ROADWORKS SUMMARY
Baillie Close, RAINHAM, RM13 9PR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Baillie Close, RM13 9PR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Baillie Close, RAINHAM, RM13 9PR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Baillie Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 14:39.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 12:12.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:53.

Thames Water logo
LONG TERM
Between
12 Feb and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are carrying out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 14:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:08.

Thames Water logo
LONG TERM
Between
20 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Fastrack The Bridge

Riverside Energy Park are carrying out Utility asset works on Fastrack The Bridge, Dartford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 09:28.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are carrying out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:14.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.

Thames Water logo
LONG TERM
Between
23 Mar and 8 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.

Thames Water logo
LONG TERM
Between
8 Apr and 6 Sep 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:02.

Thames Water logo
LONG TERM
Between
16 Apr and 30 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Apr 2025 at 18:37.

Thames Water logo
LONG TERM
Between
22 Apr and 30 Aug 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.

Thames Water logo
LONG TERM
Between
22 Apr and 11 Jul 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:17.

Thames Water logo
LONG TERM
Between
22 Apr and 20 Jun 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:29.

Thames Water logo
LONG TERM
Between
22 Apr and 23 Jun 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are carrying out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:57.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
South Road

Riverside Energy Park are carrying out Utility asset works on South Road, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:57.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are carrying out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:15.

Thames Water logo
LONG TERM
Between
28 Apr and 30 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:51.

Thames Water logo
LONG TERM
Between
1 May and 5 Aug 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
LONG TERM
Until
5 Aug 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are carrying out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 10:00 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:11.

Thames Water logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are carrying out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 09:45 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:12.

LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are carrying out Utility asset works on Northend Road, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:50.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:47.

Thames Water logo
LONG TERM
Between
6 May and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:05.

Thames Water logo
LONG TERM
Between
8 May and 18 Jul 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:06.

Thames Water logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Follow
Frinsted Road

Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:30.

Thames Water logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 18:50.

Southern Gas Networks logo
LONG TERM
Between
12 May and 30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Exmouth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Exmouth Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 11:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:12.

Thames Water logo
LONG TERM
Between
14 May and 28 Jul 2025
Details
View Map
Share
Follow
Battle Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Battle Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Ightham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ightham Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Hythe Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hythe Avenue, Bexleyheath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Bedonwell Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.

Kent County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Priory Road

Kent County Council are carrying out Highway improvement works on Priory Road, Dartford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 00:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 8 May 2025 at 07:58.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 11:28.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Medway Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Medway Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 08:29.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:37.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:17.

Royal Borough Of Greenwich logo
Finishing
Friday
Details
View Map
Share
Follow
St Nicholas Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:33.

Between
27 May and 16 Jun 2025
Details
View Map
Share
Crayford Creek Road

Aurora Utilities Limited were proposing to carry out Utility asset works on Crayford Creek Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 28 Mar 2025 at 09:23.

Southern Gas Networks logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Heath Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Heath Way, Erith.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 11:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 14:14.

Southern Gas Networks logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:29.

Thames Water logo
Between
28 May and 10 Jun 2025
Details
View Map
Share
Thanet Road

Thames Water were proposing to carry out roadworks on Thanet Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 07:45.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Julia Gardens

Thames Water are carrying out Utility repair and maintenance works on Julia Gardens, Barking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:20 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:44.

Finishing
Monday
Details
View Map
Share
Follow
Belfairs Drive

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Belfairs Drive, Chadwell Heath, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 08:38 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 2 Jun 2025 at 10:30.

Finishing
Monday
Details
View Map
Share
Follow
Queens Gardens

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Queens Gardens, Upminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 12:13 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 1 Jun 2025 at 12:54.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 11:08.

Thames Water logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are carrying out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 12:14.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 09:21.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Chieveley Road

Southern Gas Networks were proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:58.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Bunkers Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:37.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Bunkers Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:23.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:32.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are carrying out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 08:25.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Gideon Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Gideon Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Brigstock Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

London Borough Of Bexley logo
Finishing
Thursday
Details
View Map
Share
Follow
Brigstock Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.

Thames Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Bullbanks Road

Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:12.

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Cheelson Road

Cadent Gas are proposing to carry out Utility asset works on Cheelson Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 09:53.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Cheelson Road

Cadent Gas are proposing to carry out Utility asset works on Cheelson Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 11:11.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Cheelson Road

Cadent Gas were proposing to carry out Utility asset works on Cheelson Road, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:02.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas were proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works were categorised as Major.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:23.

