ROADWORKS SUMMARY
Fox Holes Grove, SHEFFIELD, S36 4HN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fox Holes Grove, S36 4HN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fox Holes Grove, SHEFFIELD, S36 4HN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fox Holes Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Hollowgate

Kirklees Council are carrying out Highway improvement works on Hollowgate, Holmfirth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 09:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Jun 2025 at 13:12.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Town Gate

Kirklees Council are carrying out Highway improvement works on Town Gate, Holmfirth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 09:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 24 Jun 2025 at 10:57.

LONG TERM
Between
18 Nov 2024 and 25 Nov 2025
Details
View Map
Share
Follow
Fairfields Road

Kirklees Council are proposing to carry out Section 50 on Fairfields Road, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Nov 2024 at 12:50.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Woodhead Road

Kirklees Council are proposing to carry out Highway improvement works on Woodhead Road, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Apr 2025 at 08:02.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Woodhead Road

Kirklees Council were proposing to carry out Highway improvement works on Woodhead Road, Holmbridge, Holmfirth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 30 Apr 2025 at 14:05.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Cross Gate Road

Kirklees Council are proposing to carry out Highway improvement works on Cross Gate Road, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 14:18.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Cross Gate Road

Kirklees Council were proposing to carry out Highway improvement works on Cross Gate Road, Holmfirth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 20 May 2025 at 12:08.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are proposing to carry out Highway improvement works on Wakefield Road, Denby Dale, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 24 Mar 2025 at 14:29.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Wakefield Road

Kirklees Council are carrying out Highway improvement works on Wakefield Road, Denby Dale, Huddersfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 19 May 2025 at 09:39.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Barnsley Road

Kirklees Council are proposing to carry out Highway improvement works on Barnsley Road, Upper Cumberworth, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 24 Mar 2025 at 14:23.

Yorkshire Water logo
LONG TERM
Between
7 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Yorkshire Water are proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 1 Jul 2025 at 09:22.

Yorkshire Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Yorkshire Water are carrying out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2025 at 09:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 09:55.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 26 Sep 2025
Details
View Map
Share
Roughbirchworth Lane

Yorkshire Water were proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Jun 2025 at 10:46.

Yorkshire Water logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are carrying out Utility asset works on Huddersfield Road, Shelley, Huddersfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 09:22.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 17 Oct 2025
Details
View Map
Share
Dam Hill

Yorkshire Water were proposing to carry out Utility asset works on Dam Hill, Shelley, Huddersfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Jun 2025 at 11:01.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Dam Hill

Yorkshire Water are proposing to carry out Utility asset works on Dam Hill, Shelley, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Jul 2025 at 10:33.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 13:49.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Hartcliff Road

Yorkshire Water are carrying out Utility asset works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 09:45 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2025 at 09:17.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bromley Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Avenue, New Mill, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 10:13.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Sycamore Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sycamore Rise, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 10:12.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Rosegarth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosegarth Avenue, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:03.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Rosegarth Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Rosegarth Avenue, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 11:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 12:10.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Rosegarth Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Rosegarth Avenue, Wooldale, Holmfirth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 12:24.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jul 2025 at 11:47.

Yorkshire Water logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Shelley Woodhouse Lane

Yorkshire Water are carrying out Utility asset works on Shelley Woodhouse Lane, Shelley, Huddersfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 09:24.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Little Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Lane, Wooldale, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 15:12.

Northern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out New service connection on New Mill Road, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 09:45.

Northern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out New service connection on New Mill Road, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 08:01.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
Dean Brook Road

Quickline Commucations are proposing to carry out Utility asset works on Dean Brook Road, Netherthong, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 9 Jul 2025 at 10:34.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
Dean Brook Road

Quickline Commucations are carrying out Utility asset works on Dean Brook Road, Netherthong, Holmfirth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 8 Sep 2025 at 10:37.

Yorkshire Water logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Penistone Road

Yorkshire Water are proposing to carry out Utility asset works on Penistone Road, Shelley, Huddersfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Jul 2025 at 10:32.

