ROADWORKS SUMMARY
Anvil Mews, RAINHAM, RM13 7AE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Anvil Mews, RM13 7AE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Anvil Mews, RAINHAM, RM13 7AE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Anvil Mews are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
18 Oct 2026
Details
View Map
Share
Follow
Fraser Road

Thames Water are carrying out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2026 at 09:45 and could run through until 18 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2026 at 16:35.

Thames Water logo
LONG TERM
Between
16 Mar and 19 Dec 2026
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2026 and could run through until 19 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Dec 2025 at 16:47.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Chequers Lane

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Chequers Lane, Dagenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 09:30 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Apr 2026 at 10:02.

Thames Water logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2026 at 10:40 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2026 at 16:26.

Thames Water logo
LONG TERM
Between
1 Jun and 23 Dec 2026
Details
View Map
Share
Follow
Frinsted Road

Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2026 and could run through until 23 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Mar 2026 at 09:08.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Heathway

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Heathway, Dagenham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Sep 2026 at 09:57.

Thames Water logo
LONG TERM
Until
17 Oct 2026
Details
View Map
Share
Follow
Colyers Lane

Thames Water are carrying out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2026 at 10:00 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 10:51.

Southern Gas Networks logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Pickford Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Pickford Lane, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 09:30 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2026 at 12:25.

LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Shannon Way

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Shannon Way, Aveley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2026 at 08:10 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 25 Aug 2026 at 08:19.

Cadent Gas logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Winchester Road

Cadent Gas are carrying out Utility asset works on Winchester Road, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 13:33 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 15:59.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Gascoyne Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gascoyne Drive, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 15:58.

Cadent Gas logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Winchester Road

Cadent Gas are carrying out Utility asset works on Winchester Road, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 12:55 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:19.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
4 Dec 2026
Details
View Map
Share
Follow
Abbey Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Abbey Road, Barking.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:30 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 22 Sep 2026 at 11:56.

Cadent Gas logo
LONG TERM
Until
11 Oct 2026
Details
View Map
Share
Follow
Eastern Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Eastern Avenue, West Thurrock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 15:54.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Battle Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Battle Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 28 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 12:46.

Cadent Gas logo
Between
7 Sep and 5 Oct 2026
Details
View Map
Share
Cruick Avenue

Cadent Gas were proposing to carry out Utility asset works on Cruick Avenue, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 5 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:35.

Cadent Gas logo
LONG TERM
Between
7 Sep and 3 Nov 2026
Details
View Map
Share
Verbena Close

Cadent Gas were proposing to carry out Utility asset works on Verbena Close, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 3 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:37.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jun 2026 at 10:43.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are carrying out Utility repair and maintenance works on Lansdowne Road, Seven Kings, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 12:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 13:37.

Cadent Gas logo
Between
7 Sep and 5 Oct 2026
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Chadwell Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 5 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:32.

Cadent Gas logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
Ardleigh Green Road

Cadent Gas are carrying out Utility asset works on Ardleigh Green Road, Hornchurch.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 12:27 and could run through until 19 October 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 15:19.

Southern Gas Networks logo
Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Walker Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Walker Close, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 5 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 16:02.

Southern Gas Networks logo
Between
14 Sep and 5 Oct 2026
Details
View Map
Share
Wyatt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyatt Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 5 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2026 at 16:03.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Stanmore Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanmore Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 12:46.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Gordon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gordon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 12:47.

London Borough Of Bexley logo
LONG TERM
Between
14 Sep 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Felixstowe Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Felixstowe Road, Abbey Wood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 27 Aug 2026 at 13:50.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 11:36.

Transport for London (TfL) logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Wangey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wangey Road, Chadwell Heath, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 12:24.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Wangey Road

Transport for London (TfL) are carrying out Highway improvement works on Wangey Road, Chadwell Heath, Romford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 08:52.

Transport for London (TfL) logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, Chadwell Heath, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2026 at 12:35.

