ROADWORKS SUMMARY
Bridgwater Walk, ROMFORD, RM3 7TB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bridgwater Walk, RM3 7TB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bridgwater Walk, ROMFORD, RM3 7TB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bridgwater Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Access Road

Essex County Council are carrying out Highway improvement works on Access Road, Brentwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2023 at 00:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 10:01.

National Highways logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

National Highways logo
LONG TERM
Between
2 Oct 2024 and 1 Jun 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.

Essex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Dagwood Lane

Essex County Council are carrying out Remedial works on Dagwood Lane, Doddinghurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 14:29 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 10:58.

Cadent Gas logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Waycross Road

Cadent Gas are carrying out Utility asset works on Waycross Road, Upminster.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:24 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Western Avenue

Cadent Gas are proposing to carry out Utility asset works on Western Avenue, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 15:26.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jan 2025 at 13:23.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Follow
A1023 Spur From M25 J28 Roundabout

National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 13 Dec 2024 at 16:30.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Follow
A1023 Spur From M25 J28 Roundabout

National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 4 Feb 2025 at 16:30.

Cadent Gas logo
LONG TERM
Until
10 Mar 2025
Details
View Map
Share
Follow
Western Avenue

Cadent Gas are carrying out Utility asset works on Western Avenue, Brentwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 08:50 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 09:13.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Priests Lane

Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 15:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Cadent Gas logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are carrying out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 12:03 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 12:26.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Upper Brentwood Road

Cadent Gas were proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 11:45.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Priests Lane

Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 06:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Warley Hill

Cadent Gas are carrying out Utility repair and maintenance works on Warley Hill, Warley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 14:59 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:09.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Little Warley Hall Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 11:30.

Finishing
Today
Details
View Map
Share
Follow
Squirrels Heath Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Squirrels Heath Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 11:37.

Finishing
Tomorrow
Details
View Map
Share
Follow
Squirrels Heath Road

London Borough Of Havering are carrying out Highway repair and maintenance works on Squirrels Heath Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 19:30 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 11 Feb 2025 at 13:57.

Cadent Gas logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Avon Road

Cadent Gas are carrying out Utility repair and maintenance works on Avon Road, Upminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 13:43 and could run through until 20 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 14:52.

Finishing
Wednesday
Details
View Map
Share
Follow
Mashiters Hill

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Mashiters Hill, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 07:50 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 12 Feb 2025 at 08:13.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jan 2025 at 12:50.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Feb 2025 at 10:51.

National Highways logo
Between
16 and 20 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Jan 2025 at 15:45.

National Highways logo
Between
16 and 20 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 29 Jan 2025 at 09:58.

Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.

Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 16:54.

LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Straight Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Straight Road, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:57.

LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Straight Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Straight Road, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 31 Jan 2025 at 08:54.

National Highways logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Feb 2025 at 11:28.

Between
19 and 21 Feb 2025
Details
View Map
Share
Dagnam Park Drive

London Borough Of Havering were proposing to carry out Remedial works on Dagnam Park Drive, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 07:37.

National Highways logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway repair and maintenance works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Feb 2025 at 11:34.

Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Dagnam Park Drive

London Borough Of Havering are proposing to carry out Remedial works on Dagnam Park Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 09:27.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Standen Avenue

London Borough Of Havering are proposing to carry out roadworks on Standen Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Feb 2025 at 09:28.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Baron Road

Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Dec 2024 at 09:37.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hubbards Chase

UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:38.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hubbards Chase

UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 15:57.

Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Mawney Road

London Borough Of Havering are proposing to carry out Highway improvement works on Mawney Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Feb 2025 at 11:40.

Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Mawney Road

London Borough Of Havering are proposing to carry out Highway improvement works on Mawney Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Feb 2025 at 13:05.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:08.

Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.

National Highways logo
Between
24 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Maylands Way

National Highways are proposing to carry out Highway improvement works on Maylands Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Feb 2025 at 15:50.

National Highways logo
Between
24 Feb and 22 Mar 2025
Details
View Map
Share
Follow
Maylands Way

National Highways are proposing to carry out Highway improvement works on Maylands Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Feb 2025 at 15:54.

Affinity Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
School Road

Affinity Water are proposing to carry out Utility repair and maintenance works on School Road, Stondon Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 12:01.

Affinity Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
School Road

Affinity Water are proposing to carry out Utility repair and maintenance works on School Road, Stondon Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 7 Jan 2025 at 14:30.

LONG TERM
Between
3 Mar and 5 Apr 2025
Details
View Map
Share
Follow
North Road

London Borough Of Havering are proposing to carry out Highway improvement works on North Road, Havering-atte-bower, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:46.

