ROADWORKS SUMMARY
Alma Avenue, HORNCHURCH, RM12 6BP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Alma Avenue, RM12 6BP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Alma Avenue, HORNCHURCH, RM12 6BP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alma Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 June 2024 at 05:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jul 2024 at 10:05.

National Highways logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Freshwater Road

London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Sep 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
13 Sep and 15 Dec 2024
Details
View Map
Share
Follow
Warley Road

Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 15:06.

Cadent Gas logo
LONG TERM
Between
13 Sep and 15 Dec 2024
Details
View Map
Share
Follow
Warley Road

Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 16:02.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:05.

National Highways logo
LONG TERM
Between
2 Oct 2024 and 1 Jun 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.

Cadent Gas logo
LONG TERM
Between
25 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2024 at 09:00.

Cadent Gas logo
LONG TERM
Between
25 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
25 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:58.

Thurrock Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Arterial Road Roundabout

Thurrock Council are carrying out Highway improvement works on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 23:00 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Thurrock Council on 12 Nov 2024 at 08:40.

Thames Water logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Mawney Road

Thames Water are carrying out Utility repair and maintenance works on Mawney Road, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:59.

Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Chequers Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Chequers Lane, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

Thurrock Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Arterial Road Roundabout

Thurrock Council are proposing to carry out Highway improvement works on Arterial Road Roundabout, West Thurrock.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Thurrock Council on 21 Aug 2024 at 15:40.

Cadent Gas logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Crowlands Avenue

Cadent Gas are carrying out Utility asset works on Crowlands Avenue, Romford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 12:23 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:26.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Crowlands Avenue

Cadent Gas are proposing to carry out Utility asset works on Crowlands Avenue, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:44.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Geoffrey Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Geoffrey Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 12:43.

UK Power Networks Eastern & London logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:22.

UK Power Networks Eastern & London logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:53.

UK Power Networks Eastern & London logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Colchester Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 07:37.

Thames Water logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Elm Walk

Thames Water are carrying out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:49.

Thames Water logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Noak Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 14:26.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Southend Arterial Road

Cadent Gas are proposing to carry out Utility asset works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:41.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Southend Arterial Road

Cadent Gas are proposing to carry out Utility asset works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 11:51.

Thames Water logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Noak Hill Road

Thames Water are carrying out Utility repair and maintenance works on Noak Hill Road, Romford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 16:28.

LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Sep 2024 at 13:56.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 11:47.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Sep 2024 at 15:35.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are proposing to carry out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Oct 2024 at 13:25.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

National Highways are carrying out Works for road purposes on Southend Arterial Road, Great Warley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 22:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Nov 2024 at 08:04.

Finishing
Today
Details
View Map
Share
Follow
Coniston Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Coniston Avenue, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:00.

Finishing
Today
Details
View Map
Share
Follow
Coniston Avenue

London Borough Of Havering are carrying out Highway improvement works on Coniston Avenue, Upminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Nov 2024 at 08:02.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Slewins Lane

Cadent Gas are carrying out Utility repair and maintenance works on Slewins Lane, Hornchurch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 17:29 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:51.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:58.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Abbotsford Road

BT are proposing to carry out Utility repair and maintenance works on Abbotsford Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 11:48.

Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2024 at 16:07.

Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:09.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Firsgrove Crescent

Essex County Council are proposing to carry out Highway improvement works on Firsgrove Crescent, Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:01.

Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2024 at 16:09.

Essex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Firsgrove Crescent

Essex County Council are proposing to carry out Highway improvement works on Firsgrove Crescent, Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 11:04.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
2 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Renwick Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Renwick Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Nov 2024 at 13:48.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2024 at 11:06.

Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Station Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Station Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Aug 2024 at 11:30.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Warley Hill

Essex County Council were proposing to carry out Highway improvement works on Warley Hill, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Warley Road

Essex County Council were proposing to carry out Highway improvement works on Warley Road, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.

Essex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Clive Road

Essex County Council were proposing to carry out Highway improvement works on Clive Road, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:31.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 14:03.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Eagle Way

Essex County Council were proposing to carry out Highway improvement works on Eagle Way, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.

BT logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:19.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Mascalls Lane

Essex County Council were proposing to carry out Highway improvement works on Mascalls Lane, Great Warley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.

Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Havering Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Havering Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 15:14.

Between
12 and 17 Dec 2024
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:53.

Between
12 and 17 Dec 2024
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 15:25.

Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:40.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Geoffrey Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Geoffrey Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:56.

BT logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Sep 2024 at 13:44.

LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:35.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:01.

National Highways logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 13:06.

National Highways logo
LONG TERM
Between
8 Jan and 31 May 2025
Details
View Map
Share
Follow
A1023 Spur From M25 J28 Roundabout

National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Nov 2024 at 08:35.

Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.

Transport for London (TfL) logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.

Transport for London (TfL) logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.

Thames Water logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Follow
Monmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 15:01.

Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Lower Bedfords Road

Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:43.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:16.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.

Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.

Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 18 Nov 2024 at 08:01.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.

Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Nags Head Lane

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 06:21.

Essex County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Northend

Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 17:53.

Essex County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Northend

Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:01.

UK Power Networks Eastern & London logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lodge Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:37.

National Highways logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.

Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Thames Water logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

UK Power Networks Eastern & London logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Little Warley Hall Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 17:06.


Roadworks Map near to Alma Avenue, HORNCHURCH, RM12 6BP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 04:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Alma Avenue, HORNCHURCH, RM12 6BP (26 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
SUTTONS GARDENS 
(0.2 miles)
UK Power Networks Eastern & London
New service connection - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
2
ALMA AVENUE 
(0.3 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 14 Nov 2024 08:00
(Scheduled: 14 Nov 2024 - 27 Nov 2024)
0.3
Details
Share
Follow
3
RANDALL DRIVE 
(0.3 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 21 Nov 2024 08:00
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.3
Details
Share
Follow
4
BT logo
SUTTONS LANE 
(0.3 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 23 Nov 2024
0.3
Details
Share
Follow
5
BT logo
HACTON DRIVE 
(0.4 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 23 Nov 2024 - 24 Nov 2024
0.4
Details
Share
Follow
6
URGENT
  
STATION LANE 
(0.4 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
18 Nov 2024 08:50 - 20 Nov 2024 16:09
0.4
Details
Share
7
URGENT
  
MAVIS GROVE 
(0.4 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
18 Nov 2024 14:31 - 20 Nov 2024 16:09
0.4
Details
Share
8
UK Power Networks Eastern & London logo
URGENT
  
SUTTONS LANE 
(0.5 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 18 Nov 2024 11:10
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
Follow
9
RANDALL DRIVE 
(0.5 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 20 Nov 2024 08:00
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
Follow
10
GLANVILLE DRIVE 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 22 Nov 2024 - 29 Nov 2024
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.