Transport for London (TfL) logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are carrying out Highway improvement works on High Road, Chadwell Heath, Romford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 08:52.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Eton Road

Cadent Gas are carrying out Utility repair and maintenance works on Eton Road, Ilford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 18:50 and could run through until 30 September 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 17:06.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
South Park Drive

Cadent Gas are carrying out Utility repair and maintenance works on South Park Drive, Seven Kings, Ilford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 18:31 and could run through until 30 September 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 17:06.

Southern Gas Networks logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Hengist Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hengist Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 11:53.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 26 Oct 2026
Details
View Map
Share
Brook Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Street, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 26 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 11:53.

London Borough Of Bexley logo
Until
10 Oct 2026
Details
View Map
Share
Follow
Anderson Way

London Borough Of Bexley are carrying out roadworks on Anderson Way, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 20:15 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2026 at 08:31.

London Borough Of Bexley logo
Until
10 Oct 2026
Details
View Map
Share
Follow
Clydesdale Way

London Borough Of Bexley are carrying out roadworks on Clydesdale Way, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 20:15 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2026 at 08:31.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Picardy Manorway

London Borough Of Bexley are proposing to carry out Highway improvement works on Picardy Manorway, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 May 2026 at 16:57.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Picardy Manorway

London Borough Of Bexley were proposing to carry out Highway improvement works on Picardy Manorway, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Aug 2026 at 13:13.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Picardy Manorway

London Borough Of Bexley were proposing to carry out Highway improvement works on Picardy Manorway, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Sep 2026 at 08:46.

London Borough Of Bexley logo
Until
10 Oct 2026
Details
View Map
Share
Follow
Picardy Manorway

London Borough Of Bexley are carrying out Highway improvement works on Picardy Manorway, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 20:15 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2026 at 08:30.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 20 Jan 2026 at 16:44.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Eastern Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Aug 2026 at 13:11.

London Borough Of Bexley logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Eastern Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 10 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Sep 2026 at 08:48.

London Borough Of Bexley logo
Until
10 Oct 2026
Details
View Map
Share
Follow
Eastern Way

London Borough Of Bexley are carrying out Highway improvement works on Eastern Way, Thamesmead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 20:15 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2026 at 08:30.

LONG TERM
Between
21 Sep and 27 Nov 2026
Details
View Map
Share
Follow
Usk Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Usk Road, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Jul 2026 at 08:57.

Finishing
Tomorrow
Details
View Map
Share
Follow
Eton Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Eton Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 9 Jun 2026 at 11:41.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Eastern Avenue

Cadent Gas were proposing to carry out Utility repair and maintenance works on Eastern Avenue, West Thurrock.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2026 and run through until 27 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 15:50.

Finishing
Monday
Details
View Map
Share
Copper Beech Road

Essex And Suffolk Water were proposing to carry out Permanent reinstatement on Copper Beech Road, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 22 Sep 2026 at 12:39.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hornchurch Road

Cadent Gas are carrying out Utility repair and maintenance works on Hornchurch Road, Hornchurch.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2026 at 18:07 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 12:04.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hornchurch Road

Cadent Gas are carrying out Utility repair and maintenance works on Hornchurch Road, Hornchurch.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2026 at 18:07 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 16:17.

Finishing
Tomorrow
Details
View Map
Share
Follow
Ennerdale Avenue

London Borough Of Havering are carrying out Highway improvement works on Ennerdale Avenue, Hornchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2026 at 08:05.

London Borough Of Barking And Dagenham logo
Finishing
Tuesday
Details
View Map
Share
Follow
Whalebone Lane North

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Whalebone Lane North, Chadwell Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2026 at 20:00 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 24 Sep 2026 at 07:43.

Cadent Gas logo
Until
11 Oct 2026
Details
View Map
Share
Follow
Weston Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Weston Avenue, West Thurrock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 September 2026 at 09:00 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 08:53.

Southern Gas Networks logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
The Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on The Drive, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 12 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 11:53.

London Borough Of Bexley logo
LONG TERM
Between
28 Sep 2026 and 12 Feb 2027
Details
View Map
Share
Follow
Felixstowe Road

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Felixstowe Road, Abbey Wood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2026 at 12:04.

