ROADWORKS SUMMARY
Acacia Avenue, HORNCHURCH, RM12 4EN
Introduction
View current and future planned roadworks and road closures for Acacia Avenue, RM12 4EN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Acacia Avenue, HORNCHURCH, RM12 4EN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Acacia Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Tomorrow
London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.
1 Jun 2025
National Highways are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.
2 Oct 2024 and 1 Jun 2025
National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.
24 Oct 2024 and 19 Feb 2025
Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.
24 Feb 2025
Thames Water are carrying out Utility asset works on Gertrude Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 12:30 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:09.
5 Nov 2024 and 3 Mar 2025
Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.
20 Nov 2024 and 12 Feb 2025
Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.
26 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.
17 Feb 2025
Thames Water are carrying out Utility asset works on Valley Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 13:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:06.
7 Feb 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Renwick Road, Barking.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 25 Jan 2025 at 12:34.
10 Dec 2024 and 21 Apr 2025
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 21 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:04.
2 Jan and 4 Apr 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:31.
2 Jan and 12 May 2025
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 10:19.
Monday
Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.
Monday
Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.
6 Jan and 14 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 11:12.
10 Feb 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Woodward Road, Dagenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 21 Jan 2025 at 15:10.
7 Jan and 10 Apr 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:56.
8 Jan and 31 May 2025
National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Jan 2025 at 13:23.
8 Jan and 31 May 2025
National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Dec 2024 at 16:30.
8 Jan and 31 May 2025
National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Jan 2025 at 13:48.
Tomorrow
Essex And Suffolk Water are carrying out Utility repair and maintenance works on St Marys Lane, Upminster.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 January 2025 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Jan 2025 at 09:35.
7 Feb 2025
Thames Water are carrying out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:30 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 14:28.
16 Jan and 18 Apr 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:15.
18 Apr 2025
Thames Water are carrying out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 08:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 08:55.
20 Jan and 23 Apr 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:50.
20 Jan and 20 Feb 2025
Southern Gas Networks were proposing to carry out New service connection on Church Manorway, Erith.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 09:39.
20 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 12:59.
28 Feb 2025
Southern Gas Networks are carrying out New service connection on Church Manorway, Erith.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 11:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 13:07.
20 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:16.
20 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.
12 Feb 2025
Cadent Gas are carrying out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:04 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 09:11.
Monday
Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.
Monday
Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.
Monday
Cadent Gas were proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:47.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.
20 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.
Monday
Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.
Monday
Cadent Gas were proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:31.
Tomorrow
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.
22 Jan and 9 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:44.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Wards Road, Newbury Park, Ilford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2025 at 12:44 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 12:00.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Charles Road, Chadwell Heath, Romford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 11:22 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:15.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Park Lane, Chadwell Heath, Romford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 January 2025 at 11:32 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:15.
7 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Gilbert Road, Belvedere.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 January 2025 at 13:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 09:45.
27 Jan and 29 May 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Dec 2024 at 13:28.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Movers Lane, Barking.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 10:07 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 10:12.
Tomorrow
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.
Tomorrow
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Suttons Gardens, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 9 Jan 2025 at 15:41.
Tomorrow
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Suttons Gardens, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:27 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 08:27.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.
Monday
Thames Water are carrying out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 09:00 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jan 2025 at 09:06.
Saturday
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.
Tomorrow
UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:01.
Tomorrow
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 06:21.
Tomorrow
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 08:21.
Tomorrow
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 07:14.
Today
Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.
7 Feb 2025
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Brook Road, Newbury Park, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 08:37 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 30 Jan 2025 at 10:15.
Monday
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Aveley Road, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 8 Jan 2025 at 08:56.
Monday
London Borough Of Havering are carrying out Highway repair and maintenance works on Aveley Road, Upminster.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 08:00 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 30 Jan 2025 at 08:54.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 09:54 and 10:19. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 10:23.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 10:56 and 11:34. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 11:35.
22 Feb 2025
London Borough Of Redbridge are carrying out Highway improvement works on Richmond Road, Ilford.
The works started on 30 January 2025 at 10:59 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 11:30.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 13:28 and 14:16. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 14:19.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 13:28 and 14:17. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 14:19.
22 Feb 2025
London Borough Of Redbridge are carrying out Highway improvement works on Richmond Road, Ilford.
The works started on 30 January 2025 at 11:01 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 11:30.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 11:02 and 13:24. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 13:28.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 10:21 and 10:55. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 11:04.
30 Jan and 22 Feb 2025
London Borough Of Redbridge carried out Highway improvement works on Richmond Road, Ilford.
The works were originally planned between 30 Jan 2025 and 22 Feb 2025 and were actually completed on 30 Jan 2025 between 10:21 and 10:54. The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 30 Jan 2025 at 11:04.
1 Feb and 8 May 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.
3 and 14 Feb 2025
London Borough Of Havering were proposing to carry out Highway repair and maintenance works on Launders Lane, Rainham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 16 Jan 2025 at 12:21.
3 and 7 Feb 2025
London Borough Of Havering were proposing to carry out Highway repair and maintenance works on Ockendon Road, Upminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Havering on 22 Jan 2025 at 10:59.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.
4 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.
10 Feb and 17 Mar 2025
Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 14:21.
10 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Mulberry Way, Belvedere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 12:59.
