ROADWORKS SUMMARY
Glebe Road, RAINHAM, RM13 9LH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glebe Road, RM13 9LH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glebe Road, RAINHAM, RM13 9LH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glebe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
12 Feb and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.

Thames Water logo
LONG TERM
Between
6 May and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:05.

Thames Water logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Follow
Frinsted Road

Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:30.

Thames Water logo
LONG TERM
Between
12 May and 31 Oct 2025
Details
View Map
Share
Frinsted Road

Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 18:50.

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Dec 2024 at 10:57.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Colyers Lane

Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:57.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are carrying out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:37.

Transport for London (TfL) logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are carrying out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 07:55.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:38.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 21:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:38.

Transport for London (TfL) logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are carrying out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 22:00 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:39.

Thames Water logo
LONG TERM
Between
27 Jun and 29 Sep 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

London Borough Of Bexley logo
LONG TERM
Between
30 Jun and 31 Dec 2025
Details
View Map
Share
Follow
Bronze Age Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

LONG TERM
Between
30 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are proposing to carry out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 13:44.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are proposing to carry out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 14:50.

LONG TERM
Between
30 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Eastern Avenue East

Essex And Suffolk Water are proposing to carry out Diversionary works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jun 2025 at 13:41.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Eastern Avenue East

Essex And Suffolk Water are carrying out Diversionary works on Eastern Avenue East, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 July 2025 at 16:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Jul 2025 at 08:11.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Bullbanks Road

Thames Water are carrying out Utility asset works on Bullbanks Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 16:18.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southend Arterial Road

Essex And Suffolk Water are carrying out Diversionary works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2025 at 12:39 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 4 Jul 2025 at 12:39.

London Borough Of Bexley logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Bronze Age Way

London Borough Of Bexley are carrying out Highway repair and maintenance works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 31 December 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 7 Jul 2025 at 16:38.

LONG TERM
Until
5 Nov 2025
Details
View Map
Share
Follow
Choats Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Choats Road, Barking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:42.

LONG TERM
Until
8 Oct 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 July 2025 at 08:00 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:43.

Thames Water logo
LONG TERM
Between
21 Jul and 1 Oct 2025
Details
View Map
Share
Bullbanks Road

Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:58.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:04.

Thurrock Council logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Ship Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Ship Lane, Aveley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 30 Apr 2025 at 15:49.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.

Network Rail logo
LONG TERM
Until
19 Oct 2025
Details
View Map
Share
Follow
Kennedy Road

Network Rail are carrying out Works for road purposes on Kennedy Road, Barking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2025 at 16:32.

Network Rail logo
LONG TERM
Until
19 Oct 2025
Details
View Map
Share
Follow
Harrow Road

Network Rail are carrying out Works for Rail Purposes on Harrow Road, Barking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Sep 2025 at 12:48.

Network Rail logo
LONG TERM
Until
19 Oct 2025
Details
View Map
Share
Follow
Blake Avenue

Network Rail are carrying out Works for Rail Purposes on Blake Avenue, Barking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Sep 2025 at 12:48.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Bob Dunn Way

Kent County Council are proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 8 May 2025 at 12:12.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Bob Dunn Way

Kent County Council were proposing to carry out Highway improvement works on Bob Dunn Way, Stone.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 31 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 14:06.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Marsh Street North

Kent County Council are proposing to carry out Highway improvement works on Marsh Street North, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 12 May 2025 at 14:32.

Kent County Council logo
LONG TERM
Between
4 Aug and 31 Oct 2025
Details
View Map
Share
Marsh Street North

Kent County Council were proposing to carry out Highway improvement works on Marsh Street North, Dartford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 14:06.

Thames Water logo
LONG TERM
Between
7 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 15:58.

Thames Water logo
LONG TERM
Between
7 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 16:53.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Street

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Church Street, Dagenham.

These works are categorised as Major.

The works will start on or after 9 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Sep 2025 at 19:38.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sterry Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Sterry Road, Dagenham.

These works are categorised as Major.

