ROADWORKS SUMMARY
Hacton Lane, UPMINSTER, RM14 2YF
Introduction

View current and future planned roadworks and road closures for Hacton Lane, RM14 2YF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hacton Lane, UPMINSTER, RM14 2YF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hacton Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
2 Jun and 18 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
20 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.
20 Jun and 29 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.
23 Jun and 7 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 21:00 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:53.
29 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2025 at 16:30.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 21:00 and could run through until 13 October 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:52.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 21:00 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:52.
29 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Straight Road, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2025 at 16:30.
30 Jun and 31 Dec 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.
Monday
Essex And Suffolk Water are carrying out Diversionary works on Eastern Avenue East, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 July 2025 at 16:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 30 Sep 2025 at 08:25.
Monday
Essex And Suffolk Water are carrying out Diversionary works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2025 at 12:39 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 30 Sep 2025 at 08:26.
31 Dec 2025
London Borough Of Bexley are carrying out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 08:00 and could run through until 31 December 2025. The works will impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 7 Jul 2025 at 16:38.
5 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Choats Road, Barking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 08:00 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:42.
Today
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 July 2025 at 08:00 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:43.
Today
London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Western Avenue, Dagenham.
These works are categorised as Major.
The works will start on or after 29 August 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 14:24.
1 Sep and 30 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on South Road, South Ockendon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:06.
1 Sep and 31 Dec 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Jul 2025 at 15:43.
Tuesday
London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on The Broadway, Dagenham.
These works are categorised as Major.
The works will start on or after 4 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 13:23.
10 Nov 2025
Thames Water are carrying out Utility asset works on Beltwood Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2025 at 10:45 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:07.
11 Sep and 21 Oct 2025
London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Haydon Road, Dagenham.
These works are categorised as Major.
The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 11:55.
11 Sep and 21 Oct 2025
London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Grantham Gardens, Chadwell Heath.
These works are categorised as Major.
The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 23 Sep 2025 at 13:23.
15 Sep and 24 Oct 2025
Thames Water were proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:27.
17 Sep and 29 Nov 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 9 Sep 2025 at 11:59.
22 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 11:34.
22 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 13:43.
22 Sep 2025 and 9 Jan 2026
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jun 2025 at 14:55.
23 Sep and 4 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:54.
23 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.
23 Sep and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.
23 Sep and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:02.
23 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.
23 Sep and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.
23 Sep and 4 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:39.
23 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.
23 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.
23 Sep and 4 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:38.
23 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.
23 Sep and 21 Oct 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 10:10.
23 Sep and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:04.
29 Sep and 20 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:09.
29 Sep and 20 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 10:23.
Monday
Cadent Gas are carrying out Utility asset works on Gale Street, Dagenham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 September 2025 at 11:30 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 12:33.
29 Sep and 4 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.
29 Sep and 15 Nov 2025
Thames Water are proposing to carry out Utility asset works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:15.
Friday
Thames Water were proposing to carry out New service connection on West Street, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Sep 2025 at 14:33.
6 Oct 2025 and 31 Mar 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Sep 2025 at 14:28.
6 Oct and 28 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.
6 Oct 2025 and 31 Mar 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Heathway, Dagenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.
Friday
Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 15:37.
Friday
BT are proposing to carry out Utility asset works on Flemings, Essex, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 Aug 2025 at 11:34.
Friday
BT are proposing to carry out Utility asset works on Flemings, Essex, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 14 Aug 2025 at 19:05.
Friday
BT are carrying out Utility asset works on Flemings, Essex, Great Warley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 09:35 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Oct 2025 at 11:19.
Friday
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Burland Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 29 Sep 2025 at 13:00.
Friday
London Borough Of Havering are carrying out Highway repair and maintenance works on Burland Road, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 6 Oct 2025 at 08:17.
Today
National Highways are proposing to carry out Highway repair and maintenance works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Oct 2025 at 10:16.
National Highways carried out Highway repair and maintenance works on Colchester Road, Romford.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 6 Oct 2025 and 8 Oct 2025 and were actually completed between 6 Oct 2025 (22:00) and 8 Oct 2025 (05:00). The works impacted the carriageway only.