Northern Gas Networks logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Little Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Little Lane, Wooldale, Holmfirth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 08:14.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Rosegarth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosegarth Avenue, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 10:15.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Wooldale, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 13:49.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hollin Edge

Yorkshire Water are carrying out Utility repair and maintenance works on Hollin Edge, Denby Dale, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:10 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 07:01.

BT logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Luke Lane

BT are proposing to carry out Utility asset works on Luke Lane, Thongsbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jul 2025 at 08:26.

BT logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Luke Lane

BT are carrying out Utility asset works on Luke Lane, Thongsbridge, Holmfirth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 15:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2025 at 14:46.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
High Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on High Lee Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
High Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on High Lee Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Sep 2025 at 14:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road A628

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road A628, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:02.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road A628

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road A628, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 18 Sep 2025 at 14:44.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road, Penistone, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:03.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Barnsley Road

Quickline Commucations are proposing to carry out Utility asset works on Barnsley Road, Penistone, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 08:54.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Halifax Road

Quickline Commucations are proposing to carry out Utility asset works on Halifax Road, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 11:01.

Quickline Commucations logo
Between
21 and 28 Sep 2025
Details
View Map
Share
Follow
Halifax Road

Quickline Commucations are proposing to carry out Utility asset works on Halifax Road, Hoylandswaine, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 18 Sep 2025 at 14:45.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hartcliff Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 21 Jul 2025 at 12:34.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hartcliff Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Hartcliff Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 4 Aug 2025 at 14:29.

Barnsley Metropolitan Borough Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cat Hill Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cat Hill Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Sep 2025 at 14:49.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
St George's Road

BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Jul 2025 at 09:53.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
St George's Road

BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Aug 2025 at 13:22.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
St George's Road

BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Aug 2025 at 12:06.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Ryefields

BT are proposing to carry out Utility asset works on Ryefields, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Jul 2025 at 09:54.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Ryefields

BT are proposing to carry out Utility asset works on Ryefields, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Aug 2025 at 13:19.

BT logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Ryefields

BT are proposing to carry out Utility asset works on Ryefields, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Aug 2025 at 14:54.

Northern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Miry Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miry Lane, Thongsbridge, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jul 2025 at 09:22.

Northern Gas Networks logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Longlands Bank

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longlands Bank, Thongsbridge, Holmfirth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jul 2025 at 09:23.

Northern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Aug 2025 at 12:58.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Oxspring Road

Yorkshire Water were proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Jun 2025 at 08:48.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Yorkshire Water are proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jul 2025 at 16:36.

Yorkshire Water logo
Between
24 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Yorkshire Water are proposing to carry out Utility asset works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 10:24.

Barnsley Metropolitan Borough Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Brockholes Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brockholes Lane, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Sep 2025 at 07:56.

Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Wooldale Road

Kirklees Council are proposing to carry out Highway improvement works on Wooldale Road, Wooldale, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 4 Aug 2025 at 11:18.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Chapel Lane

Sheffield City Council were proposing to carry out Utility asset works on Chapel Lane, Midhopestones, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Aug 2025 at 11:46.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Midhope Hall Lane

Sheffield City Council were proposing to carry out Utility asset works on Midhope Hall Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Aug 2025 at 11:46.

Sheffield City Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Midhope Lane

Sheffield City Council were proposing to carry out Utility asset works on Midhope Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 27 Aug 2025 at 11:46.

Yorkshire Water logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Cross Lane

Yorkshire Water were proposing to carry out Utility asset works on Cross Lane, Snowden Hill, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Jun 2025 at 10:47.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Royd Avenue

Quickline Commucations are proposing to carry out Utility asset works on Royd Avenue, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:39.

Quickline Commucations logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Royd Avenue

Quickline Commucations are proposing to carry out Utility asset works on Royd Avenue, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 11:58.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 12:20.

