Greaves Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 07:54 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 08:30.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ellesmere Road North

Sheffield City Council are carrying out Utility asset works on Ellesmere Road North, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 08:04 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:53.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windmill Lane

Sheffield City Council are carrying out Utility asset works on Windmill Lane, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2025 at 08:04 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:47.

Sheffield City Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenwood Avenue

Sheffield City Council are carrying out Utility asset works on Greenwood Avenue, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 07:59 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 10:33.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Motehall Road

Sheffield City Council are carrying out Utility asset works on Motehall Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2025 at 00:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Sep 2025 at 16:19.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Harborough Way

Sheffield City Council are carrying out Utility asset works on Harborough Way, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 07:51 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 10:07.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Motehall Road

Sheffield City Council are carrying out Utility asset works on Motehall Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 07:44 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Sep 2025 at 16:18.

Cadent Gas logo
LONG TERM
Between
18 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 09:00.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Barnsley Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Barnsley Road, Thorpe Hesley, Rotherham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 09:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 10:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Shoreham Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Shoreham Road, Moorgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 14:43.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Shoreham Drive

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Shoreham Drive, Moorgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 14:26.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Mile Oak Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Mile Oak Road, Broom, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 13:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Moorgate Road Service Road 2

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Moorgate Road Service Road 2, Moorgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Mushroom Roundabout

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Mushroom Roundabout, Aldwarke, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 13:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Reresby Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Reresby Road, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 13:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Sandygate Service Road West

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Sandygate Service Road West, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 13:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Dearneway

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Dearneway, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Aug 2025 at 13:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Strathmore Grove

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Strathmore Grove, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 26 Aug 2025 at 08:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
25 Aug 2025 and 24 Sep 2026
Details
View Map
Share
Follow
Market Place

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Place, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 24 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 28 Aug 2025 at 09:21.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ferguson Street

Sheffield City Council are carrying out Utility asset works on Ferguson Street, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 07:51 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:54.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Calvert Road

Sheffield City Council are carrying out Utility asset works on Calvert Road, Sheffield.

These works are categorised as Major.

The works started on 27 August 2025 at 07:56 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:49.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stevenson Road

Sheffield City Council are carrying out Utility asset works on Stevenson Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 08:07 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:52.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Europa Link

Sheffield City Council are carrying out Utility asset works on Europa Link, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 07:47 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:46.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 3 Nov 2025
Details
View Map
Share
West Bawtry Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 12 May 2025 at 16:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 3 Nov 2025
Details
View Map
Share
Follow
West Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 November 2025. The works will impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 27 Mar 2025 at 12:31.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Bentfield Avenue

Rotherham Metropolitan Borough Council are carrying out Works for road purposes on Bentfield Avenue, Brecks, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Sep 2025 at 15:42.

Rotherham Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Flash Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Flash Lane, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Aug 2025 at 14:55.

Rotherham Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Flash Lane

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Flash Lane, Bramley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 15 Aug 2025 at 14:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Westgate

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westgate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 08:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Ship Hill

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ship Hill, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 09:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 09:04.

Rotherham Metropolitan Borough Council logo
LONG TERM
Until
21 Apr 2026
Details
View Map
Share
Follow
Domine Lane

Rotherham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Domine Lane, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2025 at 08:00 and could run through until 21 April 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jul 2025 at 12:04.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 09:04.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Moorgate Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Moorgate Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 12 May 2025 at 09:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Market Place

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Place, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 09:02.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Market Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Market Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 08:24.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Church Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 09:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Follow
Upper Millgate

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Upper Millgate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 17 Jan 2025 at 08:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Sep 2026
Details
View Map
Share
Corporation Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Corporation Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 September 2026. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Apr 2025 at 12:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Bridgegate

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Bridgegate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 26 Jun 2025 at 15:10.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Bridge Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Bridge Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 26 Jun 2025 at 14:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Frederick Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Frederick Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 26 Jun 2025 at 15:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Anns Road Service Road South

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on St Anns Road Service Road South, St Anns, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 14 Apr 2025 at 10:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Anns Road Footpath 1

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Anns Road Footpath 1, St Anns, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Anns Road Footpath 1

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on St Anns Road Footpath 1, St Anns, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Nottingham Street Footpath 1

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Nottingham Street Footpath 1, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 12:02.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Nottingham Street Footpath 1

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Nottingham Street Footpath 1, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 December 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 14:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Anns Road Service Road South

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Anns Road Service Road South, St Anns, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 14 Apr 2025 at 11:03.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
York Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on York Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 12:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Centenary Way

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Centenary Way, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 12:48.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Centenary Way

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Centenary Way, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Anns Subway

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on St Anns Subway, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 May 2025 at 17:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Anns Subway

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Anns Subway, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 12 May 2025 at 07:40.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Anns Roundabout

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on St Anns Roundabout, Eastwood, Rotherham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Anns Roundabout

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Anns Roundabout, Eastwood, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 12:47.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jul 2027
Details
View Map
Share
York Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on York Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 11:30.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Kenneth Street Footpath 1

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Kenneth Street Footpath 1, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 11:45.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Kenneth Street Footpath 1

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Kenneth Street Footpath 1, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 12:12.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Anns Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Anns Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on St Anns Road, Eastwood, Rotherham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 30 Apr 2025 at 11:44.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Rawson Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Rawson Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Rawson Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Rawson Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Denman Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Denman Street, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Mar 2025 at 13:55.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Denman Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Denman Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Mar 2025 at 13:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Selwyn Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Selwyn Street, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Selwyn Street

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Selwyn Street, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Cottenham Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cottenham Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Cottenham Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cottenham Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:42.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Grosvenor Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Grosvenor Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 14:55.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Grosvenor Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Grosvenor Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Mar 2025 at 11:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Grosvenor Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Grosvenor Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Mar 2025 at 07:10.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Milton Road Back Road 1

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Milton Road Back Road 1, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Mar 2025 at 11:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Milton Road Back Road 1

