ROADWORKS SUMMARY
Lower Bedfords Road, ROMFORD, RM1 4DG
Introduction

View current and future planned roadworks and road closures for Lower Bedfords Road, RM1 4DG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lower Bedfords Road, ROMFORD, RM1 4DG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Bedfords Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
5 Jul 2025
National Highways are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 05:00 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:53.
23 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 08:15.
23 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 06:53.
23 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 08:12.
7 Apr and 27 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Station Road, Harold Wood, Romford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 12:43.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Aldborough Road South, Seven Kings, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 15:46.
Today
Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Bois, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 14:31.
Today
Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Stapleford Tawney, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 14:31.
Today
Essex County Council were proposing to carry out Highway improvement works on Epping Lane, Theydon Garnon, Epping.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 11:47.
Today
Essex County Council were proposing to carry out Highway improvement works on Epping Lane, Theydon Garnon, Epping.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 12:33.
Today
Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Garnon, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 09:41.
Today
Essex County Council are proposing to carry out Highway improvement works on Epping Lane, Theydon Mount, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 14:32.
26 May and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.
26 May and 11 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.
Monday
Squire Energy are proposing to carry out Utility asset works on Clive Road, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 6 Mar 2025 at 11:32.
27 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:53.
27 May and 20 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:43.
27 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:58.
27 May and 20 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:43.
27 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:52.
27 May and 20 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:45.
27 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.
27 May and 20 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:44.
27 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Masefield Crescent, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Dec 2024 at 09:00.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Belfairs Drive, Chadwell Heath, Romford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 08:38 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 10:30.
13 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Milton Road, Warley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 12:30 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 14:57.
31 May and 5 Jul 2025
National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 May 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:58.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Queens Gardens, Upminster.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 12:13 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 1 Jun 2025 at 12:54.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.
2 and 16 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.
These works were categorised as Major.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:23.
17 Jun 2025
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Collier Row Road, Romford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 09:19.
Tomorrow
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 30 May 2025 at 10:31.
Tomorrow
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:52.
11 Jun 2025
Cadent Gas are carrying out Utility repair and maintenance works on Hainault Road, Chigwell Town, Chigwell.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:04 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:06.
Thursday
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mores Lane, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 12 Mar 2025 at 12:58.
Thursday
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mores Lane, South Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 25 Mar 2025 at 16:04.
Friday
London Borough Of Havering are proposing to carry out Highway improvement works on Bush Elms Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:52.
Friday
Cadent Gas are proposing to carry out roadworks on Netley Road, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 14:30.
Friday
Essex County Council are proposing to carry out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Mar 2025 at 08:38.
Friday
Essex County Council are proposing to carry out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 May 2025 at 09:09.
5 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.
5 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.
5 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 Jun and 11 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:18.
15 Sep 2025
London Borough Of Redbridge are carrying out Highway improvement works on Brocket Way, Chigwell.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.
15 Sep 2025
London Borough Of Redbridge are carrying out Highway improvement works on Manford Way, Chigwell.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.
14 Sep 2025
London Borough Of Redbridge are carrying out Highway improvement works on Manford Way, Chigwell.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:00 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.
9 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 14:30.
9 and 15 Jun 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on High Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 12:43.
11 and 16 Jun 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Severn Drive, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 27 May 2025 at 16:30.
11 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 May 2025 at 15:46.
11 and 18 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:47.
11 and 18 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Larchwood Gardens, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:53.
11 and 18 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Hazelwood Gardens, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 May 2025 at 11:51.
13 and 16 Jun 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Apr 2025 at 11:20.
13 and 16 Jun 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Apr 2025 at 14:20.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Brook Road, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2025 at 14:29.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 14:06.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:09.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Beattyville Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 4 Jul 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 14 May 2025 at 12:57.
16 Jun and 4 Jul 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 28 May 2025 at 07:41.
17 and 20 Jun 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Dorian Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:50.
18 and 20 Jun 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 May 2025 at 11:29.
18 and 20 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 May 2025 at 12:52.
20 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.
20 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.
20 and 23 Jun 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 May 2025 at 14:57.
20 and 23 Jun 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 May 2025 at 10:48.
23 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
23 Jun and 22 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:57.
23 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:31.
23 Jun and 22 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:55.
23 Jun and 22 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:01.
23 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:32.
30 Jun and 19 Sep 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.
30 Jun and 3 Jul 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Patricia Drive, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 16 May 2025 at 12:59.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
30 Jun and 4 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Codham Hall Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 May 2025 at 15:30.
30 Jun and 11 Jul 2025
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Great Warley Street, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 30 Apr 2025 at 12:55.
30 Jun and 2 Jul 2025
Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 3 Apr 2025 at 15:14.
30 Jun and 4 Jul 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Apr 2025 at 14:47.
30 Jun and 4 Jul 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 2 May 2025 at 09:38.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 10 Apr 2025 at 12:54.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 28 Apr 2025 at 10:45.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
11 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Apr 2025 at 07:54.
11 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Larchwood Gardens, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Apr 2025 at 07:48.
11 and 18 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Hazelwood Gardens, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Apr 2025 at 07:42.
14 Jul and 15 Sep 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Brocket Way, Chigwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.
14 Jul and 15 Sep 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.
14 Jul and 14 Sep 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.
17 and 19 Jul 2025
Virgin Media were proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 July 2025 and run through until 19 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 3 Apr 2025 at 14:51.
21 Jul and 17 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:31.
21 and 28 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Crescent Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 15:03.
21 and 28 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Kavanaghs Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 15:06.
21 Jul and 14 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Costead Manor Road, Brentwood.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 14 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:48.
22 Jul and 12 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:39.
22 Jul and 12 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:49.
22 Jul and 12 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.
22 Jul and 5 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mascalls Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:26.
22 Jul and 5 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mascalls Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:50.
22 Jul and 5 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Mascalls Lane, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.
22 Jul and 5 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:59.
22 Jul and 5 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Warley Road, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:48.
22 Jul and 12 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Warley Hill, Great Warley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:22.
22 Jul and 12 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Warley Hill, Great Warley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.
22 and 29 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Crescent Road, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Apr 2025 at 09:37.
22 and 29 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Kavanaghs Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Apr 2025 at 10:15.
24 and 26 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 2 May 2025 at 08:16.
24 and 26 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 14 May 2025 at 13:21.
28 and 30 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Slip Road From M25 To A127 Eastbound, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Mar 2025 at 13:23.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 15:00.
28 Jul and 18 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:40.
28 Jul and 15 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Millers Lane, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 15:14.
28 Jul and 15 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Millers Lane, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 09:50.
4 and 8 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:08.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Romford Road, Chigwell Town, Chigwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 15:18.
11 Aug and 1 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Romford Road, Chigwell Town, Chigwell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:41.
11 and 13 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Sandpit Lane, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 09:12.
18 and 22 Aug 2025
Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:10.
18 and 22 Aug 2025
Thames Water are proposing to carry out Utility asset works on Station Road, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 16:33.
19 Aug and 7 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Eagle Way, Great Warley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:48.
19 Aug and 9 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Clive Road, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:55.
19 Aug and 9 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Clive Road, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2025 and run through until 9 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:48.
20 and 22 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 15:12.
25 Aug and 14 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Warescot Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 12:10.
Roadworks Map near to Lower Bedfords Road, ROMFORD, RM1 4DG (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lower Bedfords Road, ROMFORD, RM1 4DG (24 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 May 2025 - 3 Jun 2025)
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 30 May 2025 - 3 Jun 2025)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data