ROADWORKS SUMMARY
Tawny Avenue, UPMINSTER, RM14 2EP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tawny Avenue, RM14 2EP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tawny Avenue, UPMINSTER, RM14 2EP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tawny Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:57.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are carrying out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:37.

Transport for London (TfL) logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are carrying out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:55.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:38.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:38.

Transport for London (TfL) logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are carrying out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:39.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

LONG TERM
Between
30 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are proposing to carry out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 13:44.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are proposing to carry out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 14:50.

LONG TERM
Between
30 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Eastern Avenue East

Essex And Suffolk Water are proposing to carry out Diversionary works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 13:41.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Eastern Avenue East

Essex And Suffolk Water are carrying out Diversionary works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 July 2025 at 16:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Jul 2025 at 08:11.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are carrying out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2025 at 12:39 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 4 Jul 2025 at 12:39.

LONG TERM
Until
5 Nov 2025
Details
View Map
Share
Follow
Choats Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Choats Road, Barking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:42.

Thurrock Council logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Ship Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 30 Apr 2025 at 15:49.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Street

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Church Street, Dagenham.

These works are categorised as Major.

The works will start on or after 9 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Sep 2025 at 19:38.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sterry Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Sterry Road, Dagenham.

These works are categorised as Major.

The works will start on or after 9 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Sep 2025 at 16:22.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Edward Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Edward Road, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 10:50.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Mill Lane

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Mill Lane, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 12:11.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Mill Lane

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Mill Lane, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 16:21.

Cadent Gas logo
LONG TERM
Between
19 Aug and 7 Oct 2025
Details
View Map
Share
Eagle Way

Cadent Gas were proposing to carry out Utility asset works on Eagle Way, Great Warley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:48.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
22 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Rainham Road South, Dagenham.

These works are categorised as Major.

The works will start on or after 22 August 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 16:21.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
22 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Heathway

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Heathway, Dagenham.

These works are categorised as Major.

The works will start on or after 22 August 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 14:40.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
29 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Western Avenue

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Western Avenue, Dagenham.

These works are categorised as Major.

The works will start on or after 29 August 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 12:00.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 14:24.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Arcany Road

Cadent Gas were proposing to carry out Utility asset works on Arcany Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:58.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Ayron Road

Cadent Gas were proposing to carry out Utility asset works on Ayron Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:59.

Cadent Gas logo
LONG TERM
Between
1 Sep and 30 Oct 2025
Details
View Map
Share
South Road

Cadent Gas were proposing to carry out Utility asset works on South Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:06.

National Highways logo
Between
1 and 27 Sep 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Aug 2025 at 08:32.

National Highways logo
Between
1 and 27 Sep 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Sep 2025 at 07:00.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
4 Sep and 14 Oct 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on The Broadway, Dagenham.

These works are categorised as Major.

The works will start on or after 4 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 12 Sep 2025 at 13:22.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Ardmore Road

Cadent Gas were proposing to carry out Utility asset works on Ardmore Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:59.

Essex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Eagle Way

Essex County Council are proposing to carry out Highway improvement works on Eagle Way, Great Warley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Sep 2025 at 11:25.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Mill Park Avenue

Thames Water are carrying out Utility repair and maintenance works on Mill Park Avenue, Hornchurch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 09:20 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 16:23.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
11 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Grantham Gardens

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Grantham Gardens, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 12 Sep 2025 at 13:33.

Until
26 Sep 2025
Details
View Map
Share
Follow
Moor Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Moor Lane, Upminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 10:09 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2025 at 15:09.

London Borough Of Barking And Dagenham logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Wantz Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Wantz Road, Dagenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Sep 2025 at 09:21.

Finishing
Tomorrow
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jul 2025 at 15:56.

Finishing
Saturday
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 1 Sep 2025 at 12:21.

Finishing
Saturday
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are carrying out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 21:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Sep 2025 at 07:24.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Lower Bedfords Road

Cadent Gas are carrying out Utility repair and maintenance works on Lower Bedfords Road, Romford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 15:50 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 16:50.

National Highways logo
LONG TERM
Between
17 Sep and 29 Nov 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Sep 2025 at 11:59.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Mascalls Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Mascalls Gardens, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2025 at 13:45.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Moss Road

Cadent Gas were proposing to carry out Utility asset works on Moss Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:11.

Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 4 Aug 2025 at 16:12.

Between
22 and 26 Sep 2025
Details
View Map
Share
Park Lane

Essex And Suffolk Water were proposing to carry out New service connection on Park Lane, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 9 Sep 2025 at 11:36.