Cadent Gas logo
LONG TERM
Between
28 Sep and 23 Nov 2026
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2026 at 09:25.

London Borough Of Barking And Dagenham logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
New Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on New Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Aug 2026 at 09:23.

London Borough Of Barking And Dagenham logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Ballards Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Ballards Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Aug 2026 at 09:18.

UK Power Networks Eastern & London logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parkhill Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhill Close, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 10:29.

UK Power Networks Eastern & London logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Parkhill Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhill Close, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2026 at 16:26.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2026 and 1 Mar 2029
Details
View Map
Share
Follow
Alfreds Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 1 March 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2026 at 16:31.

National Highways logo
Between
2 and 3 Oct 2026
Details
View Map
Share
Follow
Arterial Road Roundabout

National Highways are proposing to carry out Highway repair and maintenance works on Arterial Road Roundabout, West Thurrock.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 23 Sep 2026 at 14:06.

Thames Water logo
Between
5 and 12 Oct 2026
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jun 2026 at 13:39.

Southern Gas Networks logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Carlton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Carlton Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 26 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 11:54.

UK Power Networks Eastern & London logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Surrey Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Surrey Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Aug 2026 at 16:19.

UK Power Networks Eastern & London logo
Between
5 and 13 Oct 2026
Details
View Map
Share
Follow
Surrey Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Surrey Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 13:32.

London Borough Of Barking And Dagenham logo
Between
5 and 10 Oct 2026
Details
View Map
Share
Follow
Oxlow Lane

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Oxlow Lane, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Aug 2026 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
5 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Valence Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Valence Avenue, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2026 at 14:47.

Virgin Media logo
Between
8 and 10 Oct 2026
Details
View Map
Share
Follow
Battery Road

Virgin Media are proposing to carry out Utility asset works on Battery Road, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Jul 2026 at 16:02.

Virgin Media logo
Between
8 and 10 Oct 2026
Details
View Map
Share
Follow
Battery Road

Virgin Media are proposing to carry out Utility asset works on Battery Road, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2026 at 09:30.

Royal Borough Of Greenwich logo
LONG TERM
Between
10 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Nathan Way

Royal Borough Of Greenwich are proposing to carry out Section 50 on Nathan Way, Thamesmead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 21 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 23 Sep 2026 at 15:13.

Between
11 and 15 Oct 2026
Details
View Map
Share
Follow
South Park Terrace

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on South Park Terrace, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 6 Aug 2026 at 16:36.

Southern Gas Networks logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Collindale Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 26 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2026 at 11:54.

London Borough Of Bexley logo
Between
14 and 17 Oct 2026
Details
View Map
Share
Follow
Yarnton Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Yarnton Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Jun 2026 at 15:36.

London Borough Of Bexley logo
Between
14 and 17 Oct 2026
Details
View Map
Share
Follow
Yarnton Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Yarnton Way, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Sep 2026 at 08:54.

Southern Gas Networks logo
Between
19 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Barnehurst Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnehurst Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2026 at 10:22.

Thames Water logo
LONG TERM
Between
19 Oct 2026 and 27 Mar 2027
Details
View Map
Share
Follow
Frinsted Road

Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 27 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:18.

London Borough Of Bexley logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Queens Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Queens Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2026 at 16:00.

Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Kinfauns Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Kinfauns Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Jul 2026 at 16:31.

Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Kinfauns Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Kinfauns Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Sep 2026 at 15:48.

T-Mobile (UK) logo
Between
20 and 26 Oct 2026
Details
View Map
Share
Follow
Romford Road Roundabout

T-Mobile (UK) are proposing to carry out Utility asset works on Romford Road Roundabout, Aveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 26 October 2026. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 4 Aug 2026 at 13:43.

London Borough Of Bexley logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Brampton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Jul 2026 at 14:52.

London Borough Of Bexley logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Abbotts Walk

London Borough Of Bexley are proposing to carry out roadworks on Abbotts Walk, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 10 Jul 2026 at 10:46.

