ROADWORKS SUMMARY
Browns Edge Road, SHEFFIELD, S36 7GR
Introduction
View current and future planned roadworks and road closures for Browns Edge Road, S36 7GR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Browns Edge Road, SHEFFIELD, S36 7GR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Browns Edge Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Station Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Bus Station, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Town Gate, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:54.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Victoria Street, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:56.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Huddersfield Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:57.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Victoria Square, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:55.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Dunford Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:55.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Hollowgate, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 27 Aug 2024 at 14:50.
31 Jul 2025
Kirklees Council are carrying out Highway improvement works on Greenfield Road, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 09:30 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 5 Feb 2024 at 09:56.
14 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Burton Acres Lane, Highburton, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 12:30 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 11:26.
18 Nov 2024 and 25 Nov 2025
Kirklees Council are proposing to carry out Section 50 on Fairfields Road, Holmbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 14 Nov 2024 at 12:50.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Oakland Court, Highburton, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 12:30 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:22.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Hallas Road, Kirkburton, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 December 2024 at 14:00 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 14:35.
Tuesday
Virgin Media are proposing to carry out Utility repair and maintenance works on Huddersfield Road, Ingbirchworth, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 15:48.
Tuesday
Virgin Media are proposing to carry out Utility repair and maintenance works on Huddersfield Road, Ingbirchworth, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 15:09.
Tuesday
Virgin Media are proposing to carry out Utility repair and maintenance works on Huddersfield Road, Ingbirchworth, Barnsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 2 Oct 2024 at 15:34.
6 and 10 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Falledge Lane, Upper Denby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 31 Oct 2024 at 11:04.
6 Jan and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 16 Oct 2024 at 15:38.
6 Jan and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 08:54.
6 and 10 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Falledge Lane, Upper Denby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Oct 2024 at 14:09.
6 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burton Acres Way, Highburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 14:10.
6 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Southfield Court, Highburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 14:10.
6 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 11:35.
6 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 15:29.
6 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Highfield Road, Highburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Oct 2024 at 08:52.
7 and 10 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lane Head Road, Cawthorne, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the verge only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 07:43.
13 and 17 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 17 Dec 2024 at 13:43.
13 and 17 Jan 2025
Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 13:36.
13 and 17 Jan 2025
Quickline Commucations were proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 14:36.
13 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Burton Acres Drive, Highburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 10:03.
14 and 16 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 7 Nov 2024 at 15:36.
15 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank Street, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 11:21.
15 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank Street, Jackson Bridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 09:43.
20 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Huddersfield Road, Ingbirchworth, Barnsley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 15:27.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliff Green Road, Kirkburton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 10:18.
21 and 23 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 6 Dec 2024 at 09:43.
21 and 23 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 27 Nov 2024 at 08:31.
3 and 7 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sandy Gate, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Nov 2024 at 14:31.
4 and 6 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Rowgate, Upper Cumberworth, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 15:10.
4 and 6 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Rowgate, Upper Cumberworth, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 11:15.
5 Feb and 25 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scholes Road, Jackson Bridge, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 11:34.
5 Feb and 25 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scholes Road, Jackson Bridge, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 09:45.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapel Lane, Emley, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:59.
10 Feb and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Riley Lane, Kirkburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 14:43.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapel Lane, Emley, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 08:18.
10 and 14 Feb 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Dec 2024 at 15:17.
17 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Riley Park, Kirkburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 14:49.
17 and 21 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Town Gate, Highburton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Jul 2024 at 10:41.
18 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Horn Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 11:01.
18 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Horn Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 09:52.
24 Feb and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Side, Scholes, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 09:44.
24 Feb and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Side, Scholes, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 11:35.
3 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Town, Kirkburton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 14:50.
3 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 09:46.
3 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 11:37.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on North Road, Kirkburton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 14:51.
10 and 14 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Dec 2024 at 08:10.
Roadworks Map near to Browns Edge Road, SHEFFIELD, S36 7GR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Browns Edge Road, SHEFFIELD, S36 7GR (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.