ROADWORKS SUMMARY
Main Road, ROMFORD, RM1 3EJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Main Road, RM1 3EJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Main Road, ROMFORD, RM1 3EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
5 Jul 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 05:00 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:53.

Transport for London (TfL) logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are carrying out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 08:15.

Transport for London (TfL) logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 06:53.

Transport for London (TfL) logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 05:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 08:12.

Cadent Gas logo
LONG TERM
Between
7 Apr and 27 Jun 2025
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Harold Wood, Romford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 12:43.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 May and 23 Jul 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Aldborough Road South

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Aldborough Road South, Seven Kings, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 15:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 May and 24 Jun 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 14:00.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Jun 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are carrying out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 08:00 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:56.

Until
10 Jun 2025
Details
View Map
Share
Follow
Melbourne Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Melbourne Road, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 28 May 2025 at 14:45.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:53.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:43.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:58.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:43.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:52.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:45.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 May 2025 at 09:44.

Transport for London (TfL) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Masefield Crescent

Transport for London (TfL) are proposing to carry out Highway improvement works on Masefield Crescent, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Dec 2024 at 09:00.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Julia Gardens

Thames Water are carrying out Utility repair and maintenance works on Julia Gardens, Barking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:20 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:44.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Longbridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Longbridge Road, Barking.

The works started on 29 May 2025 at 11:12 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 12:05.

Finishing
Monday
Details
View Map
Share
Follow
Belfairs Drive

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Belfairs Drive, Chadwell Heath, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 08:38 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 10:30.

National Highways logo
LONG TERM
Between
31 May and 5 Jul 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 May 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:58.

Finishing
Monday
Details
View Map
Share
Follow
Queens Gardens

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Queens Gardens, Upminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 12:13 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 1 Jun 2025 at 12:54.

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas were proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works were categorised as Major.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:23.

Until
17 Jun 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Collier Row Road, Romford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 09:19.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 May 2025 at 10:31.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:52.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Sandhurst Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.

Finishing
Friday
Details
View Map
Share
Follow
Bush Elms Road

London Borough Of Havering are proposing to carry out Highway improvement works on Bush Elms Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:52.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stapleford Road

Essex County Council are proposing to carry out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Mar 2025 at 08:38.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stapleford Road

Essex County Council are proposing to carry out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 May 2025 at 09:09.

Cadent Gas logo
Between
5 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cameron Road

Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cameron Road

Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Norfolk Road

Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Norfolk Road

Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
5 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
LONG TERM
Between
5 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
LONG TERM
Between
5 Jun and 11 Jul 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:18.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Hurstbourne Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:25.

London Borough Of Barking And Dagenham logo
Finishing
Sunday
Details
View Map
Share
Follow
Hurstbourne Gardens

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 19 May 2025 at 08:56.

LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Brocket Way

London Borough Of Redbridge are carrying out Highway improvement works on Brocket Way, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.

LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are carrying out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.

LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are carrying out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:00 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 27 May 2025 at 08:28.

Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Aveley Road

London Borough Of Havering are proposing to carry out Highway improvement works on Aveley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 22 May 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 14:30.

Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Severn Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Severn Drive, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 27 May 2025 at 16:30.

National Highways logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Apr 2025 at 11:20.

National Highways logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Apr 2025 at 14:20.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Pedley Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Brook Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Brook Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Nelmes Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2025 at 14:29.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Nelmes Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 14:32.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Gaysham Avenue

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Gaysham Avenue, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

Cadent Gas logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:09.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Beattyville Gardens

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Beattyville Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Dorian Road

London Borough Of Havering are proposing to carry out Highway improvement works on Dorian Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:50.

National Highways logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 May 2025 at 11:29.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

National Highways logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 May 2025 at 14:57.

National Highways logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 May 2025 at 10:48.

UK Power Networks Eastern & London logo
Between
21 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 16:50.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.