The works will start on or after 9 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Sep 2025 at 16:22.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Edward Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Edward Road, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 10:50.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
West Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on West Road, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 12:11.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Mill Lane

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Mill Lane, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 12:11.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Mill Lane

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Mill Lane, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 13 August 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 16:21.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Station Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Station Road, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 14 August 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Sep 2025 at 19:23.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
22 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Rainham Road South, Dagenham.

These works are categorised as Major.

The works will start on or after 22 August 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Sep 2025 at 16:21.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
22 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Heathway

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Heathway, Dagenham.

These works are categorised as Major.

The works will start on or after 22 August 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 14:40.

London Borough Of Bexley logo
Finishing
Monday
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are proposing to carry out Section 50 on Halt Robin Road, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 29 Jul 2025 at 11:35.

Thames Water logo
LONG TERM
Until
22 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are carrying out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 12:30 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:51.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility repair and maintenance works on Manor Road, Erith.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 11:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 15:58.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
29 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Western Avenue

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Western Avenue, Dagenham.

These works are categorised as Major.

The works will start on or after 29 August 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 12:00.

Royal Borough Of Greenwich logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Godstow Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 23 Jul 2025 at 12:32.

Royal Borough Of Greenwich logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Godstow Road

Royal Borough Of Greenwich are carrying out Section 50 on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 2 Sep 2025 at 11:06.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 14:24.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Arcany Road

Cadent Gas were proposing to carry out Utility asset works on Arcany Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:58.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Ayron Road

Cadent Gas were proposing to carry out Utility asset works on Ayron Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:59.

Cadent Gas logo
LONG TERM
Between
1 Sep and 30 Oct 2025
Details
View Map
Share
South Road

Cadent Gas were proposing to carry out Utility asset works on South Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:06.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
1 Sep and 31 Dec 2025
Details
View Map
Share
Follow
Maplestead Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Maplestead Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Jul 2025 at 15:41.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
1 Sep and 31 Dec 2025
Details
View Map
Share
Follow
Goresbrook Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Jul 2025 at 15:43.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Claridge Way

Thames Water are carrying out Utility repair and maintenance works on Claridge Way, Thamesmead.

The works started on 3 September 2025 at 10:29 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:53.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
4 Sep and 14 Oct 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on The Broadway, Dagenham.

These works are categorised as Major.

The works will start on or after 4 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 12 Sep 2025 at 13:22.

London Borough Of Bexley logo
Finishing
Saturday
Details
View Map
Share
James Watt Way

London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Jun 2025 at 11:42.

London Borough Of Bexley logo
Finishing
Saturday
Details
View Map
Share
James Watt Way

London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Jun 2025 at 08:00.

London Borough Of Bexley logo
Finishing
Saturday
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Jun 2025 at 08:12.

London Borough Of Bexley logo
Finishing
Saturday
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Jun 2025 at 08:00.

London Borough Of Bexley logo
Finishing
Saturday
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Jun 2025 at 11:42.

Southern Gas Networks logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:36.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Beltwood Road

Thames Water are carrying out Utility asset works on Beltwood Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 10:45 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:07.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Ardmore Road

Cadent Gas were proposing to carry out Utility asset works on Ardmore Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:59.

Thames Water logo
LONG TERM
Between
9 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 16:26.

Thames Water logo
LONG TERM
Between
9 Sep and 3 Dec 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:14.

Royal Borough Of Greenwich logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bentham Road

Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Bentham Road, Thamesmead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 08:45.

Thames Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are carrying out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:44.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
11 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Haydon Road

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Haydon Road, Dagenham.

These works are categorised as Major.

The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Sep 2025 at 19:23.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Mill Park Avenue

Thames Water are carrying out Utility repair and maintenance works on Mill Park Avenue, Hornchurch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 09:20 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 16:23.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
11 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Grantham Gardens

London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Grantham Gardens, Chadwell Heath.

These works are categorised as Major.

The works will start on or after 11 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 12 Sep 2025 at 13:33.

Until
26 Sep 2025
Details
View Map
Share
Follow
Moor Lane

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Moor Lane, Upminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 10:09 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2025 at 15:09.

Thames Water logo
LONG TERM
Between
15 Sep and 24 Oct 2025
Details
View Map
Share
Poplar Mount

Thames Water were proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:27.