This roadwork event was last updated by National Highways on 8 Oct 2025 at 06:43.
7 and 15 Oct 2025
Cadent Gas carried out Utility repair and maintenance works on Valence Wood Road, Dagenham.
The works were originally planned between 7 Oct 2025 and 15 Oct 2025 and were actually completed between 7 Oct 2025 (12:27) and 8 Oct 2025 (16:16). The works impacted the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 16:27.
Friday
London Borough Of Havering are proposing to carry out Highway improvement works on Avon Road, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:30.
16 Oct 2025
Cadent Gas are carrying out Utility repair and maintenance works on Valence Avenue, Dagenham.
The works started on 8 October 2025 at 08:46 and could run through until 16 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 10:04.
Tuesday
Cadent Gas were proposing to carry out Utility repair and maintenance works on Valence Avenue, Dagenham.
The works were originally planned to start 8 October 2025 and run through until 14 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 14:15.
21 Oct 2025
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Little Warley Hall Lane, West Horndon, Little Warley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 October 2025 at 03:02 and could run through until 21 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 8 Oct 2025 at 07:53.
13 Oct and 7 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway repair and maintenance works on Church Elm Lane, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Oct 2025 at 14:42.
13 Oct and 7 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway repair and maintenance works on Church Elm Lane, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 6 Oct 2025 at 21:52.
13 and 15 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Northumberland Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:39.
13 and 15 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Northumberland Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 3 Oct 2025 at 09:12.
16 Oct and 18 Dec 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:41.
16 Oct and 18 Dec 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2025 at 09:53.
18 Oct and 6 Dec 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 October 2025 and run through until 6 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
20 and 28 Oct 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 4 Sep 2025 at 10:51.
20 and 24 Oct 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Tamarisk Road, South Ockendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 16 Jul 2025 at 11:45.
20 and 22 Oct 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Tamarisk Road, South Ockendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 3 Oct 2025 at 13:46.
20 and 31 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:09.
20 and 22 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Chestnut Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:38.
20 and 22 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Chestnut Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 3 Oct 2025 at 09:14.
20 Oct and 6 Nov 2025
National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the verge only.
This roadwork event was last updated by National Highways on 31 Jul 2025 at 15:42.
20 Oct and 7 Nov 2025
National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the verge only.
This roadwork event was last updated by National Highways on 11 Aug 2025 at 16:17.
20 and 31 Oct 2025
BT were proposing to carry out Utility asset works on Mascalls Lane, Essex, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Oct 2025 at 14:22.
20 and 22 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 2 Sep 2025 at 08:22.
20 and 22 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 3 Sep 2025 at 16:00.
20 and 25 Oct 2025
Thames Water are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Aug 2025 at 15:23.
20 and 25 Oct 2025
Thames Water are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2025 at 13:38.
24 and 27 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on St Mary's Lane, Thurrock, West Horndon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 15 Sep 2025 at 12:54.
27 Oct and 4 Nov 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Sep 2025 at 11:49.
27 Oct 2025 and 2 Jan 2026
Thames Water were proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 12:15.
27 Oct and 1 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Renwick Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Sep 2025 at 09:02.
27 and 29 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Maylands Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 13 Aug 2025 at 15:22.
27 and 29 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Maylands Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 6 Oct 2025 at 13:51.
27 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 24 Sep 2025 at 16:15.
27 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 2 Oct 2025 at 14:54.
27 and 31 Oct 2025
Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telefonica UK on 27 Aug 2025 at 16:30.
27 and 31 Oct 2025
Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telefonica UK on 8 Sep 2025 at 16:30.
27 and 29 Oct 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Harold Court Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 13 Jun 2025 at 15:16.
30 Oct and 13 Nov 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Chequers Lane, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:01.
30 Oct and 13 Nov 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:14.
30 Oct and 17 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Wantz Road, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 15 Jul 2025 at 08:13.
31 Oct and 3 Nov 2025
BT are proposing to carry out Utility asset works on Hall Road, Thurrock, Aveley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Sep 2025 at 12:17.
