ROADWORKS SUMMARY
Fairfield Avenue, UPMINSTER, RM14 3AY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fairfield Avenue, RM14 3AY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fairfield Avenue, UPMINSTER, RM14 3AY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fairfield Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

National Highways logo
LONG TERM
Between
2 Oct 2024 and 1 Jun 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.

Cadent Gas logo
LONG TERM
Between
1 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:41.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:19.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:40.

Cadent Gas logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are carrying out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:09 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 10:30.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jan 2025 at 13:23.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Follow
A1023 Spur From M25 J28 Roundabout

National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Dec 2024 at 16:30.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Follow
A1023 Spur From M25 J28 Roundabout

National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Jan 2025 at 13:48.

Finishing
Tomorrow
Details
View Map
Share
Follow
St Marys Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on St Marys Lane, Upminster.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Jan 2025 at 09:35.

Thames Water logo
Until
7 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are carrying out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 09:30 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 14:28.

Cadent Gas logo
Between
20 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Thorley Road

Cadent Gas are proposing to carry out Utility asset works on Thorley Road, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:15.

Cadent Gas logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Thorley Road

Cadent Gas are carrying out Utility asset works on Thorley Road, Stifford Clays, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 11:33 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 12:00.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Cadent Gas logo
Until
12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are carrying out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:04 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 09:11.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.

Finishing
Tomorrow
Details
View Map
Share
Follow
Ockendon Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.

Finishing
Tomorrow
Details
View Map
Share
Follow
Suttons Gardens

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Suttons Gardens, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 9 Jan 2025 at 15:41.

Finishing
Tomorrow
Details
View Map
Share
Follow
Suttons Gardens

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Suttons Gardens, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:27 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 08:27.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are carrying out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:00 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 09:06.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Northend

Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:01.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Northend

Essex County Council are carrying out Highway improvement works on Northend, Warley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:34 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 09:45.

Finishing
Tomorrow
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 06:21.

Finishing
Tomorrow
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 08:21.

Finishing
Tomorrow
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 07:14.

Finishing
Today
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.

Finishing
Monday
Details
View Map
Share
Follow
Fen Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Fen Lane, Bulphan.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 05:52 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 29 Jan 2025 at 11:06.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Rose Valley

Cadent Gas are carrying out Utility repair and maintenance works on Rose Valley, Brentwood.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 12:52 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 08:47.

Finishing
Tuesday
Details
View Map
Share
Follow
Little Warley Hall Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Little Warley Hall Lane, West Horndon, Little Warley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2025 at 09:02 and could run through until 4 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jan 2025 at 08:00.

Finishing
Monday
Details
View Map
Share
Follow
Aveley Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Aveley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 8 Jan 2025 at 08:56.

Finishing
Monday
Details
View Map
Share
Follow
Aveley Road

London Borough Of Havering are carrying out Highway repair and maintenance works on Aveley Road, Upminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 08:00 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 30 Jan 2025 at 08:54.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:45.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
A13 J A1012 Leave E

Thurrock Council are proposing to carry out Highway improvement works on A13 J A1012 Leave E, Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 13 Jan 2025 at 16:30.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Link From A1012 Roundabout To A1306 Interchange

Thurrock Council are proposing to carry out Highway repair and maintenance works on Link From A1012 Roundabout To A1306 Interchange, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:35.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Link From A1012 Roundabout To A1306 Interchange

Thurrock Council are proposing to carry out Highway repair and maintenance works on Link From A1012 Roundabout To A1306 Interchange, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 24 Jan 2025 at 09:24.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Stifford Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Stifford Roundabout, North Stifford, Grays.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:46.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Stifford Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Stifford Roundabout, North Stifford, Grays.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 13 Jan 2025 at 15:11.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
A13 J A1012 Leave W

Thurrock Council are proposing to carry out Highway improvement works on A13 J A1012 Leave W, Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 13 Jan 2025 at 16:30.