Thames Water logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Filston Road

Thames Water were proposing to carry out New service connection on Filston Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 2 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:11.

Thames Water logo
Between
26 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Filston Road

Thames Water are proposing to carry out New service connection on Filston Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:14.

Southern Gas Networks logo
Between
26 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Kingswood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingswood Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 14:57.

UK Power Networks Eastern & London logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Spinney Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Spinney Close, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Aug 2026 at 09:45.

UK Power Networks Eastern & London logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Spinney Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Spinney Close, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 11:21.

Virgin Media logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Church Road

Virgin Media are proposing to carry out Utility repair and maintenance works on Church Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Aug 2026 at 14:45.

Cadent Gas logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Eton Road

Cadent Gas are proposing to carry out Utility asset works on Eton Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 15:34.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Keswick Avenue

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Keswick Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 5 Aug 2026 at 09:52.

London Borough Of Bexley logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Erith Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 14:50.

London Borough Of Bexley logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Barnehurst Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Barnehurst Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 14:58.

London Borough Of Bexley logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Merewood Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Merewood Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 15:00.

London Borough Of Bexley logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Kipling Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Kipling Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Aug 2026 at 13:09.

London Borough Of Bexley logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Shakespeare Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Shakespeare Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Aug 2026 at 13:09.

London Borough Of Bexley logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Heathview Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Heathview Drive, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Jul 2026 at 13:08.

London Borough Of Bexley logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
Woolwich Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Woolwich Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Jul 2026 at 13:07.

London Borough Of Bexley logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
New Road

London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Jul 2026 at 13:08.

Thames Water logo
Between
2 and 9 Nov 2026
Details
View Map
Share
Nathan Way

Thames Water were proposing to carry out Disconnection or alteration of supply on Nathan Way, Thamesmead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 9 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 12:57.

Thurrock Council logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Follow
Stifford Road

Thurrock Council are proposing to carry out Highway improvement works on Stifford Road, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thurrock Council on 28 May 2026 at 08:44.

National Highways logo
Between
2 and 7 Nov 2026
Details
View Map
Share
Follow
North Road

National Highways are proposing to carry out Works for road purposes on North Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 2 Jul 2026 at 13:33.

London Borough Of Barking And Dagenham logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Station Parade

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Station Parade, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Aug 2026 at 13:43.

London Borough Of Barking And Dagenham logo
Between
2 and 5 Nov 2026
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 18 Aug 2026 at 08:53.

BT logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Aug 2026 at 16:32.

Cadent Gas logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Remedial works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 15:14.

UK Power Networks Eastern & London logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Thatches Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Thatches Grove, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 11:21.

Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Brockley Crescent

London Borough Of Havering are proposing to carry out Highway improvement works on Brockley Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.

Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Burchwall Close

London Borough Of Havering are proposing to carry out Highway improvement works on Burchwall Close, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.

Between
3 and 6 Nov 2026
Details
View Map
Share
Follow
Fullers Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Fullers Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 10 Aug 2026 at 16:09.

London Borough Of Bexley logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 14:52.

London Borough Of Bexley logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Barnehurst Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Barnehurst Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 15:00.

London Borough Of Bexley logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Merewood Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Merewood Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Sep 2026 at 15:01.

LONG TERM
Between
9 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Ravel Gardens

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Ravel Gardens, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 14 Jul 2026 at 08:36.

National Highways logo
Between
9 and 12 Nov 2026
Details
View Map
Share
Dennis Road

National Highways were proposing to carry out Works for road purposes on Dennis Road, South Ockendon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 12 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2026 at 09:34.

National Highways logo
Between
9 and 21 Nov 2026
Details
View Map
Share
Follow
Pea Lane

National Highways are proposing to carry out Works for road purposes on Pea Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 21 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 23 Sep 2026 at 18:37.

National Highways logo
Between
11 and 14 Nov 2026
Details
View Map
Share
Follow
Dennis Road

National Highways are proposing to carry out Works for road purposes on Dennis Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Sep 2026 at 14:19.