Essex County Council logo
Between
3 and 15 Mar 2025
Details
View Map
Share
Follow
Ongar Road

Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Jan 2025 at 06:01.

Essex County Council logo
Between
3 and 15 Mar 2025
Details
View Map
Share
Follow
Ongar Road

Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Jan 2025 at 16:22.

UK Power Networks Eastern & London logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Lancaster Close

UK Power Networks Eastern & London were proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:37.

UK Power Networks Eastern & London logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Hubbards Chase

UK Power Networks Eastern & London were proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:19.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:46.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:55.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:44.

UK Power Networks Eastern & London logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Stanhope Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:35.

Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Straight Road

London Borough Of Havering are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 4 Feb 2025 at 11:32.

Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Straight Road

London Borough Of Havering are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 13:05.

London Borough Of Barking And Dagenham logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Rusholme Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:39.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:38.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:27.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:07.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:51.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:06.

Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Tees Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Dec 2024 at 15:04.

Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Tees Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Jan 2025 at 15:30.

UK Power Networks Eastern & London logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Manor Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Manor Road, Lambourne, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:29.

Essex County Council logo
Between
11 and 15 Mar 2025
Details
View Map
Share
Follow
Western Road

Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 11:22.

Essex County Council logo
Between
11 and 15 Mar 2025
Details
View Map
Share
Follow
Western Avenue

Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 11:27.

Between
14 and 17 Mar 2025
Details
View Map
Share
Follow
Swindon Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Swindon Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 11:01.

Between
14 and 17 Mar 2025
Details
View Map
Share
Follow
Swindon Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Swindon Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 13:27.

Cadent Gas logo
LONG TERM
Between
17 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Gregory Road

Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Cadent Gas logo
LONG TERM
Between
17 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Gregory Road

Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:21.

Cadent Gas logo
Between
17 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Cadent Gas logo
Between
17 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Stafford Avenue

BT are proposing to carry out Utility asset works on Stafford Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jan 2025 at 14:47.

Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Minster Way

London Borough Of Havering are proposing to carry out Highway improvement works on Minster Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 11:03.

Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Minster Way

London Borough Of Havering are proposing to carry out Highway improvement works on Minster Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 13:31.

UK Power Networks Eastern & London logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Limbourne Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:43.

UK Power Networks Eastern & London logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Limbourne Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Feb 2025 at 11:27.

Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Hillcrest Road

London Borough Of Havering are proposing to carry out Highway improvement works on Hillcrest Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 11:03.

Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Hillcrest Road

London Borough Of Havering are proposing to carry out Highway improvement works on Hillcrest Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 5 Feb 2025 at 13:34.

Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Shepherds Hill

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Shepherds Hill, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 31 Jan 2025 at 10:45.

Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Chase Cross Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Chase Cross Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Feb 2025 at 12:33.

National Highways logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 10:18.

Essex County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Coopers Close

Essex County Council are proposing to carry out Highway improvement works on Coopers Close, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 08:58.

Cadent Gas logo
Between
27 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Tan House Lane

Cadent Gas are proposing to carry out Utility asset works on Tan House Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:05.

Cadent Gas logo
Between
27 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Tan House Lane

Cadent Gas are proposing to carry out Utility asset works on Tan House Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 10:02.

Cadent Gas logo
Between
27 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Tan House Lane

Cadent Gas are proposing to carry out Utility asset works on Tan House Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 13:32.

Between
28 Mar and 26 Apr 2025
Details
View Map
Share
Follow
Winifred Avenue

London Borough Of Havering are proposing to carry out roadworks on Winifred Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Feb 2025 at 09:28.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:54.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:51.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:52.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:49.

National Highways logo
Between
4 and 7 Apr 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 10:56.

Cadent Gas logo
LONG TERM
Between
6 Apr and 26 Jun 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Harold Wood, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 10:14.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Little Warley Hall Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Feb 2025 at 11:20.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Warley Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 17 Jan 2025 at 11:58.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Warley Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 29 Jan 2025 at 14:09.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Lodge Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2025 at 15:21.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Hall Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 7 Feb 2025 at 15:42.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Ongar Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ongar Road, Lambourne, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2025 at 14:17.

BT logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
St Edwards Way

BT are proposing to carry out Utility asset works on St Edwards Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Feb 2025 at 13:01.

BT logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
St Edwards Way

BT are proposing to carry out Utility asset works on St Edwards Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Feb 2025 at 10:41.

Cornerstone Telecommunications Infrastructure logo
Between
10 and 13 Apr 2025
Details
View Map
Share
Follow
Valence Avenue

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Valence Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 13 April 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Jan 2025 at 13:39.