10 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Mulberry Way, Belvedere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 13:56.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
10 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:31.
10 and 13 Feb 2025
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Squirrels Heath Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 11:37.
10 and 13 Feb 2025
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Squirrels Heath Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 22 Jan 2025 at 12:20.
10 and 12 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Jan 2025 at 12:08.
10 and 12 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Jan 2025 at 12:11.
12 Feb and 7 Apr 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:31.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:21.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hood Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 14:21.
12 and 14 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Jan 2025 at 12:50.
12 and 14 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Jan 2025 at 12:12.
15 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 12:08.
15 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 14:43.
16 and 20 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Jan 2025 at 15:45.
16 and 20 Feb 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 29 Jan 2025 at 09:58.
17 Feb and 2 May 2025
Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 10:24.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 09:06.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
17 Feb and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
17 and 20 Feb 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 09:11.
17 and 20 Feb 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Church Road, Harold Wood, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 17 Dec 2024 at 16:54.
17 Feb and 21 Mar 2025
London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Straight Road, Romford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:57.
18 Feb and 28 Apr 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.
18 and 23 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:34.
18 and 23 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 11:39.
18 and 23 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:30.
18 Feb and 18 Mar 2025
Thames Water are proposing to carry out Permanent reinstatement on Vine Gardens, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:45.
19 and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Francis Avenue, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Jan 2025 at 11:15.
19 and 21 Feb 2025
London Borough Of Havering were proposing to carry out Remedial works on Dagnam Park Drive, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 07:37.
19 and 21 Feb 2025
London Borough Of Havering are proposing to carry out Remedial works on Dagnam Park Drive, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 21 Jan 2025 at 09:27.
20 Feb and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.
24 Feb and 12 Jun 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.
24 and 26 Feb 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Sherwood Gardens, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:47.
24 Feb and 28 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.
24 Feb and 28 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 13:38.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 13:30.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Dec 2024 at 09:37.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
24 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:38.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 15:57.
24 Feb and 7 Mar 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Mawney Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 11:20.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:08.
24 and 26 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.
25 Feb and 1 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:39.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Seven Kings Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.
27 Feb and 3 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Farmway, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:47.
3 Mar and 30 May 2025
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 10:26.
3 and 21 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Dec 2024 at 15:51.
3 and 21 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Jan 2025 at 11:13.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Neville Road, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:46.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Becontree Avenue, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:32.
3 and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
3 and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
3 Mar and 5 Apr 2025
London Borough Of Havering are proposing to carry out Highway improvement works on North Road, Havering-atte-bower, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 Jan 2025 at 10:46.
4 Mar and 26 May 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.
4 and 10 Mar 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:19.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:01.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:46.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:55.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:44.
5 and 11 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:35.
5 and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Greenside, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Dec 2024 at 10:31.
6 Mar and 4 Jun 2025
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.
10 Mar and 15 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:50.
10 and 13 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 14 Dec 2024 at 09:39.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Becontree Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:37.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:38.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:27.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:07.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:51.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:06.
10 and 21 Mar 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 20 Dec 2024 at 15:04.
10 and 21 Mar 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Tees Drive, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 6 Jan 2025 at 15:30.
12 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Dec 2024 at 17:08.
17 and 19 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Downing Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 13 Dec 2024 at 15:56.
17 Mar and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
17 Mar and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:21.
17 Mar and 14 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
17 Mar and 14 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.
17 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Stafford Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Jan 2025 at 14:47.
22 Mar and 30 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Jan 2025 at 15:14.
23 Mar and 8 Aug 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.
24 Mar and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
24 Mar and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Ley Street, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.
24 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Dec 2024 at 10:43.
24 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Limbourne Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jan 2025 at 13:00.
24 and 29 Mar 2025
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 10:18.
29 Mar and 25 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:54.
29 Mar and 25 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:51.
29 Mar and 25 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:52.
29 Mar and 25 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 15:49.
6 Apr and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Harold Wood, Romford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 10:14.
7 Apr and 11 May 2025
Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 17:00.
7 and 11 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Jan 2025 at 11:58.
7 and 11 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Warley Road, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 29 Jan 2025 at 14:09.
7 and 11 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2025 at 15:21.
8 and 11 Apr 2025
BT are proposing to carry out Utility asset works on St Edwards Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Jan 2025 at 12:52.
10 and 13 Apr 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Valence Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 13 April 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Jan 2025 at 13:39.
21 and 28 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 28 Jan 2025 at 14:49.
22 Apr and 23 Jun 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.
22 and 26 Apr 2025
National Highways are proposing to carry out Works for road purposes on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Dec 2024 at 08:55.
22 and 26 Apr 2025
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 26 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Jan 2025 at 15:24.
23 and 29 Apr 2025
Thames Water are proposing to carry out Utility asset works on Francis Avenue, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 13:30.
28 Apr and 2 May 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jan 2025 at 15:03.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:51.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:50.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:59.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 12:03.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 11:03.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:42.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 10:58.
28 Apr and 23 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Jan 2025 at 11:37.
Roadworks Map near to Acacia Avenue, HORNCHURCH, RM12 4EN (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Acacia Avenue, HORNCHURCH, RM12 4EN (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 29 Jan 2025 - 31 Jan 2025)
(Scheduled: 30 Jan 2025 - 4 Feb 2025)
(Scheduled: 30 Jan 2025 - 5 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data