UK Power Networks Eastern & London logo
Between
11 and 17 Nov 2026
Details
View Map
Share
Follow
Chevington Way

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chevington Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2026 at 09:56.

UK Power Networks Eastern & London logo
Between
11 and 17 Nov 2026
Details
View Map
Share
Follow
Chevington Way

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chevington Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 10:09.

London Borough Of Barking And Dagenham logo
Between
12 and 18 Nov 2026
Details
View Map
Share
Follow
Station Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Station Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Aug 2026 at 08:33.

National Highways logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Arterial Road Roundabout

National Highways are proposing to carry out Works for road purposes on Arterial Road Roundabout, West Thurrock.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Aug 2026 at 15:05.

National Highways logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Link Road From A1306 To A13 Northbound

National Highways are proposing to carry out Works for road purposes on Link Road From A1306 To A13 Northbound, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Aug 2026 at 14:18.

National Highways logo
Between
16 and 21 Nov 2026
Details
View Map
Share
Follow
Link Road From A1306 To A13 Northbound

National Highways are proposing to carry out Works for road purposes on Link Road From A1306 To A13 Northbound, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:04.

Southern Gas Networks logo
Between
16 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Elstree Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elstree Gardens, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2026 at 15:12.

Southern Gas Networks logo
Between
16 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Elstree Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elstree Gardens, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2026 at 15:36.

Thurrock Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Stifford Road

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stifford Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 7 May 2026 at 09:42.

Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
Marsh Way

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Marsh Way, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Havering on 7 Sep 2026 at 10:35.

Between
16 and 23 Nov 2026
Details
View Map
Share
Follow
New Road

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on New Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Havering on 7 Sep 2026 at 09:46.

Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Springfield Gardens

London Borough Of Havering are proposing to carry out Highway improvement works on Springfield Gardens, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 16:05.

Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Springfield Gardens

London Borough Of Havering are proposing to carry out Highway improvement works on Springfield Gardens, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 16:05.

Thurrock Council logo
Between
23 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Arterial Road Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 23 Sep 2026 at 09:22.

BT logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Rosemary Close

BT are proposing to carry out Utility asset works on Rosemary Close, Thurrock, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2026 at 10:06.

BT logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Rosemary Close

BT are proposing to carry out Utility asset works on Rosemary Close, Thurrock, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Sep 2026 at 15:22.

Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Abbey Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 18 Aug 2026 at 15:01.

Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Eton Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Eton Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 26 Aug 2026 at 11:14.

UK Power Networks Eastern & London logo
Between
25 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Orchard Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Orchard Road, South Ockendon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Sep 2026 at 15:33.

Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Lilliput Road

London Borough Of Havering are proposing to carry out Highway improvement works on Lilliput Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 12:09.

Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
East Road

London Borough Of Havering are proposing to carry out Highway improvement works on East Road, Rush Green, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 24 Aug 2026 at 12:11.

London Borough Of Barking And Dagenham logo
Between
25 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Whalebone Lane North

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Whalebone Lane North, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 26 Aug 2026 at 13:57.

London Borough Of Barking And Dagenham logo
Between
26 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Oxlow Lane

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Oxlow Lane, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 26 Aug 2026 at 12:30.

UK Power Networks Eastern & London logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Fentiman Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Fentiman Way, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2026 at 09:10.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Road

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:10.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Road

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 14:06.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Road

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 16:23.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Avenue, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:10.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Avenue, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 13:56.

Cadent Gas logo
Between
30 Nov and 20 Dec 2026
Details
View Map
Share
Follow
Goodmayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Avenue, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 16:25.

T-Mobile (UK) logo
Between
30 Nov and 6 Dec 2026
Details
View Map
Share
Lawrence Road

T-Mobile (UK) were proposing to carry out Utility asset works on Lawrence Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 6 December 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 7 Sep 2026 at 16:06.

T-Mobile (UK) logo
Between
30 Nov and 6 Dec 2026
Details
View Map
Share
Follow
Lawrence Road

T-Mobile (UK) are proposing to carry out Utility asset works on Lawrence Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 6 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 7 Sep 2026 at 16:12.