Cadent Gas logo
Between
10 Apr and 1 May 2025
Details
View Map
Share
Follow
Princes Road

Cadent Gas are proposing to carry out Utility asset works on Princes Road, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:01.

Cadent Gas logo
Between
10 Apr and 1 May 2025
Details
View Map
Share
Follow
Princes Road

Cadent Gas are proposing to carry out Utility asset works on Princes Road, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 10:14.

National Highways logo
Between
11 and 14 Apr 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Feb 2025 at 10:04.

Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Hall Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 7 Feb 2025 at 13:44.

Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Hulletts Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Hulletts Lane, Pilgrims Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 4 Feb 2025 at 12:26.

Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Hulletts Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Hulletts Lane, Pilgrims Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 10 Feb 2025 at 11:29.

Cadent Gas logo
LONG TERM
Between
17 Apr and 23 May 2025
Details
View Map
Share
Follow
Navestock Side

Cadent Gas are proposing to carry out Utility asset works on Navestock Side, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:19.

Cadent Gas logo
LONG TERM
Between
17 Apr and 23 May 2025
Details
View Map
Share
Follow
Navestock Side

Cadent Gas are proposing to carry out Utility asset works on Navestock Side, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 09:54.

Cadent Gas logo
LONG TERM
Between
17 Apr and 23 May 2025
Details
View Map
Share
Follow
Navestock Side

Cadent Gas are proposing to carry out Utility asset works on Navestock Side, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:03.

National Highways logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Works for road purposes on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Dec 2024 at 08:55.

National Highways logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 26 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Jan 2025 at 15:24.

Between
22 Apr and 16 May 2025
Details
View Map
Share
Follow
Wigley Bush Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wigley Bush Lane, South Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Jan 2025 at 11:18.

UK Power Networks Eastern & London logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Marden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Feb 2025 at 15:39.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:51.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:50.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:59.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 12:03.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:03.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:42.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:58.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:37.

Essex County Council logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Follow
Hook Lane

Essex County Council are proposing to carry out Highway improvement works on Hook Lane, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 14:39.

Affinity Water logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Horseman Side

Affinity Water are proposing to carry out Utility repair and maintenance works on Horseman Side, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 28 Jan 2025 at 09:12.

Between
6 and 8 May 2025
Details
View Map
Share
Follow
Horndon Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Horndon Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 12:00.

UK Power Networks Eastern & London logo
Between
8 and 14 May 2025
Details
View Map
Share
Ongar Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Ongar Road, Lambourne, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 14 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Feb 2025 at 16:10.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Tawney Lane

BT are proposing to carry out Utility asset works on Tawney Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Jan 2025 at 09:02.


Roadworks Map near to Bridgwater Walk, ROMFORD, RM3 7TB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 03:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bridgwater Walk, ROMFORD, RM3 7TB (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
TAUNTON ROAD 
(0.1 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 12 Feb 2025 08:00
(Scheduled: 12 Feb 2025 - 14 Feb 2025)
0.1
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
MONTGOMERY CRESCENT 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
7 Feb 2025 11:28 - 10 Feb 2025 20:33
0.2
Details
Share
3
FARNHAM ROAD 
(0.2 miles)
London Borough Of Havering
Remedial works - Footpath - No carriageway incursion
Planned
Scheduled: 10 Feb 2025 - 21 Feb 2025
0.2
Details
Share
Follow
4
WEST DENE DRIVE, HAROLD HILL 
(0.2 miles)
London Borough Of Havering
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 10 Feb 2025 - 21 Feb 2025
0.2
Details
Share
Follow
5
FARNHAM ROAD 
(0.3 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Feb 2025 14:20 - 15:20
0.3
Details
Share
6
EAST DENE DRIVE, HAROLD HILL 
(0.3 miles)
London Borough Of Havering
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 10 Feb 2025 - 21 Feb 2025
0.3
Details
Share
Follow
7
LOWER BEDFORDS ROAD 
(0.5 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 11 Feb 2025 08:00
(Scheduled: 11 Feb 2025 - 13 Feb 2025)
0.5
Details
Share
Follow
8
UK Power Networks Eastern & London logo
URGENT
  
LAVENDER CLOSE 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 12 Feb 2025 14:39
(Scheduled: 12 Feb 2025 - 18 Feb 2025)
0.6
Details
Share
Follow
9
NOAK HILL ROAD 
(0.7 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 10 Feb 2025 09:30
(Scheduled: 10 Feb 2025 - 21 Feb 2025)
0.7
Details
Share
Follow
10
BT logo
MORRIS ROAD 
(0.8 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 12 Feb 2025 10:45
(Scheduled: 12 Feb 2025 - 14 Feb 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data