London Borough Of Bexley logo
Finishing
Tomorrow
Details
View Map
Share
Eastern Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:46.

London Borough Of Barking And Dagenham logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Wantz Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Wantz Road, Dagenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Sep 2025 at 09:21.

National Highways logo
Finishing
Sunday
Details
View Map
Share
Follow
Rennie Drive

National Highways are proposing to carry out roadworks on Rennie Drive, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 May 2025 at 14:44.

National Highways logo
Finishing
Sunday
Details
View Map
Share
Follow
Bob Dunn Way

National Highways are proposing to carry out roadworks on Bob Dunn Way, Stone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 May 2025 at 14:43.

Finishing
Tomorrow
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Jul 2025 at 15:56.

Finishing
Saturday
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 1 Sep 2025 at 12:21.

Finishing
Saturday
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Havering are carrying out Highway improvement works on Ferry Lane, Rainham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 21:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Sep 2025 at 07:24.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Godstow Road

Thames Water are carrying out New service connection on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:25 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:25.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Godstow Road

Thames Water are proposing to carry out New service connection on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 13:47.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Stuart Mantle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stuart Mantle Way, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:53.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Stuart Mantle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stuart Mantle Way, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 15:45.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:50.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 09:14.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Abbotts Walk

London Borough Of Bexley are proposing to carry out Highway improvement works on Abbotts Walk, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:30.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Abbotts Walk

London Borough Of Bexley are proposing to carry out Highway improvement works on Abbotts Walk, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:37.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Powys Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:32.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Powys Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:37.

Thames Water logo
LONG TERM
Between
22 Sep and 20 Dec 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are proposing to carry out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 17:54.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:42.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 16:08.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:46.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:57.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 15:48.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Riverdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Riverdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 13:43.

Royal Borough Of Greenwich logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Grovebury Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Grovebury Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 09:21.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Moss Road

Cadent Gas were proposing to carry out Utility asset works on Moss Road, South Ockendon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:11.

Telefonica UK logo
Between
22 Sep and 18 Oct 2025
Details
View Map
Share
River Road

Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 18 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.

LONG TERM
Between
22 Sep 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jun 2025 at 14:55.

Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 4 Aug 2025 at 16:12.

Between
22 and 26 Sep 2025
Details
View Map
Share
Park Lane

Essex And Suffolk Water were proposing to carry out New service connection on Park Lane, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 9 Sep 2025 at 11:36.

Thurrock Council logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:41.

Thurrock Council logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Arterial Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Sep 2025 at 14:59.

National Highways logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ockendon Road

National Highways are proposing to carry out Works for road purposes on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 11 Jul 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:54.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Main Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:02.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Colchester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:39.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Colchester Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep and 4 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 10:10.

Transport for London (TfL) logo
Between
23 Sep and 21 Oct 2025
Details
View Map
Share
Follow
Straight Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Straight Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 16:04.

London Borough Of Bexley logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Alsike Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 May 2025 at 16:03.

London Borough Of Bexley logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Alsike Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 08:16.

London Borough Of Bexley logo
LONG TERM
Between
25 Sep and 26 Nov 2025
Details
View Map
Share
Thames Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Thames Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 13:53.

Southern Gas Networks logo
Between
25 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 15:40.

Thurrock Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Pilgrims Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Pilgrims Lane, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:35.

Thurrock Council logo
Between
25 and 27 Sep 2025
Details
View Map
Share
Follow
Pilgrims Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Pilgrims Lane, North Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 5 Sep 2025 at 15:51.

Kent County Council logo
LONG TERM
Between
28 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Bob Dunn Way

Kent County Council are proposing to carry out Highway improvement works on Bob Dunn Way, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Sep 2025 at 09:01.

Kent County Council logo
LONG TERM
Between
28 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Bob Dunn Way

Kent County Council are proposing to carry out Highway improvement works on Bob Dunn Way, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Sep 2025 at 12:08.

Kent County Council logo
LONG TERM
Between
28 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Marsh Street North

Kent County Council are proposing to carry out Highway improvement works on Marsh Street North, Dartford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Sep 2025 at 12:08.

