ROADWORKS SUMMARY
Terracotta Road, GODSTONE, RH9 8JZ
Introduction
View current and future planned roadworks and road closures for Terracotta Road, RH9 8JZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Terracotta Road, GODSTONE, RH9 8JZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Terracotta Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Apr 2025
Surrey County Council are carrying out Highway improvement works on Croydon Road, Caterham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:17.
26 Feb and 20 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Croydon Road, Caterham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 12:05.
30 Jun 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolborough Lane, Outwood, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 07:17.
12 Aug and 17 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Statutory Infrastructure Works on Pendell Road, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Feb 2024 at 09:27.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.
4 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Oxted Road, Godstone.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 11:00 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.
Tomorrow
UK Power Networks South Eastern are carrying out Utility asset works on Vicarage Road, Lingfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 12:35 and could run through until 22 November 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 13:11.
30 Sep and 29 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 11:27.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on West Street, Dormansland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:09.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Nutfield Road, Merstham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 October 2024 at 14:13 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 15:00.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:27.
1 Nov 2024 and 30 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.
1 Nov 2024 and 30 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.
1 Nov 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 18 Jul 2024 at 14:57.
1 Nov 2024 and 30 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 12:07.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.
11 Nov and 6 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 09:49.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Cormongers Lane, Redhill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:19.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 08:17.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 11:39.
Today
Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 07:13.
18 Nov and 2 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Nutfield Road, Merstham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:47.
18 Nov and 18 Dec 2024
Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.
18 Dec 2024
Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.
Wednesday
Surrey County Council are carrying out Highway repair and maintenance works on Marketfield Way, Redhill.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 19:10 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 20:33.
Today
Surrey County Council are proposing to carry out Highway repair and maintenance works on Oxted Byway 507/30, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are in progress during today only. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 09:52.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollow Lane, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:14.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dormans Road, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:12.
25 Nov and 3 Dec 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hilders Lane, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 06:30.
Wednesday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wiggie Lane, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 13:17.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 08:16.
2 and 10 Dec 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hilders Lane, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 13:07.
2 and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Underwood Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 07:48.
3 and 5 Dec 2024
BT are proposing to carry out Utility asset works on Kings Mill Lane, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 23 Aug 2024 at 15:26.
3 and 5 Dec 2024
BT were proposing to carry out Utility asset works on Kings Mill Lane, Redhill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by BT on 29 Oct 2024 at 11:11.
4 and 6 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Church Lane, Oxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2024 at 13:11.
5 and 7 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, Blindley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:05.
5 and 7 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:00.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.
9 and 21 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:06.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.
6 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:34.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:38.
6 Jan and 3 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.
6 Jan and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:01.
6 Jan and 31 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 14:17.
6 Jan and 31 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 13:05.
6 Jan and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:19.
6 Jan and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:24.
6 Jan and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:34.
6 Jan and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:03.
6 Jan and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.
6 Jan and 28 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:41.
13 and 27 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.
13 and 18 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.
13 and 18 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.
13 Jan and 24 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rook Lane, Chaldon, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 09:34.
14 and 16 Jan 2025
BT are proposing to carry out Utility asset works on Kings Mill Lane, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 5 Nov 2024 at 16:01.
15 and 21 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 8 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.
20 Jan and 8 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:29.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:20.
20 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:25.
20 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 07:27.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.
27 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:25.
27 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 07:43.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 16:14.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 15:59.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.
3 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Emlyn Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:58.
3 and 7 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Emlyn Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 09:33.
3 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.
3 Feb and 5 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:43.
3 Feb and 5 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:59.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:06.
3 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:48.
3 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:20.
4 and 6 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 09:04.
5 and 11 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.
10 and 17 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:16.
10 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nelson Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:29.
17 and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:51.
17 and 22 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:46.
17 and 24 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 09:54.
Roadworks Map near to Terracotta Road, GODSTONE, RH9 8JZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Terracotta Road, GODSTONE, RH9 8JZ (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 11 Dec 2023 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.