Southern Gas Networks logo
Between
3 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.

Southern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Picardy Manorway

Southern Gas Networks are carrying out Utility repair and maintenance works on Picardy Manorway, Belvedere.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:45 and could run through until 10 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:53.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Sandhurst Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.

Finishing
Friday
Details
View Map
Share
Follow
Bush Elms Road

London Borough Of Havering are proposing to carry out Highway improvement works on Bush Elms Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:52.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Sheridan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Thanet Road

Thames Water were proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 16:36.

Southern Gas Networks logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:26.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:58.

Thames Water logo
LONG TERM
Between
9 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 16:30.

London Borough Of Bexley logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Picardy Road

London Borough Of Bexley are proposing to carry out Section 50 on Picardy Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2025 at 11:36.

Thames Water logo
LONG TERM
Between
9 Jun and 7 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:57.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Mar 2025 at 08:30.

Between
9 and 27 Jun 2025
Details
View Map
Share
River Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 09:38.

Cadent Gas logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Follow
Wilsman Road

Cadent Gas are proposing to carry out Utility asset works on Wilsman Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 11:07.

Cadent Gas logo
Between
9 and 23 Jun 2025
Details
View Map
Share
Wilsman Road

Cadent Gas were proposing to carry out Utility asset works on Wilsman Road, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:02.

Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Aveley Road

London Borough Of Havering are proposing to carry out Highway improvement works on Aveley Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 22 May 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 14:30.

Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Severn Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Severn Drive, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 27 May 2025 at 16:30.

Southern Gas Networks logo
Between
12 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bynon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
12 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:25.

Southern Gas Networks logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Bynon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:47.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Holly Hill Road

London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Holly Hill Road

London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 29 May 2025 at 16:39.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rutland Gate

London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.

London Borough Of Bexley logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rutland Gate

London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 27 May 2025 at 16:35.

Thames Water logo
LONG TERM
Between
16 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Cadent Gas logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Nelson Road

Cadent Gas were proposing to carry out Utility asset works on Nelson Road, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:03.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Pedley Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Nelmes Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2025 at 14:29.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Nelmes Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Nelmes Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 14:06.

Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Dorian Road

London Borough Of Havering are proposing to carry out Highway improvement works on Dorian Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 29 May 2025 at 15:50.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Colyers Lane

Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:32.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:43.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Seaton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:10.

Thames Water logo
LONG TERM
Between
23 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:18.

Cadent Gas logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Annalee Gardens

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Annalee Gardens, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 12:10.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.

Thames Water logo
LONG TERM
Between
24 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:38.

Thames Water logo
LONG TERM
Between
24 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:59.

Thames Water logo
LONG TERM
Between
24 Jun and 1 Sep 2025
Details
View Map
Share
Monarch Road

Thames Water were proposing to carry out Utility asset works on Monarch Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 1 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:12.

Thurrock Council logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Sandy Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 28 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 12 Mar 2025 at 09:33.

Between
26 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Crayford Creek Road

Aurora Utilities Limited are proposing to carry out New service connection on Crayford Creek Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 23 Apr 2025 at 15:46.

Thames Water logo
LONG TERM
Between
26 Jun and 8 Sep 2025
Details
View Map
Share
Follow
Bullbanks Road

Thames Water are proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:01.

Thames Water logo
LONG TERM
Between
27 Jun and 29 Sep 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

LONG TERM
Between
28 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:06.

Southern Gas Networks logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:53.

Southern Gas Networks logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:33.

London Borough Of Bexley logo
LONG TERM
Between
30 Jun and 31 Dec 2025
Details
View Map
Share
Follow
Bronze Age Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
30 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Patricia Drive

London Borough Of Havering are proposing to carry out Highway improvement works on Patricia Drive, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 May 2025 at 12:59.

Cadent Gas logo
LONG TERM
Between
1 Jul and 14 Aug 2025
Details
View Map
Share
Arisdale Avenue

Cadent Gas were proposing to carry out Utility asset works on Arisdale Avenue, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 14 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:57.

Thurrock Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Sandy Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Apr 2025 at 09:24.

Thurrock Council logo
Between
3 and 6 Jul 2025
Details
View Map
Share
Sandy Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 July 2025 and run through until 6 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 12 Mar 2025 at 14:18.