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on Milton Road Back Road 1, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Mar 2025 at 07:09.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Milton Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Milton Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Milton Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Milton Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Cranworth Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cranworth Road, East Dene, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Cranworth Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cranworth Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:42.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Follow
Shakespeare Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shakespeare Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 5 Feb 2025 at 12:20.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Halsbury Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Halsbury Road, East Dene, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:39.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Halsbury Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Halsbury Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Fitzwilliam Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 13 Mar 2025 at 11:31.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Sep 2027
Details
View Map
Share
Fitzwilliam Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Fitzwilliam Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 11:27.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 12:12.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Shaw Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Shaw Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 July 2027. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Mar 2025 at 13:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 19 Dec 2027
Details
View Map
Share
Follow
Shaw Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shaw Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 December 2027. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Mar 2025 at 13:55.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Cherry Brook

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Cherry Brook, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Service Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Fitzwilliam Road Service Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Feb 2025 at 15:24.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Service Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Fitzwilliam Road Service Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Feb 2025 at 15:38.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Fitzwilliam Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 10:43.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Service Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Fitzwilliam Road Service Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 13 Mar 2025 at 11:19.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Sep 2027
Details
View Map
Share
Fitzwilliam Road Service Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Fitzwilliam Road Service Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 September 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road Service Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Service Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Johns Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on St Johns Road, East Dene, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Feb 2025 at 12:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
St Johns Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on St Johns Road, East Dene, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:18.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
St Johns Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway improvement works on St Johns Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Apr 2025 at 09:42.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Mowbray Gardens

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mowbray Gardens, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Mar 2025 at 07:10.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Cherry Brook

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Cherry Brook, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Footpath 3

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Fitzwilliam Road Footpath 3, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:19.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road Footpath 3

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Footpath 3, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:27.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Link Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Fitzwilliam Road Link Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Feb 2025 at 12:32.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Link Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway improvement works on Fitzwilliam Road Link Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:46.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road Link Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Link Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Chesterton Road Splay Footpath 1

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Chesterton Road Splay Footpath 1, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:09.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Chesterton Road Splay Footpath 1

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Chesterton Road Splay Footpath 1, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Follow
Fitzwilliam Road Subway Link Path

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fitzwilliam Road Subway Link Path, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 30 July 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Feb 2025 at 08:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Chesterton Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Chesterton Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:58.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Chesterton Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Chesterton Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Chesterton Road Splay Footpath 2

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Chesterton Road Splay Footpath 2, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:12.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Chesterton Road Splay Footpath 2

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Chesterton Road Splay Footpath 2, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Sycamore Road Link Path

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Sycamore Road Link Path, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:35.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Sycamore Road Link Path

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Sycamore Road Link Path, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Footpath 2

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Fitzwilliam Road Footpath 2, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:25.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road Footpath 2

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Footpath 2, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Sycamore Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Sycamore Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 11:28.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Sycamore Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sycamore Road, Eastwood, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 10 Apr 2025 at 12:13.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Doncaster Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Doncaster Road, East Dene, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Mar 2025 at 11:01.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Doncaster Road

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Doncaster Road, East Dene, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Mar 2025 at 07:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Sycamore Road

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Sycamore Road, Eastwood, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Feb 2025 at 14:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Fitzwilliam Road Footpath

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Fitzwilliam Road Footpath, Eastwood, Rotherham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 13:50.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Fitzwilliam Road Footpath

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Fitzwilliam Road Footpath, Eastwood, Rotherham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 9 Apr 2025 at 14:22.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 30 Jul 2027
Details
View Map
Share
Dalton Lane

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Dalton Lane, Dalton, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 18 Mar 2025 at 14:38.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2025 and 20 Dec 2027
Details
View Map
Share
Follow
Dalton Lane

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dalton Lane, Dalton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 December 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Mar 2025 at 08:37.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Barnsley Road

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Barnsley Road, Thorpe Hesley, Rotherham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Jul 2025 at 08:07.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Barnsley Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Barnsley Road, Thorpe Hesley, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Jul 2025 at 09:58.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Barnsley Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Barnsley Road, Thorpe Hesley, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Jul 2025 at 11:48.

Yorkshire Water logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Cortworth Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Cortworth Lane, Wentworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Jun 2025 at 07:50.

Sheffield City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Brightside Lane

Sheffield City Council are carrying out Utility asset works on Brightside Lane, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:04 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Sep 2025 at 14:57.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
4 Sep and 15 Oct 2025
Details
View Map
Share
Westgate

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Westgate, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:38.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
4 Sep and 15 Oct 2025
Details
View Map
Share
Westgate

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Westgate, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Nov 2024 at 17:08.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
4 Sep and 15 Oct 2025
Details
View Map
Share
Ship Hill

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Ship Hill, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:37.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
4 Sep and 26 Nov 2025
Details
View Map
Share
Market Place

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Market Place, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:25.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:40.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 07:27.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, Northfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 13:51.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, Northfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:44.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, Northfield, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 13:01.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 13:50.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:45.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 13:00.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 07:27.

Northern Powergrid (Yorkshire) logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Mangham Way

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Mangham Way, Barbot Hall, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Apr 2025 at 14:07.

Northern Powergrid (Yorkshire) logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Mangham Way

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Mangham Way, Barbot Hall, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Jul 2025 at 11:42.

Sheffield City Council logo
Finishing
Monday
Details
View Map
Share
Follow
Five Weirs Walk

Sheffield City Council are carrying out Utility asset works on Five Weirs Walk, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 07:33 and could run through until 29 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 22 Sep 2025 at 16:10.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are carrying out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 07:56 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:56.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Sheffield City Council are carrying out Utility asset works on Station Road, Woodhouse, Sheffield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:56 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Sep 2025 at 15:57.

Cadent Gas logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Beaver Hill Road

Cadent Gas are carrying out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:15 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:28.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Cricket Inn Crescent

Cadent Gas are proposing to carry out Utility asset works on Cricket Inn Crescent, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 12:39.