Cadent Gas logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Benton Road

Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:57.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:55.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Between
23 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2025 at 11:32.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:47.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Sunnyside Road

Cadent Gas were proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 18 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:50.

LONG TERM
Between
28 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
30 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Patricia Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Patricia Drive, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 May 2025 at 12:59.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Colenso Road

Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Essex County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Codham Hall Lane

Essex County Council are proposing to carry out Highway improvement works on Codham Hall Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 May 2025 at 15:30.

Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Great Warley Street

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Great Warley Street, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 30 Apr 2025 at 12:55.

Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lower Bedfords Road

Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Apr 2025 at 15:14.

Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 17 Apr 2025 at 14:47.

Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, South Weald, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 2 May 2025 at 09:38.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Breamore Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

London Borough Of Enfield logo
Between
10 and 17 Jul 2025
Details
View Map
Share
Water Lane

London Borough Of Enfield were proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 10 Apr 2025 at 12:54.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Water Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 28 Apr 2025 at 10:45.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Audley Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Oakwood Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Leamington Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Charlbury Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Lynford Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Nutfield Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Talbot Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Woodstock Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Arundel Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Cardigan Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Seton Gardens

Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Arden Crescent

Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.

LONG TERM
Between
14 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Brocket Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Brocket Way, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.

LONG TERM
Between
14 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.

LONG TERM
Between
14 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 May 2025 at 08:30.

Virgin Media logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Manor Road

Virgin Media were proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 19 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 3 Apr 2025 at 14:51.

Cadent Gas logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:31.

Cadent Gas logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Eagle Way

Cadent Gas are proposing to carry out Utility asset works on Eagle Way, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:39.

Cadent Gas logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Eagle Way

Cadent Gas are proposing to carry out Utility asset works on Eagle Way, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:49.

Cadent Gas logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Eagle Way

Cadent Gas were proposing to carry out Utility asset works on Eagle Way, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.

Cadent Gas logo
Between
22 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Mascalls Lane

Cadent Gas are proposing to carry out Utility asset works on Mascalls Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:26.

Cadent Gas logo
Between
22 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Mascalls Lane

Cadent Gas are proposing to carry out Utility asset works on Mascalls Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:50.

Cadent Gas logo
Between
22 Jul and 5 Aug 2025
Details
View Map
Share
Mascalls Lane

Cadent Gas were proposing to carry out Utility asset works on Mascalls Lane, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.

Cadent Gas logo
Between
22 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Warley Road

Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 12:59.

Cadent Gas logo
Between
22 Jul and 5 Aug 2025
Details
View Map
Share
Warley Road

Cadent Gas were proposing to carry out Utility asset works on Warley Road, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:48.

Cadent Gas logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Warley Hill

Cadent Gas are proposing to carry out Utility asset works on Warley Hill, Great Warley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:22.

Cadent Gas logo
Between
22 Jul and 12 Aug 2025
Details
View Map
Share
Warley Hill

Cadent Gas were proposing to carry out Utility asset works on Warley Hill, Great Warley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 16:47.

Virgin Media logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Manor Road

Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 2 May 2025 at 08:16.

Virgin Media logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Manor Road

Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 May 2025 at 13:21.

Cadent Gas logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Oval Road South

Cadent Gas are proposing to carry out Utility asset works on Oval Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:41.

Essex County Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Slip Road From M25 To A127 Eastbound

Essex County Council are proposing to carry out Highway improvement works on Slip Road From M25 To A127 Eastbound, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Mar 2025 at 13:23.

Cadent Gas logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Lambourne Road

Cadent Gas are proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 15:00.

Cadent Gas logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Lambourne Road

Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:40.

UK Power Networks Eastern & London logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Millers Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Millers Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 15:14.

UK Power Networks Eastern & London logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Millers Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Millers Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 09:50.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:52.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:43.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Gale Street

Cadent Gas were proposing to carry out Utility asset works on Gale Street, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:27.

Telefonica UK logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:08.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
11 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Perth Road

Cadent Gas are proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:45.