Northern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 09:34.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Woodlands Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Woodlands Avenue, Thongsbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Aug 2025 at 13:21.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Woodlands Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Woodlands Avenue, Thongsbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Aug 2025 at 15:11.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
New Row Lane

Quickline Commucations are proposing to carry out Utility asset works on New Row Lane, Ingbirchworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 22 Aug 2025 at 13:22.

Quickline Commucations logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
New Row Lane

Quickline Commucations are proposing to carry out Utility asset works on New Row Lane, Ingbirchworth, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Sep 2025 at 12:16.

Quickline Commucations logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Millhouse Lane

Quickline Commucations are proposing to carry out Utility asset works on Millhouse Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 09:35.

Quickline Commucations logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Millhouse Lane

Quickline Commucations are proposing to carry out Utility asset works on Millhouse Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 10:15.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Long Lane

Quickline Commucations are proposing to carry out Utility asset works on Long Lane, Penistone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 08:49.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Roughbirchworth Lane

Quickline Commucations are proposing to carry out Utility asset works on Roughbirchworth Lane, Oxspring, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 09:11.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hill Side Lane

Quickline Commucations are proposing to carry out Utility asset works on Hill Side Lane, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 14:09.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hill Side Lane

Quickline Commucations are proposing to carry out Utility asset works on Hill Side Lane, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 15:48.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hornthwaite Hill Road

Quickline Commucations are proposing to carry out Utility asset works on Hornthwaite Hill Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 14:04.

Quickline Commucations logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Hornthwaite Hill Road

Quickline Commucations are proposing to carry out Utility asset works on Hornthwaite Hill Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 15:50.

Northern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
New Mill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 13:49.

Yorkshire Water logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Thunder Bridge Lane

Yorkshire Water are proposing to carry out Utility asset works on Thunder Bridge Lane, Kirkburton, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Jul 2025 at 10:33.

Quickline Commucations logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Oxspring Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Oxspring Road, Cubley, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 15:07.

Barnsley Metropolitan Borough Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Lower Maythorn Lane

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lower Maythorn Lane, Whitley Common, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 27 Aug 2025 at 11:34.

Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Wooldale Road

Kirklees Council are proposing to carry out Highway improvement works on Wooldale Road, Wooldale, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 14:36.

Northern Gas Networks logo
Between
13 and 30 Oct 2025
Details
View Map
Share
Follow
St George's Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 11:59.

Northern Gas Networks logo
Between
13 and 30 Oct 2025
Details
View Map
Share
Follow
Park Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Side, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 12:00.

Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Horn Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Horn Lane, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Aug 2025 at 12:04.

Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Sude Hill

Kirklees Council are proposing to carry out Highway repair and maintenance works on Sude Hill, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Aug 2025 at 12:03.

Quickline Commucations logo
Between
16 and 22 Oct 2025
Details
View Map
Share
Follow
Don View

Quickline Commucations are proposing to carry out Utility asset works on Don View, Dunford Bridge, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 3 Sep 2025 at 13:53.

Quickline Commucations logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Brook Hill Lane

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Brook Hill Lane, Dunford Bridge, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:03.

Quickline Commucations logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Brook Hill Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Brook Hill Lane, Dunford Bridge, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:04.

Quickline Commucations logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Brook Hill Lane

Quickline Commucations are proposing to carry out Utility asset works on Brook Hill Lane, Carlecotes, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:03.

BT logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
St George's Road

BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Aug 2025 at 11:22.

Northern Gas Networks logo
Between
21 and 27 Oct 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 09:15.

Northern Gas Networks logo
Between
21 and 27 Oct 2025
Details
View Map
Share
Follow
King Street

Northern Gas Networks are proposing to carry out New service connection on King Street, Skelmanthorpe, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 13:12.

Quickline Commucations logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Whams Road

Quickline Commucations are proposing to carry out Utility asset works on Whams Road, Hazlehead, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 12:35.

Quickline Commucations logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on Lee Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 12:32.

Quickline Commucations logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Bents Road

Quickline Commucations are proposing to carry out Utility asset works on Bents Road, Hazlehead, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 12:34.

Quickline Commucations logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Whams Road

Quickline Commucations are proposing to carry out Utility asset works on Whams Road, Crow Edge, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2025 at 12:33.