Cadent Gas logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Cricket Inn Crescent

Cadent Gas are carrying out Utility asset works on Cricket Inn Crescent, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 17:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 06:50.

Rotherham Metropolitan Borough Council logo
Between
15 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Highfield Spring

Rotherham Metropolitan Borough Council are proposing to carry out Permanent reinstatement on Highfield Spring, Catcliffe, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 11 October 2025. The works will impact the footway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 2 Sep 2025 at 10:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
15 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Poplar Way

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Way, Catcliffe, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Aug 2025 at 08:40.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Greasbrough Street

Cadent Gas are proposing to carry out Utility asset works on Greasbrough Street, Masbrough, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:40.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Greasbrough Street

Cadent Gas were proposing to carry out Utility asset works on Greasbrough Street, Masbrough, Rotherham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 08:45.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Primrose Hill

Cadent Gas are proposing to carry out Utility asset works on Primrose Hill, Thornhill, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:40.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Primrose Hill

Cadent Gas were proposing to carry out Utility asset works on Primrose Hill, Thornhill, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 08:52.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
North Drive

Cadent Gas are proposing to carry out Utility asset works on North Drive, Northfield, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:39.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
North Drive

Cadent Gas are proposing to carry out Utility asset works on North Drive, Northfield, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 07:21.

Cadent Gas logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
North Drive

Cadent Gas were proposing to carry out Utility asset works on North Drive, Northfield, Rotherham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 13:15.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are carrying out Utility asset works on St Anns Road, Eastwood, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:45 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 08:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are carrying out Utility asset works on Rawmarsh Road, Northfield, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:20 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 12:26.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Rawmarsh Road

Cadent Gas are carrying out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:45 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 08:48.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Poplar Drive

Cadent Gas are proposing to carry out Utility asset works on Poplar Drive, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 09:25.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Oak Avenue

Cadent Gas are proposing to carry out Utility asset works on Oak Avenue, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 09:23.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Sep and 18 Nov 2025
Details
View Map
Share
Follow
West Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 18 November 2025. The works will impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 4 Sep 2025 at 12:43.

Sheffield City Council logo
Between
17 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Owler Lane

Sheffield City Council are proposing to carry out Utility asset works on Owler Lane, Sheffield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Aug 2025 at 08:37.

Sheffield City Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Owler Lane

Sheffield City Council are carrying out Utility asset works on Owler Lane, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 07:54 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 08:51.

Sheffield City Council logo
Between
17 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Wensley Street

Sheffield City Council are proposing to carry out Utility asset works on Wensley Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Wensley Street

Sheffield City Council are carrying out Utility asset works on Wensley Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 07:54 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 08:51.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
19 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Sandygate Service Road West

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Sandygate Service Road West, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 19 Sep 2025 at 11:42.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
St Leonards Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on St Leonards Lane, Eastwood, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2025 at 22:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Sep 2025 at 08:47.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Coral Drive

Yorkshire Water are carrying out Utility repair and maintenance works on Coral Drive, Aughton, Rotherham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:32 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Sep 2025 at 09:22.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2025 at 10:05.

Sheffield City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are carrying out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 07:47 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Sep 2025 at 08:17.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carbrook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carbrook Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Jul 2025 at 12:21.

National Grid Electricity Transmission logo
Finishing
Friday
Details
View Map
Share
Follow
Highgate

National Grid Electricity Transmission are proposing to carry out Utility asset works on Highgate, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 12 Aug 2025 at 08:11.

National Grid Electricity Transmission logo
Finishing
Friday
Details
View Map
Share
Follow
Highgate

National Grid Electricity Transmission are carrying out Utility asset works on Highgate, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 22 Sep 2025 at 09:26.

Sheffield City Council logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Fife Street

Sheffield City Council are proposing to carry out Utility asset works on Fife Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 21 Aug 2025 at 08:37.

Sheffield City Council logo
Until
8 Oct 2025
Details
View Map
Share
Follow
Fife Street

Sheffield City Council are carrying out Utility asset works on Fife Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 07:47 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Sep 2025 at 08:17.

Sheffield City Council logo
Between
22 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are proposing to carry out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Until
8 Oct 2025
Details
View Map
Share
Follow
Standon Road

Sheffield City Council are carrying out Utility asset works on Standon Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 07:49 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 22 Sep 2025 at 08:17.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Loicher Lane

Yorkshire Water are proposing to carry out New service connection on Loicher Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 11 Jul 2025 at 14:00.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Loicher Lane

Yorkshire Water were proposing to carry out New service connection on Loicher Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2025 at 12:29.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Loicher Lane

Yorkshire Water are proposing to carry out New service connection on Loicher Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 23 Jul 2025 at 12:43.

Yorkshire Water logo
Until
17 Oct 2025
Details
View Map
Share
Follow
Hague Lane

Yorkshire Water are carrying out Statutory Infrastructure Works on Hague Lane, Wentworth, Rotherham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:30 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Sep 2025 at 09:37.

Finishing
Thursday
Details
View Map
Share
Follow
West Street

Doncaster Metropolitan Borough Council are proposing to carry out Highway improvement works on West Street, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Aug 2025 at 14:21.

Finishing
Thursday
Details
View Map
Share
Follow
West Street

Doncaster Metropolitan Borough Council are proposing to carry out Highway improvement works on West Street, Mexborough, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Doncaster Metropolitan Borough Council on 7 Aug 2025 at 14:22.

Sheffield City Council logo
Between
24 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Beacon Road

Sheffield City Council are proposing to carry out Utility asset works on Beacon Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Between
24 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Beacon Road

Sheffield City Council are proposing to carry out Utility asset works on Beacon Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 15:32.

Sheffield City Council logo
Between
25 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Holtwood Road

Sheffield City Council are proposing to carry out Highway improvement works on Holtwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:07.

