ROADWORKS SUMMARY
Highland Road, DORKING, RH5 4RL
Introduction
View current and future planned roadworks and road closures for Highland Road, RH5 4RL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Highland Road, DORKING, RH5 4RL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Highland Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spook Hill, North Holmwood, Dorking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 12:17.
7 Oct 2024 and 7 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, North Holmwood, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 3 Jul 2024 at 09:18.
Surrey County Council carried out Highway repair and maintenance works on Horsham Road, South Holmwood, Dorking.
These works were categorised as Major.
A lane was closed for some or all of the period.
The works were originally planned between 4 Nov 2024 and 21 Nov 2024 and were actually completed between 4 Nov 2024 (10:00) and 21 Nov 2024 (14:35). The works impacted the verge only.
This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 15:03.
Today
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Mid Holmwood, Dorking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 21 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:07.
Saturday
Surrey County Council are carrying out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 20:15 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 08:37.
Monday
Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Rusper Road, Newdigate, Dorking Rural.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:42.
25 and 29 Nov 2024
Southern Gas Networks are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 13:49.
26 and 28 Nov 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 11:34.
26 and 28 Nov 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Oct 2024 at 10:53.
26 Nov and 20 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Sep 2024 at 14:51.
28 and 29 Nov 2024
Network Rail are proposing to carry out Works for Rail Purposes on Townpath - Pixham Mill, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 13:34.
28 and 29 Nov 2024
Network Rail are proposing to carry out Works for Rail Purposes on Townpath - Pixham Mill, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Jan 2024 at 10:14.
28 and 29 Nov 2024
Network Rail were proposing to carry out roadworks on Bradley Lane, Pixham, Dorking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 09:35.
2 and 6 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Partridge Lane, Newdigate, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Sep 2024 at 11:42.
2 and 5 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Abinger Hammer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 13:13.
2 and 5 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Abinger Hammer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 13:13.
2 and 6 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Partridge Lane, Newdigate, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Sep 2024 at 10:39.
9 and 13 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friday Street, Rusper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 10:59.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Norwood Hill, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 16:08.
9 and 13 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friday Street, Rusper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 13:07.
9 and 13 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Norwood Hill, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Sep 2024 at 14:24.
16 and 20 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Sep 2024 at 13:51.
6 Jan and 2 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:43.
13 and 16 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Dean Oak Lane, Leigh, Reigate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 15:45.
13 Jan and 24 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:39.
13 Jan and 24 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:37.
13 and 16 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Dean Oak Lane, Leigh, Reigate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 09:09.
20 and 23 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 10:08.
20 and 22 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 25 Oct 2024 at 15:43.
20 and 22 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Nov 2024 at 09:30.
27 and 31 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Street, Capel, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Nov 2024 at 10:52.
27 and 31 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Street, Capel, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 10:41.
27 and 30 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Street, Capel, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 09:12.
27 Jan and 16 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longfield Road, Dorking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:42.
27 Jan and 16 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longfield Road, Dorking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 08:31.
27 and 30 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Street, Capel, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:48.
3 and 16 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:44.
3 and 16 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:00.
3 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:37.
5 and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Church Street, Surrey, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Nov 2024 at 13:07.
5 and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Church Street, Surrey, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 6 Nov 2024 at 13:17.
10 and 14 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Stan Hill, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Nov 2024 at 11:22.
17 and 23 Feb 2025
BT are proposing to carry out Utility asset works on Dene Street, Surrey, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Nov 2024 at 11:15.
Roadworks Map near to Highland Road, DORKING, RH5 4RL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Highland Road, DORKING, RH5 4RL (1 Events)