London Borough Of Bexley logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2025 at 14:45.

Between
11 and 20 Jul 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out New service connection on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 17 Apr 2025 at 16:37.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Seton Gardens

Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Arden Crescent

Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.

Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Iron Mill Lane

Aurora Utilities Limited are proposing to carry out New service connection on Iron Mill Lane, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 29 May 2025 at 15:06.

Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Iron Mill Lane

Aurora Utilities Limited are proposing to carry out New service connection on Iron Mill Lane, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Aurora Utilities Limited on 25 Apr 2025 at 11:09.

London Borough Of Bexley logo
Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Brook Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:38.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:19.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:42.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Plymstock Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:55.

Southern Gas Networks logo
Between
21 and 29 Jul 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 14:49.

Thames Water logo
LONG TERM
Between
21 Jul and 17 Sep 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:54.

Thames Water logo
LONG TERM
Between
21 Jul and 1 Oct 2025
Details
View Map
Share
Bullbanks Road

Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:58.

Thames Water logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:04.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Ridge Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridge Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Aug 2024 at 15:10.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Pelham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelham Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Pickford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Lane, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:10.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Dorcis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorcis Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 08:57.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Bristow Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:25.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bristow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 13:43.

Southern Gas Networks logo
Between
23 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:25.

Southern Gas Networks logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Shakespeare Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shakespeare Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 13:56.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Holmesdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmesdale Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:42.

Southern Gas Networks logo
Between
24 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Gipsy Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gipsy Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Elsa Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsa Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Sheldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheldon Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Barnehurst Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnehurst Avenue, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:28.

Network Rail logo
Between
26 and 28 Jul 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:17.

Network Rail logo
Between
26 and 28 Jul 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 09:27.

Thames Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Broadway

Thames Water were proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 11:13.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Brantwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brantwood Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 15:03.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Bowness Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowness Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Erith Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:57.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Budleigh Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:50.

Southern Gas Networks logo
Between
28 Jul and 13 Aug 2025
Details
View Map
Share
Budleigh Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 09:37.

London Borough Of Bexley logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Brook Street

London Borough Of Bexley were proposing to carry out Highway improvement works on Brook Street, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:12.

Thurrock Council logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Ship Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 30 Apr 2025 at 15:49.

Thurrock Council logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Ship Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 7 May 2025 at 09:46.

Thames Water logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 21:44.

Thames Water logo
LONG TERM
Between
28 Jul and 24 Sep 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.

London Borough Of Bexley logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 Feb 2025 at 14:39.

London Borough Of Bexley logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:35.

London Borough Of Bexley logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Bazalgette Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 13:42.

Cadent Gas logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Oval Road South

Cadent Gas are proposing to carry out Utility asset works on Oval Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:41.

London Borough Of Bexley logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Bazalgette Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 July 2025 and run through until 2 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:40.

Network Rail logo
Between
2 and 4 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
2 and 4 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:01.

UK Power Networks Eastern & London logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Church Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 16:31.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Bob Dunn Way

Kent County Council are proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 8 May 2025 at 12:12.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Bob Dunn Way

Kent County Council are proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 8 May 2025 at 13:40.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Marsh Street North

Kent County Council are proposing to carry out Highway improvement works on Marsh Street North, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 May 2025 at 14:32.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Marsh Street North

Kent County Council are proposing to carry out Highway improvement works on Marsh Street North, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 May 2025 at 07:44.

Southern Gas Networks logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.

Southern Gas Networks logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Bowford Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowford Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Shakespeare Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Shakespeare Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:54.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Kingsgate Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Kingsgate Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:59.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Berkeley Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:50.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Preston Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:46.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Brampton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 May 2025 at 08:07.

London Borough Of Bexley logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Brampton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:21.

London Borough Of Bexley logo
Between
4 and 11 Aug 2025
Details
View Map
Share
Bexley Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Bexley Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:17.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Chancelot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chancelot Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 09:17.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:52.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:43.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Gale Street

Cadent Gas were proposing to carry out Utility asset works on Gale Street, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:27.

Telefonica UK logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:08.

Southern Gas Networks logo
Between
8 and 22 Aug 2025
Details
View Map
Share
Follow
Orchard Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 11:27.

Network Rail logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:09.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Chieveley Road

Thames Water are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 12:03.