Between
1 and 24 Dec 2026
Details
View Map
Share
South Park Terrace

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on South Park Terrace, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2026 and run through until 24 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 21 Sep 2026 at 08:23.

Between
1 and 24 Dec 2026
Details
View Map
Share
Follow
Billet Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Billet Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 15 Sep 2026 at 10:28.

Thames Water logo
Between
2 and 4 Dec 2026
Details
View Map
Share
Follow
West Street

Thames Water are proposing to carry out Utility repair and maintenance works on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:42.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 10 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 15:30.

Cadent Gas logo
Between
7 Dec 2026 and 3 Jan 2027
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 3 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 16:00.

Cadent Gas logo
Between
7 and 27 Dec 2026
Details
View Map
Share
Follow
Benton Road

Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 27 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:03.

Cadent Gas logo
Between
7 Dec 2026 and 3 Jan 2027
Details
View Map
Share
Follow
Colenso Road

Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 3 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:03.

National Highways logo
Between
9 and 12 Dec 2026
Details
View Map
Share
Follow
Link Road From A1306 To A13 Northbound

National Highways are proposing to carry out Works for road purposes on Link Road From A1306 To A13 Northbound, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Aug 2026 at 14:09.

National Highways logo
Between
9 and 12 Dec 2026
Details
View Map
Share
Follow
Link Road From A1306 To A13 Northbound

National Highways are proposing to carry out Works for road purposes on Link Road From A1306 To A13 Northbound, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:06.

National Highways logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Arterial Road Roundabout

National Highways are proposing to carry out Works for road purposes on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Sep 2026 at 15:43.

Thurrock Council logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Lance Corporal Nicky Mason Way

Thurrock Council are proposing to carry out Highway repair and maintenance works on Lance Corporal Nicky Mason Way, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 29 Jul 2026 at 11:05.

National Highways logo
Between
14 and 17 Dec 2026
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 17 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Sep 2026 at 13:17.


Roadworks Map near to Anvil Mews, RAINHAM, RM13 7AE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Sep 2026 09:02
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Anvil Mews, RAINHAM, RM13 7AE (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
GUYSFIELD DRIVE 
(0.1 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 21 Sep 2026 08:00
(Scheduled: 21 Sep 2026 - 2 Oct 2026)
0.1
Details
Share
Follow
2
BT logo
FYFIELD ROAD 
(0.2 miles)
BT
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 23 Sep 2026 - 24 Sep 2026)
0.2
Details
Share
3
UK Power Networks Eastern & London logo
URGENT
  
ELMER GARDENS 
(0.4 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 23 Sep 2026 10:30
(Scheduled: 23 Sep 2026 - 29 Sep 2026)
0.4
Details
Share
Follow
4
RAINHAM ROAD 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 23 Sep 2026 09:30
(Scheduled: 23 Sep 2026 - 25 Sep 2026)
0.4
Details
Share
Follow
5
London Borough Of Barking And Dagenham logo
MANOR CLOSE 
(0.9 miles)
London Borough Of Barking And Dagenham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 23 Sep 2026 14:40
(Scheduled: 21 Sep 2026 - 6 Oct 2026)
0.9
Details
Share
Follow
6
URGENT
  
INGREBOURNE ROAD 
(0.9 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 18 Sep 2026 09:11
(Scheduled: 18 Sep 2026 - 24 Sep 2026)
0.9
Details
Share
Follow
7
URGENT
  
DAVIES CLOSE 
(1.0 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 20 Sep 2026 12:35
(Scheduled: 20 Sep 2026 - 28 Sep 2026)
1.0
Details
Share
Follow
8
UK Power Networks Eastern & London logo
SOUTH STREET 
(1.0 miles)
UK Power Networks Eastern & London
Disconnection or alteration of supply - Footway - No carriageway incursion
Complete
18 Sep 2026 11:47 - 23 Sep 2026 14:31
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data