Sheffield City Council logo
Between
25 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Holtwood Road

Sheffield City Council are proposing to carry out Highway improvement works on Holtwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:16.

Sheffield City Council logo
Between
25 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Bellhouse Road

Sheffield City Council are proposing to carry out Utility asset works on Bellhouse Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Between
25 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Bellhouse Road

Sheffield City Council are proposing to carry out Utility asset works on Bellhouse Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 15:08.

Rotherham Metropolitan Borough Council logo
Between
25 Sep and 15 Oct 2025
Details
View Map
Share
High Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:36.

Sheffield City Council logo
Between
26 Sep and 10 Oct 2025
Details
View Map
Share
Retford Road

Sheffield City Council were proposing to carry out Utility asset works on Retford Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 10 October 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Aug 2025 at 11:09.

Sheffield City Council logo
Between
26 Sep and 10 Oct 2025
Details
View Map
Share
Orgreave Close

Sheffield City Council were proposing to carry out Utility asset works on Orgreave Close, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 10 October 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Aug 2025 at 11:09.

Sheffield City Council logo
Between
26 Sep and 10 Oct 2025
Details
View Map
Share
Ashbourne Road

Sheffield City Council were proposing to carry out Utility asset works on Ashbourne Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 10 October 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 12 Aug 2025 at 13:32.

National Grid Electricity Transmission logo
Finishing
Monday
Details
View Map
Share
Follow
Newhall Road

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Newhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 3 Sep 2025 at 08:07.

National Grid Electricity Transmission logo
Finishing
Monday
Details
View Map
Share
Follow
Newhall Road

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Newhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 8 Sep 2025 at 08:57.

Sheffield City Council logo
Between
26 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Section 50 on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 13:28.

Sheffield City Council logo
Between
26 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Section 50 on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 13:38.

National Grid Electricity Transmission logo
Between
27 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Brightside Lane

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Brightside Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 11 Sep 2025 at 15:02.

National Grid Electricity Transmission logo
Between
27 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Brightside Lane

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Brightside Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 15 Sep 2025 at 15:14.

National Grid Electricity Transmission logo
Between
27 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Upwell Street

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Upwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 11 Sep 2025 at 16:00.

National Grid Electricity Transmission logo
Between
27 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Upwell Street

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Upwell Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 15 Sep 2025 at 15:18.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Cricket Inn Crescent

Cadent Gas are proposing to carry out Utility asset works on Cricket Inn Crescent, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 12:25.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Cricket Inn Crescent

Cadent Gas are proposing to carry out Utility asset works on Cricket Inn Crescent, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2025 at 15:44.

Sheffield City Council logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Sutherland Street

Sheffield City Council are proposing to carry out Utility asset works on Sutherland Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Sutherland Street

Sheffield City Council are proposing to carry out Utility asset works on Sutherland Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 15:11.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Carbrook Street

Yorkshire Water are proposing to carry out New service connection on Carbrook Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 09:02.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Carbrook Street

Yorkshire Water are proposing to carry out New service connection on Carbrook Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 12:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Barbers Crescent

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Barbers Crescent, Rawmarsh, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Jul 2025 at 13:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Green Lane

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on Green Lane, Rawmarsh, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Jul 2025 at 13:41.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Lime Tree Crescent

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Lime Tree Crescent, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jul 2025 at 09:53.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Rose Crescent

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Rose Crescent, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 8 Jul 2025 at 09:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Kilnhurst Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Kilnhurst Road, Rawmarsh, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Jul 2025 at 13:07.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Doncaster Road

Rotherham Metropolitan Borough Council are proposing to carry out Permanent reinstatement on Doncaster Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Jul 2025 at 12:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Old Doncaster Road

Rotherham Metropolitan Borough Council are proposing to carry out Permanent reinstatement on Old Doncaster Road, Wath-upon-dearne, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 22 Jul 2025 at 12:52.

Sheffield City Council logo
Between
30 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 16 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 14 Aug 2025 at 10:17.

Sheffield City Council logo
Between
30 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Retford Road

Sheffield City Council are proposing to carry out Utility asset works on Retford Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 16 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 18 Aug 2025 at 11:03.

Sheffield City Council logo
Between
30 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Herries Road

Sheffield City Council are proposing to carry out Utility asset works on Herries Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Aug 2025 at 13:01.

Sheffield City Council logo
Between
30 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Longley Lane

Sheffield City Council are proposing to carry out Utility asset works on Longley Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 20 Aug 2025 at 10:06.

Sheffield City Council logo
Between
1 and 17 Oct 2025
Details
View Map
Share
Follow
Orgreave Close

Sheffield City Council are proposing to carry out Utility asset works on Orgreave Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 17 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 14 Aug 2025 at 10:16.

Sheffield City Council logo
Between
1 and 17 Oct 2025
Details
View Map
Share
Follow
Orgreave Close

Sheffield City Council are proposing to carry out Utility asset works on Orgreave Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 17 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Aug 2025 at 08:48.

Cadent Gas logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Laverack Street

Cadent Gas are proposing to carry out Remedial works on Laverack Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 12:04.

Sheffield City Council logo
Between
1 and 16 Oct 2025
Details
View Map
Share
Follow
Roman Ridge Road

Sheffield City Council are proposing to carry out Utility asset works on Roman Ridge Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 11:08.

Sheffield City Council logo
Between
1 and 16 Oct 2025
Details
View Map
Share
Follow
Roman Ridge Road

Sheffield City Council are proposing to carry out Utility asset works on Roman Ridge Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 15:17.

Sheffield City Council logo
Between
2 and 17 Oct 2025
Details
View Map
Share
Follow
Owler Lane

Sheffield City Council are proposing to carry out Utility asset works on Owler Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 19 Aug 2025 at 13:31.

National Grid Electricity Transmission logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Newhall Road

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Newhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 3 Sep 2025 at 08:12.