Southern Gas Networks logo
Between
29 Sep and 21 Oct 2025
Details
View Map
Share
Sun Court

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sun Court, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 16:03.

Southern Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Lincoln Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:39.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oliver Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Oliver Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:23.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Oliver Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Oliver Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 17 Sep 2025 at 14:28.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:22.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Sep 2025 at 16:17.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 17 Sep 2025 at 14:59.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 4 Jun 2025 at 09:21.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Sep 2025 at 16:18.

Thurrock Council logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Stoneness Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stoneness Road, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 17 Sep 2025 at 14:23.

UK Power Networks Eastern & London logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Arterial Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:09.

UK Power Networks Eastern & London logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Arterial Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Arterial Road, West Thurrock.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 10:23.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Gale Street

Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 12:01.

National Highways logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Ockendon Road

National Highways are proposing to carry out Works for road purposes on Ockendon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 22 Aug 2025 at 12:40.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 4 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:31.

Transport for London (TfL) logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Alfreds Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 12:31.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2025 and 28 Feb 2027
Details
View Map
Share
Follow
Alfreds Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 28 February 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 08:45.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jul 2025 at 16:12.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 28 Aug 2025 at 11:25.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Parkside Avenue

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Parkside Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2025 at 14:04.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
West Street

Thames Water are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 15:50.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Maplestead Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Maplestead Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Sep 2025 at 14:28.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Goresbrook Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Sep 2025 at 14:28.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
6 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Heathway

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Heathway, Dagenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.

Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 15:37.

Between
7 and 10 Oct 2025
Details
View Map
Share
Follow
Avon Road

London Borough Of Havering are proposing to carry out Highway improvement works on Avon Road, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 10:30.

London Borough Of Bexley logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Slade Green Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 11:45.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Lincoln Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:58.

Southern Gas Networks logo
Between
13 Oct and 3 Nov 2025
Details
View Map
Share
Ely Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ely Close, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:39.

Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Northumberland Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Northumberland Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:39.

London Borough Of Bexley logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Denton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Denton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:16.

Thames Water logo
LONG TERM
Between
16 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Gladeswood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:41.

Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 15:10.

Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 15:35.

LONG TERM
Between
18 Oct and 6 Dec 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 6 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Barnehurst Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Barnehurst Avenue, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 11:57.

Thames Water logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 10:49.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 28 Oct 2025
Details
View Map
Share
James Watt Way

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 4 Sep 2025 at 10:51.

Thurrock Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Tamarisk Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Tamarisk Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 16 Jul 2025 at 11:45.

Transport for London (TfL) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Ripple Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:09.

Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chestnut Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Chestnut Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 28 Aug 2025 at 15:38.

National Highways logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
St Marys Lane

National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 31 Jul 2025 at 15:42.

National Highways logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
St Marys Lane

National Highways are proposing to carry out Works for road purposes on St Marys Lane, Upminster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by National Highways on 11 Aug 2025 at 16:17.

Thames Water logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Okehampton Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 11:47.

Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 15:31.

Between
24 and 27 Oct 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 15:36.

Southern Gas Networks logo
Between
24 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Salmon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 14:04.

Southern Gas Networks logo
Between
24 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Salmon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 11:56.

Southern Gas Networks logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Beechcroft Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beechcroft Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:13.

Southern Gas Networks logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Beechcroft Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beechcroft Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 08:59.

Southern Gas Networks logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Heath Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 12:53.

Southern Gas Networks logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Heath Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heath Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:30.

Telefonica UK logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
River Road

Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.

London Borough Of Bexley logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bexley Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Jul 2025 at 16:06.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
27 Oct and 4 Nov 2025
Details
View Map
Share
James Watt Way

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Sep 2025 at 11:49.

Thames Water logo
LONG TERM
Between
27 Oct 2025 and 2 Jan 2026
Details
View Map
Share
Methuen Road

Thames Water were proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 2 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 12:15.

London Borough Of Barking And Dagenham logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Renwick Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Renwick Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Sep 2025 at 09:02.

London Borough Of Barking And Dagenham logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Blake Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Blake Avenue, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Sep 2025 at 09:42.

Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Maylands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Maylands Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Aug 2025 at 15:22.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Park Lane

Essex And Suffolk Water are proposing to carry out New service connection on Park Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2025 at 11:25.