London Borough Of Bexley logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Slade Green Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:21.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Mill Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Mill Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:48.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Bideford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bideford Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Northumberland Park

London Borough Of Bexley were proposing to carry out Highway improvement works on Northumberland Park, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:44.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Limewood Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Limewood Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:46.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Horsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Horsa Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:39.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Avenue Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avenue Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:42.

Southern Gas Networks logo
Between
11 and 26 Aug 2025
Details
View Map
Share
Follow
Totnes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Totnes Road, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:37.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Hengist Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hengist Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:35.

Southern Gas Networks logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Lodge Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Ling Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ling Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:32.

London Borough Of Bexley logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Bexley Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Bexley Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 11 Apr 2025 at 12:17.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Aperfield Road

Thames Water were proposing to carry out New service connection on Aperfield Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 14 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 09:54.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Aperfield Road

Thames Water are proposing to carry out New service connection on Aperfield Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 09:56.

Royal Borough Of Greenwich logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Grovebury Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Grovebury Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 May 2025 at 05:46.

Network Rail logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.

Network Rail logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2025 at 11:13.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lyndhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyndhurst Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 15:16.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Silverdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Silverdale Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:51.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Hamilton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hamilton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.

Southern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Jenton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jenton Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.

Telefonica UK logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 22 May 2025 at 09:10.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:12.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Elsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.

London Borough Of Bexley logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Avondale Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.

London Borough Of Bexley logo
Between
25 and 31 Aug 2025
Details
View Map
Share
Follow
Slade Green Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:47.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Okehampton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:28.

London Borough Of Bexley logo
Between
25 and 31 Aug 2025
Details
View Map
Share
Brook Street

London Borough Of Bexley were proposing to carry out Highway improvement works on Brook Street, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 26 Feb 2025 at 13:04.

Southern Gas Networks logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:35.

Southern Gas Networks logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Orchard Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:30.

Royal Borough Of Greenwich logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Bentham Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bentham Road, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.

London Borough Of Bexley logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Follow
Slade Green Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 08:03.

London Borough Of Bexley logo
Between
26 Aug and 1 Sep 2025
Details
View Map
Share
Slade Green Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 4 Apr 2025 at 07:40.

London Borough Of Bexley logo
Between
26 and 31 Aug 2025
Details
View Map
Share
Slade Green Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 07:57.

Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Lambs Lane South

London Borough Of Havering are proposing to carry out Highway improvement works on Lambs Lane South, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:51.

Between
26 and 28 Aug 2025
Details
View Map
Share
Lambs Lane South

London Borough Of Havering were proposing to carry out Highway improvement works on Lambs Lane South, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 16 May 2025 at 12:47.


Roadworks Map near to Baillie Close, RAINHAM, RM13 9PR (9 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
MarkerMarker
Last Updated: 3 Jun 2025 20:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Baillie Close, RAINHAM, RM13 9PR (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
WANTZ LANE 
(0.0 miles)
UK Power Networks Eastern & London
Permanent reinstatement - Footway - Give and take
In Progress
Since: 3 Jun 2025 15:51
(Scheduled: 3 Jun 2025 - 6 Jun 2025)
0.0
Details
Share
Follow
2
EASTWOOD DRIVE 
(0.4 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 29 May 2025 12:05
(Scheduled: 29 May 2025 - 4 Jun 2025)
0.4
Details
Share
Follow
3
UPMINSTER ROAD SOUTH 
(0.5 miles)
London Borough Of Havering
New service connection - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 26 May 2025 - 9 Jun 2025
0.5
Details
Share
Follow
4
FERRY LANE 
(0.6 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Two-way signals
Complete
3 Jun 2025 08:00 - 15:56
0.6
Details
Share
5
MAJOR
  
BRISCOE ROAD 
(0.7 miles)
London Borough Of Havering
Highway improvement works - Carriageway - Road closure
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 3 Jun 2025)
0.7
Details
Share
Follow
6
UPMINSTER ROAD NORTH 
(0.7 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - Give and take
Cancelled
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.7
Details
Share
7
FERRY LANE 
(0.8 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Multi-way signals
Complete
3 Jun 2025 08:00 - 15:56
0.8
Details
Share
8
MAJOR
  
ABBEY WOOD LANE 
(0.9 miles)
London Borough Of Havering
Highway improvement works - Carriageway - Road closure
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 3 Jun 2025)
0.9
Details
Share
Follow
9
Virgin Media logo
LAKESIDE 
(0.9 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data