Thurrock Council logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:41.

Thurrock Council logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Sep 2025 at 14:59.

National Highways logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ockendon Road

National Highways are proposing to carry out Works for road purposes on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 11 Jul 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:54.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:02.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:39.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 10:10.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:04.

Essex County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Codham Hall Lane

Essex County Council were proposing to carry out Highway improvement works on Codham Hall Lane, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Aug 2025 at 13:16.

Essex County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Codham Hall Lane

Essex County Council were proposing to carry out Highway improvement works on Codham Hall Lane, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Sep 2025 at 09:09.

Thurrock Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Pilgrims Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Pilgrims Lane, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:35.

Thurrock Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Pilgrims Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Pilgrims Lane, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Sep 2025 at 15:51.

UK Power Networks Eastern & London logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Arterial Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:09.

UK Power Networks Eastern & London logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Arterial Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 10:23.

National Highways logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Ockendon Road

National Highways are proposing to carry out Works for road purposes on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 22 Aug 2025 at 12:40.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 4 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Kenway

London Borough Of Havering are proposing to carry out Highway improvement works on Kenway, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:33.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Kenway

London Borough Of Havering are proposing to carry out Highway improvement works on Kenway, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 9 Sep 2025 at 11:45.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Kenway

London Borough Of Havering are proposing to carry out Highway improvement works on Kenway, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jul 2025 at 15:56.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Norman Close

London Borough Of Havering are proposing to carry out Highway improvement works on Norman Close, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jul 2025 at 15:57.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Norman Close

London Borough Of Havering are proposing to carry out Highway improvement works on Norman Close, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:33.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Norman Close

London Borough Of Havering are proposing to carry out Highway improvement works on Norman Close, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 9 Sep 2025 at 11:55.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Lower Bedfords Road

Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 10 Jul 2025 at 08:24.

Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out New service connection on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 16 Jul 2025 at 12:20.

Thames Water logo
LONG TERM
Between
29 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 16:15.

Thames Water logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:12.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jul 2025 at 16:12.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 28 Aug 2025 at 11:25.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2025 at 14:04.

Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Petersfield Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Petersfield Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:35.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Heathway

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Heathway, Dagenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.

Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 15:37.

BT logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Flemings

BT are proposing to carry out Utility asset works on Flemings, Essex, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 Aug 2025 at 11:34.

BT logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Flemings

BT are proposing to carry out Utility asset works on Flemings, Essex, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 14 Aug 2025 at 19:05.

BT logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Flemings

BT are proposing to carry out Utility asset works on Flemings, Essex, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Sep 2025 at 14:13.

Between
7 and 10 Oct 2025
Details
View Map
Share
Follow
Avon Road

London Borough Of Havering are proposing to carry out Highway improvement works on Avon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:30.

Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Northumberland Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Northumberland Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:39.

LONG TERM
Between
18 Oct and 6 Dec 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 6 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Thurrock Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Tamarisk Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Tamarisk Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Jul 2025 at 11:45.

Transport for London (TfL) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Ripple Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:09.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chestnut Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Chestnut Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:38.

National Highways logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
St Marys Lane

National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 31 Jul 2025 at 15:42.

National Highways logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
St Marys Lane

National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 11 Aug 2025 at 16:17.

BT logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Mascalls Lane

BT are proposing to carry out Utility asset works on Mascalls Lane, Essex, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Aug 2025 at 12:00.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Dark Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 2 Sep 2025 at 08:22.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Dark Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 3 Sep 2025 at 16:00.

Thames Water logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Nags Head Lane

Thames Water are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 15:23.

Thames Water logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Nags Head Lane

Thames Water are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 06:23.

Cadent Gas logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Spital Lane

Cadent Gas are proposing to carry out Utility asset works on Spital Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 11:56.

Cadent Gas logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Spital Lane

Cadent Gas are proposing to carry out Utility asset works on Spital Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 12:30.

Cadent Gas logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Spital Lane

Cadent Gas are proposing to carry out Utility asset works on Spital Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 08:01.

BT logo
Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
St Mary's Lane

BT are proposing to carry out Utility repair and maintenance works on St Mary's Lane, Thurrock, West Horndon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 15 Sep 2025 at 12:54.

Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Maylands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Maylands Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Aug 2025 at 15:22.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2025 at 11:25.

Telefonica UK logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 27 Aug 2025 at 16:30.

Telefonica UK logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 8 Sep 2025 at 16:30.

Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Harold Court Road

London Borough Of Havering are proposing to carry out Highway improvement works on Harold Court Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Jun 2025 at 15:16.

Murphy Power Distribution logo
Between
30 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Chequers Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Chequers Lane, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:01.

Murphy Power Distribution logo
Between
30 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:14.

Electricity Network Company logo
Between
30 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Wantz Road

Electricity Network Company are proposing to carry out Utility asset works on Wantz Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 Jul 2025 at 08:13.

BT logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Hall Road

BT are proposing to carry out Utility asset works on Hall Road, Thurrock, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2025 at 12:17.

LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
East Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on East Hall Lane, Wennington, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 9 Sep 2025 at 10:11.

Transport for London (TfL) logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Main Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Main Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 08:58.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 09:02.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Straight Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Straight Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Straight Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Straight Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
New Road

London Borough Of Havering are proposing to carry out Highway improvement works on New Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 09:31.

LONG TERM
Between
7 Nov and 20 Dec 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2025 and run through until 20 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:50.

Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 10:03.

Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Jun 2025 at 16:15.

Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Pettits Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 15:56.

Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Pettits Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:47.

Between
13 and 15 Nov 2025
Details
View Map
Share
Pettits Lane

London Borough Of Havering were proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Mar 2025 at 12:58.

Transport for London (TfL) logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Beauly Way

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Beauly Way, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 15 Aug 2025 at 11:54.

Between
17 and 25 Nov 2025
Details
View Map
Share
Follow
Lower Bedfords Road

London Borough Of Havering are proposing to carry out Highway improvement works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 15:57.

Between
17 and 25 Nov 2025
Details
View Map
Share
Follow
Lower Bedfords Road

London Borough Of Havering are proposing to carry out Highway improvement works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:49.

National Highways logo
Between
17 and 29 Nov 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Sep 2025 at 09:34.

Electricity Network Company logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Nags Head Lane

Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 11:22.

Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Ashton Road

London Borough Of Havering are proposing to carry out Highway improvement works on Ashton Road, Harold Hill, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:05.

Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Spilsby Road

London Borough Of Havering are proposing to carry out Highway improvement works on Spilsby Road, Harold Hill, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:12.

BT logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Rosemary Close

BT are proposing to carry out Utility asset works on Rosemary Close, Thurrock, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2025 at 09:46.

Thurrock Council logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Fen Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Fen Lane, Bulphan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 20 Aug 2025 at 10:46.

Thurrock Council logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunnings Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Dunnings Lane, Bulphan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 20 Aug 2025 at 10:46.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Eliot Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Eliot Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 14:10.

Essex County Council logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex County Council are proposing to carry out Highway improvement works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Sep 2025 at 14:10.

Electricity Network Company logo
Between
1 and 7 Dec 2025
Details
View Map
Share
Follow
Nags Head Lane

Electricity Network Company are proposing to carry out Utility asset works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Sep 2025 at 09:47.

Between
2 and 5 Dec 2025
Details
View Map
Share
Follow
Choats Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Choats Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 09:45.

BT logo
Between
10 Dec 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Little Warley Hall Lane

BT are proposing to carry out Utility asset works on Little Warley Hall Lane, West Horndon, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 1 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:51.


Roadworks Map near to Tawny Avenue, UPMINSTER, RM14 2EP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tawny Avenue, UPMINSTER, RM14 2EP (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
TUDOR GARDENS 
(0.7 miles)
London Borough Of Havering
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 10 Oct 2025
0.7
Details
Share
Follow
2
MAJOR
  
TUDOR GARDENS 
(0.7 miles)
London Borough Of Havering
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 08:00
(Scheduled: 2 Jun 2025 - 10 Oct 2025)
0.7
Details
Share
Follow
3
ST MARYS LANE 
(0.7 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 18 Sep 2025 14:35
(Scheduled: 18 Sep 2025 - 22 Sep 2025)
0.7
Details
Share
Follow
4
Virgin Media logo
GAYNES ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.8
Details
Share
Follow
5
Virgin Media logo
STATION ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 22 Sep 2025
0.8
Details
Share
Follow
6
MAJOR
  
SUNNYSIDE GARDENS 
(0.8 miles)
London Borough Of Havering
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 10 Oct 2025
0.8
Details
Share
Follow
7
MAJOR
  
SUNNYSIDE GARDENS 
(0.8 miles)
London Borough Of Havering
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 08:00
(Scheduled: 2 Jun 2025 - 10 Oct 2025)
0.8
Details
Share
Follow
8
MINSTER WAY 
(1.0 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2025 08:00
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data