Telefonica UK logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 27 Aug 2025 at 16:30.

Telefonica UK logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Manor Avenue

Telefonica UK are proposing to carry out Utility asset works on Manor Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 8 Sep 2025 at 16:30.

Murphy Power Distribution logo
Between
30 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Chequers Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Chequers Lane, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:01.

Murphy Power Distribution logo
Between
30 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:14.

Electricity Network Company logo
Between
30 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Wantz Road

Electricity Network Company are proposing to carry out Utility asset works on Wantz Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 Jul 2025 at 08:13.

BT logo
Between
31 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Hall Road

BT are proposing to carry out Utility asset works on Hall Road, Thurrock, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2025 at 12:17.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Lincoln Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Close, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:58.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Northumberland Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Northumberland Close, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 11:18.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Mill Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Mill Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:43.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Northumberland Park

London Borough Of Bexley are proposing to carry out Highway improvement works on Northumberland Park, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:36.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Limewood Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Limewood Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:36.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Horsa Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Horsa Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:44.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Avenue Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:35.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Hengist Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Hengist Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:34.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Ling Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Ling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:34.

London Borough Of Bexley logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Bexley Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:41.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:08.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:23.

LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
East Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on East Hall Lane, Wennington, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 9 Sep 2025 at 10:11.

Transport for London (TfL) logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2025
Details
View Map
Share
Wyatt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyatt Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.

Southern Gas Networks logo
Between
4 and 18 Nov 2025
Details
View Map
Share
Walker Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Walker Close, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:28.

Southern Gas Networks logo
Between
4 and 18 Nov 2025
Details
View Map
Share
Walker Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Walker Close, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:35.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Southend Arterial Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Main Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:33.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Main Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Main Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 08:58.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 09:02.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 10:32.

Transport for London (TfL) logo
Between
4 and 19 Nov 2025
Details
View Map
Share
Eastern Avenue East

Transport for London (TfL) were proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:29.

London Borough Of Bexley logo
Between
5 and 15 Nov 2025
Details
View Map
Share
James Watt Way

London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:26.

London Borough Of Bexley logo
Between
5 and 15 Nov 2025
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:22.

Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
New Road

London Borough Of Havering are proposing to carry out Highway improvement works on New Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 09:31.

Thames Water logo
Between
6 and 14 Nov 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
7 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:36.

LONG TERM
Between
7 Nov and 20 Dec 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2025 and run through until 20 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:50.

Southern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Darlton Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Darlton Close, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Gascoyne Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gascoyne Drive, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:37.

Southern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Buckley Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Buckley Close, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Ely Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ely Close, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:59.

Telefonica UK logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
St Augustines Road

Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 1 Sep 2025 at 11:10.

Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 10:03.

Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 17 Jun 2025 at 16:15.

London Borough Of Bexley logo
Between
12 and 15 Nov 2025
Details
View Map
Share
Hind Crescent

London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Jul 2025 at 07:49.

London Borough Of Bexley logo
Between
12 and 15 Nov 2025
Details
View Map
Share
Hind Crescent

London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 08:14.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Erith Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Jul 2025 at 15:17.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Mill Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Mill Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:57.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Northumberland Park

London Borough Of Bexley were proposing to carry out Highway improvement works on Northumberland Park, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:56.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Limewood Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Limewood Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:56.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Horsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Horsa Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:55.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Avenue Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avenue Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:55.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Hengist Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hengist Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:54.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Ling Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ling Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:54.

Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Pettits Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 7 Apr 2025 at 15:56.

Between
13 and 15 Nov 2025
Details
View Map
Share
Follow
Pettits Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 May 2025 at 13:47.

Between
13 and 15 Nov 2025
Details
View Map
Share
Pettits Lane

London Borough Of Havering were proposing to carry out Highway improvement works on Pettits Lane, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Mar 2025 at 12:58.

Southern Gas Networks logo
Between
17 Nov and 8 Dec 2025
Details
View Map
Share
Norris Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norris Way, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:37.

Southern Gas Networks logo
Between
17 and 30 Nov 2025
Details
View Map
Share
Follow
York Terrace

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Terrace, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:52.

