ROADWORKS SUMMARY
Woburn Avenue, HORNCHURCH, RM12 4NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woburn Avenue, RM12 4NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Woburn Avenue, HORNCHURCH, RM12 4NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woburn Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 June 2024 at 05:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jul 2024 at 10:05.

London Borough Of Bexley logo
LONG TERM
Between
5 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Bronze Age Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.

National Highways logo
LONG TERM
Until
1 Jun 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are carrying out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

Cadent Gas logo
LONG TERM
Between
13 Sep and 15 Dec 2024
Details
View Map
Share
Follow
Warley Road

Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 15:06.

Cadent Gas logo
LONG TERM
Between
13 Sep and 15 Dec 2024
Details
View Map
Share
Follow
Warley Road

Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 16:02.

Thames Water logo
LONG TERM
Between
16 Sep and 20 Dec 2024
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:06.

Thames Water logo
LONG TERM
Between
24 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 06:57.

Thames Water logo
LONG TERM
Between
24 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:42.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:24.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:00.

Thames Water logo
LONG TERM
Between
2 Oct and 17 Dec 2024
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 16:13.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 10 Jan 2025
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:21.

National Highways logo
LONG TERM
Between
2 Oct 2024 and 1 Jun 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.

Thames Water logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are carrying out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 12:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:56.

Thames Water logo
LONG TERM
Until
22 Jan 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are carrying out Utility asset works on Mayfield Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 14:00 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:22.

Thames Water logo
LONG TERM
Between
24 Oct 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.

Thames Water logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are carrying out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:30 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:09.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Jul 2024 at 09:00.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 11:14.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Beredens Lane

Cadent Gas are proposing to carry out Utility asset works on Beredens Lane, Great Warley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:58.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 10:21.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:45.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
West Street

Electricity Network Company are carrying out Utility asset works on West Street, Erith.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:55 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 11:55.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Gertrude Road

Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 11 Nov 2024 at 08:00.

Finishing
Friday
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:11.

Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Chequers Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Chequers Lane, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mawney Road

Thames Water are carrying out Utility repair and maintenance works on Mawney Road, Romford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:59.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Crowlands Avenue

Cadent Gas are proposing to carry out Utility asset works on Crowlands Avenue, Romford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:44.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Crowlands Avenue

Cadent Gas are carrying out Utility asset works on Crowlands Avenue, Romford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 12:23 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:26.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:02.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 15:50.

LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Southend Arterial Road

Cadent Gas are proposing to carry out Utility asset works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 11:51.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Southend Arterial Road

Cadent Gas are proposing to carry out Utility asset works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:41.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Elm Walk

Thames Water are carrying out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:49.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:22.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:53.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Colchester Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Colchester Road, Romford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 07:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Noak Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 14:26.

Finishing
Saturday
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 17:05.

Thames Water logo
LONG TERM
Between
20 Nov 2024 and 12 Feb 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.

Cadent Gas logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Slewins Lane

Cadent Gas are carrying out Utility repair and maintenance works on Slewins Lane, Hornchurch.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 17:29 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:59.

Between
20 Nov and 4 Dec 2024
Details
View Map
Share
Chippenham Road

Essex And Suffolk Water carried out Utility repair and maintenance works on Chippenham Road, Romford.

The road was closed for some or all of the period.

The works were originally planned between 20 Nov 2024 and 4 Dec 2024 and were actually completed between 20 Nov 2024 (08:50) and 27 Nov 2024 (16:59). The works impacted the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 17:00.

Community Fibre logo
Finishing
Today
Details
View Map
Share
Highbury Gardens

Community Fibre were proposing to carry out Remedial works on Highbury Gardens, Seven Kings, Ilford.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Community Fibre on 14 Nov 2024 at 13:25.

Thames Water logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 14:42.

Thames Water logo
Until
14 Dec 2024
Details
View Map
Share
Follow
Fraser Road

Thames Water are carrying out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:30 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:41.

London Borough Of Barking And Dagenham logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 29 Aug 2024 at 09:33.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are carrying out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:49 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:49.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abbotsford Road

BT are proposing to carry out Utility repair and maintenance works on Abbotsford Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 11:48.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are carrying out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 13:00 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:00.

Finishing
Tuesday
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:09.

Finishing
Tuesday
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2024 at 16:07.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
2 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Renwick Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Renwick Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 8 Nov 2024 at 13:48.

Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2024 at 16:09.

Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Green Lane

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Green Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 26 Nov 2024 at 09:59.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2024 at 11:06.

Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Station Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Station Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 13 Aug 2024 at 11:30.

BT logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:19.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:31.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 14:03.

Thames Water logo
LONG TERM
Between
10 Dec 2024 and 21 Apr 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:04.

Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Havering Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Havering Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 15:14.

Between
12 and 17 Dec 2024
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:53.

Between
12 and 17 Dec 2024
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 15:25.

Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:40.

Thames Water logo
LONG TERM
Between
2 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:57.

Thames Water logo
LONG TERM
Between
2 Jan and 12 May 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:42.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Movers Lane

Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Movers Lane

Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:05.

Southern Gas Networks logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:02.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 25 Nov 2024 at 13:03.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 25 Nov 2024 at 13:02.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:27.

Thames Water logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bexley Road

Thames Water are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:37.

Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 25 Nov 2024 at 13:00.

LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

London Borough Of Barking And Dagenham logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Woodward Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Woodward Road, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Nov 2024 at 10:50.

BT logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Fen Lane

BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Sep 2024 at 13:44.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Wingletye Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:35.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Geoffrey Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Geoffrey Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:56.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Colchester Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:01.

Thames Water logo
LONG TERM
Between
7 Jan and 10 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:56.

National Highways logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Colchester Road

National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 13:06.

Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Hall Lane

London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.

Transport for London (TfL) logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.

Transport for London (TfL) logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.

Thames Water logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Follow
Monmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 15:01.

Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Lower Bedfords Road

Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:05.

Thames Water logo
LONG TERM
Between
20 Jan and 23 Apr 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:50.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:16.

Cadent Gas logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Station Parade

Cadent Gas are proposing to carry out Remedial works on Station Parade, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:27.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:45.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.

Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.

Thames Water logo
LONG TERM
Between
22 Jan and 9 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:56.

Thames Water logo
LONG TERM
Between
27 Jan and 29 May 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:07.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.

Transport for London (TfL) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.

National Highways logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Colchester Road

National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.

UK Power Networks Eastern & London logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lodge Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:01.

Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.

Thames Water logo
LONG TERM
Between
1 Feb and 8 May 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.

Thames Water logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

Thames Water logo
LONG TERM
Between
10 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 14:21.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Wykeham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.

Thames Water logo
LONG TERM
Between
12 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Edwards Road

Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:27.

Thames Water logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.

Thames Water logo
LONG TERM
Between
18 Feb and 28 Apr 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:03.

London Borough Of Bexley logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Overton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Overton Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 16:05.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Rainham Road South

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Nov 2024 at 15:52.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 27 Nov 2024 at 14:57.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:08.

Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.


Roadworks Map near to Woburn Avenue, HORNCHURCH, RM12 4NG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 20:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woburn Avenue, HORNCHURCH, RM12 4NG (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
EMERGENCY
  
STATION PARADE, ELM PARK 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway, Verge - Some carriageway incursion
Complete
26 Nov 2024 09:30 - 16:10
0.2
Details
Share
2
Cadent Gas logo
DIBAN AVENUE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Complete
20 Nov 2024 08:00 - 27 Nov 2024 15:39
0.2
Details
Share
3
Cadent Gas logo
DIBAN AVENUE 
(0.2 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Complete
15 Nov 2024 08:00 - 19 Nov 2024 18:12
0.2
Details
Share
4
URGENT
  
SPRING GARDENS 
(0.3 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 26 Nov 2024 11:38
(Scheduled: 26 Nov 2024 - 2 Dec 2024)
0.3
Details
Share
Follow
5
DIBAN AVENUE 
(0.3 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 26 Nov 2024 08:00
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.3
Details
Share
Follow
6
SILVERDALE DRIVE 
(0.4 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.4
Details
Share
Follow
7
ASTRA CLOSE 
(0.5 miles)
London Borough Of Havering
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 26 Nov 2024 08:00
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.5
Details
Share
Follow
8
URGENT
  
WOOD LANE 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 27 Nov 2024 09:36
(Scheduled: 27 Nov 2024 - 3 Dec 2024)
0.5
Details
Share
Follow
9
Thames Water logo
MORECAMBE CLOSE 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Priority working
In Progress
Since: 25 Nov 2024 14:00
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.5
Details
Share
Follow
10
ABBS CROSS LANE 
(0.7 miles)
London Borough Of Havering
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
25 Nov 2024 09:30 - 27 Nov 2024 14:43
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data