ROADWORKS SUMMARY
Main Road, ROMFORD, RM1 3BT
Introduction
View current and future planned roadworks and road closures for Main Road, RM1 3BT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Main Road, ROMFORD, RM1 3BT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jun 2025
National Highways are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.
19 Jan 2025
London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 10:00 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Dec 2024 at 15:48.
2 Oct 2024 and 1 Jun 2025
National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.
18 Nov 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.
31 Jan 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Renwick Road, Barking.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:54.
Tuesday
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:09.
2 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Billet Lane, Hornchurch.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 December 2024 at 08:09 and could run through until 2 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:31.
2 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Butts Green Road, Hornchurch.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 December 2024 at 00:00 and could run through until 2 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 14:38.
20 Dec 2024 and 2 Jan 2025
Cadent Gas were proposing to carry out Utility repair and maintenance works on Billet Lane, Hornchurch.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 14:36.
30 Dec 2024 and 26 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:25.
2 and 30 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:19.
6 Jan and 14 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 11:12.
6 and 26 Jan 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 11:04.
6 and 26 Jan 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:27.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.
6 and 8 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:35.
6 and 8 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:05.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Geoffrey Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:56.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:01.
7 and 10 Jan 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 10 Dec 2024 at 08:56.
7 and 10 Jan 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Dec 2024 at 16:20.
8 and 11 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.
8 and 11 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:04.
8 Jan and 31 May 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Dec 2024 at 14:13.
8 Jan and 31 May 2025
National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Dec 2024 at 16:30.
13 and 27 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.
13 and 25 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.
13 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 15:20.
13 and 18 Jan 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Dec 2024 at 08:47.
15 and 23 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:15.
17 and 20 Jan 2025
Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:05.
20 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.
20 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 09:52.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.
20 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:47.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.
20 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:31.
20 and 31 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.
20 and 24 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Millbrook Gardens, Gidea Park, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 08:26.
21 and 23 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.
22 and 25 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 6 Dec 2024 at 16:27.
22 and 25 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 16 Dec 2024 at 16:04.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:54.
27 Jan and 1 Feb 2025
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:01.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 06:21.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 08:21.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 07:14.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 28 Nov 2024 at 07:39.
28 and 30 Jan 2025
Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 05:48.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 08:58.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 15:40.
3 Feb and 27 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
3 Feb and 27 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:30.
3 Feb and 27 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:15.
3 Feb and 27 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:30.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.
3 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
3 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.
3 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.
3 Feb and 2 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:05.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.
4 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:31.
10 and 12 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Dec 2024 at 13:17.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:21.
12 and 14 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Dec 2024 at 13:29.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:15.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.
17 and 20 Feb 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.
17 and 20 Feb 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 16:54.
24 Feb and 28 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.
24 Feb and 28 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 13:38.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 13:30.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 12:33.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:38.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 15:57.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:08.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 14:13.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.
24 and 26 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Seven Kings Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.
27 Feb and 3 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Farmway, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:47.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Neville Road, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:46.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Becontree Avenue, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:32.
3 and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
3 and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
4 and 10 Mar 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:19.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:18.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:55.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:19.
5 and 11 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:30.
5 and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Greenside, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:04.
10 and 13 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:39.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Becontree Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:37.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:38.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:27.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:07.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:51.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:06.
10 and 30 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.
10 and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
10 and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.
10 and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.
10 and 21 Mar 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 20 Dec 2024 at 15:04.
10 and 13 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Manor Road, Lambourne, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:29.
17 and 19 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Downing Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Dec 2024 at 15:56.
17 Mar and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
17 Mar and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:21.
17 Mar and 14 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
17 Mar and 14 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.
17 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Stafford Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Dec 2024 at 13:56.
22 Mar and 30 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 11:42.
24 Mar and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
24 Mar and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
24 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 15:52.
24 and 29 Mar 2025
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 10:18.
Roadworks Map near to Main Road, ROMFORD, RM1 3BT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Main Road, ROMFORD, RM1 3BT (5 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data