Between
3 and 14 Feb 2025
Details
View Map
Share
Launders Lane

London Borough Of Havering were proposing to carry out Highway repair and maintenance works on Launders Lane, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 Jan 2025 at 12:21.

Between
3 and 7 Feb 2025
Details
View Map
Share
Ockendon Road

London Borough Of Havering were proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Havering on 22 Jan 2025 at 10:59.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.

Thames Water logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gourney Grove

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:03.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gourney Grove

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 4 Dec 2024 at 09:45.

Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Gourney Grove

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 23 Jan 2025 at 09:42.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wykeham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wykeham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:31.

UK Power Networks Eastern & London logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Little Warley Hall Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 11:30.

Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Squirrels Heath Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Squirrels Heath Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 11:37.

Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Squirrels Heath Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Squirrels Heath Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 22 Jan 2025 at 12:20.

National Highways logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jan 2025 at 12:08.

National Highways logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Jan 2025 at 12:11.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:21.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 14:21.

National Highways logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Jan 2025 at 12:50.

National Highways logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Jan 2025 at 12:12.

National Highways logo
Between
16 and 20 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Jan 2025 at 15:45.

National Highways logo
Between
16 and 20 Feb 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 29 Jan 2025 at 09:58.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:30.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:58.

Cadent Gas logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:32.

Cadent Gas logo
LONG TERM
Between
17 Feb and 2 Apr 2025
Details
View Map
Share
Follow
Arisdale Avenue

Cadent Gas are proposing to carry out Utility asset works on Arisdale Avenue, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 13:00.

Cadent Gas logo
LONG TERM
Between
17 Feb and 17 Apr 2025
Details
View Map
Share
Follow
South Road

Cadent Gas are proposing to carry out Utility asset works on South Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 14:30.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Garth Road

Cadent Gas are proposing to carry out Utility asset works on Garth Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 13:00.

Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.

Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 16:54.

LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Straight Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Straight Road, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:57.

Between
19 and 21 Feb 2025
Details
View Map
Share
Dagnam Park Drive

London Borough Of Havering were proposing to carry out Remedial works on Dagnam Park Drive, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 07:37.

Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Dagnam Park Drive

London Borough Of Havering are proposing to carry out Remedial works on Dagnam Park Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 09:27.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
West Thurrock Way

Thurrock Council are proposing to carry out Highway repair and maintenance works on West Thurrock Way, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Weston Avenue

Thurrock Council are proposing to carry out Highway repair and maintenance works on Weston Avenue, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hubbards Chase

UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:38.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hubbards Chase

UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 15:57.

Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Mawney Road

London Borough Of Havering are proposing to carry out Highway improvement works on Mawney Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 11:20.

UK Power Networks Eastern & London logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Hubbards Chase

UK Power Networks Eastern & London were proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:19.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:46.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:55.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:44.

UK Power Networks Eastern & London logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Stanhope Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:35.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Crammavill Street

Cadent Gas are proposing to carry out Utility asset works on Crammavill Street, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:31.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Crammavill Street

Cadent Gas are proposing to carry out Utility asset works on Crammavill Street, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:05.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Crammavill Street

Cadent Gas are proposing to carry out Utility asset works on Crammavill Street, Stifford Clays, Grays.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:44.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Moss Road

Cadent Gas are proposing to carry out Utility asset works on Moss Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.

London Borough Of Barking And Dagenham logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Rusholme Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:39.

Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Tees Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Dec 2024 at 15:04.

Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Tees Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Jan 2025 at 15:30.

BT logo
Between
12 and 19 Mar 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 17:08.

UK Power Networks Eastern & London logo
Between
17 and 24 Mar 2025
Details
View Map
Share
Follow
Fulbrook Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Fulbrook Lane, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jan 2025 at 10:16.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Arcany Road

Cadent Gas are proposing to carry out Utility asset works on Arcany Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 13:30.