National Grid Electricity Transmission logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Newhall Road

National Grid Electricity Transmission are proposing to carry out Statutory Infrastructure Works on Newhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Grid Electricity Transmission on 8 Sep 2025 at 08:58.

Sheffield City Council logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Ashbourne Road

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 14 Aug 2025 at 13:11.

Sheffield City Council logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Ashbourne Road

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 18 Aug 2025 at 16:55.

Sheffield City Council logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Ashbourne Road

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 15 Aug 2025 at 10:23.

Sheffield City Council logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Follow
Ashbourne Road

Sheffield City Council are proposing to carry out Utility asset works on Ashbourne Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 October 2025. The works will impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 18 Aug 2025 at 16:58.

Sheffield City Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Rokeby Road

Sheffield City Council were proposing to carry out Utility asset works on Rokeby Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:19.

Sheffield City Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Wheata Road

Sheffield City Council were proposing to carry out Utility asset works on Wheata Road, Sheffield.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:19.

Sheffield City Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Wheata Road

Sheffield City Council were proposing to carry out Utility asset works on Wheata Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:19.

Sheffield City Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Wheata Road

Sheffield City Council were proposing to carry out Utility asset works on Wheata Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:19.

Yorkshire Water logo
LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Cortworth Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Cortworth Lane, Wentworth, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2025 at 08:43.

Quickline Commucations logo
Between
10 and 14 Oct 2025
Details
View Map
Share
Follow
Burying Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Burying Lane, Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 28 Aug 2025 at 10:29.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Follow
Saunders Place

Cadent Gas are proposing to carry out Utility asset works on Saunders Place, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 12:22.

Cadent Gas logo
Between
13 and 29 Oct 2025
Details
View Map
Share
Follow
Saunders Place

Cadent Gas are proposing to carry out Utility asset works on Saunders Place, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 16:42.

Northern Powergrid (Yorkshire) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Redscope Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Redscope Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2025 at 12:46.

Northern Powergrid (Yorkshire) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Redscope Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Redscope Road, Kimberworth Park, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Sep 2025 at 09:56.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
15 Oct and 26 Nov 2025
Details
View Map
Share
Church Street

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Street, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:34.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
15 Oct and 26 Nov 2025
Details
View Map
Share
Upper Millgate

Rotherham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Upper Millgate, Rotherham Town Centre, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 26 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 16 Jan 2025 at 15:29.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 19 Dec 2025
Details
View Map
Share
Follow
West Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 December 2025. The works will impact the footway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 6 Mar 2025 at 16:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 19 Dec 2025
Details
View Map
Share
Follow
West Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 December 2025. The works will impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Mar 2025 at 15:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 19 Dec 2025
Details
View Map
Share
Follow
West Bawtry Road

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 19 December 2025. The works will impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Mar 2025 at 15:06.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 19 Dec 2025
Details
View Map
Share
West Bawtry Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 19 December 2025. The works were due to impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Mar 2025 at 12:59.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
17 Oct and 19 Dec 2025
Details
View Map
Share
West Bawtry Road

Rotherham Metropolitan Borough Council were proposing to carry out Works for road purposes on West Bawtry Road, Moorgate, Rotherham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 19 December 2025. The works were due to impact the footway and verge.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 7 Mar 2025 at 12:55.

Yorkshire Water logo
Between
17 and 23 Oct 2025
Details
View Map
Share
Follow
Carbrook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carbrook Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jul 2025 at 11:39.

Quickline Commucations logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Follow
Grange Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 21 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 21 Aug 2025 at 10:43.

Quickline Commucations logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Follow
Grange Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Grange Lane, Thorpe Hesley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 21 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 26 Aug 2025 at 15:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Pickard Drive

Sheffield City Council were proposing to carry out Utility asset works on Pickard Drive, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Pickard Crescent

Sheffield City Council were proposing to carry out Utility asset works on Pickard Crescent, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 11:51.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Pickard Crescent

Sheffield City Council were proposing to carry out Utility asset works on Pickard Crescent, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Mosborough Parkway

Sheffield City Council were proposing to carry out Utility asset works on Mosborough Parkway, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Prince Of Wales Road

Sheffield City Council were proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 10:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Prince Of Wales Road

Sheffield City Council were proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 10:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Bowden Wood Crescent

Sheffield City Council were proposing to carry out Utility asset works on Bowden Wood Crescent, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 10:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Prince Of Wales Road

Sheffield City Council were proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 09:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Prince Of Wales Road

Sheffield City Council were proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 09:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
High Hazels Mead

Sheffield City Council were proposing to carry out Utility asset works on High Hazels Mead, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 09:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Woodbourn Road

Sheffield City Council were proposing to carry out Utility asset works on Woodbourn Road, Sheffield.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 12:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Infield Lane

Sheffield City Council were proposing to carry out Utility asset works on Infield Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 14:27.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Infield Lane

Sheffield City Council were proposing to carry out Utility asset works on Infield Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 14:27.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Main Road

Sheffield City Council were proposing to carry out Utility asset works on Main Road, Darnall, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 09:24.

