ROADWORKS SUMMARY
Outwood Lane, REDHILL, RH1 4LS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Outwood Lane, RH1 4LS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Outwood Lane, REDHILL, RH1 4LS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Outwood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are carrying out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
26 Feb and 20 Dec 2024
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are proposing to carry out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 12:05.

Surrey County Council logo
LONG TERM
Between
2 Jun and 22 Dec 2024
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.

Surrey County Council logo
LONG TERM
Between
2 Jun and 22 Dec 2024
Details
View Map
Share
Follow
Albert Road

Surrey County Council are proposing to carry out Highway improvement works on Albert Road, Horley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.

Surrey County Council logo
LONG TERM
Between
30 Jun 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Woolborough Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolborough Lane, Outwood, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 17 Apr 2024 at 07:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
12 Aug and 17 Dec 2024
Details
View Map
Share
Follow
Pendell Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Statutory Infrastructure Works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Feb 2024 at 09:27.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Wheelers Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.

Southern Gas Networks logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Oxted Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oxted Road, Godstone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 11:00 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Jun 2024 at 12:07.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Jul 2024 at 15:41.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Nutfield Marsh Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:27.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Pendell Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 15 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Oct 2024 at 14:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 09:40.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
East Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Jul 2024 at 14:57.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:22.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:00.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:31.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2024 at 14:13.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Slipshatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Slipshatch Road, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 08:17.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Brandsland

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brandsland, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 13:18.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bell Street

Surrey County Council are proposing to carry out Highway improvement works on Bell Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:09.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:23.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway improvement works on Church Street, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Jan 2024 at 15:10.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Nutfield Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Nutfield Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Pendleton Road

Thames Water are carrying out Utility repair and maintenance works on Pendleton Road, Redhill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 November 2024 at 05:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 08:37.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 12:15.

Surrey County Council logo
Today
Details
View Map
Share
Wiggie Lane

Surrey County Council carried out Highway repair and maintenance works on Wiggie Lane, Redhill.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 25 Nov 2024 and 27 Nov 2024 and were actually completed between 25 Nov 2024 (21:30) and 27 Nov 2024 (04:00). The works impacted the verge only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 08:13.

Southern Gas Networks logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Nutley Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Nutley Lane, Reigate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:45 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:51.

Thames Water logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Brighton Road

Thames Water are carrying out Utility repair and maintenance works on Brighton Road, Salfords.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 16:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:02.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Hitchings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hitchings Way, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 11:05.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 07:55.

Southern Gas Networks logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Underwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Underwood Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 07:48.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Kings Mill Lane

BT are proposing to carry out Utility asset works on Kings Mill Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Aug 2024 at 15:26.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Kings Mill Lane

BT were proposing to carry out Utility asset works on Kings Mill Lane, Redhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 29 Oct 2024 at 11:11.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Church Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Church Lane, Oxted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2024 at 13:11.

Surrey County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Eastbourne Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, Blindley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:58.

Surrey County Council logo
Between
5 and 7 Dec 2024
Details
View Map
Share
Follow
Eastbourne Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Eastbourne Road, South Godstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:55.

Surrey County Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 07:58.

Surrey County Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 08:10.

Network Rail logo
LONG TERM
Between
9 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 14:45.

Network Rail logo
LONG TERM
Between
9 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Nov 2024 at 15:15.

Surrey County Council logo
Between
10 and 18 Dec 2024
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 15:11.

Surrey County Council logo
Between
10 and 18 Dec 2024
Details
View Map
Share
Reigate Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 10:41.

Surrey County Council logo
Between
10 and 18 Dec 2024
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 12:54.

Surrey County Council logo
Between
10 and 18 Dec 2024
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 15:11.

Surrey County Council logo
Between
10 and 18 Dec 2024
Details
View Map
Share
Follow
Dovers Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 15:37.

Surrey County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Smallfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Smallfield Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 15:18.

Network Rail logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Nov 2024 at 13:42.

Network Rail logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Oct 2024 at 12:01.

Surrey County Council logo
LONG TERM
Between
6 Jan and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 24 Apr 2024 at 12:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitewood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitewood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Hitchings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hitchings Way, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 11:23.

Southern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Sandcross Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandcross Lane, Reigate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 11:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brightlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Oct 2024 at 09:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brightlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brightlands Road, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Oct 2024 at 12:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 15 Jun 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Brook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 14:17.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 13:05.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:03.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 14:54.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 07:45.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crowhurst Lane End

Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:41.

Surrey County Council logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Redehall Road

Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Rook Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rook Lane, Chaldon, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 09:34.

BT logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Kings Mill Lane

BT are proposing to carry out Utility asset works on Kings Mill Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Nov 2024 at 16:01.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:20.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:25.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 07:27.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baxter Avenue

Thames Water are proposing to carry out Utility asset works on Baxter Avenue, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 17:14.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.

Surrey County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Somerset Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Somerset Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 11:22.

Surrey County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Cronks Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cronks Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 11:21.

UK Power Networks South Eastern logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Outwood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:25.

UK Power Networks South Eastern logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Outwood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Outwood Lane, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
West Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 16:14.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Nov 2024 at 15:59.

Surrey County Council logo
LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Reigate Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Reigate Road, Sidlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 14:21.

Surrey County Council logo
LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Dovers Green Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Dovers Green Road, Reigate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Sep 2024 at 14:30.

Southern Gas Networks logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Emlyn Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Emlyn Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:00.

Southern Gas Networks logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Emlyn Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Emlyn Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 09:33.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ranelagh Road

UK Power Networks South Eastern are proposing to carry out New service connection on Ranelagh Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 20:56.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ranelagh Road

UK Power Networks South Eastern are proposing to carry out New service connection on Ranelagh Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Nov 2024 at 16:45.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 09:12.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 08:47.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 09:12.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:20.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:46.

Southern Gas Networks logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:16.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nelson Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:29.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:49.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:51.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:46.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:26.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:29.

Southern Gas Networks logo
Between
20 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Harestone Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestone Valley Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:00.

Southern Gas Networks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Chaldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 12:40.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:30.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.


Roadworks Map near to Outwood Lane, REDHILL, RH1 4LS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Outwood Lane, REDHILL, RH1 4LS (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.