Cadent Gas logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Ayron Road

Cadent Gas are proposing to carry out Utility asset works on Ayron Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 15:00.

London Borough Of Barking And Dagenham logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Downing Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Downing Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Dec 2024 at 15:56.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Stafford Avenue

BT are proposing to carry out Utility asset works on Stafford Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Jan 2025 at 14:47.

Cadent Gas logo
Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Ardmore Road

Cadent Gas are proposing to carry out Utility asset works on Ardmore Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 11:00.

UK Power Networks Eastern & London logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Limbourne Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:43.

UK Power Networks Eastern & London logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Limbourne Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jan 2025 at 13:00.

National Highways logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 10:18.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:54.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:51.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:52.

Transport for London (TfL) logo
Between
29 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:49.

Cadent Gas logo
LONG TERM
Between
6 Apr and 26 Jun 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Harold Wood, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 10:14.

UK Power Networks Eastern & London logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Little Warley Hall Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jan 2025 at 11:18.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Warley Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 17 Jan 2025 at 11:58.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Warley Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 29 Jan 2025 at 14:09.

BT logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
St Edwards Way

BT are proposing to carry out Utility asset works on St Edwards Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Jan 2025 at 12:52.

Murphy Power Distribution logo
Between
21 and 28 Apr 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 28 Jan 2025 at 14:49.

National Highways logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Works for road purposes on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Dec 2024 at 08:55.

National Highways logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 26 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Jan 2025 at 15:24.

Between
22 Apr and 16 May 2025
Details
View Map
Share
Follow
Wigley Bush Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wigley Bush Lane, South Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 22 Jan 2025 at 11:18.

UK Power Networks Eastern & London logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Marden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jan 2025 at 15:03.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:51.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:50.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:59.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 12:03.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:03.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:42.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:58.

Transport for London (TfL) logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:37.


Roadworks Map near to Fairfield Avenue, UPMINSTER, RM14 3AY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Jan 2025 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fairfield Avenue, UPMINSTER, RM14 3AY (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
GAYNES PARK ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 30 Jan 2025 08:00
(Scheduled: 30 Jan 2025 - 31 Jan 2025)
0.4
Details
Share
Follow
2
STATION ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 30 Jan 2025 09:30
(Scheduled: 30 Jan 2025 - 31 Jan 2025)
0.4
Details
Share
Follow
3
STATION ROAD 
(0.5 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 31 Jan 2025
0.5
Details
Share
Follow
4
ST MARYS LANE 
(0.5 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 30 Jan 2025 09:30
(Scheduled: 30 Jan 2025 - 31 Jan 2025)
0.5
Details
Share
Follow
5
UK Power Networks Eastern & London logo
URGENT
  
HIGHVIEW GARDENS 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 16 Jan 2025 10:46
(Scheduled: 16 Jan 2025 - 31 Jan 2025)
0.6
Details
Share
Follow
6
URGENT
  
HARWOOD HALL LANE 
(0.6 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 30 Jan 2025 08:40
(Scheduled: 30 Jan 2025 - 4 Feb 2025)
0.6
Details
Share
Follow
7
GAYNES PARK ROAD 
(0.7 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 30 Jan 2025 08:00
(Scheduled: 30 Jan 2025 - 31 Jan 2025)
0.7
Details
Share
Follow
8
BT logo
BERKELEY CLOSE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 30 Jan 2025 10:16
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
0.7
Details
Share
Follow
9
Cadent Gas logo
EMERGENCY
  
THE MEADS 
(0.8 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 30 Jan 2025 09:22
(Scheduled: 30 Jan 2025 - 7 Feb 2025)
0.8
Details
Share
Follow
10
UPMINSTER ROAD 
(0.8 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - No carriageway incursion
In Progress
Since: 29 Jan 2025 09:30
(Scheduled: 29 Jan 2025 - 31 Jan 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data