Quickline Commucations logo
Between
24 and 28 Oct 2025
Details
View Map
Share
Follow
Shore Hall Lane

Quickline Commucations are proposing to carry out Utility asset works on Shore Hall Lane, Millhouse Green, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 28 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 2 Sep 2025 at 10:21.

Northern Gas Networks logo
Between
24 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Kirkroyds Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkroyds Lane, New Mill, Holmfirth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jul 2025 at 13:12.

Quickline Commucations logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Crabtree Hill Lane

Quickline Commucations are proposing to carry out Utility asset works on Crabtree Hill Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 Sep 2025 at 08:25.

Quickline Commucations logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Renald Lane

Quickline Commucations are proposing to carry out Utility asset works on Renald Lane, Hoylandswaine, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 12 Sep 2025 at 08:27.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Dobb Top Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dobb Top Road, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:07.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Hollin Brigg Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Brigg Lane, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:06.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Dobb Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dobb Lane, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:07.

Between
28 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Upperthong Lane

Kirklees Council are proposing to carry out Section 50 on Upperthong Lane, Upperthong, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 27 Aug 2025 at 15:07.

Northern Powergrid (Yorkshire) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Royd Moor Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Royd Moor Road, Thurlstone, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 10:10.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Paris Road

BT are proposing to carry out Utility asset works on Paris Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Sep 2025 at 16:38.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
St George's Road

BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Aug 2025 at 08:41.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Ryefields

BT are proposing to carry out Utility asset works on Ryefields, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 09:16.

Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Horn Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Horn Lane, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 11:24.

Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sude Hill

Kirklees Council are proposing to carry out Highway repair and maintenance works on Sude Hill, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 11:25.

Yorkshire Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 14:14.

Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Sandy Gate

Kirklees Council are proposing to carry out Highway repair and maintenance works on Sandy Gate, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 12:09.

Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Cinder Hills Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Cinder Hills Road, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 12:08.

Yorkshire Water logo
Between
19 and 26 Nov 2025
Details
View Map
Share
Follow
Field End Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 13:55.

Yorkshire Water logo
Between
19 and 26 Nov 2025
Details
View Map
Share
Follow
Field End Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Field End Lane, Holmbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 11:07.

Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Victoria Street

Kirklees Council are proposing to carry out Permanent reinstatement on Victoria Street, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:10.

Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Victoria Street

Kirklees Council are proposing to carry out Permanent reinstatement on Victoria Street, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 15:30.

BT logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Wooldale Road

BT are proposing to carry out Utility asset works on Wooldale Road, Wooldale, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2025 at 14:26.

BT logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Follow
Out Lane

BT are proposing to carry out Utility asset works on Out Lane, Netherthong, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Sep 2025 at 13:57.

Yorkshire Water logo
Between
20 and 22 Nov 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 08:25.

Yorkshire Water logo
Between
20 and 22 Nov 2025
Details
View Map
Share
Follow
Huddersfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 08:23.

BT logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Paris Road

BT are proposing to carry out Utility asset works on Paris Road, Scholes, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Sep 2025 at 08:38.

Between
22 and 28 Nov 2025
Details
View Map
Share
Follow
Town Gate

Kirklees Council are proposing to carry out Permanent reinstatement on Town Gate, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:14.

Between
22 and 28 Nov 2025
Details
View Map
Share
Follow
Town Gate

Kirklees Council are proposing to carry out Permanent reinstatement on Town Gate, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 15:29.

Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Permanent reinstatement on Huddersfield Road, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:21.

Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Permanent reinstatement on Huddersfield Road, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 15:28.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Woodlands Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Thongsbridge, Holmfirth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2025 at 14:19.

Yorkshire Water logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Birks Lane

Yorkshire Water are proposing to carry out Utility asset works on Birks Lane, Stocksmoor, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Jul 2025 at 10:33.


Roadworks Map near to Fox Holes Grove, SHEFFIELD, S36 4HN (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fox Holes Grove, SHEFFIELD, S36 4HN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.