Cadent Gas logo
LONG TERM
Between
11 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Perth Road

Cadent Gas are proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:15.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Colombo Road

Cadent Gas are proposing to carry out Utility asset works on Colombo Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:30.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Colombo Road

Cadent Gas are proposing to carry out Utility asset works on Colombo Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 13:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Montreal Road

Cadent Gas are proposing to carry out Utility asset works on Montreal Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 13:00.

Cadent Gas logo
Between
11 and 25 Aug 2025
Details
View Map
Share
Follow
Montreal Road

Cadent Gas are proposing to carry out Utility asset works on Montreal Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Quebec Road

Cadent Gas are proposing to carry out Utility asset works on Quebec Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Quebec Road

Cadent Gas are proposing to carry out Utility asset works on Quebec Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Cranley Drive

Cadent Gas are proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Cranley Drive

Cadent Gas are proposing to carry out Utility asset works on Cranley Drive, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Romford Road

Cadent Gas are proposing to carry out Utility asset works on Romford Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 15:18.

Cadent Gas logo
Between
11 Aug and 1 Sep 2025
Details
View Map
Share
Romford Road

Cadent Gas were proposing to carry out Utility asset works on Romford Road, Chigwell Town, Chigwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:41.

Telefonica UK logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:10.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:12.

Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Lambs Lane South

London Borough Of Havering are proposing to carry out Highway improvement works on Lambs Lane South, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:51.

Between
26 and 28 Aug 2025
Details
View Map
Share
Lambs Lane South

London Borough Of Havering were proposing to carry out Highway improvement works on Lambs Lane South, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 May 2025 at 12:47.

Cadent Gas logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Netley Road

Cadent Gas are proposing to carry out roadworks on Netley Road, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.


Roadworks Map near to Main Road, ROMFORD, RM1 3EJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Main Road, ROMFORD, RM1 3EJ (51 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAIN ROAD 
(0.1 miles)
London Borough Of Havering
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 21 May 2025 - 3 Jun 2025
0.1
Details
Share
Follow
2
Transport for London (TfL) logo
MERCURY GARDENS 
(0.1 miles)
Transport for London (TfL)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 30 May 2025 08:00
(Scheduled: 30 May 2025 - 3 Jun 2025)
0.1
Details
Share
Follow
3
MARKET PLACE 
(0.1 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.1
Details
Share
Follow
4
ST EDWARDS WAY 
(0.3 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway -
In Progress
Since: 3 Jun 2025 09:30
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.3
Details
Share
Follow
5
Transport for London (TfL) logo
MAJOR
  
ST EDWARDS WAY 
(0.3 miles)
Transport for London (TfL)
Highway improvement works - Carriageway - No carriageway incursion
Planned
Scheduled: 3 Mar 2025 - 28 Oct 2025
0.3
Details
Share
Follow
6
Transport for London (TfL) logo
MAJOR
  
ST EDWARDS WAY 
(0.3 miles)
Transport for London (TfL)
Highway improvement works - Carriageway - No carriageway incursion
Planned
Scheduled: 10 Mar 2025 - 28 Oct 2025
0.3
Details
Share
Follow
7
Its Technology Group logo
SOUTH STREET 
(0.3 miles)
Its Technology Group
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
30 May 2025 10:25 - 2 Jun 2025 08:20
0.3
Details
Share
8
ST EDWARDS WAY 
(0.3 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Lane closure
In Progress
Since: 3 Jun 2025 09:30
(Scheduled: 3 Jun 2025)
0.3
Details
Share
Follow
9
Its Technology Group logo
SOUTH STREET 
(0.3 miles)
Its Technology Group
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.3
Details
Share
Follow
10
UK Power Networks Eastern & London logo
URGENT
  
SOUTH STREET 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 21:17
(Scheduled: 2 Jun 2025 - 9 Jun 2025)
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data