Southern Gas Networks logo
Between
17 and 30 Nov 2025
Details
View Map
Share
Follow
York Terrace

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Terrace, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:52.

Southern Gas Networks logo
Between
17 and 30 Nov 2025
Details
View Map
Share
Follow
Brook Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:50.

London Borough Of Bexley logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Hind Crescent

London Borough Of Bexley are proposing to carry out Highway improvement works on Hind Crescent, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:23.

London Borough Of Bexley logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Hind Crescent

London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:15.

London Borough Of Bexley logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Hind Crescent

London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:14.

Southern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.

Transport for London (TfL) logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Thames Gateway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.

London Borough Of Bexley logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 14:58.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
James Watt Way

London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:15.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
James Watt Way

London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:40.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
Follow
James Watt Way

London Borough Of Bexley are proposing to carry out Highway improvement works on James Watt Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:03.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:12.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
Queens Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 09:53.

London Borough Of Bexley logo
Between
19 and 29 Nov 2025
Details
View Map
Share
Follow
Queens Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:04.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:18.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 14:23.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.

London Borough Of Bexley logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Old Barn Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Old Barn Way, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.

London Borough Of Bexley logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Manor Way, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.

London Borough Of Bexley logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Oakwood Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Oakwood Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.

London Borough Of Bexley logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Mayplace Road East

London Borough Of Bexley are proposing to carry out Highway improvement works on Mayplace Road East, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:18.

London Borough Of Bexley logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Midfield Avenue Parade

London Borough Of Bexley are proposing to carry out Highway improvement works on Midfield Avenue Parade, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.

Telefonica UK logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
St Augustines Road

Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 3 Sep 2025 at 15:39.

BT logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Rosemary Close

BT are proposing to carry out Utility asset works on Rosemary Close, Thurrock, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Aug 2025 at 09:46.

Southern Gas Networks logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Dale View

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale View, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:57.

Southern Gas Networks logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 12:19.

Southern Gas Networks logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:50.

Southern Gas Networks logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:36.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Bostall Manorway

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bostall Manorway, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 17:04.

UK Power Networks Eastern & London logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Eliot Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Eliot Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 14:10.

London Borough Of Bexley logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 15:14.

Between
2 and 5 Dec 2025
Details
View Map
Share
Follow
Choats Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Choats Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 09:45.

Southern Gas Networks logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
The View

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The View, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:34.

Cadent Gas logo
Between
8 and 17 Dec 2025
Details
View Map
Share
Follow
Highgrove Road

Cadent Gas are proposing to carry out Utility asset works on Highgrove Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 14:30.


Roadworks Map near to Glebe Road, RAINHAM, RM13 9LH (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glebe Road, RAINHAM, RM13 9LH (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
WENTWORTH WAY 
(0.1 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 18 Sep 2025 08:00
(Scheduled: 18 Sep 2025 - 19 Sep 2025)
0.1
Details
Share
Follow
2
PARSONAGE ROAD 
(0.1 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
16 Sep 2025 08:00 - 18 Sep 2025 16:00
0.1
Details
Share
3
URGENT
  
PARSONAGE ROAD 
(0.1 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 17 Sep 2025 12:08
(Scheduled: 17 Sep 2025 - 30 Sep 2025)
0.1
Details
Share
Follow
4
WAVERLEY ROAD 
(0.2 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 17 Sep 2025 08:00
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
5
BT logo
UPMINSTER ROAD SOUTH 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 18 Sep 2025 14:32
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
6
STIRLING CLOSE 
(0.3 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footpath - No carriageway incursion
Cancelled
(Scheduled: 11 Sep 2025 - 24 Sep 2025)
0.3
Details
Share
7
INGREBOURNE ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.4
Details
Share
Follow
8
URGENT
  
BRISCOE ROAD 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Complete
17 Sep 2025 08:36 - 18 Sep 2025 14:32
0.5
Details
Share
9
Virgin Media logo
ABBEY WOOD LANE 
(0.6 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
18 Sep 2025 13:05 - 15:08
0.6
Details
Share
10
EASTWOOD DRIVE 
(0.8 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Give and take
Complete
16 Sep 2025 08:00 - 18 Sep 2025 16:00
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data