T-Mobile (UK) logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Catley Road

T-Mobile (UK) are proposing to carry out Utility asset works on Catley Road, Sheffield.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Sep 2025 at 09:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Leveson Street

Sheffield City Council were proposing to carry out Utility asset works on Leveson Street, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 14:42.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Staniforth Road

Sheffield City Council were proposing to carry out Utility asset works on Staniforth Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 09:24.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Clun Street

Sheffield City Council were proposing to carry out Utility asset works on Clun Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 11:00.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Ditchingham Street

Sheffield City Council were proposing to carry out Utility asset works on Ditchingham Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 11:00.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Buckenham Street

Sheffield City Council were proposing to carry out Utility asset works on Buckenham Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 13:21.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Europa Link

Sheffield City Council were proposing to carry out Utility asset works on Europa Link, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 14:42.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Europa Link

Sheffield City Council were proposing to carry out Utility asset works on Europa Link, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 14:42.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Carlisle Street East

Sheffield City Council were proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 12:18.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Carlisle Street East

Sheffield City Council were proposing to carry out Utility asset works on Carlisle Street East, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Blayton Road

Sheffield City Council were proposing to carry out Utility asset works on Blayton Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 13:21.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Gayton Road

Sheffield City Council were proposing to carry out Utility asset works on Gayton Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:10.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Firshill Rise

Sheffield City Council were proposing to carry out Utility asset works on Firshill Rise, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 12:10.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Carbrook Street

Sheffield City Council were proposing to carry out Utility asset works on Carbrook Street, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 14:42.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Goddard Hall Road

Sheffield City Council were proposing to carry out Utility asset works on Goddard Hall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 14:43.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Wincobank Lane

Sheffield City Council were proposing to carry out Utility asset works on Wincobank Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 13:45.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Wincobank Lane

Sheffield City Council were proposing to carry out Utility asset works on Wincobank Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 12:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Skelwith Road

Sheffield City Council were proposing to carry out Utility asset works on Skelwith Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 13:21.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Herries Road

Sheffield City Council were proposing to carry out Utility asset works on Herries Road, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Wensley Street

Sheffield City Council were proposing to carry out Utility asset works on Wensley Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 12:09.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Wensley Green

Sheffield City Council were proposing to carry out Utility asset works on Wensley Green, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Hinde House Lane

Sheffield City Council were proposing to carry out Utility asset works on Hinde House Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Hinde House Lane

Sheffield City Council were proposing to carry out Utility asset works on Hinde House Lane, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 12 Sep 2025 at 13:49.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Hall Way

Sheffield City Council were proposing to carry out Utility asset works on Longley Hall Way, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Walling Close

Sheffield City Council were proposing to carry out Utility asset works on Walling Close, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:10.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Tipton Street

Sheffield City Council were proposing to carry out Utility asset works on Tipton Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:11.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Castledine Gardens

Sheffield City Council were proposing to carry out Utility asset works on Castledine Gardens, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 09:56.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Hall Way

Sheffield City Council were proposing to carry out Utility asset works on Longley Hall Way, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Castledine Croft

Sheffield City Council were proposing to carry out Utility asset works on Castledine Croft, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:10.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Sheffield Road

Sheffield City Council were proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 08:54.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Castledine Croft

Sheffield City Council were proposing to carry out Utility asset works on Castledine Croft, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:10.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Sheffield Road

Sheffield City Council were proposing to carry out Utility asset works on Sheffield Road, Tinsley, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 8 Sep 2025 at 09:20.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Castledine Croft

Sheffield City Council were proposing to carry out Utility asset works on Castledine Croft, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 13:11.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Castledine Croft

Sheffield City Council were proposing to carry out Utility asset works on Castledine Croft, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 09:24.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Hall Road

Sheffield City Council were proposing to carry out Utility asset works on Longley Hall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Hall Road

Sheffield City Council were proposing to carry out Utility asset works on Longley Hall Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Hall Rise

Sheffield City Council were proposing to carry out Utility asset works on Longley Hall Rise, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 16 Sep 2025 at 10:47.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Longley Lane

Sheffield City Council were proposing to carry out Utility asset works on Longley Lane, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 09:24.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Taunton Avenue

Sheffield City Council were proposing to carry out Utility asset works on Taunton Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 12:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Southey Green Road

Sheffield City Council were proposing to carry out Utility asset works on Southey Green Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 13:43.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Fairthorn Road

Sheffield City Council were proposing to carry out Utility asset works on Fairthorn Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 13:45.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Lindsay Road

Sheffield City Council were proposing to carry out Utility asset works on Lindsay Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 13:21.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Woodbury Close

Sheffield City Council were proposing to carry out Utility asset works on Woodbury Close, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 12:19.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Deerlands Avenue

Sheffield City Council were proposing to carry out Utility asset works on Deerlands Avenue, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 09:24.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Deerlands Avenue

Sheffield City Council were proposing to carry out Utility asset works on Deerlands Avenue, Sheffield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 12:53.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Sycamore House Road

Sheffield City Council were proposing to carry out Utility asset works on Sycamore House Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 14:43.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Concord Road

Sheffield City Council were proposing to carry out Utility asset works on Concord Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 13:43.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Concord Road

Sheffield City Council were proposing to carry out Utility asset works on Concord Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by Sheffield City Council on 17 Sep 2025 at 12:27.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Ronksley Road

Sheffield City Council were proposing to carry out Utility asset works on Ronksley Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 11 Sep 2025 at 14:44.

Sheffield City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Woolley Wood Road

Sheffield City Council were proposing to carry out Utility asset works on Woolley Wood Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 13:45.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Bradstone Road

Cadent Gas are proposing to carry out Utility asset works on Bradstone Road, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:30.

Yorkshire Water logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Hague Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Hague Lane, Wentworth, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Jun 2025 at 07:50.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Hatherley Road

Cadent Gas are proposing to carry out Utility asset works on Hatherley Road, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 13:08.

Sheffield City Council logo
Between
24 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Beaumont Close

Sheffield City Council are proposing to carry out Utility asset works on Beaumont Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 28 Aug 2025 at 13:58.

Sheffield City Council logo
LONG TERM
Between
24 Oct 2025 and 16 Apr 2026
Details
View Map
Share
Follow
Ferrars Road

Sheffield City Council are proposing to carry out Utility asset works on Ferrars Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 16 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Sep 2025 at 10:11.

