ROADWORKS SUMMARY
Upminster Road North, RAINHAM, RM13 9SA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Upminster Road North, RM13 9SA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Upminster Road North, RAINHAM, RM13 9SA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Upminster Road North are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Rennie Drive

Kent County Council are carrying out Highway improvement works on Rennie Drive, Dartford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 15:21 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 26 Nov 2024 at 15:24.

London Borough Of Bexley logo
LONG TERM
Between
5 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Bronze Age Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.

Thames Water logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are proposing to carry out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:44.

Thames Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are carrying out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:46.

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
19 Jan 2025
Details
View Map
Share
Follow
Freshwater Road

London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:00 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Dec 2024 at 15:48.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:06.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:24.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:00.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 10 Jan 2025
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:21.

Thames Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Paroma Road

Thames Water are carrying out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 12:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 13:03.

Thames Water logo
LONG TERM
Until
22 Jan 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are carrying out Utility asset works on Mayfield Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 14:00 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:22.

Thames Water logo
LONG TERM
Between
24 Oct 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.

Thames Water logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are carrying out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:30 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:09.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Gertrude Road

Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 11 Nov 2024 at 08:00.

LONG TERM
Between
14 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 09:40.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Goddard Road

Cadent Gas are carrying out Utility asset works on Goddard Road, Stifford Clays, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 08:38 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:48.

LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.

Thames Water logo
LONG TERM
Between
20 Nov 2024 and 12 Feb 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.

Thurrock Council logo
Finishing
Friday
Details
View Map
Share
Follow
Burnley Road

Thurrock Council are proposing to carry out Highway improvement works on Burnley Road, West Thurrock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Nov 2024 at 15:31.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Fraser Road

Thames Water are carrying out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:30 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 15:02.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are carrying out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 13:00 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
28 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Parkside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:17.

Southern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are carrying out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Eversley Cross

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eversley Cross, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 17:44.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Parkside Cross

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkside Cross, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 17:17.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Renwick Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Renwick Road, Barking.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:54.

Thames Water logo
Between
3 and 31 Dec 2024
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:09.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

Cadent Gas are carrying out Utility asset works on Long Lane, Stifford Clays, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:37 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 14:00.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Glenview

Southern Gas Networks are carrying out Utility repair and maintenance works on Glenview, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 14:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:30.

Anglian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eastern Avenue

Anglian Water are carrying out Utility repair and maintenance works on Eastern Avenue, West Thurrock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 14:28.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Weston Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Weston Avenue, West Thurrock.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 06:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:08.

Thames Water logo
LONG TERM
Between
10 Dec 2024 and 21 Apr 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:04.

BT logo
Finishing
Saturday
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Sep 2024 at 09:57.

BT logo
Finishing
Saturday
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Sep 2024 at 09:19.

Finishing
Friday
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:40.

Cadent Gas logo
LONG TERM
Between
1 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:41.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:25.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:10.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Mar 2025
Details
View Map
Share
Avenue Road

Thames Water were proposing to carry out Utility asset works on Avenue Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:06.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:31.

Thames Water logo
LONG TERM
Between
2 Jan and 12 May 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 16:33.

Thames Water logo
Between
2 and 30 Jan 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:17.

Between
6 and 26 Jan 2025
Details
View Map
Share
Bob Dunn Way

Riverside Energy Park were proposing to carry out Utility asset works on Bob Dunn Way, Dartford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 11:35.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, West Thurrock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Aug 2024 at 11:35.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, West Thurrock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 13 Feb 2024 at 10:27.

Thurrock Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 13 Sep 2024 at 12:00.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:05.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:02.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:51.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:42.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Dec 2024 at 16:13.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:27.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:54.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 12 Dec 2024 at 20:32.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 4 Dec 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:40.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Fieldway

Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:20.

LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 11:12.

London Borough Of Barking And Dagenham logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Woodward Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 11:04.

London Borough Of Barking And Dagenham logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Woodward Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:27.

BT logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Sep 2024 at 13:44.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:35.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:05.

Thames Water logo
LONG TERM
Between
7 Jan and 10 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:56.

Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.

Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:04.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:30.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Oct 2024 at 09:42.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2024 at 11:20.

BT logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 11:41.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:44.

London Borough Of Bexley logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brook Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 15:50.

London Borough Of Bexley logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brook Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 13:01.

Transport for London (TfL) logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.

Transport for London (TfL) logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.

National Highways logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Dec 2024 at 08:47.

Thames Water logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Monmouth Road

Thames Water were proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:15.

Thames Water logo
LONG TERM
Between
16 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:15.

Thames Water logo
LONG TERM
Between
16 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:29.

Thurrock Council logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 8 Oct 2024 at 14:58.

Thurrock Council logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 14 Nov 2024 at 13:24.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:15.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:42.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:13.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
New Road

London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Oct 2024 at 16:50.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:51.

