ROADWORKS SUMMARY
Craven Gardens, ROMFORD, RM3 0DF
Introduction
View current and future planned roadworks and road closures for Craven Gardens, RM3 0DF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Craven Gardens, ROMFORD, RM3 0DF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Craven Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
24 Mar 2025 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Brookfield Close, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 October 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Feb 2025 at 08:55.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Faringdon Avenue, Romford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 17:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Sep 2026 at 15:47.
19 Oct 2026
Cadent Gas are carrying out Utility asset works on Ardleigh Green Road, Hornchurch.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 12:27 and could run through until 19 October 2026. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 15:19.
Friday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Daventry Road, Romford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 22 Sep 2026 at 16:25.
15 Oct 2026
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Edenhall Close, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 11:58 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 4 Sep 2026 at 15:37.
16 Oct 2026
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Edenhall Glen, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:45 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2026 at 08:45.
21 Sep and 16 Oct 2026
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Havering Road, Romford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 16 October 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Aug 2026 at 10:29.
30 Sep 2026
Cadent Gas are carrying out Utility repair and maintenance works on Hornchurch Road, Hornchurch.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 September 2026 at 18:07 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 12:04.
30 Sep 2026
Cadent Gas are carrying out Utility repair and maintenance works on Hornchurch Road, Hornchurch.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 September 2026 at 18:07 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 16:17.
Friday
London Borough Of Havering are carrying out Highway improvement works on Ennerdale Avenue, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 Sep 2026 at 08:05.
Tuesday
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Whalebone Lane North, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Aug 2026 at 10:22.
28 Sep and 2 Oct 2026
Essex And Suffolk Water are proposing to carry out New service connection on Priory Grove, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 22 Sep 2026 at 16:49.
28 Sep and 2 Oct 2026
Essex And Suffolk Water are proposing to carry out New service connection on Priory Grove, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Aug 2026 at 11:43.
28 Sep and 28 Oct 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wigton Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2026 at 15:26.
29 Sep and 5 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhill Close, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 10:29.
29 Sep and 5 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhill Close, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2026 at 16:26.
29 Sep and 5 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Old Road, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 10 Jul 2026 at 15:42.
29 Sep and 5 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Old Road, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Sep 2026 at 12:47.
1 and 3 Oct 2026
Telefonica UK are proposing to carry out Utility asset works on Childerditch Lane, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 20 Aug 2026 at 09:38.
2 and 5 Oct 2026
National Highways are proposing to carry out Highway repair and maintenance works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Sep 2026 at 10:53.
5 and 7 Oct 2026
BT are proposing to carry out Utility asset works on Beredens Lane, Essex, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Jul 2026 at 15:25.
12 Oct and 6 Nov 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Broseley Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2026 at 15:35.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Wednesbury Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jul 2026 at 12:35.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Wednesbury Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2026 at 15:48.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Wednesbury Gardens, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jul 2026 at 13:05.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Wednesbury Gardens, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2026 at 15:48.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Barnsley Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jul 2026 at 11:03.
12 and 14 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Barnsley Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2026 at 15:49.
19 and 23 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Kinfauns Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jul 2026 at 16:31.
19 and 21 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Essex Way, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Jun 2026 at 22:09.
19 Oct 2026 and 27 Feb 2027
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 27 February 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:27.
19 and 23 Oct 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Kinfauns Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2026 at 15:48.
19 Oct 2026 and 27 Feb 2027
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 27 February 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:27.
19 Oct 2026 and 27 Feb 2027
Essex County Council were proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 27 February 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:50.
19 Oct and 13 Nov 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dorking Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 8 Sep 2026 at 14:14.
19 Oct and 13 Nov 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dorking Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2026 at 15:41.
19 Oct 2026 and 27 Feb 2027
Essex County Council were proposing to carry out Highway improvement works on London Road, South Weald, Brentwood.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 27 February 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:51.
19 Oct 2026 and 27 Feb 2027
Essex County Council were proposing to carry out Highway improvement works on London Road, Brentwood.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 27 February 2027. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:53.
20 and 27 Oct 2026
Gigaclear are proposing to carry out Utility asset works on Church Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Sep 2026 at 09:51.
20 and 27 Oct 2026
Gigaclear are proposing to carry out Utility asset works on Church Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 5 Sep 2026 at 15:47.
24 Oct and 1 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Alexander Lane, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 18 Aug 2026 at 09:12.
24 Oct and 1 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Alexander Lane, Shenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex County Council on 28 Aug 2026 at 11:32.
26 Oct and 6 Nov 2026
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Keswick Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 5 Aug 2026 at 09:52.
26 and 28 Oct 2026
BT are proposing to carry out Utility asset works on Church Lane, Essex, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 23 Jul 2026 at 08:56.
26 and 28 Oct 2026
Gigaclear are proposing to carry out Utility asset works on Kelvedon Hall Lane, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 5 Sep 2026 at 15:40.
26 and 28 Oct 2026
Gigaclear are proposing to carry out Utility asset works on Kelvedon Hall Lane, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Sep 2026 at 10:04.
27 and 30 Oct 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Highview Crescent, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2026 at 10:12.
27 and 30 Oct 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Highview Crescent, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 5 Sep 2026 at 12:07.