3 Nov and 12 Dec 2025
London Borough Of Havering are proposing to carry out Highway improvement works on East Hall Lane, Wennington, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 7 Oct 2025 at 10:58.
3 Nov and 12 Dec 2025
London Borough Of Havering are proposing to carry out Highway improvement works on East Hall Lane, Wennington, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 7 Oct 2025 at 16:29.
3 and 14 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 08:58.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 09:02.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Straight Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Straight Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.
4 and 19 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.
5 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:26.
5 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:22.
5 and 7 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on New Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 30 Sep 2025 at 09:45.
7 Nov and 20 Dec 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2025 and run through until 20 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:50.
10 and 21 Nov 2025
ESP Electricity are proposing to carry out Utility asset works on South Street, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 30 Sep 2025 at 09:33.
10 and 13 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 10:03.
10 and 13 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 17 Jun 2025 at 16:15.
13 and 15 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 15:56.
13 and 15 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:47.
13 and 15 Nov 2025
London Borough Of Havering were proposing to carry out Highway improvement works on Pettits Lane, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Mar 2025 at 12:58.
17 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on James Watt Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Sep 2025 at 14:48.
17 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Queens Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Sep 2025 at 14:46.
17 Nov and 5 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.
17 and 28 Nov 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Beauly Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 15 Aug 2025 at 11:54.
17 and 21 Nov 2025
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Ashton Road, Harold Hill, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 19 Sep 2025 at 12:11.
17 and 25 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Lower Bedfords Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 15:57.
17 and 25 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Lower Bedfords Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:49.
17 and 29 Nov 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Sep 2025 at 09:34.
17 and 21 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 25 Sep 2025 at 16:01.
17 and 21 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 26 Sep 2025 at 15:07.
17 and 21 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 8 Oct 2025 at 13:50.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:15.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:40.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Sep 2025 at 12:03.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:12.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 09:53.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Sep 2025 at 12:00.
24 Nov and 2 Dec 2025
Electricity Network Company were proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 2 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 8 Oct 2025 at 13:42.
25 and 27 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Ashton Road, Harold Hill, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 30 Sep 2025 at 10:18.
25 and 27 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Spilsby Road, Harold Hill, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 30 Sep 2025 at 10:17.
26 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Rosemary Close, Thurrock, South Ockendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2025 at 09:46.
1 and 5 Dec 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Fen Lane, Bulphan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thurrock Council on 20 Aug 2025 at 10:46.
1 and 5 Dec 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Dunnings Lane, Bulphan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thurrock Council on 20 Aug 2025 at 10:46.
1 and 5 Dec 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Eliot Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Sep 2025 at 14:17.
1 and 19 Dec 2025
Essex County Council are proposing to carry out Highway improvement works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Sep 2025 at 14:10.
1 and 7 Dec 2025
Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 09:47.
2 and 5 Dec 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Choats Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 09:45.
8 and 17 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Highgrove Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 14:30.
10 Dec 2025 and 1 Jan 2026
BT are proposing to carry out Utility asset works on Little Warley Hall Lane, West Horndon, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 1 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 1 Oct 2025 at 11:23.
10 Dec 2025 and 2 Jan 2026
BT are proposing to carry out Utility asset works on Little Warley Hall Lane, West Horndon, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 2 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Oct 2025 at 12:17.
5 Jan and 20 Feb 2026
Thames Water were proposing to carry out Utility asset works on Parkside Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 20 February 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 14:37.
5 Jan and 25 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on New Road, Rainham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 25 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 11:30.
5 Jan and 27 Mar 2026
Thames Water are proposing to carry out Utility asset works on Brook Street, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 27 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 Sep 2025 at 11:48.
Roadworks Map near to Hacton Lane, UPMINSTER, RM14 2YF (12 Events)

















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hacton Lane, UPMINSTER, RM14 2YF (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 7 Oct 2025 - 9 Oct 2025)
(Scheduled: 8 Oct 2025 - 10 Oct 2025)
(Scheduled: 7 Oct 2025 - 9 Oct 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data