Sheffield City Council logo
LONG TERM
Between
24 Oct 2025 and 16 Apr 2026
Details
View Map
Share
Follow
Ferrars Road

Sheffield City Council are proposing to carry out Utility asset works on Ferrars Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 16 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 15 Sep 2025 at 17:31.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Rawmarsh Road

Yorkshire Water are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 09:03.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Rawmarsh Road

Yorkshire Water are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 10:46.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Rawmarsh Road

Yorkshire Water are proposing to carry out Utility asset works on Rawmarsh Road, St Anns, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 08:10.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Forge Way

Yorkshire Water are proposing to carry out Utility asset works on Forge Way, Parkgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Aug 2025 at 10:10.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Forge Way

Yorkshire Water are proposing to carry out Utility asset works on Forge Way, Parkgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 10:45.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Forge Way

Yorkshire Water are proposing to carry out Utility asset works on Forge Way, Parkgate, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 15:41.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Victoria Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Victoria Street, Kilnhurst, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Sep 2025 at 13:24.

Yorkshire Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Victoria Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Victoria Street, Kilnhurst, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 13:49.

Cadent Gas logo
LONG TERM
Between
27 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Beaver Hill Road

Cadent Gas are proposing to carry out Utility asset works on Beaver Hill Road, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 14:27.

Yorkshire Water logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Olivers Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Olivers Mount, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 14:44.

Sheffield City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lindsay Road

Sheffield City Council are proposing to carry out Utility asset works on Lindsay Road, Sheffield.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 1 Sep 2025 at 15:21.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Poplar Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Poplar Avenue, Thrybergh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Aug 2025 at 13:48.

Yorkshire Water logo
Between
27 Oct and 4 Nov 2025
Details
View Map
Share
Victoria Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Victoria Street, Kilnhurst, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2025 at 07:48.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Muirfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Muirfield Avenue, Swinton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:32.

Quickline Commucations logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Old Warren Vale

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Warren Vale, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 11:39.

Quickline Commucations logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Old Warren Vale

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Old Warren Vale, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 Sep 2025 at 13:52.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Nov 2025 and 25 Feb 2026
Details
View Map
Share
Follow
Westgate

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Westgate, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 25 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2025 at 11:11.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Nov 2025 and 25 Feb 2026
Details
View Map
Share
Follow
Ship Hill

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ship Hill, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 25 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2025 at 11:12.

Rotherham Metropolitan Borough Council logo
LONG TERM
Between
1 Nov 2025 and 25 Feb 2026
Details
View Map
Share
Follow
High Street

Rotherham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Rotherham Town Centre, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 25 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 21 Aug 2025 at 11:11.

Cadent Gas logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Creswick Road

Cadent Gas are proposing to carry out Utility asset works on Creswick Road, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 11:52.

Cadent Gas logo
LONG TERM
Between
3 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Creswick Road

Cadent Gas are proposing to carry out Utility asset works on Creswick Road, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 09:31.

Cadent Gas logo
LONG TERM
Between
3 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Creswick Road

Cadent Gas are proposing to carry out Utility asset works on Creswick Road, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 13:08.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Dalton Lane

Cadent Gas are proposing to carry out Utility asset works on Dalton Lane, Dalton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 11:51.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Dalton Lane

Cadent Gas are proposing to carry out Utility asset works on Dalton Lane, Dalton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 09:30.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Dalton Lane

Cadent Gas are proposing to carry out Utility asset works on Dalton Lane, Dalton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 13:07.

Cadent Gas logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Carlisle Street

Cadent Gas were proposing to carry out Utility asset works on Carlisle Street, Kilnhurst, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 8 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 14:38.

Cadent Gas logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Carlisle Street

Cadent Gas are proposing to carry out Utility asset works on Carlisle Street, Kilnhurst, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:22.

Cadent Gas logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Langley Close

Cadent Gas are proposing to carry out Utility asset works on Langley Close, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:33.

Cadent Gas logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Creswick Road Service Road

Cadent Gas are proposing to carry out Utility asset works on Creswick Road Service Road, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:29.

Cadent Gas logo
LONG TERM
Between
10 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Newsam Road

Cadent Gas are proposing to carry out Utility asset works on Newsam Road, Kilnhurst, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:22.

Rotherham Metropolitan Borough Council logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
The Gorse

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on The Gorse, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Aug 2025 at 14:06.

Rotherham Metropolitan Borough Council logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
The Gorse

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on The Gorse, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Aug 2025 at 14:08.

Rotherham Metropolitan Borough Council logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Rose Court

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Rose Court, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Aug 2025 at 14:04.

Rotherham Metropolitan Borough Council logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Rose Court

Rotherham Metropolitan Borough Council are proposing to carry out Works for road purposes on Rose Court, Wickersley, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rotherham Metropolitan Borough Council on 20 Aug 2025 at 14:05.

Cadent Gas logo
On
23 Nov 2025
Details
View Map
Share
Follow
Dun Street

Cadent Gas are proposing to carry out Utility asset works on Dun Street, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 09:08.

Cadent Gas logo
Between
24 Nov and 24 Dec 2025
Details
View Map
Share
Follow
The Lanes

Cadent Gas are proposing to carry out Utility asset works on The Lanes, East Dene, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 11:37.

Cadent Gas logo
Between
24 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Highthorn Road

Cadent Gas are proposing to carry out Utility asset works on Highthorn Road, Kilnhurst, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:23.

Cadent Gas logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Fitzwilliam Street

Cadent Gas are proposing to carry out Utility asset works on Fitzwilliam Street, Swinton, Rotherham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:23.

Cadent Gas logo
Between
30 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Moor Lane

Cadent Gas are proposing to carry out Utility asset works on Moor Lane, Micklebring, Doncaster.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 5 December 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:41.

Cadent Gas logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Creswick Close

Cadent Gas are proposing to carry out Utility asset works on Creswick Close, East Herringthorpe, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:34.

Yorkshire Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Carbrook Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Carbrook Street, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2025 at 13:32.

Yorkshire Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Carbrook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carbrook Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 10:50.