Thames Water logo
LONG TERM
Between
20 Jan and 23 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:50.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:16.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.

Thames Water logo
LONG TERM
Between
22 Jan and 9 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:44.

Between
22 and 25 Jan 2025
Details
View Map
Share
Follow
Airfield Way

London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 6 Dec 2024 at 16:27.

Between
22 and 25 Jan 2025
Details
View Map
Share
Follow
Airfield Way

London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 Dec 2024 at 16:04.

Thames Water logo
LONG TERM
Between
27 Jan and 29 May 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:07.

Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ockendon Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.

Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ockendon Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Havering on 18 Dec 2024 at 07:21.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.

Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.

Thames Water logo
LONG TERM
Between
1 Feb and 8 May 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:35.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:45.

Thurrock Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Link From A1012 Roundabout To A1306 Interchange

Thurrock Council are proposing to carry out Highway repair and maintenance works on Link From A1012 Roundabout To A1306 Interchange, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:35.

Thurrock Council logo
LONG TERM
Between
3 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Stifford Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Stifford Roundabout, North Stifford, Grays.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:46.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.

Thames Water logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 15:12.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:40.

Southern Gas Networks logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Lavernock Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:16.

Thames Water logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 14:21.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wykeham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wykeham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:31.

Thames Water logo
LONG TERM
Between
12 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 16:33.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:27.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:45.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:37.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 12:44.

Thames Water logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.

Thames Water logo
LONG TERM
Between
18 Feb and 28 Apr 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.

Thames Water logo
Between
18 and 23 Feb 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:34.

Thames Water logo
Between
18 and 23 Feb 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 16:44.

Southern Gas Networks logo
Between
23 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
West Thurrock Way

Thurrock Council are proposing to carry out Highway repair and maintenance works on West Thurrock Way, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

Thurrock Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Weston Avenue

Thurrock Council are proposing to carry out Highway repair and maintenance works on Weston Avenue, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Oct 2024 at 09:19.

Thames Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bostall Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bostall Lane, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:28.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:43.

London Borough Of Bexley logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Overton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Overton Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 16:05.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:21.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Baron Road

Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 12:33.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hubbards Chase

UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:38.

Thames Water logo
Between
25 Feb and 1 Mar 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:39.

London Borough Of Bexley logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Howbury Lane

London Borough Of Bexley are proposing to carry out Highway improvement works on Howbury Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 15:39.

London Borough Of Barking And Dagenham logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Farmway

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Farmway, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:47.

Thurrock Council logo
Between
2 and 10 Mar 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on London Road, South Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:55.

Southern Gas Networks logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 16:52.

Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Dec 2024 at 15:51.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Neville Road

Cadent Gas were proposing to carry out Utility asset works on Neville Road, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:46.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Becontree Avenue

Cadent Gas were proposing to carry out Utility asset works on Becontree Avenue, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:32.

Thames Water logo
LONG TERM
Between
4 Mar and 26 May 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.

UK Power Networks Eastern & London logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Hubbards Chase

UK Power Networks Eastern & London were proposing to carry out New service connection on Hubbards Chase, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:19.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:50.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:55.

UK Power Networks Eastern & London logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Stanhope Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:30.

Thames Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Greenside

Thames Water are proposing to carry out Utility repair and maintenance works on Greenside, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:04.

London Borough Of Barking And Dagenham logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Rusholme Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:39.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Becontree Avenue

Cadent Gas are proposing to carry out Utility asset works on Becontree Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:37.

Southern Gas Networks logo
Between
11 and 25 Mar 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 10:42.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 09:45.

BT logo
Between
12 and 19 Mar 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 17:08.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 4 Dec 2024 at 10:25.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 09:49.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 15:53.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 29 Nov 2024 at 14:29.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 2 Dec 2024 at 08:15.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, South Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 4 Dec 2024 at 10:25.

London Borough Of Barking And Dagenham logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Downing Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Downing Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Dec 2024 at 15:56.


Roadworks Map near to Upminster Road North, RAINHAM, RM13 9SA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Upminster Road North, RAINHAM, RM13 9SA (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
MACLENNAN AVENUE 
(0.0 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.0
Details
Share
2
URGENT
  
WARWICK ROAD 
(0.3 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Carriageway, Footpath - Give and take
In Progress
Since: 16 Dec 2024 09:49
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
0.3
Details
Share
Follow
3
PARSONAGE ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Dec 2024 08:00
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.4
Details
Share
Follow
4
NEW ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 20 Dec 2024
0.4
Details
Share
Follow
5
FARM ROAD 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Verge - Give and take
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.5
Details
Share
6
BRIGHTS AVENUE 
(0.6 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Dec 2024 08:00
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.6
Details
Share
Follow
7
URGENT
  
WENNINGTON ROAD 
(0.8 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 11 Dec 2024 09:24
(Scheduled: 11 Dec 2024 - 27 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data