2 and 27 Nov 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Broseley Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 2 Sep 2026 at 16:31.
2 and 6 Nov 2026
BT are proposing to carry out Utility asset works on Weald Road, Essex, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 20 Aug 2026 at 14:11.
2 and 4 Nov 2026
BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the verge only.
This roadwork event was last updated by BT on 28 Aug 2026 at 16:32.
2 and 6 Nov 2026
BT are proposing to carry out Utility asset works on Weald Road, Essex, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Aug 2026 at 13:50.
3 and 6 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Brockley Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.
3 and 6 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Burchwall Close, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.
3 and 6 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Fullers Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.
5 and 24 Nov 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Hillrise Road, Romford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Sep 2026 at 15:45.
6 and 10 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Myrtle Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2026 and could run through until 10 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Sep 2026 at 10:16.
9 and 11 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Weald Road, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Aug 2026 at 14:10.
9 and 11 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Weald Road, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Aug 2026 at 11:27.
9 and 21 Nov 2026
National Highways are proposing to carry out Works for road purposes on Pea Lane, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 21 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 23 Sep 2026 at 18:37.
9 and 12 Nov 2026
National Highways were proposing to carry out Works for road purposes on Dennis Road, South Ockendon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 12 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Sep 2026 at 09:34.
9 Nov and 11 Dec 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Priests Field, Ingrave.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 14 Sep 2026 at 08:52.
10 Nov 2026 and 2 Feb 2027
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Shenfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 2 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 17 Sep 2026 at 09:36.
11 and 17 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chevington Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 10:09.
11 and 17 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chevington Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2026 at 09:56.
11 and 14 Nov 2026
National Highways are proposing to carry out Works for road purposes on Dennis Road, South Ockendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Sep 2026 at 14:19.
16 Nov 2026 and 3 Apr 2027
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 3 April 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 5 Sep 2026 at 13:07.
16 and 18 Nov 2026
Affinity Water are proposing to carry out Remedial works on Blackmore Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Sep 2026 at 13:37.
16 Nov 2026 and 3 Apr 2027
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 3 April 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 5 Sep 2026 at 13:22.
16 Nov 2026 and 3 Apr 2027
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Brentwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 3 April 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Sep 2026 at 13:07.
16 Nov 2026 and 3 Apr 2027
Essex County Council are proposing to carry out Highway improvement works on London Road, Brentwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 3 April 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Sep 2026 at 13:13.
16 Nov 2026 and 3 Apr 2027
Essex County Council are proposing to carry out Highway improvement works on London Road, South Weald, Brentwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 3 April 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Sep 2026 at 13:10.
18 and 20 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Springfield Gardens, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 16:05.
18 and 20 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Springfield Gardens, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 16:05.
18 and 20 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Wheelers Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Sep 2026 at 15:56.
23 Nov and 4 Dec 2026
BT are proposing to carry out Utility asset works on Dark Lane, Essex, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 14 Sep 2026 at 16:04.
23 and 25 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Coxtie Green Road, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Aug 2026 at 14:03.
25 and 27 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on East Road, Rush Green, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 12:11.
25 Nov and 1 Dec 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Whalebone Lane North, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 26 Aug 2026 at 13:57.
25 and 27 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Coxtie Green Road, Pilgrims Hatch, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Sep 2026 at 06:25.
25 and 27 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Coxtie Green Road, Pilgrims Hatch, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Sep 2026 at 14:10.
25 and 27 Nov 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Lilliput Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 12:09.
30 Nov and 4 Dec 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Fentiman Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2026 at 09:10.
30 Nov and 3 Dec 2026
London Borough Of Havering are proposing to carry out Highway improvement works on Woodstock Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 3 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 16:05.
30 Nov and 6 Dec 2026
T-Mobile (UK) are proposing to carry out Utility asset works on Lawrence Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 6 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 7 Sep 2026 at 16:12.
30 Nov and 6 Dec 2026
T-Mobile (UK) were proposing to carry out Utility asset works on Lawrence Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2026 and run through until 6 December 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 7 Sep 2026 at 16:06.
1 and 24 Dec 2026
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Billet Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 15 Sep 2026 at 10:28.
4 and 7 Dec 2026
BT were proposing to carry out Utility asset works on Warley Road, Essex, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2026 and run through until 7 December 2026. The works were due to impact the verge only.
This roadwork event was last updated by BT on 11 Sep 2026 at 13:32.
7 and 11 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Blackmore Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 13:25.
7 and 11 Dec 2026
BT are proposing to carry out Utility asset works on Weald Road, Essex, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 15 Sep 2026 at 14:14.
14 and 17 Dec 2026
National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 17 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 9 Sep 2026 at 13:17.
Roadworks Map near to Craven Gardens, ROMFORD, RM3 0DF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Craven Gardens, ROMFORD, RM3 0DF (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 23 Sep 2026 - 25 Sep 2026)
(Scheduled: 22 Sep 2026 - 30 Sep 2026)
(Scheduled: 22 Sep 2026 - 24 Sep 2026)
(Scheduled: 23 Sep 2026 - 25 Sep 2026)
(Scheduled: 1 May 2025 - 31 Oct 2026)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data