Quickline Commucations logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Street Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Street Lane, Hoober, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 14:17.

Quickline Commucations logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Linthwaite Lane

Quickline Commucations were proposing to carry out Utility asset works on Linthwaite Lane, Wentworth, Rotherham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 14:16.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Dun Street

Cadent Gas are proposing to carry out Utility asset works on Dun Street, Swinton, Rotherham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:27.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Walker Street

Cadent Gas are proposing to carry out Utility asset works on Walker Street, Swinton, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:26.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Richmond Road

Sheffield City Council are proposing to carry out Utility asset works on Richmond Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:29.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Prince Of Wales Road

Sheffield City Council are proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:20.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Saxonlea Crescent

Sheffield City Council are proposing to carry out Utility asset works on Saxonlea Crescent, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:30.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Prince Of Wales Road

Sheffield City Council are proposing to carry out Utility asset works on Prince Of Wales Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:25.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Handsworth Road

Sheffield City Council are proposing to carry out Utility asset works on Handsworth Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:00.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Woodbourn Road

Sheffield City Council are proposing to carry out Utility asset works on Woodbourn Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:50.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Catley Road

Sheffield City Council are proposing to carry out Utility asset works on Catley Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:45.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Stadium Way

Sheffield City Council were proposing to carry out Utility asset works on Stadium Way, Sheffield.

These works were categorised as Major.

The works were originally planned to start 9 December 2025 and run through until 9 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 2 Sep 2025 at 13:54.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Stadium Way

Sheffield City Council are proposing to carry out Utility asset works on Stadium Way, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:41.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Ouseburn Croft

Sheffield City Council are proposing to carry out Utility asset works on Ouseburn Croft, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:18.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Shirland Lane

Sheffield City Council are proposing to carry out Utility asset works on Shirland Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:37.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Staniforth Road

Sheffield City Council are proposing to carry out Utility asset works on Staniforth Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:42.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Kashmir Gardens

Sheffield City Council are proposing to carry out Utility asset works on Kashmir Gardens, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:04.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Bridport Road

Sheffield City Council are proposing to carry out Utility asset works on Bridport Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:29.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Barleywood Road

Sheffield City Council are proposing to carry out Utility asset works on Barleywood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:02.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Attercliffe Road

Sheffield City Council are proposing to carry out Utility asset works on Attercliffe Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 10:38.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Attercliffe Common

Sheffield City Council are proposing to carry out Utility asset works on Attercliffe Common, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 10:46.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Brightside Lane

Sheffield City Council are proposing to carry out Utility asset works on Brightside Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:43.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Broughton Lane

Sheffield City Council are proposing to carry out Utility asset works on Broughton Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:44.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Bright Street

Sheffield City Council are proposing to carry out Utility asset works on Bright Street, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:33.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Shepcote Lane

Sheffield City Council are proposing to carry out Utility asset works on Shepcote Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:36.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Greasbro Road

Sheffield City Council are proposing to carry out Utility asset works on Greasbro Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:56.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Meadowhall Road

Sheffield City Council are proposing to carry out Utility asset works on Meadowhall Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:12.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Ferrars Close

Sheffield City Council are proposing to carry out Utility asset works on Ferrars Close, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 11:52.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Highgate

Sheffield City Council are proposing to carry out Utility asset works on Highgate, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:02.

Sheffield City Council logo
LONG TERM
Between
9 Dec 2025 and 9 Mar 2026
Details
View Map
Share
Follow
Norborough Road

Sheffield City Council are proposing to carry out Utility asset works on Norborough Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 9 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Sep 2025 at 12:14.

Quickline Commucations logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
Kilnhurst Road Service Road

Quickline Commucations are proposing to carry out Utility asset works on Kilnhurst Road Service Road, Rawmarsh, Rotherham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 15:16.


Roadworks Map near to Howard Street, ROTHERHAM, S60 1QU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 03:13
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Howard Street, ROTHERHAM, S60 1QU (132 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Rotherham Metropolitan Borough Council logo
MAJOR
  
BRIDGEGATE, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Works for road purposes - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 19 Dec 2025
0.1
Details
Share
Follow
2
Rotherham Metropolitan Borough Council logo
MAJOR
  
FREDERICK STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Works for road purposes - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 19 Dec 2025
0.1
Details
Share
Follow
3
Rotherham Metropolitan Borough Council logo
MAJOR
  
BRIDGE STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Works for road purposes - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 19 Dec 2025
0.1
Details
Share
Follow
4
Rotherham Metropolitan Borough Council logo
MAJOR
  
UPPER MILLGATE, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 1 Sep 2025 - 30 Sep 2026
0.1
Details
Share
Follow
5
Rotherham Metropolitan Borough Council logo
MAJOR
  
CHURCH STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 1 Sep 2025 - 30 Sep 2026
0.1
Details
Share
Follow
6
Rotherham Metropolitan Borough Council logo
MAJOR
  
CORPORATION STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
In Progress
Since: 29 Apr 2025 08:00
(Scheduled: 29 Apr 2025 - 28 Feb 2026)
0.1
Details
Share
Follow
7
Rotherham Metropolitan Borough Council logo
MAJOR
  
CORPORATION STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 12 May 2025 - 31 Oct 2025)
0.1
Details
Share
8
Rotherham Metropolitan Borough Council logo
MAJOR
  
CORPORATION STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 29 Apr 2025 - 31 May 2026
0.1
Details
Share
Follow
9
Rotherham Metropolitan Borough Council logo
MAJOR
  
CORPORATION STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 29 Apr 2025 - 31 May 2026
0.1
Details
Share
Follow
10
Rotherham Metropolitan Borough Council logo
MAJOR
  
CORPORATION STREET, ROTHERHAM TOWN CENTRE 
(0.1 miles)
Rotherham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 29 Apr 2025 - 31 May 2026
0.1
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.